3. What assessment his Department has made of level crossing safety in Bassetlaw constituency.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

Network Rail assesses the risks at the 6,200 level crossings on main lines, with oversight provided by the regulator. The UK already has the best level crossing safety record in the EU, but Network Rail—supported by this Government, with dedicated funding—is working to reduce that risk still further.

Lord Mann Portrait John Mann
- Hansard - - - Excerpts

What a load of waffle. After the Beech Hill tragedy in Bassetlaw in 2012, Network Rail said it would get rid of all eight level crossings on the east coast mainline in Bassetlaw. It has had a public consultation on the schemes, but what has happened in recent months? The money has been pulled. Will the Minister and the Chancellor meet Network Rail, to ensure that the money is put back in? It is good for business, good for the economy, good for safety and good for the people of Bassetlaw.

Claire Perry Portrait Claire Perry
- Hansard - -

The tragic accident that resulted in the loss of life of Emma Lifsey happened in the hon. Gentleman’s constituency. Anyone who has read about it will know that it was a dreadful tragedy. After that incident, the rail accident investigation branch made four recommendations that meant that such an accident could never happen again. I have been told they have been implemented across the network, but I want to follow up on that and make sure.

The hon. Gentleman refers to the plan to close the 73 crossings on the east coast mainline. That work has been progressed, but we cannot just shut off communities that rely on some of those contacts.

Lord Mann Portrait John Mann
- Hansard - - - Excerpts

indicated dissent.

Claire Perry Portrait Claire Perry
- Hansard - -

The hon. Gentleman shakes his head. He should do my job and listen to people campaigning to keep level crossings open. The work will happen. It is absolutely right to focus on it and we will continue to fund it. There is no shortage of money for it—£109 million will be spent on making level crossings safer.

David Mowat Portrait David Mowat (Warrington South) (Con)
- Hansard - - - Excerpts

4. What progress the Government have made on finalising the route for phase two High Speed 2.

--- Later in debate ---
Kevin Foster Portrait Kevin Foster (Torbay) (Con)
- Hansard - - - Excerpts

13. What progress his Department has made on upgrading and enhancing the railway in the south-west.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

We are making significant progress in upgrading and enhancing the railway in the south-west by investing in track and stations, upgrading and delivering new trains to carry more people on faster journeys, and, as we heard earlier, improving resilience to ensure that the region can stay connected.

Kevin Foster Portrait Kevin Foster
- Hansard - - - Excerpts

The Devon and Cornwall peninsula rail task force recently published its interim report on a 20-year plan for Devon and Cornwall’s railways. Can the Minister confirm that the Government’s primary aim is to secure the resilience of the Great Western main line through south Devon, and that any other options that are considered will be additional measures, not alternatives?

Claire Perry Portrait Claire Perry
- Hansard - -

I have the report here, I have read it, and I am happy to confirm that the other options would indeed be alternatives, not replacements.

Ben Bradshaw Portrait Mr Ben Bradshaw (Exeter) (Lab)
- Hansard - - - Excerpts

What impact will the delay and cost overruns affecting the electrification of the Great Western main line have on the investment that the Minister has just mentioned?

Claire Perry Portrait Claire Perry
- Hansard - -

I am so sorry, Mr Speaker. May I ask the right hon. Gentleman to repeat his question?

Ben Bradshaw Portrait Mr Bradshaw
- Hansard - - - Excerpts

The Minister should actually listen to questions, rather than talking to her colleague. My question was this: what will be the impact of the cost overruns and delays affecting the electrification of the Great Western main line—from which we in the south-west are not benefiting beyond Bristol—on the investment that the Minister has just trumpeted?

Claire Perry Portrait Claire Perry
- Hansard - -

I apologise, Mr Speaker. I misspoke in my previous answer, and I was reassuring myself about that. I want to make it clear, if I may, that the new routes will be additional, not alternatives, to the main line.

The right hon. Gentleman knows that an enormous amount of investment is taking place in the south-west: investment in resilience, and in the new, faster AT300 trains. I wish he would get behind the Government’s attempts to connect this vital region, rather than keeping on shouting about things.

Iain Stewart Portrait Iain Stewart (Milton Keynes South) (Con)
- Hansard - - - Excerpts

15. What progress his Department has made on re-opening the east-west rail line.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I will try to get it right this time, Mr Speaker.

I am sure my hon. Friend will be delighted to know that the first section of the east-west rail line was opened on Monday. It will allow people to travel from Oxford Parkway to London Marylebone, and will give them alternative opportunities when they make that vital journey.

Iain Stewart Portrait Iain Stewart
- Hansard - - - Excerpts

I welcome the new Chiltern service, which will run along the first stage of the east-west line. There is a strong business case for that service, as there is for the project as a whole. Will my hon. Friend do everything she can to ensure that the Hendy review does not delay East West Rail as a whole?

Claire Perry Portrait Claire Perry
- Hansard - -

I most certainly will, and we shall know more in a few weeks’ time. I pay tribute to my hon. Friend, and to other Members whose constituencies are along the route: they have left us in no doubt about the importance of the east-west rail link.

Clive Betts Portrait Mr Clive Betts (Sheffield South East) (Lab)
- Hansard - - - Excerpts

T1. If he will make a statement on his departmental responsibilities.

--- Later in debate ---
Robin Walker Portrait Mr Robin Walker (Worcester) (Con)
- Hansard - - - Excerpts

The Secretary of State mentioned the great success of the Norwich in 90 campaign by my hon. Friend the Member for Norwich North (Chloe Smith). As he will know, Worcester is just six miles further from London than Norwich is, as the crow flies, and 15 miles further away by car, yet it regularly takes my constituents more than 150 minutes to reach the capital by train. Will he do everything he can to lean on Great Western and Network Rail to get our service down to under two hours on a regular basis?

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

My hon. Friend and other Members—including the one my officials like to call “the MP for Witney”—have campaigned extremely hard on this very issue. There is a lot of work being done on finding ways to improve journey times, but my hon. Friend is absolutely right to suggest there is a lot to be done. We have started the work on delivery.

Jeff Smith Portrait Jeff Smith (Manchester, Withington) (Lab)
- Hansard - - - Excerpts

T3. Rail commuter routes into Manchester are soon to lose trains to London Midland, raising memories of the TransPennine Express rolling stock debacle, which cost taxpayers £20 million and led to some services being downgraded. The Secretary of State had the opportunity to prevent the loss of TransPennine trains, but he chose not to use it. Did he have a similar option in the latest case? Is not this yet another example of fragmented railways letting passengers down?

Julian Sturdy Portrait Julian Sturdy (York Outer) (Con)
- Hansard - - - Excerpts

Will the Minister give me an assurance that the new stations fund will be accessible to applications from all councils? As she knows, the proposal for a new station at Haxby in my constituency has one of the strongest business cases anywhere in the north of England, and my constituents would benefit hugely from such a station.

Claire Perry Portrait Claire Perry
- Hansard - -

I would be delighted to review that matter with my hon. Friend. The new stations fund announced in the Budget is of course open to all applicants.

Lord Mann Portrait John Mann (Bassetlaw) (Lab)
- Hansard - - - Excerpts

T4. The Sheffield city region, now strengthened by Derbyshire Dales, is a real hub for manufacturing in the rail industry. Does the Secretary of State agree that this presents a real opportunity for forward planning to get the manufacturing companies together to prepare bids for HS2?

--- Later in debate ---
Martin Vickers Portrait Martin Vickers (Cleethorpes) (Con)
- Hansard - - - Excerpts

In recent weeks, passengers on the Cleethorpes to Manchester rail services have had to put up with regular cancellations due to driver shortage. Passengers do not care whether that is the company’s problem or ASLEF’s. Will the Rail Minister use her good offices to sort the matter out, please?

Claire Perry Portrait Claire Perry
- Hansard - -

I would be delighted to do so, or to try to do so. This is why the new invitations to tender and franchises have customer service and passenger experience right at their heart.

Rail Services: Portsmouth and the South-West

Claire Perry Excerpts
Wednesday 21st October 2015

(9 years, 1 month ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

It is, as always, a pleasure to be part of a debate that you are chairing, Sir Roger. I extend thanks to my hon. Friend the Member for Portsmouth South (Mrs Drummond). I will go on to give a detailed response to her questions, but first I want to welcome the hon. Member for Stalybridge and Hyde (Jonathan Reynolds), who I believe is my newly confirmed shadow, to his position. I will not try to answer most of his questions today; I would rather focus on the subject of the debate. I would be delighted if he called an Opposition day debate on the railways. I would be delighted to have a conversation over the Dispatch Box about the Labour Government electrifying less than 10 miles of track in 13 years. We will do many times more than that in this Parliament. Indeed, the Labour Government had the chance to get rid of the Pacers that so upset his constituents in 2003 and 2004 and chose not to. It is this Government who will take the railways forward. I would be delighted to have that conversation with him in more detail on a more generic level.

This was a fantastic debate. These debates are often hard to listen to and respond to because they are full of superb facts. Before getting on to the meat of the conversation that my hon. Friend started, I want to talk about some of the other questions that were raised. My hon. Friend the Member for Havant (Mr Mak) highlighted extremely well the fact that this is about not just London-based connectivity, but east-west connectivity. In fact, regional rail now has the highest growth rates across the rail network. People are increasingly choosing to use rail for short journeys as well as long ones, and I think that it is incredibly important that that is recognised in future investment planning.

I have already had many good conversations with my hon. Friend the Member for North East Hampshire (Mr Jayawardena) on this subject. He likes to analyse the economics of the railways, which is always very welcome. I was pleased that he recognised that a lot of investment is going into these services. Indeed, the works at Waterloo, costing more than £350 million, are designed to alleviate capacity problems. That, plus the new rolling stock commitment that will apply to some of the lines in the South West franchise area, is designed to deal with growth up until the mid-2020s and is a necessary precursor to additional work that needs to happen to lift capacity further on the Portsmouth line. My hon. Friend also talked about the importance of wi-fi on trains—a personal commitment and interest of mine. I can assure him that the Government are committed to introducing free wi-fi on all classes by 2018, either through the franchising process or through in-franchise changes. It is extremely important, particularly on longer distance journeys.

My hon. Friend the Member for Isle of Wight (Mr Turner) once again made very telling points. I am happy to confirm again my commitment and the Government’s commitment to finding a long-term sustainable solution for Island Line and to pay tribute to Mr Garnett, who has worked so hard on this. I am also happy to ask ATOC to look at the issue of ticketing and joining-up of timetabling. There may be some technical issue, but I am happy to ensure that we explore that further. I also pay tribute to my hon. Friend for all the work that he has done for a line that is lovely to look at, but perhaps is not delivering some of the benefits that could be delivered. I urge Isle of Wight Council to continue its good work on that process.

My right hon. Friend the Member for Basingstoke (Mrs Miller) spoke very eloquently, as always, about the importance of dealing with crowding, particularly in fast growing areas. She raised the issue of trains during the peak shoulders. The challenge with that is that if we buy lots of trains to run into London during the peak, they are in London, not in Basingstoke, when we want them to be full of people—

Roger Gale Portrait Sir Roger Gale (in the Chair)
- Hansard - - - Excerpts

Order. I am sorry to interrupt the hon. Lady, but the microphones in this Chamber are rather more directional than those in the main Chamber. The hon. Lady is off the microphone, which is making things difficult for those responsible for the sound.

Claire Perry Portrait Claire Perry
- Hansard - -

I apologise. Do you want me to shout more loudly, Sir Roger? I shall speak with passion.

Roger Gale Portrait Sir Roger Gale (in the Chair)
- Hansard - - - Excerpts

It might be helpful if the hon. Lady were to address the microphone.

Claire Perry Portrait Claire Perry
- Hansard - -

I am so sorry. I was trying to address Members, but you are quite right, Sir Roger.

