(10 years, 6 months ago)
Written StatementsI attended the final Transport Council under the Greek presidency (the presidency) in Luxembourg on Thursday 5 June.
The Council reached political agreement on its first reading of the technical pillar of the fourth railway package—recast directives on interoperability and safety, and a regulation on the European Agency for Railways (ERA). Discussions were generally positive with the UK and other member states overwhelmingly supporting the presidency compromise texts. I emphasised the benefits of market opening in the UK and welcomed the incoming Italian presidency’s position to progress the political pillar (a position strongly endorsed by the Commission), but abstained from the votes on procedural grounds as only one of the three texts (the regulation on ERA) had cleared all our parliamentary scrutiny processes.
The Council also reached political agreement on the amended directive laying down the maximum weights and dimensions of road vehicles in national and international traffic. Discussions focused on the outstanding issue of cross-border movement of vehicles that exceed the maximum weights and dimensions laid down in the directive. Member states were divided between those pushing for legal clarity and those that could not support any changes to the relevant article (article 4) due to concerns about negative modal shift and increased demands on infrastructure. I strongly supported a proposal which would have provided the legal certainty the UK was seeking in order to safeguard the long-standing cross-border movement of vehicles of over 4 metres in height between the UK and Ireland. This was supported by several other member states. There was, however, significant opposition and as a result the presidency had no option but to conclude that no changes would be made to article 4 in order to secure a deal on the overall file. Following lobbying in the margins from the UK and other likeminded member states the Commission agreed to make a declaration reaffirming that its interpretation of the directive is that if two neighbouring member states both allow vehicles that deviate from the requirements in the annex, then those neighbouring member states may permit the cross-border movement of these vehicles, but not more widely. This was a positive outcome for the UK as it confirmed that our existing cross-border practices could continue.
The Council took note of progress reports on the proposed air passenger rights and the port services regulations. The Commission expressed disappointment that the Council had not yet reached a common view on air passenger rights and hoped rapid agreement could be reached on this and all other aviation dossiers including the EU-Ukraine common aviation area agreement. On the specifics of the air passenger rights dossier, the Commission expressed reservations regarding the category of unexpected flight safety shortcomings and the proposed deletion of the compensation regime for missed connecting flights. Several member states used the opportunity of the progress report on the port services regulation to emphasise their concerns, in particular on scope and whether a regulation was the appropriate legal instrument.
Any other business was dominated by a wide range of aviation items with the Commission providing updates on work at international and European levels to improve aircraft tracking following the disappearance of Malaysian Airlines flight MH 370, and also its report on the application of the airport charges directive. Spain presented its information paper on preserving and enhancing the EU influence in the International Civil Aviation Organisation (ICAO) and the Netherlands pressed the Commission for a clear timetable to discuss further the social dimension in the air transport sector.
Under land transport the presidency provided information on the outcome of the 8 May informal Transport Council and on Shift2Rail. The Commission also provided an update on the cross-border traffic offence directive. On the maritime side, the Council conclusions on the EU’s maritime transport policy were adopted without debate.
Finally, Italian Transport Minister, Maurizio Lupi, set out the theme for the Italian EU presidency as “infrastructure and transport for growth and cohesion” and confirmed that the transport priorities will be actions on TEN-T networks, ports services, the political pillar of the fourth railway package and the single European sky. The key dates for the Italian presidency will be Transport Councils on 8 October in Luxembourg and 3 December in Brussels. An informal council will be held in Milan on 16-17 September.
(10 years, 7 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I congratulate my hon. Friend the Member for Broadland (Mr Simpson) on securing this important debate on the strategic importance of the A47. I know the subject is of great importance to him and a number of other hon. Friends, and I am aware that he has long campaigned for improvements to the route.
The A47 is an important trunk road that connects Norfolk with the midlands, and improving it has been considered by successive Governments. I recognise the strategic importance of the corridor and therefore of finding solutions to its problems. I plan to visit that stretch of road next month, although I am no stranger to it, having returned from my visit to the Norwich North by-election not so long ago, where my hon. Friend the Member for Norwich North (Chloe Smith) had such a glorious victory. Indeed, I know the area well, having spent a season driving a combine harvester during my student days.
