Rail Services: Portsmouth and the South-West Debate
Full Debate: Read Full DebateFlick Drummond
Main Page: Flick Drummond (Conservative - Meon Valley)Department Debates - View all Flick Drummond's debates with the Department for Transport
(9 years, 2 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Good morning, ladies and gentlemen. Five Back-Bench Members wish to contribute to the debate. I will decide whether it is necessary to impose a time limit after the opening speech.
I beg to move,
That this House has considered rail services to Portsmouth and the South West.
It is such a pleasure to serve under your chairmanship, Sir Roger.
We constantly hear about the northern powerhouse, but we hear little about the southern powerhouse. We hear how the Government are putting money into cities, businesses and infrastructure in the north, but where is the investment in the south? The south is an area of 3.6 million people that contributes 15% of the UK’s output, but when will we start hearing about investment in the southern powerhouse?
I represent Portsmouth, which is often referred to as a northern city in the south because of its background in heavy engineering, building and maintaining our Royal Navy. The immediate post-war decades took a heavy toll on our traditional industrial base, but the city has been transforming itself over the past 20 years—the Royal Navy is more technically advanced than ever before, we have diversified beyond defence and we have a brilliant entrepreneurial community, as well as new cutting-edge technological companies. However, we still have to fight hard for investment. Portsmouth suffers from the assumption in some quarters that all parts of the south and the south-east are prosperous and well provided with infrastructure. In fact, I represent a city with neighbourhoods that are among the very poorest in the country.
I secured this debate because of the poor rail service in Portsmouth, but anything that helps Portsmouth will help other cities on the Solent, the Isle of Wight, Hampshire, further west and points between that area and London. The train service from London to Portsmouth Harbour takes as long as it did in Victorian times: one hour and 40 minutes to travel just 70 miles. It is quicker for me to drive door-to-door to Westminster than it is for me to take the train. Compare that with Manchester, which is 217 miles from London and takes just a little over two hours on the train, as we all found out when we went to the Conservative party conference. Birmingham takes 85 minutes for a 125-mile journey, and it will take just 50 minutes when High Speed 2 has been completed.
The train between Portsmouth and Southampton, a journey of 20 miles, takes 65 minutes. Compare that with Nottingham to Derby, a journey of 15 miles, which takes just 23 minutes. Newcastle to Sunderland, 17 miles, takes just 18 minutes. The Solent local enterprise partnership, our local authorities and businesses do great work in trying to maximise the potential of the area around Portsmouth and Southampton, which is one of the most widely spread conurbations in the country, but the Solent has been left behind and will continue to be so unless we introduce new rail infrastructure.
I am grateful to my hon. Friend for securing this debate. As she says, this issue affects not only Hampshire and Portsmouth but our stations in Dorset. From London, it takes two hours and eight minutes to get to Poole, and two hours and 21 minutes to get to Wareham—the Minister has seen that station. Increased capacity and speeds would help to encourage people to use the railway, rather than the roads, thereby reducing congestion on roads such as the A351 in my constituency.
My hon. Friend is right. As I continue, I hope that he will see some solutions. I am pleased that other places are behind me on this subject, because we must work together to show the Government why this is so important.
We often hear the area spoken of as the M27 corridor, but we need more than a motorway to make it a successful and competitive place to live and work in the 21st century. We need a sustainable transport policy that includes public transport and support for cycling provision, as well as making space for more cars. Other Members from along the route will highlight other areas affected by this debate, so I will concentrate on the Solent region, particularly Portsmouth.
Why are rail services important? The Chancellor is keen to increase productivity across the country, as he says in “Fixing the Foundations: Creating a more prosperous nation,” published in July 2015. He acknowledges that improving infrastructure is one of the many steps that he can take to improve the economy’s productivity. The Solent local enterprise partnership extends from Havant in the east to Southampton in the west and includes Winchester, Eastleigh and Fareham. Local productivity in the area, as measured by output per job, lags behind the south-east average by 15%. Portsmouth has some of the country’s most deprived areas, with wages falling well below those of other cities in the south-east. We must improve connectivity if we are to improve productivity.
By improving the train service, we would help employers by providing a wider choice of potential employees and, conversely, we would help employees have a greater choice of potential employers. We would help businesses broaden their markets and their supplier base. We would provide greater access to social infrastructure such as universities and city centres. All of that would increase the region’s productivity and help to improve the UK’s overall productivity.