This is an important point about how we maximise the capacity of the existing rolling stock. I thank my right hon. Friend the Member for Basingstoke for raising the points made by my right hon. Friend the Member for Guildford (Anne Milton), who often shares those views with me by text when she is in her favourite seat. I am grateful for the work that my hon. Friend the Member for Portsmouth North (Penny Mordaunt) has done assiduously over the years, focusing on the challenges of the different sorts of rolling stock.

My right hon. Friend the Member for Basingstoke asked me two questions. First, she asked whether I am content with the planning process, and whether I think that it joins up growth projections and challenges sufficiently. My answer is, “partly”. I know that local authorities feed into the Network Rail route study work, but I am unconvinced that we have got things right across government in terms of the economic value added that a well-designed transport network can bring. We are really working to solve that challenge. It is important that we get representations from local Members, local enterprise partnerships and communities so that we can see where that growth comes from.

My right hon. Friend raised the sad challenge of reducing fatalities on the railway. I am happy to confirm that we have the safest railway in Europe, but she is right to say that the number of fatalities is growing, with people often choosing to end their lives on the tracks. There is an enormous amount of work going on with operators, Network Rail and Samaritans to try to reduce that. I want to mention how dreadful that experience can be for the train drivers who witness it. It is a terrible problem, which is a source of enormous delay on the network and of terrible trauma for the victims’ families and the drivers.

Everybody, including me, hates three-plus-two seating. It is awful, and we all know that. The challenge on the lines we are discussing is whether you design for inner-London routes, such as those in the constituency of my hon. Friend the Member for Kingston and Surbiton (James Berry), or for long-distance routes. At the moment, the franchise has been doing its best with the rolling stock to try to design a system that minimises crowding, although I know that it does not always feel like that. It would be possible to remove the seats, as has been done on trains on the Great Western network, but then more people will be unable to sit. It is a conundrum, and I may be able to mention some of the solutions later.

Many hon. Members who are present today have taken me around their constituencies and showed me the trains, and they continue to campaign assiduously for transport improvements. My hon. Friend the Member for Somerton and Frome (David Warburton) managed to include in his speech furred-up arteries, George Eliot and Somerset County Council, which was an impressive achievement. I am happy to ask my officials to work with Somerset County Council on how to get a bid for a new station together. That is absolutely imperative, and we know that it has been done very successfully by Taunton, just down the road. The money for that project came out of a growth fund deal, but it is possible to bid for a new station and doing so would be valuable. I would be happy to see how we might be able to help.

My hon. Friend the Member for Eastleigh (Mims Davies) talked about the importance of the Eastleigh chord, and described well the need to join up transport. We need to think not about road or rail in isolation, but about what is best for the local communities. My hon. Friend the Member for Winchester (Steve Brine) was right to say that the local plan is the way to encapsulate that, and I know that he will urge the local authorities to get on with it.

Steve Brine Portrait Steve Brine
- Hansard - - - Excerpts

We have covered many subjects over the past hour and a half, but we have not talked about the Government’s commitment to smarter ticketing and part-time season tickets, which might have a significant impact by alleviating some overcrowding, although only some. Does the Minister still have her passion for that?

Claire Perry Portrait Claire Perry
- Hansard - -

Yes, and I will race through my final comments and come on to what I think are some of the solutions. My hon. Friend the Member for Kingston and Surbiton pointed out what a balancing act we face, because train usage across the country is rising, and trains that start off empty become crowded. Indeed, I have travelled on some of the top 10 most crowded trains, because I tend to go out and mystery shop them. It is not encouraging to be unable to sit down on the journey into London at 6 o’clock in the morning, work for 12 or 14 hours and then go home. People deserve better.

What are the possible solutions? I will abandon my speech now—when I do so, it always makes my officials incredibly nervous—and talk about what could be done. There is a cascade of things that can be done to increase capacity. We can work on existing lines, and do the sorts of work talked about in the Wessex route Study. Such work is important, and it is being looked at, reviewed and prioritised. We need to ensure that everybody understands the costs and benefits of such work for economic value added, not just for transport users. Such works are always expensive and difficult, because they involve so much disruption.

We can do things such as digital enhancements on the railway. When it comes to the number of train paths, the railways are now full, but if we can use digital technology to reduce the time between trains, we will be able to run more of them. That is a big long-term investment plan for Network Rail. Building new lines is often cheaper than expanding existing lines. We heard a lot of mention of Crossrail 2, a vital project that will help to alleviate congestion—as will Crossrail 1—in the metro and suburban areas.

We can buy new trains. Indeed, many new trains are being delivered to the South West franchise, but what tends to happen is that they are built to satisfy demand at peak times, and they run empty for much of the day. Is that an effective thing to do? Would it be possible to use those trains better? That brings me to the point about part-time season tickets. Providing incentives for people to change their journey patterns and move around outside peak time can be cost-effective and help us to use train capacity better.

Finally, we can, as my hon. Friend the Member for North East Hampshire mentioned, change stopping patterns. It is completely possible to run a very high speed, non-stop train to Portsmouth if it does not stop anywhere else. As we move forward and consider the consultation, we have to ask ourselves that sort of question. What is the right journey pattern for the demand? Is it right to devolve more services to TfL, to deal with some of the inner-London metro demand and outer-London demand, in order to run services that are better fitted for long-distance users?

What are the right solutions? I do not know, and I do not think that we, individually, know. Part of the problem in the industry is that people work in silos when they make decisions, so there will be an operational solution, a solution for passengers and perhaps a political solution. We need to get the right people in the right place to make those decisions, to make sure that the money is there and that organisations can deliver. That is why the Hendy review is so important. We need to take politics out of the process, which is why I so welcome the appointment of Lord Adonis; I think he is a good man to do the long-term infrastructure planning. We need to work together to solve some of the knotty problems. There is a huge amount of financial commitment to the railways, and we are committing to the biggest investment programme since Victorian times, which is a vital part of delivering economic growth. Collectively as Members, working with our local communities, local businesses, my officials, Network Rail and the operators, we can come up with the right solutions.

What do we need to do? First, we need to keep all the information coming in in response to the route study. That will determine the near-term investment plans, which cover the next five to 10 years. Secondly, the consultation on the franchise process will start before Christmas, and it is absolutely vital that we have a real, in-depth analysis of what we want. Is this the right time to start putting in some express services that do not stop between some of the big conurbations, with a consequent possible loss of services in terms of stopping patterns? Can the network collectively work that out? Following that consultation, the invitation to tender will go out before April 2016, and the franchise will start in 2017.

I do not know what the right solution is, and I do not believe that any individual holds it. Collectively, however, working together across the boundaries that have built up in the railway sector between operators, the network and regulators, we can come up with a better solution. The experience of passengers must be put front and centre, because the railway is not about boxes running about on rails. I was told by somebody who has left the industry that if it were not for the passengers, the timetabling would be perfect. I found that both amusing and incredibly offensive, because it suggested that we were talking about somebody’s train set rather than a transport system that millions of people rely on to get to work and to get back home to their families.

My plea to team Hampshire—I am delighted that it has an identity—and also to team Somerset, team Wiltshire, team Stalybridge and Hyde—

Jonathan Reynolds Portrait Jonathan Reynolds
- Hansard - - - Excerpts

Team Isle of Wight.

Claire Perry Portrait Claire Perry
- Hansard - -

And to team Isle of Wight. My plea is that I hope that, by working together, we can come up with a better solution. We want to invest in the railways. They are a vital part of delivering local, regional and national economic growth. We are in an exciting place, because we have finally realised the importance of railway investment in delivering the economic growth that we want for our constituents.

I congratulate my hon. Friend the Member for Portsmouth South once more. With her eloquent and intelligent speech, she auditioned extremely well for my job. I commend her for securing the debate.

Rail Franchising: East Anglia

Claire Perry Excerpts
Thursday 17th September 2015

(9 years, 2 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

Today I have published the invitation to tender (ITT) documents setting out the specification for the next East Anglia rail franchise. This asks bidders to set out detailed proposals on what improvements for passengers they will deliver and how they will build on the East Anglia line should they win the franchise.

Alongside the ITT I have published a stakeholder briefing document which describes what the specification will mean for passengers and how the responses to the public consultation held between December 2014 and March 2015 have been taken into account when my officials developed the ITT.

We know that customers are not satisfied with the current arrangements on this route. The rolling stock is too old and unreliable and there is demand for more, faster services. That is why this ITT has the condition and quality of trains at its very heart. I believe that the minimum standards we have set out today will provide bidders with the opportunity to address these fundamental issues. We expect to see new trains servicing this route but have not specified this because we want to incentivise the bidders to price their options competitively while ensuring that the taxpayer gets maximum value for their investment. We have reformed franchising to place quality of service and passenger experience at the centre of the process. These changes have already led to a step change in performance elsewhere in the country and I expect East Anglia to fully benefit as well.

The region served by the East Anglia franchise is vital to the long-term economic growth of the country. It was clear from the more than 1,300 responses my officials received to the consultation exercise that we need to make sure that the railway does more to support it in the next franchise. The specification I have published today sets out how we will do just that.

A key part of the ITT is that bidders will be required to plan for how they will introduce at least four services (two in each direction) between Norwich and London that have a journey time of 90 minutes or less each weekday; and at least two services between Ipswich and London (one in each direction) that have a journey time of less than 60 minutes. These headline journey times were a key recommendation of the Great Eastern main line taskforce and were highlighted in responses to the consultation. I am therefore delighted that the next franchise will see these services become a reality.

There are a number of other requirements that will mean passengers will see a step change in the franchise. Approximately 180 additional services are specified each week across the franchise, significantly enhancing journey opportunities for passengers. The franchise’s rolling stock too will be significantly improved as a result of this ITT and while we have not been specific about what class of train bidders must use, we have been clear that they should be of a high quality and fit for the railway of the 21st century. That means that all of the trains should include provision for wi-fi and controlled emission toilets, so that waste is not dropped onto the tracks. The specification also acknowledges the calls to reduce crowding on the franchise by establishing challenging targets for bidders to meet in their plans.

Throughout the ITT my officials have taken an output based approach to specification. This means that the private sector bidders for the franchise have the space to innovate and use their experience to develop the best possible solutions for passengers on the franchise.

The three bidders for the franchise—Abellio East Anglia Ltd (a joint venture between Abellio and Stagecoach); First East Anglia Ltd; and National Express East Anglia Trains Ltd—will now have until 17 December 2015 to provide their bids to the Department. These will then be evaluated and I expect to announce my intention to award the contract to the preferred bidder in June 2016, with the new nine-year East Anglia franchise expected to start in October that year.

For too long, East Anglia has not had the high-quality rail services that it deserves. The specification that I have published today will reverse this situation. I now look forward to the bidders stepping up to this challenge and providing plans that will provide a transformation on the East Anglia franchise for passengers and taxpayers.

[HCWS210]

Midland Main Line (Electrification)

Claire Perry Excerpts
Wednesday 16th September 2015

(9 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Richard Burden Portrait Richard Burden (Birmingham, Northfield) (Lab)
- Hansard - - - Excerpts

It is always a pleasure to serve under your chairmanship, Sir Roger. I always seem to do so in debates about infrastructure, and today is no exception. I congratulate my hon. Friend the Member for Sheffield, Brightside and Hillsborough (Harry Harpham) on securing this important and timely debate, which is his first in Westminster Hall. He introduced the subject skilfully and his arguments had great force. He has been a constant champion of public transport for many years, both on Sheffield City Council and since his election to this place.

It is four months or so since the publication of the Conservative party’s general election manifesto. Let us remind ourselves of what it said:

“We will back business by…electrifying the Midland Main Line from St Pancras to Sheffield”.

