Wales and Borders Franchise

Paul Maynard Excerpts
Tuesday 7th November 2017

(6 years, 6 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

It is a pleasure to serve under your chairmanship, Ms Dorries. I congratulate the hon. Member for Carmarthen East and Dinefwr (Jonathan Edwards) on securing this debate. He has taken a long-term interest in this issue, as indeed have the hon. Members for Dwyfor Meirionnydd (Liz Saville Roberts) and for Ynys Môn (Albert Owen). I hope that I can provide some reassurance. I realise it is tempting to provide a running commentary on these issues, particularly when one is not involved in the negotiations, but I hope that I can set the mind of the hon. Member for Carmarthen East and Dinefwr at rest. He has asked many questions on the issue, both of me and in the House more generally, so I know he is very knowledgeable on these matters.

I start by reassuring the hon. Gentleman that we are committed to devolving rail powers to the Welsh Government, as we stated in 2014. The devolution of these powers takes forward one of the Silk commission’s recommendations and is an important part of the St David’s day Command Paper that he referred to. Like him, I want improved rail services for passengers in Wales. I always focus on the output for the customer, not just the input into the train set.

Last month, we saw the launch of the invitation to tender for the next Wales and Borders franchise. I agree with the hon. Gentleman’s comments about the previous franchise. It was a very good example of some of the flaws of the earlier franchising models, and one that we hope to learn from in setting out what we aim to do with this franchise. I am sure he will recognise that it is one key milestone among many on the journey towards a new franchise.

It may help if I set out the other milestones that we seek to achieve. First and foremost, we hope that bidders will respond by 21 December this year to the ITT. The evaluation will take place over January and February, and between March and June 2018 there will be a contract award by the Welsh Government, signed on 13 June 2018, we hope, with a new franchise commencement date of 18 October 2018.

We have a clear set of timelines ahead that we are looking to achieve. I remain committed to supporting the Welsh Government in progressing with the procurement of the next Wales and Borders franchise to make sure that it does indeed commence in October 2018. I also repeat our commitment to progressing with the procurement of an infrastructure provider for the south Wales metro. I am sure that the hon. Gentleman would agree that devolution cannot be a simple task, and it is worth reminding ourselves of what the Government are actually doing. We have seen tireless work by officials, both here and in Cardiff, to give effect to the formal transfer of powers, which had required the resolution of a number of very detailed policy and practical considerations, particularly around cross-border services, but I am pleased that we have been able to agree the broad principles under which that devolution should happen. This will see Welsh Ministers’ statutory powers in Wales supplemented by powers exercised on behalf of the Secretary of State.

These proposed arrangements will, for the first time, enable Welsh Ministers to procure a franchise that, like the current one, includes important cross-border services to and from parts of England, as well as services entirely within Wales. I am sure the hon. Member for Carmarthen East and Dinefwr will agree that it is in Wales’ economic interests to have a strong set of cross-border connectivity, not least to Manchester airport to the north of Wales, and to London along the Great Western main line to the south of Wales.

Both the hon. Gentleman and the hon. Member for Ynys Môn raised the point about not-for-profit services. As they will understand, because this franchise involves cross-border services, the nature of the contracting vehicle cannot be a decision solely for the Welsh Government. That is why a not-for-profit solution, tempting though it may be to hon. Members, is not necessarily appropriate in this case.

Jonathan Edwards Portrait Jonathan Edwards
- Hansard - - - Excerpts

Will the Minister give way?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I will give way just once, but I am keen to make sure that I answer the hon. Gentleman’s questions.

Jonathan Edwards Portrait Jonathan Edwards
- Hansard - - - Excerpts

I am grateful to the Minister for giving way. Can he explain why, if it is indeed his Government’s intention to improve the transport links between Wales and England, they have taken the treacherous decision to cancel the electrification of the main line all the way to Swansea?

Paul Maynard Portrait Paul Maynard
- Hansard - -

The hon. Gentleman is almost tempting me to give another 10 minute speech on how to improve rail services for passengers. I am afraid, as ever, that he falls into the trap of focusing on how we power the trains, and not the benefits for the passengers. As he will be aware, if the 40 miles from Cardiff to Swansea were to be electrified, that would have a cost-benefit ratio of less than 0.3, with no added benefits for passengers—not a single extra seat, mile per hour of the train, or minute off the journey time. As he will also be aware, the National Audit Office and the Public Accounts Committee have been clear that the Department needs to consider each electrification project in isolation to ensure that it still represents good value for money.

It is my duty as Rail Minister to focus on how to deliver the benefits for passengers in south Wales, including in his constituency, and to bring those benefits forward as soon as possible. That is what we are doing with the Intercity Express Programme trains that are already in operation. When electrification to Cardiff is complete, that will save 15 minutes on the existing journey time. Electrifying further to Swansea would not reduce that journey time by a single minute; nor would it add a single seat to any one of those journeys.

Albert Owen Portrait Albert Owen
- Hansard - - - Excerpts

The Minister makes an important point on the not-for-profit issue. He will know that the Secretary of State for Transport has the power, if a franchise were to go wrong, to operate it directly from the Department for Transport, which would run the franchise. Are those safeguards in the devolution settlement, so that the Welsh Government could take over if the franchise were to go wrong? That is very important. They could be a not-for-profit organisation, and that could lead to investment back into the railways.

Paul Maynard Portrait Paul Maynard
- Hansard - -

The hon. Gentleman is right to identify the importance of the operator of last resort. Discussions are still ongoing with the Welsh Government, but those will need to be concluded before we lay the transfer of functions order before Parliament, which I am about to come to. If he bears with me, he will find out the answer shortly.

I reiterate the importance of ensuring that the Secretary of State has some duties relating to journeys in England. English passengers will be travelling on those trains, perhaps even between two English stations, so it makes sense for the Department for Transport to have a degree of oversight. It is worth further recognising efforts on both sides, in Cardiff and Whitehall, to make sure that we continue to draft the transfer of functions order appropriately. This very detailed set of functions—I gather more than 40—will need to be transferred under existing railway legislation. Technical work is progressing well, and I anticipate that the order will be laid before Parliament early next year. The proposed order will be subject to the affirmative resolution procedure in both Houses, so Members of this House can be assured that they will have the opportunity to scrutinise the detailed provisions. I am confident that we are on track to complete the transfer of franchising powers in Wales and other necessary agreements over the next few months, in good time for Welsh Ministers’ planned award and commencement of the new franchise contract.

Much positive and practical work has been done by both Governments in readiness for these responsibilities. As the hon. Member for Carmarthen East and Dinefwr identified, Transport for Wales has been established to help deliver both the new franchise and the south Wales metro project. As a Department, we are providing extensive support to help to progress all its aims and ambitions. He will no doubt be aware that the procurement process is already well underway. He referred to some of the bidders, and mentioned Arriva. It might be worth my explaining to hon. Members that every owning company in the country has only one bid team. When there are multiple franchise competitions at any one time, it can stretch the resources of individual owning groups, which may be participating in more than one competition at any one time. So I would caution against reading too much into Arriva’s specific decision on the Welsh franchise.

Both our Governments have worked together to deliver a series of milestones, most recently the ITT. Importantly, this has been facilitated by an agency agreement with the Secretary of State, whereby the Welsh Government published the ITT on behalf of the Secretary of State. Over the coming months, my officials will continue to work with Transport for Wales to develop the day-to-day franchise working arrangements to ensure that they are fit for purpose under the new contract.

I recognise the ambition that many stakeholders in Wales have to discover more about what the invitation to tender will contain and what the likely shape of the future franchise will be. I share that ambition; I am always keen to look at what the outputs for passengers are, and not just at the inputs might be. The hon. Gentleman will be aware that the Transport for Wales document, “Rail Services for the Future”, gives some indication of the future direction the franchise will take; but I am sure that like me, he would welcome more information from the Welsh Government about service enhancements that may or may not be proposed as part of the future vision.

I recognise that concerns exist that the rolling stock is not as good as it could be. That is always an important part of any part of franchise consideration, but I must reiterate that decisions about rolling stock will now be taken by the Welsh Government. I share the hon. Gentleman’s frustration about the fact that Pacers remain on our network. I very much hope that we take this opportunity to see the back of them, as we are doing on the northern franchise, for example. They are long past their sell-by date. I recognise the need for new rolling stock, but that will have to be a decision taken by the Welsh Government.

I continue to urge a collaborative approach with the Government in Wales. I am sure that the hon. Gentleman, as a Plaid Cymru Member, will judiciously judge both sides’ performance with equal criticality of eye. All options need to be considered in the development of future services, and I remain optimistic that passengers will see big improvements delivered in the next franchise, which will have to include devolution of the core valley lines infrastructure in some way, shape or form. We are committed to £125 million of investment as part of the wider deal in south Wales. I recognise the importance that the Welsh Government attach to their ambitions in this regard, and hope that we do all that we can to support them in that. I also recognise the ambitions for Cardiff station. Although predicted passenger numbers to 2043 show an increase, there is a particular issue in Cardiff around sporting and entertainment events, and I know that more thinking is going on in that regard.