In terms of this Government’s commitment to infrastructure investment, we have already announced increased levels of Government funding to deliver improvements all around the strategic road network, targeted at supporting economic growth. Our commitment to deliver a step change in future investment in transport infrastructure was made clear by the Chancellor in his statement of 26 June last year, in which he announced the conclusions of the Government’s 2013 spending review. The Treasury’s Command Paper “Investing in Britain’s Future” set out that the Government would invest more than £28 billion in enhancements to and maintenance of both national and local roads. That includes £10.7 billion for major national road projects and £4.9 billion for local major projects. More than £12 billion has been allocated for maintenance, with nearly £6 billion for repairs to local roads and £6 billion for the maintenance of strategic roads, including resurfacing 80% of that network.
I will now comment on points that have been made during the debate. My hon. Friend the Member for Broadland talked about a competition. I should like to make it clear that this is not a competition in which there can only be one winner. I hazard to suggest that there will be a degree of success in all six areas that we have identified. His campaign—he talks about hunting as a pack with his colleagues from that part of the world—has certainly highlighted the importance to the whole region of improving the A47. I pay tribute to the A47 Alliance for its work in that regard.
My hon. Friend asked about the timetable for announcements and mentioned the autumn statement. I suggest that he makes sure he gets a place for the autumn statement, to hear what the Chancellor says. As my hon. Friend said, we will complete stage 2 by the end of July, and we will be ready to make announcements by the time of the autumn statement.
My hon. Friend the Member for Norwich South (Simon Wright) brought a coalition aspect to the debate, and he mentioned the importance of the A11 junction at the Thickthorn roundabout, the B1108 traffic signals and how the potential of the Norwich research park may be unlocked. He, like all Members, stressed the importance of looking at the whole route. It is good to see that hon. Members are not only campaigning for their bit of the route but understand the holistic approach that is needed.
My hon. Friend the Member for Waveney (Peter Aldous) talked about the A12 south from Great Yarmouth. He talked about how roads can rebalance the economy and how that could unlock the potential of Great Yarmouth and Lowestoft. My hon. Friend the Member for North West Norfolk (Mr Bellingham) talked about safety issues. He drew my attention to the tragic accident in East Winch and how, in many places, the road cuts villages in half, which can make it difficult for people to access village halls or schools on the other side of the road.
My hon. Friend the Member for Mid Norfolk (George Freeman) described himself as a young whippersnapper, and I suggest that we all feel like young whippersnappers in the presence of my hon. Friend the Member for Broadland. My hon. Friend the Member for Mid Norfolk talked about the importance of science and innovation to the economy of East Anglia and how investment could fan the white heat of technology, to use Harold Wilson’s words. He also mentioned the importance of food, biotech and engineering to the area. We are considering the Dereham to Swaffham section, which I make clear is not omitted from the study.
My hon. Friend the Member for Norwich North talked about the NDR and the importance of Norwich airport. As the Minister with responsibility for aviation, I understand the importance of our regional international airports. I know her constituency well for that reason. My hon. Friend the Member for South Norfolk (Mr Bacon) mentioned that Norfolk is now a serious high-tech county in many sectors, and he name-checked several successful businesses in his area.
My hon. Friend the Member for North East Cambridgeshire (Stephen Barclay) mentioned the importance of the road haulage industry. One of the problems on the single carriageway sections of the A47 is that there is a 20 mph difference between the 40 mph national speed limit for trucks and the 60 mph national speed limit for cars, which in some cases can lead to reckless overtaking manoeuvres by car drivers due to the frustration of following slow trucks.
I endorse the Minister’s point, which is that the difference in speed limits often causes accidents and road safety issues, as well as having a significant economic cost. For transparency, I draw the attention of Members to the Register of Members’ Financial Interests, as there was a donation to my association in 2010. Due to both road safety and economic impact concerns, there is considerable desire in my constituency, and I am sure in others, to consider increasing the speed limit for heavy goods vehicles to ease the discrepancy.