That is all very good. A decision to support electrification was made some three years ago, which was welcomed by passengers, local authorities and hon. Members of all parties. The midland main line has been the Cinderella of Britain’s main lines. As hon. Members have mentioned, the campaign to electrify the route goes back to the ’70s and ’80s, when British Rail said that doing so was “a first priority”, until the Conservative Government of the day withdrew their support. There is a distinct sense of history repeating itself. Nobody can fail to appreciate the strength of feeling that still exists on the issue in all parts of the House and all parties, and I am sure that passengers up and down the route will welcome the contributions of hon. Members on both sides of the Chamber.

The case for electrifying the midland main line is compelling. A Network Rail assessment in 2009 found that the project’s benefit-cost ratio was “technically infinite”, as my hon. Friend the Member for Sheffield Central (Paul Blomfield) has said. More recent figures published by the Department show that the benefit-cost ratio of the project is superior to those of other major projects that are proceeding. Network Rail has said that the project is

“critical to delivering a reliable and sustainable railway and tackling overcrowding.”

In 2012, the Government talked about an “electric spine” that would convey passengers and freight from Southampton to Sheffield, which was, again, described as a first priority in terms of rail investment.

Rail investment in the north of England, including Yorkshire, falls notoriously short compared with the funding made available to other regions. According to the Department’s own figures, rail investment per head is lower in the east midlands than in any other English region. That point has been emphasised by hon. Members from the region; I am sure that the Minister will agree that they have been giving her “aggro” about that, to quote the hon. Member for Newark (Robert Jenrick). The electrification of the midland main line would have gone some way towards addressing the inequalities.

Electrification is not the only problem, however. Some of the trains on the route date back to the 1970s. Although they have performed admirably over the years, they must be withdrawn or upgraded at significant cost by 2020 to comply with the Disability Discrimination Acts, as my hon. Friend the Member for Sheffield South East (Mr Betts) has pointed out. The clear aspiration was that the rolling stock would be replaced by superior electric trains, but that, too, has been thrown into doubt.

I will return to electrification in a moment, but it is important to set out that the upgrade package also contained significant speed improvements. Indeed, when the Secretary of State announced his decision to “pause” the electrification programme, he said:

“We will press on with the rebuilding to speed up and straighten the track at Market Harborough, and with the rebuilding of the Derby track layout. That will mean faster services soon, and it will enable us to make the most of the electrification and new trains that will result from future franchises.”—[Official Report, 25 June 2015; Vol. 597, c. 1073.]

That point has been made by several hon. Members. The problem is that as far as we can tell, there is still a £9 million funding gap for the Market Harborough project, and there has been no clarity from the Department about whether and how that gap will be filled. Worse still, there are worrying rumours and reports—most recently in Construction News—that the Hendy review has concluded that only a fraction of Network Rail’s control period 5 schemes are affordable. That throws into further doubt some of the things that the Government have been saying, so I hope that the Minister can provide some clarity today. It has been reported in The Sunday Times and Passenger Transport that on top of escalating costs, Network Rail’s budget may be cut further in the comprehensive spending review, threatening not only improvement projects, but essential maintenance.

That is a world away from what we were told in April, when the Chancellor said:

“Spending review will set out improvements to rail travel in East Mids including electrifying Midland Main Line from Bedford to Sheffield”.

Let us not pretend that that has nothing to do with the choices that the Government have made, and nothing to do with the fact that different choices are announced before and after an election when marginal seats are at stake. Ministers have adopted a policy of implausible deniability on the matter, but let us recap some of the facts. We first raised concerns about cost overruns on the great western main line in in May 2014, just weeks into the new investment period. Last October, the then shadow Secretary of State, my hon. Friend the Member for Wakefield (Mary Creagh), asked the Transport Secretary to say

“which electrification projects will be delayed or cancelled”—[Official Report, 23 October 2014; Vol. 586, c. 1030.]

as a consequence of cost overruns. The Secretary of State was apparently so concerned about those matters that he ordered an “urgent” review of Network Rail’s projects, which he received in September. He has refused to publish it, so we can only speculate on its contents. The Transport Committee warned in January:

“We are concerned that key rail enhancement projects…have been announced by Ministers without Network Rail having a clear estimate of what the projects will cost, leading to uncertainty about whether the projects will be delivered on time, or at all.”

The Committee stated:

“Electrification of lines in the North West, the North trans-Pennine line, and the Midland Main Line, should not be put at risk due to the projected overspend on the Great Western Main Line.”

Crucially, we now know, thanks to documents obtained by Labour under the Freedom of Information Act, that in March, Network Rail’s board agreed to

“decisions required jointly with the DfT re enhancement deferrals from June”.

Unnamed sources in the Department initially denied to the BBC that there was any knowledge of these discussions before the election. However, Network Rail’s chief executive subsequently confirmed:

“In mid-March 2015, Network Rail informed DfT that decisions may need to be made in the coming months about the deferral of certain schemes.”

Are we now asked to believe that Ministers really had no knowledge? I have previously described the midland main line as something of a Cinderella route, and to believe what the Government have been saying about the route is a bit like believing in fairy stories, which always seem to end with a silver carriage turning into a pumpkin.

Voters heard promises to deliver the electrification of the midland main line in the best of faith. The only people who did not know that the investment programme was collapsing, apparently, were Ministers in the Department for Transport. Will the Minister address that today? It is a straightforward question, but her Department has refused to answer it until now. When Network Rail told the Department in March that decisions may be required on the deferral of major rail projects, were Ministers in the Department informed?

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I am happy to put to rest once and for all the conspiracy theory that the hon. Gentleman knows better than to perpetrate. My boss, the Secretary of State for Transport, has stated unequivocally on multiple occasions that the first time he received advice that either of these projects should be paused was on 15 June 2015.

--- Later in debate ---
Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

It is always a pleasure to serve under your chairmanship, Sir Roger. I have many questions to answer, and I will do my best to answer them. If I do not answer Members’ questions, I will be extremely happy to write with any specifics.

I will start by restoring what I agree with my hon. Friend the Member for Wellingborough (Mr Bone) was an important, factual and consensual debate that raised some extremely important questions about this vital infrastructure. I congratulate the hon. Member for Sheffield, Brightside and Hillsborough (Harry Harpham) on securing this debate, and I am delighted that it is his first debate—I still remember mine. He has big shoes and four paws to fill, and I hope he will personally pass my best wishes to his predecessor, with whom I worked and for whom I have the greatest respect.

It is great to see such a strong cross-party turnout for, and to hear such excellent contributions to, today’s important debate. I will address a couple of issues that came up. The first is the importance of investment in railways to drive economic growth on a local, regional and national basis, as the hon. Gentleman said in his opening speech.

I am delighted—I suspect this has something to do with some of his jobs in a former life—with the hon. Gentleman’s reference to freight, which is often not considered when we talk about improvements to the railways and which is vital to the economic prosperity of such regions that export and manufacture. Indeed, I have visited several upgrade projects across the region, such as the Great Northern Great Eastern line, that have been specifically designed and delivered to improve freight paths for manufacturers in the region. Investment in transport across the UK is vital if the economy is to grow. I am happy to give what should be not a cast-iron guarantee but a stainless-steel guarantee that £38 billion of investment will be spent on British railways over the next few years, which is the biggest spend in generations—since Brunel’s time.

My hon. Friend the Member for Wellingborough asked how many miles of track the last Labour Government electrified in 13 years, and the answer is nine. The shadow Minister, with whom I work frequently, is embarrassed to talk about that because we have finally woken up, on a cross-party basis, to the vital role of rail infrastructure investment in driving economic growth and better journeys for people using the railway.

I am happy to confirm that £38 billion is being spent. Successive Governments have not spent the right amount or invested enough in the railways. If we roll back the clock more than 10 years to 2003-04, when the last deals for the northern and TransPennine Express franchises were being negotiated, was there any conversation about replacing the clapped-out Pacers? There was none. The TPE and northern routes, which provide some services to the constituency of the hon. Member for Sheffield, Brightside and Hillsborough, will transform passenger services in the north of England. It cannot come too soon.

I will quickly cover a couple of other things. The first is the Sheffield city region, of which the hon. Gentleman is a great supporter. The city is working across parties, across business and across political boundaries, and it is working closely with Transport for the North, an organisation that my Government have funded to the tune of £30 million and is designed to pull such decisions about the right form of transport investment as close as possible to the region’s people and wealth creators. It is not enough for officials at Network Rail or in my Department to sit and plan what improvements should take place; those improvements have to deliver the maximum benefit for people and businesses using the railways.

Sheffield has been a strong supporter of the proposals to enhance east-west connectivity and to maximise the potential and benefit of High Speed 2, and I am delighted that we still have cross-party consensus on the importance of the HS2 route, despite the voting record of the new Leader of the Opposition—that is a cheap shot, but I could not resist. I am delighted that the Labour party is completely committed to going ahead with HS2.

The deal for Sheffield gives more control over local transport schemes. It enables Sheffield to work directly with Network Rail to support the delivery of the Sheffield to Rotherham tram-train project, and it improves the vital co-ordination between Sheffield, Network Rail and Highways England to ensure that investment is pulled through by local economic priorities. I thank Members who have championed the Sheffield devolution deal.

My second point is on the TPE and northern franchises. I will not be drawn on several things, including the debate on where “the north” starts and the prediction of football results, although I am disappointed that there was no mention of the Leicester Foxes, of whom I have been a lifelong supporter. But I can assure Members that the current franchise negotiations for the northern and TPE routes will be transformational for passengers in the north.

Train capacity into major cities will increase by 30%. There will be brand-new trains, not the Pacers and not reworked tube rolling stock. Existing trains will be fully modernised. There will be £30 million of northern station investment funds. I could go on. The franchise negotiations will transform travel in the north and change passenger experiences from among the worst to some of the best in the country.

As I have been asked many questions about the midland main line, I want to discuss it in detail. I emphasise that a pause is a pause. For me—I think my hon. Friend the Member for Mid Derbyshire (Pauline Latham) said this—when an organisation such as Network Rail has been given an unprecedented burden, because it has never been asked to do this much investment in the railway before, and there is evidence that some of the work is starting to go wrong and that promises will not be delivered on, one can either carry on and then not deliver or say, “We must get this right.”

We have to deliver these improvements. We understand the economic case for delivering them. We have to find someone, who in this case was Sir Peter Hendy—a railway man to his fingertips—who can take the organisation to a point where it can offer cast-iron guarantees about delivery dates. Network Rail is tasked with delivering the improvements. We are relying on Hendy and his team to come back and set out exactly what that delivery programme looks like. He will shortly deliver a plan that will outline the delivery of the upgrades and set out specific clarity around the electrification projects.

Many hon. Members have asked me what all this means for projects that are already happening. If one travels from Corby to Kettering, one can see that the four-track work is going ahead. It is being delivered and tens of millions of pounds are being spent on the track-doubling project. We are removing the long-standing bottleneck at Derby station to speed up both Midland Mainline and CrossCountry services. We are improving the line speed south of Leicester station, between Derby and Chesterfield and at Market Harborough. Station-lengthening work is going on right across the network to enable longer trains to run, and we are adding capacity between Bedford and Kettering.

I want to mention freight, because the hon. Member for Sheffield, Brightside and Hillsborough shares my interest in it. The promised freight gauge clearance schemes, which are vital to allow more freight on these lines, are going ahead, so additional freight services will be run.

Paul Blomfield Portrait Paul Blomfield
- Hansard - - - Excerpts

Before the Minister moves on—I appreciate that she is trying to answer all the questions —I want to be absolutely clear on Market Harborough, which she mentioned in passing and skipped over. Is it guaranteed that the full funding—the money topped up from that provided through the local growth fund and identified by Network Rail—will be available for the full necessary works at Market Harborough?

Claire Perry Portrait Claire Perry
- Hansard - -

The hon. Gentleman refers to the £9 million shortfall. I need to investigate that further and will write to him. I believe that efforts are being made by several organisations to fill that important funding gap.