We have already discussed Cardiff to Swansea, but it was important that our decision on that be accompanied by a commitment to work with Network Rail on how we can deliver further journey time savings both on the line out as far as Pembrokeshire and on the north Wales line, and to look at what other improvements we can make around the Swansea-Cardiff corridor.

It is worth stating clearly that we recognise that electrification can bring benefits to passengers; therefore, we do not rule it out on any stretch of the network, but it has to deliver benefits for passengers. There has been a tendency to regard electrification as the gold standard, but that is not always the case. Often, the benefits that accrue from electrification are because parallel infrastructure works deliver the journey time savings instead. I caution all hon. Members about assuming that if somewhere is not on an electrified line, it is a second-class destination in some way. That is very far from the case. Anyone who has travelled on the new IEP trains will see that they are very much state of the art. I do not think passengers on them notice when they change from diesel to electric power. They are high-quality rolling stock with 130 more seats per service and, when electrification is complete, journey time savings of 15 minutes.

I hope I have explained where I believe the process of the franchising and devolution to be. I have no doubt that the hon. Gentleman will come back with more questions in due course—I would expect no less from him—but I hope that that gives him enough to work on for the moment. I thank him for his time, and thank you, Ms Dorries, as well.

Planning Act 2008: Development Consent Order

Paul Maynard Excerpts
Tuesday 7th November 2017

(6 years, 6 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I have been asked by my right hon. Friend, the Secretary of State, to make this written ministerial statement. This statement concerns the application made by Transport for London under the Planning Act 2008, of 29 April 2016 for a proposed development known as Silvertown Tunnel.

The application will allow for the construction of a new twin bore road tunnel to pass under the River Thames, providing a new connection between the A102 Blackwall Tunnel southern approach and the Tidal Basin roundabout junction on the A1020 Lower Lea Crossing, London.

Under sub-section 107(1) of the Planning Act 2008, the Secretary of State must make his decision within three months of receipt of the examining authority’s report unless exercising the power under sub-section 107(3) to extend the deadline and make a statement to the House of Parliament announcing the new deadline. The Secretary of State received the examining authority’s report on Silvertown Tunnel on 11 July 2017 and the current deadline for a decision is 10 November 2017 having been extended from 11 October 2017 by way of my written ministerial statement of 11 October 2017 [HCWS153].

The deadline for the decision is to be extended to 10 May 2018 (an extension of 6 months) to enable further consideration of the effect of the scheme on air quality (including its compliance with the updated UK plan for tackling roadside nitrogen dioxide concentrations published by Government on 26 July 2017).

The decision to set a new deadline is without prejudice to the decision on whether to give development consent.

[HCWS230]

Rail Links: South-west England

Paul Maynard Excerpts
Tuesday 24th October 2017

(6 years, 6 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Evans. I congratulate the hon. Member for Plymouth, Sutton and Devonport (Luke Pollard) not just on securing this debate but on his first debate in Westminster Hall—the first of many, I am sure.

I thank hon. Members who have come along and participated on the generally good-natured, good-spirited and constructive tone that they have all adopted. It has been a helpful debate. I will do my utmost to cover all the points raised, but as hon. Members can see, I have a carpet of notes before me that have been passed my way. If I do not cover everything, a simple email to my office might suffice to get more of an answer. However, I will do my best to cover everything in the time available before the hon. Member for Plymouth, Sutton and Devonport responds.

We are clearly seeing a great deal of change at the moment on rail in the south-west: brand-new trains, upgraded infrastructure, more capacity, faster journeys, greater resilience and greater reliability. That, after all, is what I believe passengers want. It is part of our record investment of more than £40 billion in the railways between 2014 and 2019, which will continue beyond that date to 2024, as set out in the statement of funds available that we announced just last week. We now expect to spend £48 billion on the railways between 2019 and 2024. It has allowed us to continue our extensive programme of renewals and deliver the enhancements deferred from the current period, to which the hon. Member for York Central (Rachael Maskell) referred. More than £5 billion is being invested in the wider modernisation of the Great Western route.

Amid all the numbers that we have released in recent weeks, I entirely understand that the frequent response is, “But what about project X in my particular local area?” We have not issued a great wodge of documentation that details the status of every single project, for the specific reason to which the right hon. Member for Exeter (Mr Bradshaw) alluded: we need to ensure that we do not disappoint people. When we announce a project, we need to understand its cost, scope and delivery, and have confidence that we can deliver it in the agreed timescale. That was a key finding that underpinned the reprogramming of control period 5, and led to the report by Dame Colette Bowe that was welcomed by the Labour Front Bench and the Government.

The Bowe report sets out another way to approach investment in the railway, by ensuring that we understand what we are putting our money into and make commitments only when we are confident that we understand them. That is a really important step forward. Over the remainder of the year, as part of our rail upgrade plan, we will make further announcements about how the insights from Dame Colette Bowe will inform the projects we take forward, and about where they sit among our priorities. We aim to take forward as many projects as possible, but we must ensure that we are confident in what we promise.

We have heard a lot about the peninsula rail taskforce, which remains a personal priority of mine; I thank my hon. Friend the Member for South West Devon (Mr Streeter) in particular for his kind comments. I stand by what I said at the launch: it is a most impressive piece of work, which I constantly cite to people around the country as a model for this sort of project. I do not want to be churlish, because I understand his desire for an official Government response, but I do not believe in gesture politics. A mere box-ticking exercise in which I issued a rigid ministerial statement entitled “Response to peninsula rail taskforce” would be less valuable than actual progress on the taskforce’s many recommendations. Some of that progress will occur as part of the rail upgrade plan, which will identify where different projects sit in the development process, but some of it will be delivered through franchise change, which operates to a slightly different timetable. I note that Great Western Railway is consulting locally on a scale never seen before in any franchise in the country. CrossCountry’s franchise is also coming up for renewal; it, too, is braving the south-west—even Torbay, I believe—and undertaking a consultation to understand what is most needed there.

I hear the frustrations of my hon. Friend the Member for South West Devon about trains not functioning at Dawlish in bad weather. My focus is on ensuring that we deliver the taskforce’s very worthwhile recommendations. When he sees the rail upgrade plan, I hope he will see the philosophy behind my seeming reticence today, but I am more than happy to continue discussions with all south-west Members in the all-party group about how to keep up momentum.

There may be an impression that we have done nothing since the launch of the taskforce. Far from it, we have done an awful lot, and I want to keep up that momentum. We are re-signalling the main line from Totnes to Penzance, providing faster journeys and potentially paving the way for the introduction of a half-hourly service on the Cornish main line. We are investing in 29 brand-new bi-mode AT300 trains for the route from Paddington to Plymouth and Penzance. We are completely overhauling the popular Night Riviera sleeper trains in Cornwall and expanding the Long Rock train maintenance site to help to maintain them.

We are continually investing to provide more solutions to deliver a more resilient railway in the south-west, and the taskforce’s blueprint remains a very important part of our work. It continues to work with Network Rail on its “Speed to the West” plans. Many hon. Members have mentioned the potential for selective electrification in the Devon banks. All that worthwhile work is ongoing; we need to do all we can to support it and get it to the next stage of development, which I look forward to.

There are several things that Network Rail can do to reduce journey times to Plymouth and the south-west more widely, which is the ambition of the hon. Member for Plymouth, Sutton and Devonport. It can try to understand how the benefits of the new trains can be maximised; it can look at the causes of dips in speed across the route; it can ascertain what quick wins can be delivered to achieve incremental marginal gains to demonstrate journey time improvement; and it can consider the discrete electrification proposals with its research and development department.

We can make significant improvements to journey times on this line, partly through new timetabling, which will be consulted on and introduced in the coming months. At the moment, there is a wide spectrum of journey times to Plymouth—between three hours and three and a half hours—but we may be able to begin to reduce that through better timetabling, so there is more good news to come.

Many hon. Members have mentioned the new IEP trains. There were initial hiccups—the train that has the politicians in it is always the one that breaks down on day one—but such is life. That investment will see much-improved reliability, increased capacity, reduced journey times and improved emission rates. The hon. Member for York Central might be forgiven for not noticing the statistics released today that show a 5.5% reduction in carbon dioxide emissions per passenger kilometre since last year. I welcome that and its continuation in years to come.

The AT300 bi-mode trains will not only improve connectivity with London, but significantly enhance it within the region. Many hon. Members mentioned local rail services that they would like to be improved. The hon. Member for Bristol North West (Darren Jones) referred to the Henbury spur and loop. Exeter is booming and has many ambitious plans for local transport. The network is growing. Hon. Members also mentioned the two separate competitions for the new stations fund, in which Portway Parkway and Reading Green Park were successful but, sadly, Edginswell and Marsh Barton were not. I am keen to work with all the local promoters of unsuccessful station proposals to help them to do better in the next competition and maximise their chances of winning. I am always happy to work with anyone who wishes to work with me.

