Rail Services: Portsmouth and the South-West Debate
Full Debate: Read Full DebateSteve Brine
Main Page: Steve Brine (Conservative - Winchester)Department Debates - View all Steve Brine's debates with the Department for Transport
(9 years, 1 month ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I congratulate my hon. Friend on securing this debate. I hope that the Minister has noted the A-team turnout from Hampshire MPs. It takes a lot to get this many Hampshire MPs in one room, so I congratulate my hon. Friend on doing that.
In the previous Parliament, nearly £4 million was spent in my constituency on an improvement scheme at the railway station, which included parking, a new footbridge and improved wi-fi facilities and staffing of the station. Those were all fantastic, but they were icing on the cake. Does my hon. Friend agree that we need to turn our attention to the cake itself? Ultimately, it is about building a bigger railway. We can put on more trains and deal with the three-plus-two seating issue, but unless we build a bigger railway and deal with Clapham Junction and London Waterloo, the problems back down the line for us will never change.
I thank my hon. Friend for that very good intervention. I completely agree with him, and was about to come on to that point.
We need a new line between Surbiton and Clapham Junction to relieve capacity, and we strongly support the development of Crossrail 2. Those measures will help Portsmouth by cutting 10 minutes from the journey during peak times, as the train would not have to take the slow route avoiding Woking. However, it will still take about 90 minutes, the same time as it takes during off-peak times. The Wessex route study also proposes building an overtaking loop along the Havant to Guildford line that would enable faster services to overtake the slow services. If that was implemented, Portsmouth would be well on the way to having the same sort of services it had in the 1970s, when it was possible to get from Portsmouth to London in 75 minutes by train.
However, that is not all. That solution does not address the problem of connectivity within the Hampshire and Solent area. It is almost as fast to get from Portsmouth to Gatwick airport as it is to get from Portsmouth to Southampton airport, even though Gatwick is nearly five times the distance. To address the problem, all we need is the building of a chord at Eastleigh, or increasing the junction’s capacity to enable a train from Portsmouth to head south as well as north at the junction. That would enable a direct service from Portsmouth to Southampton airport and Southampton and save a lot of time.
The existing route to Eastleigh is made up of a number of single-track sections. Those have to be made into double-track sections, which together with upgraded signalling would enable service frequency to be improved, which would help to attract passengers. Network Rail estimated in its route utilisation strategy that that would cost £135 million. The improvements would not only help Portsmouth connect with its neighbours, but enormously improve the journey for passengers getting from Brighton to Bournemouth and Weymouth, and from Weymouth to Basingstoke, Winchester and London.
When high-voltage electrification of the main line takes place, train speed can increase and we can start getting the same level of service that the rest of the country enjoys. Overhead electrification in the region, as already partly allowed for in the electric spine proposals, would make a big difference to train speed, and I would like that included in any proposal. It would make technical sense. Modern rolling stock uses alternating current motors. Converting high-voltage AC from the national grid down to 750 V DC for the third rail and then converting it back to AC on the train to power it makes no sense at all. We already know that the South West Trains Desiro fleet is unable to operate on some parts of our lines at high speed because there is not the power capacity in the trackside equipment to permit it. High-voltage overhead electrification overcomes those problems.
Those measures would help improve productivity throughout the region. They would certainly help transform the economy in Portsmouth. In the “Rail Value for Money Study”, Sir Roy McNulty said that we should make best use of existing railways before considering new investment. The cost of the improvements as outlined is extremely small compared with that of new rail projects, such as High Speed 2 or Crossrail 2. There have been practically no major infrastructure rail projects on the line since 1967. The line from Portsmouth to Southampton was electrified only in 1989. In 2007, there was an expensive package of signal and power upgrades on the Portsmouth direct line. Not only did those works overrun, drawing a large fine for Network Rail, but we still have constant signal and power failures right from the point that the supposed upgrade was installed. That causes massive inconvenience for a large number of our constituents and damages our economic prospects.
Passenger satisfaction on routes from Portsmouth to London is among the lowest in the country. The latest national rail passenger survey shows that just 60% of passengers on the route think there is sufficient room. I am surprised it is that high, given the three-plus-two seating of the suburban stock on which my long-distance travelling constituents have to sit on their way to London. I am sure that some of my colleagues will talk about that. We now have no proper long-distance stock on peak services on the direct route from Portsmouth to London. Portsmouth passengers give a huge thumbs-down to the value for money of their ticket, with just 31% feeling satisfied.
Most of what I have covered is not new. It has been analysed, but nothing has been done. The measures would make journeys faster and have a major effect, taking people off the roads and making it easier to move around the whole area. The growth in passenger numbers on the Manchester to London line has increased by having services every 20 minutes. Increasing the number of trains an hour would be expected to help increase the numbers of passengers who travel by train in our area. The impact of faster trains on the economy along the Solent region, including a fast train from the south-west region and from Portsmouth to London, would be a massive boost to the southern powerhouse.