Congestion on the main motorway connecting the area, the M27, is legendary. It can take anything from 30 minutes to two hours to travel by road between Portsmouth and Southampton. Traffic into Fareham and Gosport moves very slowly during rush hour. Some £250 million-worth of investment is going into upgrading the M27 to smart motorway status. Data from the Department for Transport tell us that traffic in one direction on the M27 between junctions 8 and 9 has increased from 99,000 vehicles a day to more than 112,000 vehicles a day. Even with improvements, the road will always struggle to cope.
The Atkins study “Economic Costs of Congestion in the Regions” states that congestion in the Hampshire region costs £400 million per annum and a further £100 million for Portsmouth and another £100 million for Southampton. That is eroding our productivity potential, and, if not addressed, will equal a loss in gross value added of 1.3% by 2025. The south Hampshire strategy document shows that total road trips are expected to increase by 11% in the period 2010 to 2026, which will increase time spent in queues by 53%. Business costs will increase, including the direct costs of drive time and fuel, but there will also be the indirect costs of logistics scheduling and general competitiveness and other costs such as increased pollution.
If there is no worsening of congestion within the Solent LEP area, we expect that the number of jobs will climb by 44,000 from 435,000 in 2006 to nearly 480,000 in 2026. If there is no infrastructure investment, we expect an increase of just 36,000 new jobs, a loss of 8,000 jobs. Figures from the last census show a flow of workers into Portsmouth of more than 40,000 a day, with 20,000 people leaving the city to work elsewhere. More jobs have been created since then, and the labour market figures every month show that the number of jobs is going up and up.
We need sustainable transport solutions to cater for those workers, but we need to ensure that we create the conditions that foster more high-skill, high-pay jobs, which requires investment. We have to build 75,000 houses in the Solent region over the next 10 years, so the congestion and infrastructure problems will just get worse. If we improve the rail service, we will be able to take traffic off the roads. We can improve the rail service by improving the speed and frequency of the service.
I believe there is a solution that will help not only Portsmouth and Southampton but the south-west towards Weymouth, as my hon. Friend the Member for Mid Dorset and North Poole (Michael Tomlinson) has mentioned, by helping to alleviate the crowding on trains on all lines going from the area to London Waterloo. There are three routes from Portsmouth to London, but I will focus on just two of those routes, both operated by South West Trains at present. One route goes via Havant, Haslemere, Petersfield and Guildford to Woking and Waterloo, and the other goes via Eastleigh, Winchester and Basingstoke to Woking and Waterloo. Both routes suffer from overcrowding and capacity constraints. The rail system is unable to cope with existing demand.
Network Rail published the excellent “Wessex Route Study” in August 2015, and it describes the problem and proposes solutions. The report says that the system is experiencing demand that is 20% greater than it can cope with and that, within the planning period, the demand is expected to grow still further by another 20%. Network Rail’s solution is summarised as follows: junction improvements and platform capacity at Basingstoke; and, again, junction improvements and platform capacity at Woking. Those two projects will cost £175 million each.
I congratulate my hon. Friend on securing this debate. I hope that the Minister has noted the A-team turnout from Hampshire MPs. It takes a lot to get this many Hampshire MPs in one room, so I congratulate my hon. Friend on doing that.
In the previous Parliament, nearly £4 million was spent in my constituency on an improvement scheme at the railway station, which included parking, a new footbridge and improved wi-fi facilities and staffing of the station. Those were all fantastic, but they were icing on the cake. Does my hon. Friend agree that we need to turn our attention to the cake itself? Ultimately, it is about building a bigger railway. We can put on more trains and deal with the three-plus-two seating issue, but unless we build a bigger railway and deal with Clapham Junction and London Waterloo, the problems back down the line for us will never change.
I thank my hon. Friend for that very good intervention. I completely agree with him, and was about to come on to that point.
We need a new line between Surbiton and Clapham Junction to relieve capacity, and we strongly support the development of Crossrail 2. Those measures will help Portsmouth by cutting 10 minutes from the journey during peak times, as the train would not have to take the slow route avoiding Woking. However, it will still take about 90 minutes, the same time as it takes during off-peak times. The Wessex route study also proposes building an overtaking loop along the Havant to Guildford line that would enable faster services to overtake the slow services. If that was implemented, Portsmouth would be well on the way to having the same sort of services it had in the 1970s, when it was possible to get from Portsmouth to London in 75 minutes by train.
However, that is not all. That solution does not address the problem of connectivity within the Hampshire and Solent area. It is almost as fast to get from Portsmouth to Gatwick airport as it is to get from Portsmouth to Southampton airport, even though Gatwick is nearly five times the distance. To address the problem, all we need is the building of a chord at Eastleigh, or increasing the junction’s capacity to enable a train from Portsmouth to head south as well as north at the junction. That would enable a direct service from Portsmouth to Southampton airport and Southampton and save a lot of time.