I stress the importance that the Government attach to ensuring reliability. The situation at Dawlish is important and we are addressing it—we have already put money in. The rail upgrade plan will help us to understand how to ensure that Network Rail’s current work leads to meaningful work in the next two control periods. I thank hon. Members for participating in the debate. No region should ever feel that it is left out of the transport picture. The taskforce report is a fine piece of work, and I look forward to working with hon. Members on all sides to make it a reality.

Luke Pollard Portrait Luke Pollard
- Hansard - - - Excerpts

I thank the Minister for his reply. I am grateful to hon. Members on both sides of the House for expressing their passionate and sincere belief that we need a better deal for rail in the far south-west. It is clear from all the schemes that they mentioned that there is a good case for investment. Although I understand why the Minister was not able to give assurances, I imagine that we will all look carefully at the autumn Budget for the £600,000 and the £30 million. Will the Minister write to hon. Members about the global system for mobile trial?

Paul Maynard Portrait Paul Maynard
- Hansard - -

indicated assent.

Luke Pollard Portrait Luke Pollard
- Hansard - - - Excerpts

That is great. All members of the all-party group have a strong sense that the south-west deserves its fair share of funding. I anticipate that hon. Members on both sides of the House are gearing up to an intensified, relentless campaign. I am sure the Minister will be back to discuss this further in the future.

Question put and agreed to.

Resolved,

That this House has considered improving rail links in south-west England.

Oral Answers to Questions

Paul Maynard Excerpts
Thursday 19th October 2017

(6 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Henry Smith Portrait Henry Smith (Crawley) (Con)
- Hansard - - - Excerpts

8. What steps his Department is taking to accelerate the availability of smart ticketing on the rail network.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

We are investing some £80 million through our smart ticketing on national rail programme, so that all passengers have a paperless option for their journey by the end of 2018. We are also working to facilitate a rail industry pilot of smartcards on mobile phones, as well as rolling out pay-as-you-go ticketing across the hon. Gentleman’s franchise.

Henry Smith Portrait Henry Smith
- Hansard - - - Excerpts

I welcome Southern railway’s plans to introduce smart ticketing across its network. I have also put in a request for the Oyster system to extend south of Gatwick airport to Three Bridges and Crawley stations. However, will my hon. Friend please speak urgently with GTR, the parent company of Southern, as their new ticket machines at many stations, including Three Bridges, have been malfunctioning, causing passengers significant disruption and queues? That situation needs to be resolved.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am grateful for that comment. Ticket vending machines, which are meant to be among the most straightforward of equipment on our railways, seem to cause more problems than any other type of equipment. I understand that Govia Thameslink Railway is due to visit every ticket machine over the coming fortnight to make sure that the software is updated and that the machine functions properly, although I share my hon. Friend’s concern and will be meeting the supply chain in due course to emphasise the importance of getting this right.

Kate Green Portrait Kate Green (Stretford and Urmston) (Lab)
- Hansard - - - Excerpts

I welcome progress on smart ticketing, and also plans for new ticket machines on the station platforms in my constituency, but the Northern Rail service through my constituency has been absolutely abysmal in recent weeks. May I echo the question that my hon. Friend the Member for Dewsbury (Paula Sherriff) asked? What is being done to hold train operating companies to account when trains are overcrowded and short of carriages, and when there are cancellations and delays and people cannot even get to work on time?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I share the concern. We have continuous contact with the train operating companies at an official and a ministerial level—I frequently meet them. Where there are sustained examples of poor performance, they are escalated to what is called the national taskforce, where the train operating company must present to the wider industry what measures it is taking to reverse poor performance, and I will then meet that train operating company. I recognise the concerns around Northern. My primary concern at this stage is to ensure that new infrastructure is opened around the Greater Manchester area so that Northern can operate new rolling stock to replace the appalling Pacers, and introduce the new services that the Ordsall Chord, in particular, will enable.

Nigel Mills Portrait Nigel Mills (Amber Valley) (Con)
- Hansard - - - Excerpts

Can the Minister require train operators to allow passengers who start their journey at a station that has no ticket facilities to use a print-at-home ticket, so that passengers at Langley Mill station in my constituency can actually use the cheaper advance tickets that they currently cannot?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I think that is a perfectly fair observation. We are seeking to ensure that when technology enables new forms of ticketing to be introduced, we move on that as far as possible. That includes paperless ticketing. It also includes work on barcode ticketing, which can be displayed on mobile phones. We have to do much better at ensuring that people may choose the ticket mode that works best for them.

David Drew Portrait Dr David Drew (Stroud) (Lab/Co-op)
- Hansard - - - Excerpts

I welcome what the Minister says about smart ticketing, but in advance of that, might he have a word with the rail authorities about how many tickets they send out? When someone pre-books, they get between eight and 10 tickets. Surely it is not beyond the wit and wisdom of the rail companies to put that information on one ticket. I hate to think how many forests we cut down for one rail journey.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I think that the rail authorities have already heard what the hon. Gentleman has said. I have noticed that I now get my seat reservation and my ticket on the same piece of paper, instead of on five. As we move towards more forms of paperless ticketing, we should have no pieces of paper at all unless we want them.

Rachael Maskell Portrait Rachael Maskell (York Central) (Lab/Co-op)
- Hansard - - - Excerpts

We were told £45 million, but the cost was £96 million. We were told 11 train operators co-ordinated, but it was just five working separately. We were told all passengers, but it was just season ticket holders, and full season ticket holders at that. Only 8% of those now eligible are using the system, with its scope cut, and it being overspent and massively overtime—and then the Government handed the problem back to the train operators. From this example in the south-east, can we really have confidence that the Government can deliver smart ticketing?

Paul Maynard Portrait Paul Maynard
- Hansard - -

There is quite a straightforward reason why we can have confidence about the future, and it is largely because the south-east flexible ticketing programme did not just deliver smart ticketing across the south-east, which many passengers are now using, but put in place the architecture and computer systems that will enable smart ticketing on national rail to be a success.

Rachael Maskell Portrait Rachael Maskell
- Hansard - - - Excerpts

Well, it was a pretty damning report from the National Audit Office. Yet again we have a Government unable to deliver on the railways and on something as simple as smart ticketing. Labour will be at the cutting edge of rail tech, while this Government still expect people to book separate tickets from separate operators—one national chaos under the Tories, one national public service with Labour. How much longer will the Government champion fragmented ticketing on a fragmented railway?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I always get rather frustrated when people have had an answer but paid no attention to what I said—but there we go. The report from the National Audit Office was important. It contained a number of lessons, which we took on board when setting out the national smart ticketing programme. Technology is changing rapidly. We have to make sure that the schemes we put in place now meet what technology can do in a year’s time, or two or three years’ time. We will be moving fast with tickets, and tickets will be unbelievably advanced by the time the Labour party ever gets back into power.

Luke Hall Portrait Luke Hall (Thornbury and Yate) (Con)
- Hansard - - - Excerpts

9. What steps his Department is taking to reduce congestion on the strategic road network.

--- Later in debate ---
Stephen Hammond Portrait Stephen Hammond (Wimbledon) (Con)
- Hansard - - - Excerpts

10. What plans he has to issue safeguarding directions for the unsafeguarded sections of the Crossrail 2 route.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

A thorough analysis of the Crossrail 2 business case is being carried out by the Department to ensure it is a robust scheme, as is undertaken for all transport scheme proposals. Once this analysis has been completed, the Secretary of State will be in a position to outline the next steps on Crossrail 2, which will include any discussions and decisions on future plans for updating the current safeguarding directions.

Stephen Hammond Portrait Stephen Hammond
- Hansard - - - Excerpts

I listened carefully to the Minister’s answer. However, the delay to Crossrail 2 is causing real anxiety to constituents in Wimbledon and across south London and causing investment decisions to be delayed. Will he urge the Mayor to get on with the funding proposals so that the Department can make a decision one way or the other?

Paul Maynard Portrait Paul Maynard
- Hansard - -

As Members have heard this morning, we have regular meetings with the Mayor. I assure my hon. Friend that one of the most common topics for discussion is how to ensure that Crossrail 2 is both affordable and fair to the taxpayer. It is really important that we do not unduly raise public expectations or, indeed, provoke undue concerns in relation to Crossrail 2 ahead of developing a fair, sustainable and deliverable funding plan.

Ian Mearns Portrait Ian Mearns (Gateshead) (Lab)
- Hansard - - - Excerpts

11. When his Department plans to make a decision on the mechanism for the Tyne and Wear metro to receive funding to replace and renew its rolling stock.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

The Department accepts the need to replace the Nexus fleet and is actively discussing the most appropriate method of funding this vital work with Nexus and the Treasury.