The hon. Gentleman has prompted me to answer his important rolling stock question regarding electrification and the cascade, on which he is absolutely right to focus. It will be the case that when preparation work starts for the new franchise, which will be let in 2018, all the questions around rolling stock specification and the requirement for new trains will be put into it. When we invited tenders for the TPE franchise, we gave bidders an option and set out what we knew about improvement works.

By the way, there is this idea that we are somehow not investing in the north, but has the hon. Member for Birmingham, Northfield (Richard Burden) travelled on the new electric trains that run between Manchester and Liverpool and Liverpool and Wigan? Electrification has come to that part of the UK for the first time. I hope that he will join me in celebrating the fact that those cities now have new electric trains, which were delivered by this Government, as promised. We are 100% committed to ensuring that the £38 billion unprecedented investment in the railways happens right across the UK, not including HS2, which, as my hon. Friends pointed out, is vital to speed up journey times to and from the north and to pull wealth out of the south-east. We will also continue—[Interruption.] Did the hon. Gentleman want to celebrate and welcome that electrification?

Richard Burden Portrait Richard Burden
- Hansard - - - Excerpts

There have been reports—I mentioned the one in Construction News—that say that the Hendy review has already concluded that only a fraction of the control period 5 projects are financially sustainable. Does the Minister have those reports as well? If so, how does she square them with what she has just said?

--- Later in debate ---
Claire Perry Portrait Claire Perry
- Hansard - -

If I had heeded all the reports, I would have been letting the East Coast franchise to a French company instead of a fine Scottish and English company that is delivering unprecedented improvements for passengers on the east coast main line. I want to see the facts. I do not want to speculate, which can damage business confidence. We must be absolutely clear about what has been delivered, and I will wait for Peter Hendy’s report and my Department’s response. I am always happy to work on a cross-party basis with Members who pay so much attention to these vital improvements. As we go forward with the investment programme, that will help us to understand where the most important connections need to be made.

I want to mention today’s franchise announcement, about which I have already spoken in public. Although this direct award has less than two and a half years to run, we have negotiated some pretty significant improvements for passengers. I hope that hon. Members will agree that East Midlands Trains is a good operator. Its punctuality record is good. It has won multiple awards and ranks pretty highly in terms of passenger satisfaction, so we have allowed it to continue operating the service. From today, there will be 22 extra services between Nottingham and Newark Castle. As my hon. Friend the Member for Newark (Robert Jenrick) mentioned, 24 new services were already delivered earlier this year. Timetable improvements will mean faster journey times and more services between Lincoln and Nottingham. Crucially, there will also be a pause—a freeze—on fares, so anytime fares on the route will not go up at all in the next two years. That is a company commitment.

Tom Pursglove Portrait Tom Pursglove
- Hansard - - - Excerpts

In light of what the Minister has just said, has consideration been given to increasing the number of services, both northbound and southbound, from Corby? There is currently a real appetite for that, and it would be welcome for the reasons of growth that I suggested earlier.

Claire Perry Portrait Claire Perry
- Hansard - -

I thank my hon. Friend for pointing out the crucial link between a growing local economy and transport. I encourage him, and all Members here, to submit such proposals to the franchising consultation and planning process, which will be starting in the next few months. It is vital that we get these important routes right.

The freeze on fares—we will be paying the same in 2017 as we do now—is in addition to the Government’s cap on any rail fare increase above inflation for the next five years, which is a substantial commitment to ensuring that rail fares are appropriately priced for the travelling public. In addition, 15 more automatic ticket machines are being installed, along with better accessibility information and better customer information. There is an improved compensation scheme to ensure that if there are delays, such as those earlier this week mentioned by my hon. Friend the Member for Mid Derbyshire, passengers can quickly and easily get the compensation to which they are entitled in cash or bank transfer, not railway vouchers. We made that change earlier this year. Improved wi-fi across the service has already been delivered to ensure that people can work effectively on the train.

I talked about some of the schemes that are going ahead. They are tangible and can be seen as one travels along the line. I have discussed today’s announcement, which will deliver some substantial improvements for passengers, despite the direct award only having a short time to run. I reassure Members across the House about the seriousness and determination with which the Government and my Department take the improvements. We have to deliver on what we promise. That is the purpose of the Hendy re-plan, which means that we will have a deliverable and affordable set of improvements. I invite all Members to work together to develop the proposals as we go into the new franchise. When we get the Hendy re-plan and confirmation of the work, I ask Members to work with me and constituents to ensure that people are fully aware of what is going on.

In conclusion, I never interpret enthusiastic, honest and fact-filled debates and submissions from hon. Members or broader groups as “aggro”. I am happy to keep working and to be as open, honest and transparent as I can. I thank hon. Members and people right across the country for realising that a rail renaissance is taking place in Britain. It is vital that we get it right and that we deliver right across this great country.

Question put and agreed to.

Resolved,

That this House has considered electrification of the Midland Main Line.

Rail Franchise: East Midlands

Claire Perry Excerpts
Wednesday 16th September 2015

(9 years, 2 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I am pleased to inform the House that my Department has reached agreement with Stagecoach to continue to operate train services on the East Midlands franchise. This new agreement means that passengers from London St Pancras International to Northamptonshire, the East Midlands, Lincolnshire, Staffordshire and South Yorkshire will continue to be served by East Midlands Trains for a period of two years and five months from 18 October 2015, with an optional extension period of 13 railway periods callable at my sole discretion.

East Midlands Trains have had a good track record of punctuality and passenger satisfaction since they began operating the franchise in 2007 and I expect this service to be the minimum provided throughout the period of this direct award.

In addition to retaining at least the same train services as today, this new agreement will see East Midlands Trains provide 22 additional trains between Newark and Nottingham, which will ensure that there is a half hourly service on Saturdays as well as week days. There are also further improvements to the Nottingham to Lincoln timetable that will provide for reduced journey times and more services on Saturdays. My Department is continuing to work with East Midlands Trains to examine further improvements to the weekend timetables for many passengers.

The agreement will also see a number of significant enhancements for passengers as a result of £13 million investment in the franchise. This will provide for improved passenger information; more ticket machines; a new mobile app that will provide up to the minute information as well as allowing tickets to be purchased; cleaner trains; and an extended catering service. Passengers to and from London will also benefit from improved wi-fi up to 4G standard.

This agreement not only provides benefits for passengers today but also ensures that this franchise is in the best position for the full franchise competition in 2018. By laying the groundwork for this now and in conjunction with the significant upgrade works already delivered, such as the transport hub in Nottingham, and those planned and underway for the railway in the area, such as the track doubling between Kettering and Corby, I am confident that we will see the East Midlands franchise continue to provide excellent service for passengers at good value for the taxpayer for many years to come.

[HCWS196]

Shoreham Air Show Crash

Claire Perry Excerpts
Tuesday 15th September 2015

(9 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I thank my hon. Friend the Member for East Worthing and Shoreham (Tim Loughton) for his deeply moving and very thoughtful speech, and I congratulate him on securing this debate. I also thank my hon. Friend the Member for Aldershot (Sir Gerald Howarth) for contributing his knowledge of this subject, which is clearly profound.

On Saturday 22 August, 11 people were killed when a Hawker Hunter aircraft taking part in the Shoreham air show crashed into the A27. Those people were going about their daily business: one was working as a chauffeur on his way to pick up a bride on her wedding day; another was taking photographs of the air show from the verge; and others were travelling entirely separately from the air show to have fun, to see friends and to play sport. Tragically, none of those people completed their journey. As my hon. Friend the Member for East Worthing and Shoreham has said, this awful accident resulted in the first loss of life on the ground at an air show since 1952 and the largest single loss of civilian life since the incidents of 7/7. It is a true tragedy.

This debate allows me to put on record my condolences, and indeed the condolences of the Prime Minister and the Secretary of State for Transport, to all those affected, especially the families who have lost loved ones. I also offer my profound thanks to the emergency services, which, as we have heard so eloquently described, responded with professionalism and effectiveness in the face of what must have been a harrowing task—the first responders, the police officers and the fire service personnel. We have heard how those people were supported by members of the local community, both on that tragic day and since. I have asked the question and am pleased to know that counselling and support is available for members of the emergency services who need it. Emergency service personnel and West Sussex County Council are working to provide post-traumatic counselling for those affected by the crash.

I express my admiration for my hon. Friend, who worked tirelessly on what must have been an extremely difficult day, and over the difficult weeks since, to help the local community come together, to further the investigation and to ask tough questions to ensure that this does not happen again. I understand that he is involved in discussions with the community about an appropriate service of memorial. This is a deeply personal and local matter, but the Government stand by willing to help and support in any way we can.

It might be helpful if I set out exactly what is happening with the investigation timetable, and hopefully I will answer my hon. Friend’s questions during that process. As he knows, the air accidents investigation branch is in the careful and forensic process of investigating the causes of this accident, and it is working to ensure that such an accident cannot happen again. There has been a preliminary report on the circumstances of the crash, and he will have seen some of that information. The weather was good and the aircraft met its pre-flight checks. The aircraft was conducting a high-energy manoeuvre with both a vertical and a rolling component and, following the subsequent descent, it did not achieve level flight before striking the westbound carriageway of the A27, with tragic consequences. It was truly chilling to hear how it could have been so much worse if the timings had been different by even a split second.

I cannot speculate on the causes of the crash beyond what was stated in the preliminary report, and I do not want to pre-judge the outcome of the AAIB’s investigation, but I reassure hon. Members that action is already being taken to ensure that we learn from this tragedy and prevent it from being repeated. Three things are happening.

First, the Civil Aviation Authority, which is responsible for regulating the safety of air displays, has acted promptly. It grounded all Hawker Hunter aircraft immediately and indefinitely on Saturday 22 August and has limited flying displays over land by vintage jet aircraft to fly-pasts. High-energy aerobatics, as my hon. Friend the Member for Aldershot said, have been banned.

Secondly, following the accident, the CAA is conducting additional risk assessments of all future air displays and has already introduced additional precautionary measures at some locations, resulting in changes to the displays flown. Given that this weekend is the 70th anniversary of the battle of Britain, a number of shows are being planned. Duxford air base, which many hon. Members will know, has already made changes to its display to offer more protection for the surrounding infrastructure and area.

I am sure that my hon. Friend will join me in welcoming such a thorough and comprehensive immediate response to the incident. It is clearly appropriate. As he said, it is not the time for knee-jerk reactions. As he also said, air shows are a proud tradition in the UK, with many local events providing a centre point for the community. What made the Shoreham accident all the more tragic and poignant is that so many local families were involved, attending what had become a much-loved local event. It illustrates the need to ensure that we mitigate any future safety risks proportionately. We do not want to be heavy-handed, potentially ending the much-loved tradition of local air shows, which support local economies and charities, and more significant national displays that support our proud national aviation industry.

As my hon. Friend knows, to ensure the most appropriate long-term safety solution, the CAA has commenced a full review of civil air display safety standards. Although this is not an exhaustive list, it will consider: the range of permitted manoeuvres for aircraft, particularly high-performance or vintage jet aircraft; the content of the air display; the location and characteristics of the air display venue, taking particular account of the surrounding land and infrastructure. The review will conclude by the beginning of next year, but an interim report will be produced next month. The CAA has appointed an external challenge panel to test the report’s findings. The panel will be led by Geoffrey Podger, a gentleman with extensive experience of internal and external communication and risk-based regulation policy and enforcement.

The CAA has also committed to acting immediately as necessary on any new information that emerges from the current AAIB investigation. The safety of the public is of paramount concern, and of course the Government support the independent investigation and review in order to ensure that they happen in an appropriate and timely manner. On conclusion of the processes, we will give further consideration to any additional legislation that may be required to ensure that safety is maintained.