The existing route to Eastleigh is made up of a number of single-track sections. Those have to be made into double-track sections, which together with upgraded signalling would enable service frequency to be improved, which would help to attract passengers. Network Rail estimated in its route utilisation strategy that that would cost £135 million. The improvements would not only help Portsmouth connect with its neighbours, but enormously improve the journey for passengers getting from Brighton to Bournemouth and Weymouth, and from Weymouth to Basingstoke, Winchester and London.
When high-voltage electrification of the main line takes place, train speed can increase and we can start getting the same level of service that the rest of the country enjoys. Overhead electrification in the region, as already partly allowed for in the electric spine proposals, would make a big difference to train speed, and I would like that included in any proposal. It would make technical sense. Modern rolling stock uses alternating current motors. Converting high-voltage AC from the national grid down to 750 V DC for the third rail and then converting it back to AC on the train to power it makes no sense at all. We already know that the South West Trains Desiro fleet is unable to operate on some parts of our lines at high speed because there is not the power capacity in the trackside equipment to permit it. High-voltage overhead electrification overcomes those problems.
Those measures would help improve productivity throughout the region. They would certainly help transform the economy in Portsmouth. In the “Rail Value for Money Study”, Sir Roy McNulty said that we should make best use of existing railways before considering new investment. The cost of the improvements as outlined is extremely small compared with that of new rail projects, such as High Speed 2 or Crossrail 2. There have been practically no major infrastructure rail projects on the line since 1967. The line from Portsmouth to Southampton was electrified only in 1989. In 2007, there was an expensive package of signal and power upgrades on the Portsmouth direct line. Not only did those works overrun, drawing a large fine for Network Rail, but we still have constant signal and power failures right from the point that the supposed upgrade was installed. That causes massive inconvenience for a large number of our constituents and damages our economic prospects.
Passenger satisfaction on routes from Portsmouth to London is among the lowest in the country. The latest national rail passenger survey shows that just 60% of passengers on the route think there is sufficient room. I am surprised it is that high, given the three-plus-two seating of the suburban stock on which my long-distance travelling constituents have to sit on their way to London. I am sure that some of my colleagues will talk about that. We now have no proper long-distance stock on peak services on the direct route from Portsmouth to London. Portsmouth passengers give a huge thumbs-down to the value for money of their ticket, with just 31% feeling satisfied.
Most of what I have covered is not new. It has been analysed, but nothing has been done. The measures would make journeys faster and have a major effect, taking people off the roads and making it easier to move around the whole area. The growth in passenger numbers on the Manchester to London line has increased by having services every 20 minutes. Increasing the number of trains an hour would be expected to help increase the numbers of passengers who travel by train in our area. The impact of faster trains on the economy along the Solent region, including a fast train from the south-west region and from Portsmouth to London, would be a massive boost to the southern powerhouse.
We must also remember our friends across the Solent. I am delighted that my hon. Friend the Member for Isle of Wight (Mr Turner) is here. I know he will have a lot to say. There are commuters who travel from the Isle of Wight to London every day. The Isle of Wight is a vital part of the regional economy. Its trade passes through Portsmouth with Wightlink and Hovertravel, and through Southampton with Red Funnel. I am delighted that a new operator, Scoot, is coming on to the Portsmouth to Cowes route. Improving rail links to the ports will help the Isle of Wight develop as a place to visit and to do business, and it will help the ports, too.
The Chancellor, while looking at the opportunities that could make up the northern powerhouse, must not forget the goose that lays the golden eggs in the south. The south requires only incremental amounts of investment to continue increasing production.
Portsmouth would be transformed by having a fast train service to London and along the Solent region. Any investment in our infrastructure will have an immediate impact on the local area, not forgetting that South West Trains already contributes £374 million per annum to the Exchequer, which could be reinvested to make that investment happen. I know that other Members will be talking about the quality of trains and the impact on their areas, but I hope that this debate will put down a marker to ensure that our rail infrastructure is upgraded to the same level as the rest of the country.
Six Members have indicated that they wish to speak. Do the maths. If everyone is reasonably sensible, all colleagues should be able to get in.
I thank my hon. Friend for turning up. I think that there are solutions to the problem. I will be pursuing it, and I am sure that we will all work together on that. As part of that, I will write a report to the Chancellor to see whether we can get some funding as well. Thank you, Sir Roger, for your chairmanship of the debate.
Question put and agreed to.
Resolved,
That this House has considered rail services to Portsmouth and the South West.