Ian Mearns Portrait Ian Mearns
- Hansard - - - Excerpts

The metro system’s rail stock is more than 40 years old, and I am afraid to say that it is failing on a daily basis, causing delays for its 40 million users each year. On 17 July, nine of my right hon. and hon. Friends representing the Tyne and Wear area and I wrote to the Secretary of State about this issue. We again wrote to him on 12 September asking for at least an acknowledgement of our concerns. It may surprise you, Mr Speaker, to hear that we have not yet had an acknowledgment, never mind a reply. My patience is wearing a little thin on this. The people of Tyne and Wear deserve much better from this Government, even though they have no MPs in the area.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am always disappointed when I hear that we do not achieve what we should in our correspondence. I am sorry that the hon. Gentleman has not had an acknowledgement; we will draft one immediately today. I assure him that I personally understand the importance of the metro system to the people of the north-east. We understand the need to replace these ageing carriages, and we are keen to ensure that we make a decision as soon as possible.

Chi Onwurah Portrait Chi Onwurah (Newcastle upon Tyne Central) (Lab)
- Hansard - - - Excerpts

Transport spend in the north-east is only £220 per head, compared with £2,000 per head in London, and the effect of that can be felt every single day on the Tyne and Wear metro. Will the Minister commit that the investment will be publicly funded, not coming from some financially engineered private finance initiative scheme, so that the public benefits of a decent transport system can be publicly controlled?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We continue to work closely with the Treasury to make sure that we get the right funding package to deliver these carriages, which I know the network needs. In response to the hon. Lady’s concern about levels of investment in her region, I point out that we are finally completing the motorway to the north-east that Labour never built in 13 years.

Faisal Rashid Portrait Faisal Rashid (Warrington South) (Lab)
- Hansard - - - Excerpts

13. What assessment he has made of the potential merits of removing tolls on bridges.

--- Later in debate ---
Peter Bone Portrait Mr Peter Bone (Wellingborough) (Con)
- Hansard - - - Excerpts

T2. The excellent Rail Minister is drawing up a new franchise for east midlands railways, which will improve the service. Will he be able to publish an indicative timetable, so that my constituents can see how their rail service will improve?

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I was more than happy to meet a cross-party delegation of Northamptonshire and Bedfordshire MPs this week to discuss this very issue. We have located the information that my hon. Friend desires, and I will place it in the Library and write to him.

Holly Lynch Portrait Holly Lynch (Halifax) (Lab)
- Hansard - - - Excerpts

T8. If High Speed 3 connected Leeds and Manchester via the Calder Valley line, that would be an absolute game changer for my part of the world. Given that the Secretary of State was keen to spend time in my constituency during the general election campaign talking about how important rail was to the area, will he update the House on whether and when that connection could become a reality?

--- Later in debate ---
Esther McVey Portrait Ms Esther McVey (Tatton) (Con)
- Hansard - - - Excerpts

T7. Can the Minister provide an update on the progress of the mid-Cheshire rail line?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I certainly can. I was pleased to meet both my right hon. Friend and the mid-Cheshire rail line promotion group in her constituency back in August. Since then, we have been liaising with Transport for the North. She will be aware that one of its key strategic corridors is the Wales and the west stretch in the north-west. It is looking at how the mid-Cheshire rail line scheme fits into its strategic proposals, and I hope to hear more in due course.

Norman Lamb Portrait Norman Lamb (North Norfolk) (LD)
- Hansard - - - Excerpts

To return to community transport operators, many are concerned, including North Norfolk community transport, that the new ruling will push it under, with the loss of absolutely vital rural community transport links. What is the Minister doing to ensure that that does not happen? What is the timescale for the consultation? When will it actually come in, because the uncertainty is very dangerous?

--- Later in debate ---
Kevin Foster Portrait Kevin Foster (Torbay) (Con)
- Hansard - - - Excerpts

I know that the Rail Minister will share my excitement at the prospect of the first new station in the bay since world war two at Edginswell. Will he agree to meet me and the local council to see how we can take this forward and what the prospects might be for new stations funding?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am aware that it was one of the unsuccessful bidders in the most recent round of the new stations fund. We make a point of giving positive feedback whenever we can to help make sure that future bids have the maximum chance of success, so I am more than happy to meet my hon. Friend and his council to discuss how we can maximise the opportunities.

High Speed Rail (Preparation Act 2013)

Paul Maynard Excerpts
Thursday 19th October 2017

(6 years, 6 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

The High Speed Rail (Preparation) Act annual expenditure report is published today under section 2 of the High Speed Rail (Preparation) Act 2013. The report covers the period from 1 April 2016 to 31 March 2017.

A copy of the report will be placed in the Libraries of both Houses.

Attachments can be viewed online at: http://www. parliament.uk/business/publications/written-questions-answers-statements/written-statement/Commons/2017-10-19/HCWS179/

[HCWS179]

Silvertown Tunnel Development

Paul Maynard Excerpts
Wednesday 11th October 2017

(6 years, 7 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I have been asked by my right hon. Friend, the Secretary of State, to make this written ministerial statement. This statement concerns the application made by Transport for London under the Planning Act 2008 on 29 April 2016 for a proposed development known as Silvertown Tunnel.

The application will allow for the construction of a new twin bore road tunnel to pass under the River Thames, providing a new connection between the A102 Blackwall Tunnel southern approach and the Tidal Basin roundabout junction on the A1020 Lower Lea Crossing, London.

Under sub-section 107(1) of the Planning Act 2008, the Secretary of State must make his decision within three months of receipt of the examining authority’s report unless exercising the power under sub-section 107(3) to extend the deadline and make a statement to Parliament announcing the new deadline. The Secretary of State received the Examining Authority’s report on Silvertown Tunnel on 11 July 2017 and the current deadline for a decision is 11 October 2017.

The deadline for the decision is to be extended to 10 November 2017 (an extension of one month). This extension is to enable further consideration of the recent responses to the Secretary of State consultations on the scheme which relate to the updated UK plan for tackling roadside nitrogen dioxide concentrations published by Government on 26 July 2017.

The decision to set a new deadline is without prejudice to the decision on whether to give development consent.

[HCWS153]

HS2: Phase 2b Route (Manchester and Leeds)

Paul Maynard Excerpts
Wednesday 6th September 2017

(6 years, 8 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr McCabe. I shall do my best to cram as much as I can into the remaining 10 minutes. The hour-long debates in this place are neither fish nor fowl, I have rapidly learned.

I thank my hon. Friend the Member for Eddisbury (Antoinette Sandbach) for doughtily providing her usual list of issues for me to consider. She is a firm champion of the people of Eddisbury, and I shall try to focus on her main concerns, but I want briefly to address some of the points made by the hon. Member for York Central (Rachael Maskell) from the Labour Front Bench. I agreed with much of what she said about economic investment and the need to ensure that things all join up. However, I must gently chide her on one key point: we have not stopped work on east-west links across the north. I met only the other week with both Network Rail and Transport for the North to talk about how they are bringing forward Northern Powerhouse Rail. I have always argued that HS2’s full potential will not be fully delivered unless we properly improve east-west links as well. It is not for me to determine the engineering solution that Network Rail will alight on for any particular line or stretch of line, but that work is ongoing—on a cross-party basis, as Transport for the North is also governed by Labour local government leaders across the north, who are also setting the objectives. That seems to me to be how things should be taken forward.

Rachael Maskell Portrait Rachael Maskell
- Hansard - - - Excerpts

Will the Minister give way?

Paul Maynard Portrait Paul Maynard
- Hansard - -

If the hon. Lady will forgive me, I will not; I am sure it will not be the last time we have the discussion, and I must give some time to the concerns of my hon. Friend the Member for Eddisbury. Her main concerns focused largely on some of the ground instability problems that we encounter in Cheshire, crossing the salt fields. As someone born and bred in Northwich I have been brought up on photos of houses that have collapsed because of subsidence, and have suddenly disappeared into the Bull Ring in the town centre. I am more than aware of those issues; but I reassure hon. Members that we are seeking to manage them actively.

HS2 has commissioned a specialist mining engineer, in consultation with the Cheshire Brine Subsidence Compensation Board, to undertake a study on the consultation route using available data such as those from the British Geological Survey, the salt industry and local authorities. Those light detection and ranging surveys have been completed by HS2 Ltd, identifying the wet rockhead features to which my hon. Friend referred near to the route, and will be considered with other LIDAR surveys. I think it is fair to say that between Crewe and Manchester every route option presents risks and issues. It is a matter of balancing those carefully and working out which offers the optimum solution. We carefully weighed those matters both in 2013, when we listened to concerns, and on the now-confirmed 2016 route. On our assessment those risks were more manageable on the latest version of the route. One of the key reasons for that was to avoid the gas storage caverns to which my hon. Friend referred. The route has been moved to better avoid salt brining and gas storage infrastructure, reducing underlying mining and geological risks during construction and operation. The route has also been raised to better allow for drainage and options for ground stabilisation. In terms of travel through Cheshire, other alternatives were looked at, including tunnelling options, but this was felt to be the best option of those on the table.