We must also remember our friends across the Solent. I am delighted that my hon. Friend the Member for Isle of Wight (Mr Turner) is here. I know he will have a lot to say. There are commuters who travel from the Isle of Wight to London every day. The Isle of Wight is a vital part of the regional economy. Its trade passes through Portsmouth with Wightlink and Hovertravel, and through Southampton with Red Funnel. I am delighted that a new operator, Scoot, is coming on to the Portsmouth to Cowes route. Improving rail links to the ports will help the Isle of Wight develop as a place to visit and to do business, and it will help the ports, too.
The Chancellor, while looking at the opportunities that could make up the northern powerhouse, must not forget the goose that lays the golden eggs in the south. The south requires only incremental amounts of investment to continue increasing production.
Portsmouth would be transformed by having a fast train service to London and along the Solent region. Any investment in our infrastructure will have an immediate impact on the local area, not forgetting that South West Trains already contributes £374 million per annum to the Exchequer, which could be reinvested to make that investment happen. I know that other Members will be talking about the quality of trains and the impact on their areas, but I hope that this debate will put down a marker to ensure that our rail infrastructure is upgraded to the same level as the rest of the country.
I echo my colleagues’ sentiments about highlighting the importance of the debate, which was introduced by my hon. Friend the Member for Portsmouth South (Mrs Drummond). It is a vital debate in the light of the new franchising process.
We have heard about the importance of the Eastleigh chord—I am the Member for Eastleigh. It is exciting to hear because that could unlock connectivity for us in the south. I have certainly had many letters from upset, abject commuters who feel that Eastleigh has long not had the strong voice that it should have in discussions of productivity and added value in the Solent region. Eastleigh needs a strong voice among the voices of Winchester, Portsmouth and Southampton to secure better train links, and to ensure that the big cities of the Solent region continue to bring in key investment for our constituencies to reflect the £374 million that our region gives to the Exchequer through our rail services. Frankly, many of us in the south-east parts of the south-west feel taken for granted. The debate is a chance for us to be heard by the Minister, who has visited Eastleigh. She has seen its importance as a railway town and what the railway gives to the local economy.
We must take notice of the Wessex route study, which reports 20% higher-than-expected demand. The new franchise gives us the investment opportunity. The Waterloo throat has long been the subject of conversation on the doorstep with my constituents, because it has an impact on their commute to London. We must all reflect on the fact that commuting is now longer, harder and more difficult, with people having to consider their home situations and to travel further than they might like.
I should also reflect on the comments made by my right hon. Friend the Member for Basingstoke (Mrs Miller) about house building, which greatly concerns me, too. I already have a constituency of almost 80,000 residents. The 17,000 new homes likely to feature in the long-awaited new plan for the Eastleigh constituency could take the population to about 120,000. Frankly, our rail services will not be able to cope with that. That is only one little picture of hard-pressed commuters in the south.
I welcome the comments made by my hon. Friend the Member for North East Hampshire (Mr Jayawardena) about branch lines. I find it baffling that we have so many empty trains heading along the track when people do not need them. Commuters, in particular those of Hedge End, feel that their voices should be heard more clearly.
Getting around Eastleigh is difficult. The Secretary of State for Transport came down for the election campaign. I told him that the roads are extremely bad and he said, “Everyone tells me that,” but he experienced it for himself. Many of my constituents have to head to Portsmouth, Southampton or Gosport in the morning. The train between my constituency and Portsmouth and Southampton takes well over an hour, so people take to their cars. The M27 simply cannot cope. We have heard that more than 100,000 people travel between junctions 8 and 9—I say “travel” but most of them spend a lot of time just sitting there. During the election campaign, there was an incident on the motorway and, for 12 hours, nobody could move. That is a big problem because our acute hospital services for Eastleigh are in the major cities. Travel is a problem for people to get their health services. We have no escape routes. We have narrow, old-fashioned rural roads, which are absolutely chocker. When I left my office on that particular day in the campaign at 11 o’clock at night, it took me about an hour and a half to go two miles. There are so many cars on our roads. The M27 corridor is creaking and the M3 is suffering.
My hon. Friend and I share a bit of the Eastleigh borough—I represent the Chandler’s Ford and Hiltingbury part of it—and the local roads are a nightmare. Does she agree that it might be helpful if Eastleigh borough council got on with its local plan, which is currently a complete disaster zone?
Absolutely—that is music to my ears, given that we are going to be waiting until November next year for a plan. Consistently, there is hostile development on green spaces. Those are not sustainable places on which to be building, and at the moment, a planning application for a car lot and a drive-through restaurant is going through for the old council offices. That is a sustainable place for more houses that would be within walking distance of Eastleigh train station.
In Eastleigh, we have Southampton airport, which is an important regional airport and a hub for passengers coming into the area from Guernsey in particular. It has been highlighted, however, that it is sometimes easier for people to get to Gatwick than to Southampton, given that they can take a train from Swanwick heading up towards Gatwick and fly out that way, rather than trying to get from Guernsey or the island into Southampton to fly. That is a big concern for me. We have many short commutes that should be eminently doable, but they are a major problem because of the number of people doing those commutes on a struggling motorway, with no rail option. We have an extremely important enterprise zone bid based around the airport. The local enterprise partnership is backing that, but it can work only if we get better rail services. We need bypasses and link roads, and I have been making the case for those very strongly.