In my view, the CAA’s response to this terrible tragedy is sensible and proportionate. My hon. Friend asked me to put on record the result of careful contingency planning for emergencies, and I am happy to acknowledge its importance and the need for continued training in emergency preparedness. I am happy to provide him with that reassurance.

Of course, none of this can bring back the people who so tragically lost their lives. Again, I put on record my condolences and those of the whole Government to the families of the victims and those who had to deal as part of their professional or voluntary jobs with the horrific consequences of the incident. It has been a truly testing time for the local community, and it was heart-warming to hear from my hon. Friend how the communities pulled together with clean socks, cups of tea, cakes and flowers, and have come together to acknowledge the scale of the tragedy and memorialise the work and lives of those who so tragically lost their lives.

Tim Loughton Portrait Tim Loughton
- Hansard - - - Excerpts

I am grateful to my hon. Friend for her comments. She has made a point that I neglected to make and want to reinforce about the importance of providing support for the emergency services. Those first responders and those involved in the clean-up operation afterwards saw some extraordinarily harrowing scenes. Many of them suffered as a result, and they may not realise it until some time later. Does she agree that while it is obviously important to provide support to the families of the victims, we should not neglect to ensure that full psychological and other services are available for those on whom we depend to be professional, who are human just like us?

Claire Perry Portrait Claire Perry
- Hansard - -

My hon. Friend makes that point well. We are asking people, in the course of their daily work and lives, things that are beyond the imagination of anyone in this room. I was delighted to ask specifically that facilities were in place to ensure that members of the emergency services receive all the counselling and support necessary.

It is a tribute to my hon. Friend’s energy and commitment that he has secured this debate. It was a tragedy of immense proportions. The immediate response has been proportionate and sensible, and a forensic review is going on to determine what more is required to ensure that we have safe air shows in future. I thank my hon. Friend for securing this debate.

Oral Answers to Questions

Claire Perry Excerpts
Thursday 16th July 2015

(9 years, 4 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Robert Neill Portrait Robert Neill (Bromley and Chislehurst) (Con)
- Hansard - - - Excerpts

13. If he will meet senior management of Southeastern to discuss the reliability of its rail service; and if he will make a statement.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I regularly meet the senior management of Southeastern to discuss their rail services, and I want to assure my hon. Friend that the recovery of reliability on that route is of the utmost importance to Southeastern, to Network Rail, to my Department and to Transport Focus. I now chair the weekly meeting of a taskforce comprising all those bodies and Southern Railway that is dedicated to improving the reliability and performance of the railway for customers travelling on those vital routes.

Robert Neill Portrait Robert Neill
- Hansard - - - Excerpts

I am grateful to the Minister for the steps she has taken, of which I have had experience, but the fact remains that the performance of Southeastern trains is wholly unacceptable. I am getting emails from my constituents saying that their train is five minutes late more than 60% of the time, which tells me that the message is still not getting through. Should we not be urgently considering the introduction of financial penalties? Should we perhaps consider, even in advance of the franchise renewal in 2018, bringing in an operator such as London Overground, which operates its services infinitely more efficiently?

Claire Perry Portrait Claire Perry
- Hansard - -

My hon. Friend will be pleased to hear that performance is recovering, from a pretty low point last autumn, and that right-time performance is about 62%. That is still not good enough, in my view, but performance is on the mend. We face a massive challenge, in that we are doing some of the biggest engineering works in the UK around the critical stations that serve that part of the network, but that is not an excuse. We have to get performance better during these times of disruption, and that is what the quadrant taskforce is dedicated to doing.

Heidi Alexander Portrait Heidi Alexander (Lewisham East) (Lab)
- Hansard - - - Excerpts

17. One of the main frustrations of my constituents who use Southeastern trains is the number of occasions on which shorter trains than expected arrive at stations, resulting in acute overcrowding. Will the Minister commit to redeploying some of the Thameslink class 319 carriages to the Southeastern network to ease that problem?

Claire Perry Portrait Claire Perry
- Hansard - -

I commend the hon. Lady, who, unlike some of her colleagues, is an assiduous campaigner on the railways in her constituency. It is nice to see someone who really cares about the railways, rather than someone who simply reads out the Whips’ questions. [Interruption.] She is a Whip, as she points out, and this is her own question. She is right to focus on the issue of rolling stock, and she will be pleased to know that we have received a proposal for improving the rolling stock on that route, which we are now considering. I will take her suggestion into account.

Peter Kyle Portrait Peter Kyle (Hove) (Lab)
- Hansard - - - Excerpts

Will the Minister tell us when the feasibility study on the Brighton main line 2 rail project was completed, and whether she will put the study in the House of Commons Library?

Claire Perry Portrait Claire Perry
- Hansard - -

Another person who cares about his local railways. I am hoping the hon. Gentleman will join us at London Bridge on Monday, where we are having a really deep dive into what is going on there and the recovery plans for his route. He will know that the Chancellor has committed further funding to the feasibility study, which will help inform us as to the overall benefits. Of course the hon. Gentleman knows that this line, although very welcome to many, has to be effective in terms of cost and affordability—that is what we will be looking to see.

Peter Kyle Portrait Peter Kyle
- Hansard - - - Excerpts

On a point of order, Mr Speaker.

--- Later in debate ---
Kelvin Hopkins Portrait Kelvin Hopkins (Luton North) (Lab)
- Hansard - - - Excerpts

T4. Some 85% of internal and cross-channel freight goes by lorry. A substantial modal shift of freight from road to rail cannot happen unless and until full-size lorry trailers can be carried on trains, which is impossible on the existing network. When will the Government look seriously at investing in new large gauge rail capacity to accommodate lorry trailers on trains and linking the regions and nations of Britain both to each other and to the channel tunnel?

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I commend the hon. Gentleman for his long-term promotion of this large rail project, the G8 freight project. He will know that I was delighted to renew the modal shift grant. We are very focused on getting freight off the roads and on to trains. One freight train saves 72 HGV journeys. I am happy to meet him on this. I understand that the proposal has been looked at several times and was declined about 10 years ago. If he has new information, I would be delighted to see it.

Alex Chalk Portrait Alex Chalk (Cheltenham) (Con)
- Hansard - - - Excerpts

Potholes in my constituency cause inconvenience, expense and even danger. Does my right hon. Friend agree that technology is a key weapon in the battle against this menace and that councils should look to use the latest pothole resistant coatings during road resurfacing?

--- Later in debate ---
Kate Osamor Portrait Kate Osamor (Edmonton) (Lab/Co-op)
- Hansard - - - Excerpts

T7. A recent report published by the Papworth trust found that one in five stations in England is accessible to disabled people and that two thirds of disabled passengers need to book assistance in advance to travel. Will the Minister commit to making accessibility a condition of future rail franchises?

Claire Perry Portrait Claire Perry
- Hansard - -

I am sure the hon. Lady, like me, welcomes the fact that under the previous Government we spent and now continue to spend an unprecedented amount of money on accessibility. She is right to focus on the fact that the rail industry voluntarily provides an amazing free service for disabled passengers who need to make shift changes. I think we have made good progress. I am happy to look at individual station applications, but it is right that the railway network is accessible for all.

Martin Vickers Portrait Martin Vickers (Cleethorpes) (Con)
- Hansard - - - Excerpts

The Sheffield-Gainsborough-Cleethorpes line has many dilapidated stations and a Saturdays-only service. This is a ludicrous state of affairs. People want to visit Cleethorpes seven days a week. Will the rail Minister agree to a meeting with me and the other Members affected?

Claire Perry Portrait Claire Perry
- Hansard - -

Like me, my hon. Friend is an assiduous reader of Rail Magazine. That was a cover story two weeks ago. He is right. The problem we have is a system that has pushed money out of the top, rather than pulled money through the bottom, so even where there are services and new trains, the station infrastructure does not always keep up. I would be delighted to meet him and to come to Cleethorpes once again.

Martyn Day Portrait Martyn Day (Linlithgow and East Falkirk) (SNP)
- Hansard - - - Excerpts

T9. Some 68% of over-70s households have a car and older drivers are more experienced and generally safer road users who make fewer insurance claims, yet often face higher premiums than those of us in our 40s. What, if anything, will the Secretary of State do to encourage insurance companies to adopt a health-based rather than an age-based approach to insurance premiums?

Southern Railway (Performance)

Claire Perry Excerpts
Wednesday 8th July 2015

(9 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Crispin Blunt Portrait Crispin Blunt
- Hansard - - - Excerpts

My hon. Friend points out that they stand on the line. My constituents are at the point of the service where, if they are taking a busy train—a quarter of which have been cancelled because of the London Bridge upgrade—and trying to get on at Redhill, which is a significantly longer journey than for the constituents of the hon. Member for Dulwich and West Norwood, the prospect of getting a seat is close to zero. At times, the prospect of getting on the train at all is now in doubt. Hon. Friends from further up the line will no doubt have more to say about the fact that they cannot even get on the trains because they are so crowded.

I stood for re-election in Reigate on a pledge to campaign for fair fares and compensation for rail users. It was a central part of my election campaign. I went to every single station to make the point about the campaign for fair fares and to meet the people getting on trains at 6 o’clock in the morning. There is no point in going at 7 o’clock, because it is far too busy, so people’s days have been extended because of Southern’s diabolical performance levels, combined with those of Network Rail and the botched implementation of the upgrade at London Bridge.

I want to focus on the milking of my constituents as cash cows for the system. Ours is a so-called negative subsidy area, so the people I represent pay not only for the rail service that they get, but for the rail service in the rest of the country. That adds insult to injury. For example, a Redhill annual season ticket holder who also buys zone 1 to 6 travel in London will pay £1,088 more than someone travelling from Coulsdon South, two stops up the line. Passengers from other stations outside zone 6, such as Dorking, Oxted, East Grinstead and Three Bridges, who have a greater or similar length of rail journey into London, pay less for the service.

Southern has enjoyed the second highest income among train operators, and unlike many other companies it has not received funding from the Government, because it is a negative subsidy area. There is a change to the franchise coming, with Govia Thameslink taking over the management of the contract from 26 July. From that point, unhappily for the Minister and her accountability, the Department for Transport will take the fare box. I strongly appreciate her moves to convene the rail bosses and oversee the implementation of a performance improvement plan, but I am afraid I have to put her on notice that we will expect a meaningful level of effort now that she is effectively taking responsibility, so that commuters will be given a decent level of compensation to take account of the deteriorated services until the London Bridge works are completed in 2018.

The opportunity for my constituents comes with the extension of Oyster to Gatwick, which is part of the requirement of the new franchise. Transport for London has been ready to roll that out for ages, but it is being blocked by the Department for Transport while it and Southern sort out their fare arrangements.

Crispin Blunt Portrait Crispin Blunt
- Hansard - - - Excerpts

The Minister is now shaking her head, so I am delighted that she will be pushing Southern and Govia to deliver that instantly. Will she intervene so that the Oyster roll-out can go ahead as soon as possible?

Will the Minister also take the necessary steps to extend TFL zone 6 to Reigate, Redhill, Merstham, Earlswood and Salfords, and out to Gatwick, until the London Bridge works have finished? At this point I declare my interest as a commuter from Horley who, along with the people I represent, would benefit. Some 2,000 people have signed the Reigate, Redhill and District Rail Users Association petition to the Secretary of State calling for zone 6 to be extended as a fair and proper reflection of the poorer service. That zoning could then be reassessed once the London Bridge works are complete in 2018. I look forward to a one-on-one meeting with the Minister to discuss that further.

Finally, I turn to the issue of compensation for delay, which my right hon. Friend the Member for Arundel and South Downs touched on. DelayRepay.net estimates that if compensation were properly claimed, 15% would go back to customers in the form of money reclaimed. That is using a service level whereby a train has to be 30 minutes late for someone to be able to claim, and a 30-minute delay on a 30-minute journey is a pretty shocking level of performance. A 15% reduction would be a return to customers of more than £500 on their season ticket.