My hon. Friend the Member for Eddisbury referred to the report by TerraConsult. Its first report was taken into account before the November 2016 announcement, as was its second report before the July 2017 announcement. I further understand that HS2 Ltd is meeting on Tuesday 12 September with TerraConsult and Mid Cheshire Against HS2 on how HS2 Ltd came to make its recommendation on the alignment between Middlewich and Pickmere. Senior engineers with a background in geotechnical engineering will attend that meeting. I also understand that HS2, accompanied by engineers, is more than happy to meet my hon. Friend to discuss her concerns and is waiting to confirm a date with her office. Once she has had that meeting, I will still be more than happy to put myself—with my limited expertise—at her disposal also.

I recognise that this is a sensitive and complex section of the route. There is more work to be done to further assess geological risks and to provide suitable mitigations for them. HS2 Ltd plans to carry out early geotechnical investigation work in the mid-Cheshire area to gather more advanced survey information. We will continue to work with my hon. Friend to try to ensure that the best mitigation possible occurs.

I also want to touch briefly on my hon. Friend’s concerns about the siting of the depot at Wimboldsley and its proximity to the primary school. The re-siting of the rolling stock depot to Wimboldsley has taken into account both the potential risks of the previous site in Golborne, which saw the demolition of a grade I listed property, and the potential impacts in Wimboldsley. The site is strategically located on the HS2 network, south of the Manchester junction, so that it can receive empty trains from both the HS2 main line—from Preston and indeed further north—and the HS2 Manchester spur. It is also located at the point where the line deviates from the existing west coast main line, so it is also well placed to receive empty HS2 trains from Liverpool. Other locations around Basford and Crewe are less proximate to where empty trains from Liverpool and Manchester might be coming from.

While I understand that there will be impacts associated with the rolling stock depot, I very much welcome the fact that HS2 Ltd is in conversation with the headteacher at Wimboldsley Primary, and I hope that any outstanding concerns get fed into me as well, so that I am aware of them.

In particular, this proposal avoids direct impacts on the grade II listed buildings to which my hon. Friend refers and also proximity to sites of special scientific interest. I recognise that there are still concerns about the Leeds and Liverpool canal. Indeed, other canals were also mentioned. As someone born in mid-Cheshire, I have a great fondness for canals and want to ensure they do not suffer in this process.

Antoinette Sandbach Portrait Antoinette Sandbach
- Hansard - - - Excerpts

indicated dissent.

Paul Maynard Portrait Paul Maynard
- Hansard - -

If my hon. Friend has further information on where she thinks there might be impacts, I will happy to look into it.

Furthermore, significantly less infrastructure is required at this location than if it were at Golborne. In particular, there is no need for a northern chord from Manchester out to the HS2 junction. That reduces the overall infrastructure development requirements in the area and, indeed, creates more space in the HS2 budget for other mitigation elsewhere on this stretch of the route.

In the remaining two and a half minutes, I will not be able to do justice to everything that my hon. Friend said, so I am more than happy to meet her. I recognise her points about ancient woodlands and about some of the lowland deciduous woodland in Cheshire. There are woods around Plumley, Smoker wood and woods around Lostock Gralam. I know that HS2 is very keen to ensure that when it does the environmental assessment, it can put forward how it intends to mitigate that loss of woodland. I urge Members to look carefully at that assessment when it comes out later in the year, because it will be full of information, and I am sure that local people will want to have their say on whether the mitigation is adequate.

I want to finish on the most important point. I apologise to the right hon. Member for Rother Valley (Sir Kevin Barron) that he will not get any look-in in what I am saying, because I have run out of time, but I am more than happy to meet him as well. I know that there is an outstanding meeting, and I will be keen to meet him. There is a wider point here about how HS2 engages and consults with local communities and how it processes need-to-sell applications. This is a difficult area, but it is impossible to build infrastructure of this scale without inconveniencing someone. The key test is whether those people who are being inconvenienced and asked to sell or leave their homes feel that they are being treated in a fair and proportionate manner.

I urge all Members here today who have specific cases to come to see me personally, as my hon. Friend the Member for Erewash (Maggie Throup) did. It is only by properly understanding those individual cases that I get a more holistic sense of whether the system is working or not. I noted the concerns that my hon. Friend raised about how some specific local circumstances make the existing package not always appropriate. I have heard that message and will ask officials to look more closely at Long Eaton in particular. If Members have a specific local issue, they need to let me see the detail, because there have been examples already where I have been able to exert influence. I expect HS2 to get this right, and that will be my final word on the matter at this stage.

Thameslink

Paul Maynard Excerpts
Wednesday 19th July 2017

(6 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Bailey. I congratulate my hon. Friend the Member for St Albans (Mrs Main) on securing this debate and presenting her case, as she always does, with great vigour and force; I expect no less from her. She is right to hold Ministers to account for the service on her railway.

Passengers expect a timely, punctual and reliable service, and when they do not get it, they are right to want to understand why, and what Ministers and the train operators intend to do about it. This has been a helpful debate on what is occurring with Thameslink, and I am grateful to both the hon. Member for Dulwich and West Norwood (Helen Hayes) and my hon. Friend the Member for Hertsmere (Oliver Dowden) for their contributions. There was also a sensible contribution from the shadow Minister, the hon. Member for York Central (Rachael Maskell). We may not agree on the final paragraphs of her speech, but I thought that much of what she said made great sense.

I am aware of how important it is that we deal with this issue. As I said, passengers want a service that they can rely upon, and if they cannot, that should be a concern for us all. The Thameslink service is vital for our country, not least because our capital city depends upon it. Reliability of services through central London is critical. It is one of Europe’s busiest rail routes, so it is right that passengers will see new stations—and better stations, in fact—new trains, new infrastructure and new systems to increase capacity, reduce crowding and provide better connections for passengers across London and the wider south-east.

A number of points have been made in the debate, but I want to focus first and foremost on answering the points made by my hon. Friend the Member for St Albans. I often find that these one-hour debates are neither fish nor fowl, and I want to give proper attention to the points made by the Member who secured the debate without ignoring the other points made. Normally I run out of time in that ambition, so if I do not manage to respond to all the points now, I ask Members to make sure that I reply to them all subsequently.

The first point made by my hon. Friend the Member for St Albans was about the impact of the new trains. Of course, people want new trains. It is right to point out that the new Thameslink trains have advanced technology; they are more spacious and modern by their very definition. We have contracted Siemens to deliver 115 of them overall. We have 37 currently in service, between Bedford and Brighton, on the Wimbledon loop and on services in Kent. We expect all Thameslink services to be served by Class 700 trains by October 2017.

Train performance on the brand-new trains is improving bit by bit every period, but I recognise that it has not been good enough. I have spoken to Siemens myself to urge improvement. I know that it is working very closely with GTR. With every software improvement we see a significant improvement, but it is worth bearing it in mind that this platform is a step beyond what Siemens has produced before with its Desiro platform. There will always be slightly more challenges with such a new piece of rolling stock, but we are seeing significant improvement over time, and I fully expect to see significant improvement in reliability over the coming weeks.

My hon. Friend the Member for St Albans gave a number of examples of where her constituents were not getting the service they desire. I have been hearing those tales about this GTR network since I started in this role last July, and that is what has inspired me to focus on trying to deliver the rail ombudsman that we had in our manifesto as rapidly as I can. That is making good progress. I want to ensure that passengers can get binding arbitration at the end of the day where they cannot secure the right outcome from their appeals. We do not want these situations to occur—far from it—but where they do, I want the passenger to feel empowered. That is why I wanted to ensure that we had passenger representation on the Gibb report panel, for example—to ensure that their voice was being heard.

I was fascinated to hear about the Train Suffragettes to whom my hon. Friend referred. I would be delighted if she could send me more of their ideas about how the service could be improved, and I would be happy to take on board as many of them as possible.

Oliver Dowden Portrait Oliver Dowden
- Hansard - - - Excerpts

I should also highlight Thamestink, which is the campaign group in my constituency. I would be grateful if the Minister could extend the invitation to that group as well.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I always risk creating extra work for my private office in inviting all submissions, wherever they are from, but I am more than happy to receive them and give them my full attention.

A number of hon. Members mentioned what is referred to in the industry as passenger information during disruption. It has been a major concern of mine that passengers may, at the breakfast table, consult their mobile phone, get one piece of information that their train is running, beetle down to the station to get the train and then discover that for some reason it has been cancelled. There are too many sources of information across the industry. The Office of Rail and Road has two key obligations under law. One is improving passenger information during disruption. I have asked it to look closely at how that is working across the south-east quadrant as a whole, because I have concerns about both GTR and Southeastern ensuring that we have consistent information. I accept that that is a key point, and it is one that I am taking up.