The Government are considering that measure. The Scottish Government are considering a trial on the A9 north of Perth, where there are particular problems, with a view to increasing the speed limit for trucks to improve safety on the road.
I know my hon. Friend the Member for Great Yarmouth (Brandon Lewis) would have liked to contribute to the debate, but his ministerial duties precluded him from doing so. I am sure he would have mentioned the importance of the Acle straight and Great Yarmouth to the energy industry.
The hon. Member for Birmingham, Northfield (Richard Burden) talked about the stop-start investment in roads. I am proud that we are tripling investment in roads, and we must not forget that when the Blair Government came into power they announced a moratorium on new road building, even though they had the money to build roads. Later in that disastrous period of government, they had to cut road building because they ran out of money. When we took over, we had to make some tough decisions because of the dire financial position that we inherited. Fortunately, things are looking a lot better, which is why we are able to invest in infrastructure generally, not only in roads but in the conventional rail network and our new high-speed rail network.
The hon. Gentleman also mentioned the GoCo through which we will deliver many of the infrastructure projects. That is part of our long-term plan to deliver better value for money for the taxpayer. I am sure we will have opportunities to discuss that across the Dispatch Box.
On the timetable, assuming that this idea is approved in the autumn statement, will the GoCo have a further look at the proposal, or will it have been approved at that stage? What is the timetable?
The whole point of the GoCo is to get on with these jobs, not to delay them. I can allay the hon. Gentleman’s fears in that regard. Network Rail works in that way, and it does not tend to delay rail projects; it tends to deliver them efficiently.
I met a number of hon. Friends in February to discuss the updated proposals put together by the A47 Alliance in its “Gateway to Growth” prospectus. The updated prospectus is an excellent example of how a range of local and regional interests can work closely together to set out the case for future Government investment. The prospectus sets out a targeted programme of improvements to both the strategic and local road networks. It details some 19 specific schemes, with indicative costs and timings.
I will now set out how my Department will consider options for future investment. My hon. Friend the Member for Broadland highlighted the issues on the A47 and the potential for those problems to be exacerbated by planned developments and growth in the region. He will know that the Government recognise those issues and the importance of transport infrastructure to supporting the economy. He will also know that we are committed to identifying and funding early solutions to the long-standing problems on the A47 corridor, initially by undertaking a feasibility study. The A47 corridor feasibility study was announced by the Secretary of State for Transport on 20 August 2013 following the spending review, and it is one of six studies on the strategic road network. On 14 January 2014 I also announced that the section of the A12 between Great Yarmouth and Lowestoft would be included within the study’s geographic scope.
It may be useful if I say a little more about the approach we are taking, as the feasibility study is the mechanism by which we will identify early solutions to the problems on the A47 corridor. The study’s aim is to identify opportunities and understand the case for future investment solutions on the A47 corridor that are deliverable, affordable and offer value for money. Although much of the work has been done previously, agreement has not been reached on the solutions. It is therefore important for us to carry out the study to ensure that we understand the priorities for the corridor and that proposals for investment demonstrate a strong and robust economic case for investment, demonstrate value for money and are deliverable. As part of the study, we have committed to engage with stakeholders to develop and agree the detailed scope of the work. My officials discussed the proposed scope of the work with stakeholders at a meeting in Norwich in late January, and they considered the views expressed before finalising and publishing the scope on 23 April. A number of my hon. Friends have also provided views on the study work’s scope and the range of possible solutions and priorities.
The study work will be conducted in stages, with the initial stage aiming to identify the current and future challenges along the corridor, taking account of local growth plans and priorities. We have built on existing evidence bases and previous study work, including the evidence collected as part of the Highways Agency’s route strategy process and evidence presented in the A47 Alliance’s “Gateway to Growth” prospectus. We are now concluding that stage of the work. We will continue to engage with stakeholders throughout the life of the study.
I again congratulate my hon. Friend the Member for Broadland on securing this debate. I have made it clear that the Government are committed to, and have set out plans for, large-scale improvements to our national strategic road network in the relative short term. The Government have also committed to developing a longer-term programme of investments through the route strategy process.