If I understand the Minister’s private views correctly, she, too, cannot see why customers have to be put through the hoops that they are put through by some of the companies to claim compensation money. It must be possible to make things far more automated—indeed, from her briefings, I know that that is the case in other parts of the country. It is technically possible to use Network Rail data to allow passengers to enter their journey details and to receive the compensation that they are owed. Compensation could even be paid out automatically to those with a contactless card. Has she considered requiring the train operating companies to tender for the technologies available to put that into practice? Will she introduce phased compensation for journeys delayed by more than two minutes, as the data and the technology would now permit?

Southern’s performance, and therefore the Minister’s revenue when she takes responsibility from 26 July, will be a significant problem for her and the Department given that more than half of trains are late. I recognise that, but it is right that such an incentive is placed on her, so that she can then place it on the rail operating company. The incentive will be to ensure performance levels that secure for the Department for Transport the revenues that it deserves from customers, not the revenue that it can rake in as a monopoly supplier when people have absolutely no choice about how they travel to work.

Passengers using the trains in my constituency are at the end of their tether. I look forward to hearing from the Minister about the actions that she will take to turn that appalling state of affairs around and to ensure that customers pay a fair fare for the service that they receive, which is definitely not the case today.

--- Later in debate ---
Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - - - Excerpts

It is always a pleasure to serve under your chairmanship, Mr Turner.

I begin by congratulating the right hon. Member for Arundel and South Downs (Nick Herbert) on securing this important debate. As we have heard in a number of powerful contributions, the declining performance of Southern is clearly a cause of major frustration and, at times, real anger for the millions of commuters and occasional travellers who rely on its services. Even after hitting ever lower ebbs, Southern’s performance has continued to deteriorate further.

The facts are stark: just 83% of trains were on time in the past year—the worst annual punctuality rate in 15 years. Only 70% of trains were on time during the morning peak, when thousands of commuters struggle to find a seat on increasingly expensive and overcrowded trains. The 6.35 am train from Caterham to London Victoria was reckoned to be one of the most overcrowded trains in the country at the time of the last surveys in 2013, with more than 200 passengers left standing. One in 20 trains were cancelled or seriously late. The operator reports some improvements in recent months, but overall, Southern missed its punctuality targets by almost 5%—the most significant gap between target and performance of any operator—which helped to trigger the regulator’s current investigation of Network Rail’s performance in 2014-15. Famously, of course, the 7.29 am train from Brighton to London Victoria did not run to time on one single day last year.

It is therefore not surprising that passenger satisfaction has fallen. As the right hon. Member for Arundel and South Downs said, overall satisfaction is down by 10% since 2010. Among commuters, less than a quarter of passengers say that they are getting value for money for their fares, which have risen by 23% on average since 2010, as my hon. Friend the Member for Dulwich and West Norwood (Helen Hayes) noted.

This is a world away from the standards that passengers expect and deserve, and we have all seen the disgraceful scenes at London Bridge station. The closure of tracks and platforms may be an unavoidable consequence of the £6.5 billion Thameslink project, but the poor management of London Bridge station and the lack of information provided to passengers during periods of disruption are inexcusable.

We also have to look at how Network Rail and the train operators work with one another. Even after it was known that tracks would be taken out of service, the decision was taken to run 22 trains an hour during the peak period. As Network Rail and Govia later admitted,

“we have discovered that this number is not feasible.”

At a time when the planning of rail projects is under intense scrutiny, it is clear that that lack of adequate preparation cannot be allowed to happen again. Network Rail and Southern have produced a recovery plan, about which I will say more later. I know that the Minister has been meeting the responsible parties, but the Government’s involvement must be judged on the results that it yields, not just the number of meetings that are held.

Claire Perry Portrait Claire Perry
- Hansard - -

As always, the shadow Minister is saying a lot of things that I entirely agree with, and I am looking forward to addressing those points. However, will she join me in condemning the rail unions, who are determined, across London and across the network, to maximise disruption at a time when we all should be working together to deliver the best possible service for our customers?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - - - Excerpts

I agree that it would be very unfortunate if industrial action went ahead, because I know that it would cause extra disruption to passengers. However, as Government Members said, the way to avoid that is to get back round the negotiating table and talk about the issues at stake.

When the Minister replies today, I hope that she will give hon. Members an update on the progress that has been made against the short and medium-term goals in the recovery plan. When we look at the wider problems facing Southern, it is important to identify where responsibility lies. In spite of the best efforts of its engineering staff, Network Rail has not consistently provided reliable infrastructure services on this route over the last year, and indeed the regulator has identified Southern as a franchise where

“punctuality and reliability is below expectations”.

I note, however, that 31% of delays were attributed to the operator during the last year, so it does not escape blame. It is clearly for Southern to address issues such as the cleanliness of trains and the provision of information to passengers—including about delays, cancellations and compensation—but there are also areas in which the Government are directly accountable for the treatment of passengers. I will move on to that issue in the time remaining.

It is often asserted that Ministers exercise influence through the franchising process, but Southern will cease to function as a traditional franchise by the end of the month, when it will join Thameslink and Great Northern under a single, combined management contract. As the hon. Member for Reigate (Crispin Blunt) noted, that contract gives the Department and Ministers significant new powers over the operator, including in relation to the setting of fares. Last year, the Government confirmed their intention to remove gradually cheaper “Thameslink only” tickets on the Brighton main line from 2016. The cost difference for annual season tickets to London was as much as £664. At the time, the Minister said:

“When we move from two operators to one on the line…fares will be gradually equalised.”

Will the Minister confirm that that is still the Government’s position, and will she set out what level of fare rises commuters will face when they return to work in January? Or has the policy had to be abandoned as a consequence of the Government’s last-minute decision to adopt Labour’s policy of scrapping the unfair flex loophole?

Claire Perry Portrait Claire Perry
- Hansard - -

That you introduced—that Labour introduced.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - - - Excerpts

That was introduced under privatisation.

We have heard today that compensation arrangements need to be improved. The Minister has previously indicated that she is willing to consider an automated system for awarding compensation when services are more than two minutes late. That would certainly be welcomed by passengers, but it is worrying that the introduction of such a system appears to be explicitly tied to the franchising process. Does that mean that Southern passengers could have to wait until the early 2020s, when the next franchise will be awarded, before enjoying that benefit?

Equally, the Government could take action now to require train companies to provide cash compensation, in contrast to the inflexible national rail vouchers that cannot be used online. Our understanding is that the Secretary of State could make that change by authorising a revision to the national rail conditions of carriage. Will the Minister confirm that that is the case, and if so, why that authorisation has not yet been given?

Similarly, the Minister’s colleague, the Under-Secretary of State for Transport, the hon. Member for Harrogate and Knaresborough (Andrew Jones), said that part- time season tickets—if they are ever created—will be implemented through franchise awards. Does that mean that Southern passengers could face a wait of at least six years before accessing those products, even though part-time season tickets could save some commuters hundreds of pounds a year?

Another issue, which is clearly of particular interest to a number of hon. Members, is the possible devolution of some routes to Transport for London. London Overground, as has been said today, has transformed services elsewhere in the capital, and significant investment is going into the recently devolved routes to Cheshunt, Enfield Town and Chingford. Southern’s punctuality, as my hon. Friend the Member for Dulwich and West Norwood highlighted, is poorest on its south London metro routes, so there is real interest in TfL taking over management of those services. What consideration has the Minister given to those proposals? Has she had any recent discussions with TfL on the devolution of those routes, either in whole or in part?

If Southern is to accommodate growing demand, further infrastructure improvements are likely to be necessary. The operator is running 700 more trains a day than the route carried 20 years ago, across some of the most complex and congested sections of the national rail network. There appeared to be cause for celebration in March, when the Chancellor promised

“a feasibility study into Brighton Main Line 2, speeding up journeys and relieving congestion”.

However, the Budget document itself mentioned only

“a further study into reopening the Lewes to Uckfield rail line”

and not into the whole of Brighton main line 2. Will the Minister say a bit more about whether the scope of that study will extend to the whole project or not?

I come to my final point. The recovery plan that I mentioned earlier stated that the quality of signalling equipment was

“under review, with the potential for investing in enhancements being assessed.”

However, the reality is that the status of Network Rail’s whole investment programme is now unclear and is unlikely to be clarified before the end of the year. Ultimately, better services will require investment in improved infrastructure, but Network Rail is facing enormous cost pressures on its enhancement, renewals and maintenance budgets. Will the Minister confirm today that while passengers face delayed and cancelled trains, rising fares and cramped carriages, essential measures to improve their journeys are now in jeopardy?

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Turner, and I am sorry that the hon. Member for Nottingham South (Lilian Greenwood) did not adhere to the four-minute rule. I appreciate that she raised a lot of points, many of which I may not be able to answer, but I will write to everyone whose questions I do not cover today.

I congratulate my right hon. Friend the Member for Arundel and South Downs (Nick Herbert) on securing the debate. Many people in the Chamber have either been, or have replaced, Members of Parliament who are absolutely assiduous and dogged in their pursuit of a better transport system. It really shows—I extend this point to the shadow Minister as well—the importance that we now place on our national, local and regional transport infrastructure not only as an absolute agent of economic growth, but as an agent of human happiness. I was struck by the point made by the hon. Member for Dulwich and West Norwood (Helen Hayes), and I entirely agree. The worst thing about the whole situation would be to be that mother or father trying to get home to pick up their children from childcare, and month after month, week after week, day after day, being unable to say what time you will get home. That is an unacceptable burden on working families.

Sorting out the route will deliver potentially the biggest productivity gain in the UK. The Southern route carries the second highest number of passengers. It is the biggest franchise: it will, as my hon. Friends pointed out, be merging into the GTR franchise at the end of the month. It has some of the oldest and most complicated track layout in the country—there is a reason why the upgrade works have not been done by successive Governments. Some of the track is 176 years old. Doing this work is like doing open-heart surgery on a marathon runner. It creates delay, and misery when that delay becomes too great. There are serious lessons for the railway industry to learn about how works are done. Is it right to keep stations open and running, or is it better to use a blockade and have all the pain at once? Those are very important questions and challenges for the industry.

The work on the route is one of the largest investment programmes in the UK, and it is contributing to the problem—it is not the sole cause. It is not just about London Bridge station. There is the new station at Blackfriars, which has a wonderful layout and has added new capacity into the system. There is the introduction of new trains, which has started to happen on the route that my right hon. Friend the Member for Arundel and South Downs mentioned. I know that he has seen the 387s already introduced, but equally the class 700s that come in will double the number of people who can be brought into London during peak commuting hours. So much is going on, but it is true that performance is often unacceptable and sometimes inexcusable.

My hon. Friend the Member for Bexhill and Battle (Huw Merriman) made the point that the majority of the time—I have the latest right-time performance figures—the trains are on time. It is not all doom and gloom, but we have got to a situation in which passengers have lost their trust in the operator and front-line staff have been left to deal with some unacceptable delay incidents themselves. It is not fun to work at London Bridge and not have the tools and information; to want to help deliver better performance for customers but be unable to do so; and to be spat at and abused. We should recognise that behind all these problems are often good people trying to do their best but lacking the tools to do so. I wanted to say a bit about that.

I have heard consistent themes in the debate, which I will try to address today. I am referring to reliability of service, communication and compensation. The reason why it is so important to get this right is that the Government have an unprecedented investment plan for transport infrastructure over the next five years. It is not jam tomorrow; the new stations and new trains will be delivered. I say to the hon. Member for Nottingham South that it is churlish to suggest that Network Rail’s £38 billion investment programme is in jeopardy. The only part of the programme that has been paused is the electrification programme. All the rest of the works are proceeding as scheduled, and quite right too.

Demand has increased by more than 60% in this part of the country, and of course passengers have expectations of a better service now. People do not want to be shuffled around and not given information. I think that one of my hon. Friends said that the guard had less information than he did, because he was able to dial into social media applications.