My hon. Friend the Member for St Albans has raised concerns both with me and with my right hon. Friend the Secretary of State about the Radlett freight interchange. Those representations were augmented today by my hon. Friend the Member for Hertsmere (Oliver Dowden). I genuinely recognise those concerns; that is why I want to ensure that the timetable is protected from the impact of the works. Network Rail has reassured my Department, just as it has reassured both my hon. Friends, that the work at Park Street has been planned to have minimum impact on passengers, as freight trains will run only outside peak times and overnight, but I recognise that the concerns remain and that there is a wish to have greater oversight of the detail of what is being planned. I suspect the best thing I can offer is to broker a meeting with Network Rail, with me present as well, and perhaps we can test some of those assumptions against what my officials and the Department are also aware of. That might be of assistance to my hon. Friend the Member for St Albans, so we will co-operate as best we can to try to find that reassurance.

My hon. Friend also mentioned overcrowding at St Albans station. We are extending the platform to accommodate 12-carriage trains as part of the Thameslink programme. GTR is working to deliver extended automatic ticket gates at platform 4, which I believe is called the Ridgmont entrance, by 2019. The main station building will also receive an enhanced retail offering, a larger concourse area to accommodate peak periods and associated platform furniture and shelter facilities to improve the station environment. I recognise that there remain capacity concerns at St Albans station. We are thinking through the implications of that for future rail control periods.

In terms of future Thameslink services and how they will benefit St Albans, it is a matter of improved peak frequency and more capacity between central London, St Albans and Bedford, with more peak services, new cross-London routes, and Thameslink services reinstated to serve London Bridge. I expect passengers to see more comfort benefits, with more than 3,000 standard-class seats into London St Pancras, which is 15% extra from today, particularly through using the 12-carriage trains.

Essentially, Thameslink is all about expanding capacity on a key commuter route. We are trying to deliver the trains and the infrastructure to enable that, with 24 trains an hour in the peak through the Thameslink core between Blackfriars and St Pancras, which is an additional nine trains in each direction.

Part of our focus is on making sure that we have the right infrastructure—not just track but signalling. My hon. Friend the Member for Hertsmere is right to identify that we need to make sure that signalling and timetabling are robust. We have a planning board, chaired by Chris Gibb, of Gibb report fame, and an assurance panel, chaired by another industry expert, Chris Green, double-checking the work that is going on to make sure it is reliable and will deliver the outputs that we seek.

To date, the Thameslink programme has delivered a new Blackfriars station connecting both side of the Thames. We have seen major enhancements at Farringdon, platform extensions on midland main line stations to allow longer trains and, as I said, 37 of the new class 700 trains. There are new maintenance depots at Three Bridges in Crawley and Hornsey in north London, and many hon. Members will be familiar with the new London Bridge station, two thirds of the concourse of which has been open since August 2016.

What else can passengers expect? The rest of London Bridge station will be open for business in early 2018. The new class 700 trains will start operating on Great Northern routes and on services in Kent and Sussex. Entire new journeys, such as Cambridge to Gatwick, will open up new journey options and connections for customers, including an interchange with the Elizabeth line services at Farringdon, which I think will transform how people approach travel options within London. Most importantly, from 2018 there will be services every two to three minutes through the central London core between Blackfriars and St Pancras International.

I recognise concerns about performance. We have seen performance steadily improving since the start of the year. When we are able to focus on improving the network, rather than just on industrial relations, we can deliver a real improvement in performance, working together with the drivers. The jump in public performance from 62% last December to a high of 85% this year reinforces that point, but I recognise that we need to do better—85% is still not good enough. We continue to have an immense amount of pressure on the network.

We are also looking carefully at the future Thameslink timetable. Journeys will be improved with better travel across the network, but modern track will make journeys more reliable and new trains will provide additional capacity. GTR has been actively seeking feedback from any interested parties on the timetable changes to make sure that they best match passenger need. The second stage of the consultation has just closed and we are looking carefully at what people are saying.

As I mentioned earlier, our Thameslink industry readiness board, chaired by Chris Gibb, is doing important work. Thameslink brings many other franchises on to its network, and the board is looking at making sure we maximise the potential for all aspects of the train network.

My hon. Friend the Member for St Albans mentioned delay repay, as did the shadow Minister. We have brought “delay repay 15” specifically into GTR as the first franchise to trial it, because we recognise the impact that the disturbances across the network as a whole have had. I share the concern that we need to explain more carefully that the impact of Thameslink is not just felt south of London. It is often hard to envisage how Thameslink is a regional service. What occurs north of London has an impact south of London and vice versa. It is worth highlighting, for example, that right-time presentation, as we call it—in other words, the right-time arrival of the train at the station—is rarely higher than 50% on services from the north of London going south through to Brighton. That indicates that problems in Brighton on trains going northwards also impact on punctuality and reliability, so investment in both sides of the central core is absolutely crucial.

We have improved delay repay, although I take on board the point about improving its delivery. We have to be careful about our terminology, as I have learned. Automated compensation is about improving the behind-the-scenes progress of individual train operating companies. It is about someone getting their compensation without doing anything to achieve it. That requires them to demonstrate that they have been on the train in question. They can either nominate their usual commuter train, in which case it can be automatic compensation, or, where they have not specified a train, they must prove that they were on the delayed train. There is sadly a risk of fraud, and we are talking about considerable sums of money from regular commuters, so there has to be that element of assurance.

I share the ambition of the hon. Member for York Central, which is why I have been pushing for delay repay to be rolled out as much as possible. Passengers have a right to expect it. We need to be much better at making people aware of it and confident about using it. I would rather, as my hon. Friend the Member for St Albans said, that there were no delays at all; then we would have a better service in the first place.

As I often mention, there is a £300 million investment in improvement across the Thameslink network. Not all of that is occurring south of London. Hon. Members may think this an issue just on the Brighton main line, but it is not. We are investing in additional land sheriff shifts to reduce trespass and railway crime across the entire length of the line, and there will be more use of predict and prevent condition-monitoring software and processes on the infrastructure. There will be additional incident response teams and embankment works at New Barnet. All of that is occurring north of London on the stretch that covers St Albans. Because of the point I made earlier about interaction, service delays, either north or south, inevitably have an impact on St Albans at some point.

We will continue to deliver that £300 million until December 2018, when we cease the current control period. We will need to invest further in control period 6, and we will be making future announcements about how that spending will be allocated. We are committed to doing what is needed to bring this stretch of track up to the standards required to deliver timely and punctual rail services.

I will try to make a bit of progress, because I recognise that I have not covered any of the points made by the hon. Member for Dulwich and West Norwood. I am not sure whether the shadow Minister had time to be briefed on this before she arrived here, but there will be talks tomorrow at the Department involving GTR, ASLEF and, I think, the RMT—I am not sure whether that is precisely correct. Hopefully, that will be an opportunity to have the discussion the hon. Lady is aiming for.

I do not think anyone disagrees that having a second person on board is a bad thing. We have been able to have a second person on board across the network where GTR is in operation. That is a good thing in my view. The issue will be the circumstances in which a train may depart if someone is not available. That is the narrow point that was in dispute in the past, and perhaps tomorrow will be the chance to resolve that—we will have to wait and see.

The hon. Member for Dulwich and West Norwood made a number of perfectly relevant suggestions. I am not sure I can do them justice in two minutes, but if it would be helpful to her I would like her to come to see me and my officials to go through them in more detail. I am aware of schemes such as the expansion of Loughborough Junction and Camberwell, and she deserves a better response than me saying, “We will look at it.” If she gets in touch, I will be more than happy to meet her. I know the Secretary of State met the Mayor yesterday and had constructive discussions.

On the hon. Lady’s point about resilience, we are already seeing greater resilience through a re-diagramming of services. Part of the problem is drivers joining and leaving a service as it passes through the GTR network. By simplifying the diagrams with the agreement of the drivers, we can make for a more resilient service by ensuring that that interruption is reduced.

I noted the points made by my hon. Friend the Member for Hertsmere. We should not overlook the fact that GTR was criticised in the Gibb report—as was the Department. We saw penalties imposed on GTR last week, which will go towards improving the network. This is not just about trade unions, GTR or the Department; it is about an entire ecosystem, as some have pointed out. I heard my hon. Friend’s point about car parking, and I know the rail delivery group is looking at that. The passenger’s experience begins when they decide to make a journey, and that includes car parking.

Vertical integration is moving according to plan. We have already seen some of the benefits for this franchise of getting Network Rail and GTR to work more closely together and of continuing to work with TfL on the Oyster zone, which should help my hon. Friend’s constituents in particular. One highlight of the last week was the rail delivery group’s announcement of new statistics on right-time arrivals at stations, which I urge all hon. Members to have a look at.