In conclusion, as we have heard, the Transport Secretary has kindly visited my patch. He knows the importance of Eastleigh. It is a great place to work, live and do business, but it is a terrible place to get around. The new franchise in 2017 is a vital opportunity for all of us across Hampshire and the south-west to seize the opportunity and stand up for the Solent and the south-west corridor. We must deal with capacity, power supply and the Waterloo throat issue. We must fight for investment, recognise the demand increase and ensure that we enact as much as possible, as soon as possible, from the Wessex route study.
We have covered many subjects over the past hour and a half, but we have not talked about the Government’s commitment to smarter ticketing and part-time season tickets, which might have a significant impact by alleviating some overcrowding, although only some. Does the Minister still have her passion for that?
Yes, and I will race through my final comments and come on to what I think are some of the solutions. My hon. Friend the Member for Kingston and Surbiton pointed out what a balancing act we face, because train usage across the country is rising, and trains that start off empty become crowded. Indeed, I have travelled on some of the top 10 most crowded trains, because I tend to go out and mystery shop them. It is not encouraging to be unable to sit down on the journey into London at 6 o’clock in the morning, work for 12 or 14 hours and then go home. People deserve better.
What are the possible solutions? I will abandon my speech now—when I do so, it always makes my officials incredibly nervous—and talk about what could be done. There is a cascade of things that can be done to increase capacity. We can work on existing lines, and do the sorts of work talked about in the Wessex route Study. Such work is important, and it is being looked at, reviewed and prioritised. We need to ensure that everybody understands the costs and benefits of such work for economic value added, not just for transport users. Such works are always expensive and difficult, because they involve so much disruption.
We can do things such as digital enhancements on the railway. When it comes to the number of train paths, the railways are now full, but if we can use digital technology to reduce the time between trains, we will be able to run more of them. That is a big long-term investment plan for Network Rail. Building new lines is often cheaper than expanding existing lines. We heard a lot of mention of Crossrail 2, a vital project that will help to alleviate congestion—as will Crossrail 1—in the metro and suburban areas.
We can buy new trains. Indeed, many new trains are being delivered to the South West franchise, but what tends to happen is that they are built to satisfy demand at peak times, and they run empty for much of the day. Is that an effective thing to do? Would it be possible to use those trains better? That brings me to the point about part-time season tickets. Providing incentives for people to change their journey patterns and move around outside peak time can be cost-effective and help us to use train capacity better.
Finally, we can, as my hon. Friend the Member for North East Hampshire mentioned, change stopping patterns. It is completely possible to run a very high speed, non-stop train to Portsmouth if it does not stop anywhere else. As we move forward and consider the consultation, we have to ask ourselves that sort of question. What is the right journey pattern for the demand? Is it right to devolve more services to TfL, to deal with some of the inner-London metro demand and outer-London demand, in order to run services that are better fitted for long-distance users?
What are the right solutions? I do not know, and I do not think that we, individually, know. Part of the problem in the industry is that people work in silos when they make decisions, so there will be an operational solution, a solution for passengers and perhaps a political solution. We need to get the right people in the right place to make those decisions, to make sure that the money is there and that organisations can deliver. That is why the Hendy review is so important. We need to take politics out of the process, which is why I so welcome the appointment of Lord Adonis; I think he is a good man to do the long-term infrastructure planning. We need to work together to solve some of the knotty problems. There is a huge amount of financial commitment to the railways, and we are committing to the biggest investment programme since Victorian times, which is a vital part of delivering economic growth. Collectively as Members, working with our local communities, local businesses, my officials, Network Rail and the operators, we can come up with the right solutions.
What do we need to do? First, we need to keep all the information coming in in response to the route study. That will determine the near-term investment plans, which cover the next five to 10 years. Secondly, the consultation on the franchise process will start before Christmas, and it is absolutely vital that we have a real, in-depth analysis of what we want. Is this the right time to start putting in some express services that do not stop between some of the big conurbations, with a consequent possible loss of services in terms of stopping patterns? Can the network collectively work that out? Following that consultation, the invitation to tender will go out before April 2016, and the franchise will start in 2017.
I do not know what the right solution is, and I do not believe that any individual holds it. Collectively, however, working together across the boundaries that have built up in the railway sector between operators, the network and regulators, we can come up with a better solution. The experience of passengers must be put front and centre, because the railway is not about boxes running about on rails. I was told by somebody who has left the industry that if it were not for the passengers, the timetabling would be perfect. I found that both amusing and incredibly offensive, because it suggested that we were talking about somebody’s train set rather than a transport system that millions of people rely on to get to work and to get back home to their families.
My plea to team Hampshire—I am delighted that it has an identity—and also to team Somerset, team Wiltshire, team Stalybridge and Hyde—