There have already been some improvements on this line. I know that hon. Members mentioned this. We have started to see a slow uptick in the various performance measures, whether public performance measures or right-time performance measures. We have seen driver recruitment increase. One big challenge for Southern was that it did not take on enough drivers when it took on the franchise. Its driver recruitment plans are now running ahead of where it wanted to be. It is losing drivers as other parts of the network grow, but it is recruiting. It is 50% ahead of plan, and training is proceeding apace. That is incredibly important.

Jeremy Quin Portrait Jeremy Quin (Horsham) (Con)
- Hansard - - - Excerpts

My hon. Friend the Minister talks about the investment programme over the next five years. My commuters from Horsham and elsewhere are already focusing on the control period beginning in 2019 and the pinch points in Clapham and elsewhere. I hope that we will continue to have investment flowing in the next control period as well. I am not asking the Minister to commit herself completely right now on what will be going on in 2019—other events this afternoon will determine that—but I hope that that will remain a priority.

Claire Perry Portrait Claire Perry
- Hansard - -

I appreciate my hon. Friend’s comment. I think that on the day of the Budget, it would be a foolish Minister who committed to longer-term spending, but my hon. Friend has my assurance that I will listen to him and his constituents on this important matter.

I thank my right hon. Friend the Member for Arundel and South Downs for his kind comments about my involvement. I think the hon. Member for Nottingham South is possibly the only member of the shadow Transport team who is actually interested in transport. She shows up at every debate; her boss is too busy running various leadership campaigns. She knows the issues on the railways well, and I look forward to continuing to work productively with her, but this is not about the Department getting involved and Ministers trying to drive change. As has been said today, what we want is the industry to be able to do this itself, so what are the levers that we need to use?

It is reassuring, I am sure, for hon. Members to know that the chief executive of Network Rail, when he gave a presentation to the Department for Transport board, said that the recovery of the area of the country that we are debating was one of his top five priorities for this year. It is obvious to everyone that the system is creating millions of hours of misery for millions of people in one of the fastest-growing areas of the country. That is simply unacceptable, and it is not good enough to have one-off interventions, despite the fact that we have unprecedented levels of work going on. The industry has to learn how to do things differently. The challenge, in thinking about Euston, High Speed 2 and connectivity into London, is to learn the lessons now to ensure that mistakes are not repeated.

I think the hon. Member for Dulwich and West Norwood may have made a point about the existence of current passengers not being valued enough in the overall process. I cannot remember whether it was her, but that point came from the Opposition Benches. I agree. Understanding what matters to people now is crucial, so let me outline some of the things that are happening and will happen. I invite my hon. Friends to be part of the process.

The merger is happening, and that will bring in a raft of new performance measures that will hold to account those responsible a fair amount. Hon. Members may know that the franchise is currently in breach of some of its performance measures, and there has been a conversation with the Department about the implications of that. Performance improvement plans were presented back in the spring—I know that hon. Members saw them—and are already starting to be implemented. That is driving the slow and steady improvement in performance.

Beyond that, there are three main problems. The first is that delivering the London Bridge improvement programme will not solve all the problems on the lines in question, particularly the Brighton main line. The second is that although the public performance measure is improving, recovery from delays and the volatility of the service remain real challenges. As was mentioned by the hon. Member for Brighton, Pavilion (Caroline Lucas), who is no longer in her place, some trains are always late, and that is simply not good enough. The third point is that rail customers—those who are paying for the goods and services—are consistently unhappy. They have lost trust. They do not see the improvements, and they do not think they will be sustained.

So what has happened? Network Rail brought in its chief engineer to do a deep dive on the real, underlying problems on the line, from both an operations and an infrastructure point of view. That has been turned into a short-term and long-term plan for real recovery. I know we talk a lot about plans, recoveries and summits. There is a war room at London Bridge station that all hon. Members are invited to visit with me on the 20th. I would be delighted if the hon. Member for Nottingham South would join us. It is a cross-party invitation, which I believe she has already received, to see the depth of planning and understanding that is going on on a joined-up basis between Network Rail and the operator.

I can confirm to my right hon. Friend the Member for Arundel and South Downs that I chair the weekly meeting. We have also invited in Transport Focus, because I am keen for improvements to be seen and felt by passengers. We are not just telling ourselves that things are getting better. We are tracking social media sentiment and how people feel about their journeys. We are tracking what matters to people and what is actually improving for people.

I want to mention some of the points that have been made about compensation. My hon. Friend the Member for Lewes (Maria Caulfield) made a valuable point. Compensation should almost never be paid, because we should have a system that delivers people to their destination on time. Members are right that it is estimated that only 12% of people claim compensation. We have a manifesto commitment to deliver better compensation—and part-time season tickets—right across the industry. I continue to look at the problem of giving compensation to passengers from London Bridge. It is difficult, because it is hard to target those passengers in a fairly open network, but we continue to work on it.

Of course, there are already companies, such as c2c, that are delivering compensation automatically to people’s phones if they are more than a minute delayed. That is the sort of model that we want to see. I will also refer to DelayRepay.net, which is a way to take all the paperwork out of claiming compensation. There are already some important innovations in the industry.

Ultimately, we have to have an unswerving commitment to and focus on passengers—customers—in the industry. The industry does so much right, but when things go wrong, the fact that we have capped fares at RPI for the remainder of this Parliament almost does not matter, because people are frustrated about their journey. So I am determined, and the Department is determined, to hold the industry to account. I am agnostic on the structure—whether this is done through an alliance or in another way. Whatever the structure happens to be, I just want better services to be delivered. I believe that the best way to do that is through transparency, a continued focus on quality in the franchising process and all of us being involved in holding the companies to account.

Question put and agreed to.

Resolved,

That this House has considered the performance of Southern railway.

Crossrail (Annual Update)

Claire Perry Excerpts
Thursday 2nd July 2015

(9 years, 4 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

On Thursday 4 June 2015, the Prime Minister joined the Mayor of London and the Secretary of State for Transport at Farringdon to mark the end of Crossrail tunnelling. For almost three years, eight tunnel boring machines have been in operation seven days a week below the streets of London to construct the 42 km of new rail tunnels.

Excavation of the Crossrail tunnels has also now been completed, and with it comes the creation of Wallasea Island, a Royal Society for the Protection of Birds nature reserve in Essex. A total of 1,528 shipments delivered 3 million tonnes of excavated material from the Crossrail tunnels to create the nature reserve.

In the past year we have made great progress in many different areas of the project. The project is now over 65% complete with work well under way on planning for and delivering an operational railway.

Major surface works being delivered by Network Rail on the existing rail network continue apace with a number of key milestones reached. The first section of the Stockley flyover has been completed; a new signalling system between Reading and the Heathrow Junction has been implemented; in south-east London the first mile of new Crossrail track has been installed and the existing station at Abbey Wood demolished; and improvement works are well under way at a number of surface stations.

In July 2014, Transport for London announced that it had awarded the contract to operate future Crossrail services to MTR Corporation (Crossrail) Ltd (MTR). MTR is expected to employ around 1,100 staff with up to 850 new posts. This will include almost 400 drivers and over 50 apprenticeships for people from communities along the route. MTR have now taken over the operation of services between Liverpool Street and Shenfield on behalf of TfL Rail in readiness for the introduction of the new Crossrail trains supplied by Bombardier from May 2017.

In November 2014, together with the Mayor of London, we announced that all 40 future Crossrail stations will be step free, dramatically improving accessibility provision along the route. All newly built Crossrail stations will have marked routes together with simple signage and information, and the Crossrail fleet will be built by Bombardier to the latest accessibility standards.

In January of this year we marked the appointment of the 400th apprentice on the project, beating the original target of 400 apprentices over the lifetime of the project. Crossrail has now appointed 460 apprentices. Alongside this, 3,886 jobs have been created by contractors for local and/or previously unemployed people on the project. Crossrail’s tunnelling and underground construction academy has had over 10,000 enrolments on courses since opening in 2012; and over 12,000 people are currently working across 45 Crossrail construction sites.

The Crossrail board continues to forecast that the costs of constructing Crossrail will be within the agreed funding limits. We expect Crossrail to cost no more than £14.5 billion—excluding rolling stock costs.

During the passage of the Crossrail Bill through Parliament, a commitment was given that a statement would be published at least every 12 months until the completion of the construction of Crossrail, setting out information about the project’s funding and finances.

In line with this commitment, this statement comes within 12 months of the last one which was published on 3 July 2014. The relevant information is attached.

The numbers above are drawn from Crossrail Ltd’s books of account and have been prepared on a consistent basis with the update provided last year. The figure for expenditure incurred includes moneys already paid out in relevant periods, including committed land and property expenditure where this has not yet been paid. It does not include future expenditure on construction contracts that have been awarded.

Attachments can be viewed online at:

http://www.parliament.uk/business/publications/written-questions- answers-statements/written- statement/Commons/2015-07-02/HCWS80/.

[HCWS80]

Oral Answers to Questions

Claire Perry Excerpts
Thursday 11th June 2015

(9 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Chi Onwurah Portrait Chi Onwurah (Newcastle upon Tyne Central) (Lab)
- Hansard - - - Excerpts

1. What assessment he has made of recent progress in improving disabled people’s access to public transport.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

The Department for Transport’s 2015 annual progress report on promoting accessibility for disabled people on public transport has just been published, and it demonstrates good progress in achieving an inclusive transport system. The Government remain firmly committed to improving disabled people’s access to all public transport services.

Chi Onwurah Portrait Chi Onwurah
- Hansard - - - Excerpts

In Newcastle, we are proud that our Metro was the first in the country to be fully wheelchair accessible, and I hope that the Minister will support renewed investment in it. That vision of inclusive transport should by now include talking buses, given that the technology is so widely available, but the Minister has done nothing to ensure that is implemented and has cut by half the budget for accessibility, so when will we have inclusive public transport?

Claire Perry Portrait Claire Perry
- Hansard - -

The hon. Lady will be pleased to know that 83% of buses operating in the UK now meet legal accessibility requirements, and that will rise to almost 100% by the end of next year. She is right to focus on talking buses—something that she and I have worked on with the Guide Dogs for the Blind Association—but we have been advised that the cost of rolling that out across the country is prohibitively high. However, another way—I am sure that she, as a highly experienced digital expert, will approve of this—is to make all data on public transport open-sourced so that applications such as the Next Stop app, which is being trialled in Leeds, can be rolled out. That would give a much more personalised service to disabled people accessing public transport.

Paul Maynard Portrait Paul Maynard (Blackpool North and Cleveleys) (Con)
- Hansard - - - Excerpts

I am sure that the Minister welcomes the progress being made across the country in improving disabled access, but will she look at the issue of theoretical access, where elevators are often left out of order for days, if not weeks, on end, making disabled access only theoretical?

Claire Perry Portrait Claire Perry
- Hansard - -

I would be delighted to meet my hon. Friend to discuss that further.

Jim Shannon Portrait Jim Shannon (Strangford) (DUP)
- Hansard - - - Excerpts

Across the whole United Kingdom of Great Britain and Northern Ireland, there have obviously been great advances in improving access for those with sensory disablement—sight and hearing problems. As people travel between the four regions, has the Minister had any discussions with the Minister responsible in Northern Ireland to ensure uniformity in access for those with sensory disablements across the whole United Kingdom?

Claire Perry Portrait Claire Perry
- Hansard - -

I have had not had those discussions, because I have only recently picked up that part of my portfolio, but my predecessor might have done. I shall apprise myself of the facts and, if necessary, would be delighted to have that meeting.