If there is anything I have missed, I ask Members to get in touch. We will keep Members informed—

Oral Answers to Questions

Paul Maynard Excerpts
Thursday 13th July 2017

(6 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
James Duddridge Portrait James Duddridge (Rochford and Southend East) (Con)
- Hansard - - - Excerpts

14. What steps his Department is taking to simplify ticketing information for rail passengers.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

Passengers are frustrated by the lack of information they get when choosing their ticket. The problems can be deep-rooted, but when I started as rail Minister I wanted to make rapid progress. I have been working with industry, the regulator and consumer groups, having launched an action plan on fares and ticketing. We are getting on with the job of delivering the many, many proposals contained therein.

Damien Moore Portrait Damien Moore
- Hansard - - - Excerpts

Does the Minister agree that if rail franchises do not adopt a more transparent ticket price system voluntarily, the Government should step in to ensure that rail passengers are offered the best value for money?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We certainly recognise that fares revenue is crucial to funding the day-to-day operation of the railway. I agree that all franchises should listen to passengers, and ensure that their fare structures are both fair and logical, as well as keenly priced, to support the many passengers who rely upon them.

James Duddridge Portrait James Duddridge
- Hansard - - - Excerpts

Southend has two train lines and multiple stations within the Southend boundary. Would it not be simpler if the same ticket could be used on both lines, which would be good for residents and visitors alike? It would clear things up for visitors, allowing them to do journeys into Southend and then pop in somewhere else on the way back to London.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I agree that Southend’s beauties merit a journey by all passengers, wherever possible. We are seeing rapid technological change on the railway. The growth in smart ticketing and the various ticket media within a relatively short period will enhance the possibility for passengers to experience the flexibility to which my hon. Friend refers. I am looking forward to working with the industry on driving that technological change to make that vision a reality.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I call the Chair of the Transport Committee, Lilian Greenwood.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - - - Excerpts

The ticketing information in which passengers are most interested is the price. Since 2014, commuter rail fare increases have been capped to the retail prices index, but in an answer to me yesterday, the rail Minister said that that fares policy is “under review”. Next month’s inflation figures will determine the cap for January 2018. If the Department reverts to the old formula, fares could rise by 5% or more, pricing many off the railways. Next week, when the Secretary of State announces his investment plans for control period 6, will he pledge that the improvements that passengers need will come at a price they can afford?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I suppose that I should start by welcoming the hon. Lady to her new position, although she has started to prognosticate already about what may or may not occur in the future. We have no intention of seeking to raise fares in the way that she describes, and it is not an appropriate path to go down. We always seek to put passengers first. We are continuing to maintain the cap at the moment, but we keep policies under review at all times. She should not read more into that than is actually there.

Philip Hollobone Portrait Mr Philip Hollobone (Kettering) (Con)
- Hansard - - - Excerpts

9. If he will ensure that work to strengthen the Kettering rail bridge (a) starts and (b) is completed to schedule.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

Network Rail has announced that the A6013 Northampton Road, from Northfield Avenue mini roundabout to Lake Avenue, will be closed between 24 July 2017 and 4 Sep 2017. Network Rail is confident that the work will begin and finish as scheduled, and we are in regular contact with Network Rail in regard to this work.

Philip Hollobone Portrait Mr Hollobone
- Hansard - - - Excerpts

The Northampton Road railway bridge is located right next to the busiest road junction in Kettering town centre. The junction will be closed for six weeks and will cause major disruption to the town. The frustration of local residents will at least be partly assuaged if the Minister could reassure all of us who live in Kettering that he is at least actively considering proposals to reinstate the half-hourly mainline train service north from Kettering, which will go over the repaired bridge in the new franchise.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I recognise why my hon. Friend’s constituents would have concerns, having seen a similar closure in my own constituency and the issues and problems that that has caused. I have also heard his observations and views on the extra services that he wishes to see from Kettering. We will shortly be launching a consultation on the new east midlands franchise and I am sure that his request will figure prominently in our thinking on what we do next on that franchise.

Sharon Hodgson Portrait Mrs Sharon Hodgson (Washington and Sunderland West) (Lab)
- Hansard - - - Excerpts

10. What steps his Department is taking to promote the use of liquefied natural gas as an alternative to diesel fuel.

--- Later in debate ---
Esther McVey Portrait Ms Esther McVey (Tatton) (Con)
- Hansard - - - Excerpts

13. Whether he plans to expand the rail network in Cheshire.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

We are investing more than £1 billion in the great north rail project to transform rail travel for passengers across the north of England. In addition, we are supporting local enterprise partnerships and Transport for the North in progressing their priorities for investment in new stations and upgraded infrastructure.

Esther McVey Portrait Ms McVey
- Hansard - - - Excerpts

I am grateful to the Minister for his reply, and I want to impress on him the urgency of getting the mid-Cheshire rail link and the Manchester airport western link. Our population is expanding, businesses are increasing in size and the local plans will mean tens of thousands of new homes in the area. This cannot be catered for on the local roads and High Speed 2 will not be an answer. Will the Minister commit to support these schemes and come to meet me and the Mid Cheshire Rail Users Association?

Paul Maynard Portrait Paul Maynard
- Hansard - -

First, let me welcome my right hon. Friend back to her place in this House. It is good to see her here again. As a regular commuter to school on the mid-Cheshire rail line, from Cuddington to Hale, I am all too aware of the attractions of reopening the line to Middlewich. I am more than happy to meet her and local campaigners, and it is really important that all local transport authorities and local enterprise partnerships are supportive of such projects. I am sure that in her early days as the Member for Tatton she will work with those groups to make this a reality.

David Hanson Portrait David Hanson (Delyn) (Lab)
- Hansard - - - Excerpts

The Mersey-Dee Alliance, which includes the Cheshire West and Chester local authority, has a growth deal bid that includes rail improvements and the Chancellor indicated in his Budget that that might get some support. Can the Minister say whether any money has been given to the Department for Transport, in particular to improve the links between Crewe and Chester and on to north Wales?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We certainly recognise that our decision to take HS2 to Crewe by 2027 opened up a range of possibilities for improving connectivity into north Wales, considering the potential outcomes that passengers might want in terms of improved capacity, improved service frequency and so on. We are looking forward to doing more work on the Crewe hub and seeing what potential is unlocked by development at Crewe. Hopefully that will benefit not just Cheshire but north Wales.

Bill Esterson Portrait Bill Esterson (Sefton Central) (Lab)
- Hansard - - - Excerpts

One pound is spent per person on transport infrastructure in Cheshire and the north-west for every £7 spent per person in London and the south-east. Can we have our extra £6 per person, please, to spend on things such as rail and road links to the port of Liverpool, which will help jobs and growth across the north-west?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We are always looking to ensure that we balance our investment across the country over time. I know that during my time on the Select Committee on Transport we looked very carefully at the relevant regional transport spending figures and what they do and do not tell us. We could have a very lengthy answer to this question, but that would displease you, Mr Speaker, so I point out once again the £1 billion investment across the north to improve rail infrastructure, including in the hon. Gentleman’s area.

Tim Loughton Portrait Tim Loughton (East Worthing and Shoreham) (Con)
- Hansard - - - Excerpts

15. When he plans to publish his proposals for the upgrade of the Lancing to Worthing section of the A27.

--- Later in debate ---
Michael Tomlinson Portrait Michael Tomlinson (Mid Dorset and North Poole) (Con)
- Hansard - - - Excerpts

T5. For the first time in 45 years, there is a commercial rail service between Swanage and Wareham in my constituency, thanks to the dedication and hard work of the volunteers and members of Swanage Railway. What assurances can the rail Minister give that he will support our rail heritage and ensure that this trial becomes a permanent success?

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I am pleased to hear what is happening on Swanage Railway. I have met the all-party group on heritage rail, and it is always good to hear examples of where heritage rail can work with main line operators, although I agree that that has to be done safely. We are looking to build on more franchise agreements when there are sensible schemes that we can support.

--- Later in debate ---
Vicky Ford Portrait Vicky Ford (Chelmsford) (Con)
- Hansard - - - Excerpts

T8. Chelmsford is one of the busiest commuter stations in the country, but Chelmsford commuters have experienced frequent and significant delays. Will the Minister please provide an update on what actions are being taken to counter these delays?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am sorry to hear of the delays that are being experienced by my hon. Friend’s constituents. Clearly we have had a period of very hot weather, which does impact on rail reliability, and speed restrictions do help to protect overhead line equipment. I met the industry forums just this week to discuss what lessons can be learned about repeated periods of hot weather and how we can best protect critical infrastructure, and I hope the decisions they now move on to take can start to improve reliability.

Kerry McCarthy Portrait Kerry McCarthy (Bristol East) (Lab)
- Hansard - - - Excerpts

When the Chancellor came to Bristol in May, he refused to confirm whether electrification of the Great Western line into the city centre would go ahead. Will the Transport Secretary confirm whether it has been deferred, as we were told last year, or has it really been ditched?