James Gray Portrait Mr James Gray (North Wiltshire) (Con)
- Hansard - - - Excerpts

We all strongly support proper access to public transport for disabled people, which is absolutely essential. As the Minister represents a rural area, as I do, does she agree that some bus companies simply cannot afford to provide that? One way forward must be through dial-a-ride services, such as the one offered by Bradies taxis in Malmesbury, which I launched last Saturday, whereby elderly and disabled people in particular can ring up and find small buses to take them where they want to go.

Claire Perry Portrait Claire Perry
- Hansard - -

My hon. Friend, whose constituency neighbours mine, makes an important point. Of course, I was delighted that the Government made money available in the previous Parliament to support exactly that sort of community access scheme.

Gordon Marsden Portrait Mr Gordon Marsden (Blackpool South) (Lab)
- Hansard - - - Excerpts

The Minister’s colleague, the Under-Secretary of State for Transport, the hon. Member for Harrogate and Knaresborough (Andrew Jones)—I congratulate him on his appointment—said at a transport event last night that his door would always be open. I invite the Minister and her new colleague to start with disabled people’s access to buses, because the Guide Dogs for the Blind Association, the Royal National Institute of Blind People and the Transport Committee have all said that the Government’s exemption of bus companies from mandatory driver training is not working. The Government have ducked and dived on this: a review was first promised for 2014, then more evidence this January confirmed the disquiet, and this week I received a written answer telling me that there will be a research project—a review of the review of the review. Will she use the open door that her colleague spoke about to stop the buck being passed for disabled people on buses?

Claire Perry Portrait Claire Perry
- Hansard - -

All our ministerial doors are always open to all colleagues. I invite the hon. Gentleman to focus on the fact that almost 100% of drivers have now received some form of disability awareness training. We think that the future lies in providing public sector data, so that people can use an app themselves to make their specific journey. The cost of providing this across the UK can be prohibitive, but we will have 100% accessibility on all buses by the end of next year.

Stephen McPartland Portrait Stephen McPartland (Stevenage) (Con)
- Hansard - - - Excerpts

2. What steps his Department is taking to deliver the road investment strategy.

--- Later in debate ---
Alex Chalk Portrait Alex Chalk (Cheltenham) (Con)
- Hansard - - - Excerpts

9. What steps his Department is taking to promote cycling.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

The Government are committed to doubling the number of journeys made by bicycle and to continuing the excellent progress we made in the previous Parliament when, thanks to a strong economy, we were able to invest record amounts in cycling. The Infrastructure Act 2015, which will shortly come into force, places a duty on us to produce a cycling and walking strategy. It will contain specific objectives and funding requirements to meet those objectives.

Lord Evans of Rainow Portrait Graham Evans
- Hansard - - - Excerpts

Weaver Vale has many excellent cycling groups and initiatives, such as Pedal Power and Breeze, to encourage constituents of all ages to get on their bikes. Under the last Government there was record investment in cycling. Will my hon. Friend please confirm that the Government will carry on the previous Government’s excellent work?

Claire Perry Portrait Claire Perry
- Hansard - -

I know of my hon. Friend’s great interest in and support for local cycling. Indeed, as a keen Boris biker myself—or perhaps they will soon be known as Zac zippers—I am delighted to support both my own personal commitment and the Government’s firm commitment to making cycling the journey method of choice, particularly for short journeys.

Alex Chalk Portrait Alex Chalk
- Hansard - - - Excerpts

As has been noted, cycling has been enjoying a renaissance in recent years. Will my hon. Friend reconfirm that new road schemes built by Highways England will be cycle-proofed to enable more of us to get on our bikes?

Claire Perry Portrait Claire Perry
- Hansard - -

I welcome my hon. Friend to his place. He fought a marvellous campaign, and I know he is a keen cycler. He was also one of the first MPs to lobby me on behalf of his own rail services. He is doing a brilliant job. Yes, I can confirm that the Government are committed to cycle-proofing any new road scheme— a really important change—and we have committed £100 million to do just that.

Ben Bradshaw Portrait Mr Ben Bradshaw (Exeter) (Lab)
- Hansard - - - Excerpts

Is it not an act of the deepest cynicism for the Government, a few months before the election, to announce, in a fanfare of self-congratulation, a very modest increase in spending on cycling safety, only for that money to be axed in the first week after the election? Why should any of Britain’s millions of cyclists believe a single word the Government say?

Claire Perry Portrait Claire Perry
- Hansard - -

I am slightly disappointed, because I know that the right hon. Gentleman is a keen cyclist, and I am sure he will know and welcome the fact that when the last Administration came to power, cycle spending across the country was around £2 a head; that currently it is around £6 a head; and that in the cycle ambition cities, it will reach £10 a head. I have been assured that the cycle ambition city programme, which the previous Government introduced, will fully deliver its outputs. He should welcome that.

Diane Abbott Portrait Ms Diane Abbott (Hackney North and Stoke Newington) (Lab)
- Hansard - - - Excerpts

What steps is the Minister taking to make cycling safer, particularly in our great cities, such as London? There can be no greater deterrent to people getting on their bikes than their fear of cycling on busy roads.

Claire Perry Portrait Claire Perry
- Hansard - -

I am sure that, like me, the hon. Lady has had some very scary cycle journeys. We have to continue to work with cyclists. Bikeability training—so we start young—is important. We also have to make sure that any new road scheme does what road schemes of old did not do, which is make sure that cycling is “baked in” to those road designs. She will also know that we are working closely with local authorities and Transport for London to make sure that any pilot changes to HGV requirements are looked at carefully and, potentially, implemented.

--- Later in debate ---
Jo Churchill Portrait Jo Churchill (Bury St Edmunds) (Con)
- Hansard - - - Excerpts

10. What recent discussions he has had with local authorities and local enterprise partnerships on delivery of transport infrastructure projects.

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I am delighted to say that this Government will spend an unprecedented £56 billion on transport infrastructure over the next five years. It is our view that this money is most usefully spent when organisations such as local authorities and local enterprise partnerships, which know best about the needs of local people and the community, are involved. That is why we consult them on every large national project and indeed why we are devolving local funding to them, putting them firmly in the driving seat for local decision making.

Jo Churchill Portrait Jo Churchill
- Hansard - - - Excerpts

As my hon. Friend is no doubt aware, my Bury St Edmunds constituency sits directly on both the rail link from Norwich through to London, which I know is due for improvements, and on the A14 road corridor that connects Felixstowe, the country’s fifth largest container port, to the rest of the country. Could the Secretary of State and Ministers visit the constituency to discuss a collaborative funding approach with the local enterprise partnership and other bodies to facilitate improvements on the A14 and the campaign for no more delays on that road?

Claire Perry Portrait Claire Perry
- Hansard - -

I welcome my hon. Friend to her place. I saw her predecessor enjoying a small glass of wine in Westminster only last night, and he wishes her well. I would be delighted to visit, with other colleagues if appropriate, to see what is going on in her constituency. She will know that the local growth fund is already providing £8 million-worth of investment in Bury St Edmunds, including in the eastern relief road. I look forward to seeing that and to hearing about other projects.

Barry Sheerman Portrait Mr Barry Sheerman (Huddersfield) (Lab/Co-op)
- Hansard - - - Excerpts

May I remind the Minister that many local enterprise partnerships and local authorities feel bypassed by Government policy at the moment when it comes to infrastructure? The northern powerhouse, which many of us have not yet fully assimilated, is one thing, but my constituents want fast improvement in rail and road infrastructure now.

Claire Perry Portrait Claire Perry
- Hansard - -

May I just gently say to the hon. Gentleman that there are some stunning examples, particularly around the Anglia region, where the east of England LEPs have been absolutely in the driving seat of delivering really good analysis and pulling in important amounts of funding? I suggest that the hon. Gentleman gets involved with his LEP and makes sure that it has the right people on board, because LEPs can be very powerful agents of change.

Andrew Turner Portrait Mr Andrew Turner (Isle of Wight) (Con)
- Hansard - - - Excerpts

Will my hon. Friend confirm the Government’s willingness to work with the Solent LEP and the Isle of Wight council to set up an island infrastructure taskforce to examine the future of transport on the Isle of Wight and cross-Solent options?

Claire Perry Portrait Claire Perry
- Hansard - -

During the last Parliament, my hon. Friend brought in a team to make that point, and they argued the case very assiduously. I am delighted to confirm that our Department is committed to working with him and local partners to deliver the infrastructure upgrade.

Greg Mulholland Portrait Greg Mulholland (Leeds North West) (LD)
- Hansard - - - Excerpts

It is welcome that the Government are saying that decisions on infrastructure projects should be made locally, but later this year a Conservative Secretary of State will decide on the Leeds New Generation trolleybus scheme, which is being forced on us because the Labour Government said that we could not have a bus-based scheme. Will the Secretary of State now intervene, and allow us to make our own decisions about what is the best transport system?

Claire Perry Portrait Claire Perry
- Hansard - -

Perhaps the hon. Gentleman and I should meet to discuss the matter—I should be delighted to discuss it further—but, as I have said, we believe that local people are best placed to make decisions about local transport.

Anna Turley Portrait Anna Turley (Redcar) (Lab/Co-op)
- Hansard - - - Excerpts

11. What recent assessment he has made of the effectiveness of the rail franchise system.

--- Later in debate ---
Lord Haselhurst Portrait Sir Alan Haselhurst (Saffron Walden) (Con)
- Hansard - - - Excerpts

What level of assurance can my right hon. Friend give to my constituents who most frequently use the Great Eastern and West Anglia lines that the outcome of the Greater Anglia franchising process will lead to new rolling stock?

Claire Perry Portrait The Parliamentary Under-Secretary of State for Transport (Claire Perry)
- Hansard - -

I congratulate my right hon. Friend and his colleagues, my hon. Friends the Members for Hertford and Stortford (Mr Prisk), for Norwich North (Chloe Smith), for Ipswich (Ben Gummer) and for Chelmsford (Mr Burns), and my right hon. Friend the Member for Witham (Priti Patel), on leaving us in no doubt of the importance of upgraded, improved rolling stock on that franchise. We are looking at all rolling stock options as part of the process and high quality points will be awarded for proposals to upgrade the franchise. The invitation to tender will be provided to bidders in August of this year.

Jonathan Edwards Portrait Jonathan Edwards (Carmarthen East and Dinefwr) (PC)
- Hansard - - - Excerpts

T3. Now that HS2 Ltd has declared that it sees no business case for extending the high-speed line to Scotland, will the Secretary of State confirm that it is now an England-only railway and that full Barnett consequentials for the devolved countries will be announced in the next comprehensive spending review?

--- Later in debate ---
Joan Ryan Portrait Joan Ryan (Enfield North) (Lab)
- Hansard - - - Excerpts

T9. Last week, I attended the handover ceremony at Enfield Town station whereby some suburban rail lines were transferred to London Overground. Its promise of a better service and cheaper fares is good news for commuters. But how does the Minister intend to ensure that all passengers, across Enfield and beyond, will get a fair deal, given that some are having to pay National Rail pay-as-you-go fares simply because their services are operated by Govia Thameslink Railway or Abellio Greater Anglia, and not London Overground? Will she put pressure on those companies to match London Overground?

Claire Perry Portrait Claire Perry
- Hansard - -

The Government welcome the devolution of these inner services to the Mayor and Transport for London, which, again, demonstrates our support for devolution when appropriate. However, many people using those lines will be coming from further afield, and the national franchising system provides the best way to secure rail services. We are freezing rail fares for the next five years and working extremely hard to deliver a massive infrastructure improvement that will benefit the right hon. Lady’s constituents, as well as those across the UK.

Philip Davies Portrait Philip Davies (Shipley) (Con)
- Hansard - - - Excerpts

A collapsed wall is blocking one lane of an already congested road through the centre of Shipley. That wall is owned by Network Rail. My constituents have been waiting for months for it to be repaired by Network Rail, but it keeps delaying and we now face a further three-month delay before the wall is fixed. Will the Minister get Network Rail to pull its finger out and get that wall repaired straightaway?