Esther McVey Portrait Ms Esther McVey (Tatton) (Con)
- Hansard - - - Excerpts

T9. A number of my constituents are deeply concerned about the impact of High Speed 2—particularly residents in Ashley, who came to see me in a surgery last week. I am sure that you, Mr Speaker, will be pleased that I am not going to go through every point they raised with me, but could the Minister meet me to go through every concern they had?

Paul Maynard Portrait Paul Maynard
- Hansard - -

At the same time as we meet to discuss the mid-Cheshire line, I will be more than happy also to discuss some of the issues with the HS2 phase 2b route, which goes through my right hon. Friend’s constituency.

Daniel Zeichner Portrait Daniel Zeichner (Cambridge) (Lab)
- Hansard - - - Excerpts

When the Conservative manifesto was published, there was no mention of Crossrail 2. Will the Minister tell us whether that was by accident or design? When does he plan to make a decision on the business case?

Chris Gibb Report: Improvements to Southern Railway

Paul Maynard Excerpts
Tuesday 4th July 2017

(6 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

Thank you, Madam Deputy Speaker. It is a pleasure to serve under your chairmanship for the first time in your new role. I also welcome the hon. Member for York Central (Rachael Maskell) to her place as a new shadow Minister. Having had to face the Transport Committee on this very issue on day two of my job, I know the challenge of taking up this complex issue at short notice, and the hon. Lady has acquitted herself well in her performance at the Dispatch Box. I thank all right hon. and hon. Members across the Chamber for participating in this helpful debate today, particularly those whose constituencies are on the line of route—whatever party they represent—who have worked so hard to support their constituents and deal with the impact of the disruption over the past months.

I believe that we have to continue to apologise to all those passengers who have been affected by the disputes and the disruption. We have heard many Members speak eloquently today about lives that have been disrupted, jobs that have not been a success and people who have been unable to get the treatment they need. We have heard so many examples, and my hon. Friend the Member for Lewes (Maria Caulfield) spoke most eloquently about the impact on her constituency.

It is worth reflecting on why we asked for this report in the first place. The hon. Member for Hove (Peter Kyle) seemed to suggest that I should have sufficient knowledge of these matters to know precisely what was wrong immediately. I think we can all agree that Mr Gibb was a powerful and persuasive performer when he met the all-party parliamentary group on Southern rail, and I brought him in precisely because, in my early days in this role, I wanted to understand what the real issues on the network were. We were having an epidemic of finger-pointing, and I wanted someone with a lifetime’s experience on the railway, in whom everyone on all sides had confidence, to come in and analyse the situation. I think that that is what Mr Gibb has done, and I was surprised to hear some Opposition Members express surprise that he had sought to meet representatives of GTR. I do not think he could have written a proper report without doing so.

It is worth restating the central finding of the report, which is that, were it not for the actions of the unions, passengers would have experienced a much better service. Ultimately then, the quickest and surest path to improvements on Southern is for the unions to refrain from their intransigence. Members on both sides have said that many factors lie behind the poor performance on Southern, and yes, there are lessons for the Department, but one thing is abundantly clear: when the service is not subject to industrial action, performance improves because of the actions that Mr Gibb has recommended.

Peter Kyle Portrait Peter Kyle
- Hansard - - - Excerpts

The Minister is quite right to say that the service has improved over the past six months when industrial action has not been running. However, in the previous two years, service levels were falling without any industrial action taking place. The central finding of the Gibb report is that we need another £1 billion in the next period after this funding agreement. Will the Government provide it?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I will come to that in a moment. The hon. Gentleman has spoken sensibly on this issue, as did the hon. Member for Luton South (Mr Shuker). They both made thoughtful contributions to the debate. I will do my best to answer all the points that have been raised, but I doubt that I will succeed in the eight minutes remaining. I will do my best to write to anyone I miss.

Tim Loughton Portrait Tim Loughton
- Hansard - - - Excerpts

I am grateful to the Minister for taking my intervention. I did not speak earlier because I missed most of the debate. I would just ask him to mention one thing that was not covered. We made a manifesto commitment to customers to establish a railway ombudsman to ensure that the operators are properly penalised when they provide a rubbish service, so that customers do not have to jump through all sorts of hoops to get the compensation to which they are entitled.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am glad that my hon. Friend mentioned that. It was indeed a manifesto commitment, and it is my personal crusade. I am determined to ensure that we bring it in, partly because of what I have seen for myself in dealing with the issues on Southern. I have had meetings today and—as they always say at the Dispatch Box—I will have further meetings in due course. I believe that this proposal is on track, and we hope to deliver it as soon as possible. I am sure that it will be welcomed across the House.

We have talked about some of the wider pressures on the network. The £300 million investment that we announced in January was a specific response to many of Mr Gibb’s recommendations, but I recognise that more will be needed. The hon. Member for Kilmarnock and Loudoun (Alan Brown), who spoke for the Scottish National party, asked about the speed with which it would be spent. We made it clear from day one that it would be spent up to the end of control period 5—that is, until December 2018. That money is being spent at the moment, in addition to the £20 million he referred to. It is, for example, being spent on replacing old tracks, points and signalling. That is not just a matter of replacing bits of old kit; it will result in 15% fewer delay minutes and a more reliable and resilient railway.

There are other examples. My hon. Friend the Member for Croydon South (Chris Philp) showed interest in high output ballast cleaning, and I can happily share with him that that is about replacing the ballast on the track. One might think that it is just a matter of cosmetics—not at all. Not only does it provide a smoother journey, but it reduces the number of temporary speed restrictions that increase perturbation on the network and make it harder to adhere to the timetable. Some £17 million has been spent on vegetation clearance, which may also appear to be a matter of cosmetics, but two of the five most recent incidents in the last control period that caused significant delays were due to trespassing. There is a clear link between vegetation management and the likelihood of trespassing on the railways, and that causes delays on the railways.

My hon. Friend the Member for Wealden (Ms Ghani) mentioned the Uckfield electrification. We are well aware of that project, and we are looking at it closely to ensure that we have the best possible business case. My hon. Friend the Member for Lewes referred to BML2, and I know that the Secretary of State has met with the group and is urging it to carry on its work. Others have mentioned issues at stations. A particular finding about Victoria of Mr Gibb’s is that we need single station leadership, much like that being developed at London Bridge. A problem at stations is when train operating companies and Network Rail are all trying to make different decisions at the same time. We need single station leadership at our major termini.

We also recognise—I recognised it on day two at the Transport Committee—that the number of drivers at the start of the franchise was inadequate. We needed to understand why that was. Some of it was down to unexpected departures—fine—but I wanted to be clear about what procedures the Department had in place to ensure that any franchise handover involved adequate driver numbers. I am delighted that we now have over 322 drivers in training across the GTR network, but it takes 18 months to train a driver adequately with the route knowledge they need to operate safely on the network. I look forward to those drivers being part of the GTR network, reducing the reliance upon overtime and reducing the impact of any ASLEF overtime ban.

As we have heard, performance has been significantly better when we have not been facing industrial action. Back in December, it was as low as 62% on the PPM measure, but it is now at 82.5%. That is positive, but it came about only because so many of Mr Gibb’s recommendations have already been put in place. Many people referred to the benefits of smart ticketing. I constantly urge GTR to do more with its key and keyGo smart cards, and I look forward to that benefiting constituents, particularly those in Lewes, soon.

The hon. Member for Nottingham South (Lilian Greenwood) mentioned the Thameslink programme, and my understanding is that many journeys on the East Midlands Trains franchise will be significantly shorter due to the new Thameslink timetable. That is why Mr Gibb is continuing in his role for the Department and is looking at the Thameslink readiness board, ensuring that all the different actors work together in that complex interaction, which will deliver a significant enhancement to the railway. I look forward to sharing more information with the hon. Lady. Mr Gibb’s willingness to chair the Thameslink readiness board is a sign that an approach to rail where we use expert knowledge and bring it to the table ensures that both Network Rail—many Opposition Members seem to forget that it is publicly owned—and train operating companies point in the same direction and have aligned incentives. She also briefly talked about level crossings, which I take seriously. We must ensure that the Law Commission proposal does what it seeks to achieve, but we also want to address safety around level crossings more widely—not just how we close them more quickly.

We will continue to do all that we can to try to bring an end to the dispute. We have no magic wand, but some evidence that a resolution can be reached is that ASLEF and GTR met for 32 days and managed to reach agreement on two occasions. That proves that things can be done without a Minister having to sit in the room. They are actually grown-ups, and they can reach agreement.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am afraid that I have already given way.

In conclusion, a lot has gone on already, but there will be a lot more to do. There is far more to do to ensure that all passengers get the timely, punctual and reliable service that they deserve on this railway. My Department will work hard to ensure that that happens. I thank everyone for their participation today.

Question put and agreed to.

Resolved,

That this House has considered the Chris Gibb Report: Improvements to Southern Railway.