Through the A47 corridor feasibility study, we will work closely with local stakeholders to ensure that we consider current and future transport problems and the range of possible solutions that could address those problems. As I said, it is important that proposals for future investment are clearly supported by local stakeholders—which the presence of so many Members underlines—and that there is a clear consensus on what is required. Ultimately, any proposals for future investment need to demonstrate a strong business case and the delivery of both transport and wider economic benefits.
(10 years, 7 months ago)
Commons Chamber1. What representations he has received on his proposed reforms to the regulation of the taxi and private hire industry.
The Department undertook a targeted consultation in January with the intention of seeking immediate reactions to three proposed taxi and private hire vehicle measures, for inclusion in the Deregulation Bill. Our position on the measures is clear: they are liberalising, cost-saving steps that will benefit many thousands of small businesses and customers throughout the country.
I must tell the Minister that drivers in Sheffield have expressed grave concern to me about his proposals. They fear that these rushed changes, which will allow minicab operators to subcontract bookings to other operators in a different district, could result in drivers working hundreds of miles away from their home licensing authority, and that our licensing authority in Sheffield would be unable to carry out effective enforcement. Does the Minister share those drivers’ fear that the changes will put the public’s safety at risk?
No, I do not. In fact, I believe that the changes will give the public a better service. For example, if someone rings a private hire vehicle company and all its vehicles—or, perhaps, all its disabled-access vehicles—are occupied, it will be able to call on another company from across the border to fill the gap. People will get the service that they want, and I do not believe that safety will be compromised at all.
Will the Minister reflect on the fact that if his proposals are implemented, someone who gets into a minicab will not know whether it has come from the company that he or she telephoned, will not be able to assume that the person driving it is licensed to do so, and will not even be able to assume that the car itself has been passed as okay to carry passengers in his or her own town or city? Expert opinion after expert opinion has warned the Minister that all this could put passengers’ safety at risk. Why does he feel that he knows better than anyone else?
I do not accept those criticisms. The fact that a company is registered across the border in another local authority area does not mean that it will not meet the standards that apply in that local authority area. This is about more flexibility and a better service for people using private hire vehicles.
2. What consideration he has given to extending the proposed east-west route from Oxford to Bristol or Cardiff.
Passenger train services that could use the east-west route could be extended to Bristol. However, additional capacity on parts of the Great Western main line is likely to be required to accommodate the additional services.
I thank the Minister for that encouraging reply. Before long, we shall start to look at the specifications for the next Great Western franchise, and services along that route could stop at a reopened Corsham station. Given the importance of our ambitions for Corsham in the strategic economic plan, how should we go about including those services in the next franchise?
I am well aware of my hon. Friend’s aspiration to reopen Corsham station, which closed in 1962, even before the Beeching cuts. We are reopening 45 miles of the Oxford to Bedford line, and I believe that the long-term aspiration is to extend it to Peterborough, which would possibly include reopening Corsham station. However, when it comes to aspirations, I think we are looking at the next decade.
3. What plans he has to introduce new rolling stock on the railways.
6. If the Parliamentary Under-Secretary of State for Transport will visit the sites of the proposed junction 10A on the A14 and the proposed Weekley-Warkton bypass, and meet representatives of Kettering borough council to discuss those proposals on 23 May 2014. [R]
I thank the Minister for his positive response. Thousands of new houses are being built in and around Kettering, so these two projects, which will cost a total of £60 million, are vital not only to unlock £1 billion of economic development under the Treasury Green Book rules but to prevent the town of Kettering from grinding to a halt because of all the extra traffic.
I think that my hon. Friend found out that I was due to be in Corby that day to open a new road, so I will be able to combine the two visits. This is a £40 million to £50 million scheme to which we have no policy objections, but as it will unlock potential development for up to 5,000 houses and improve access to the business and energy parks, I think that it is only fair that those who stand to gain—that is, the developers and the local authority, through the new homes bonus—should pay some of the costs.
When the Minister is in north Northamptonshire, will he ensure that his visit to Kettering does not eat into the time he has with us to celebrate the opening of the new Kettering to Corby link road? In my dealings with the Minister I have found him to be an even-handed and fair-minded man, so will he acknowledge that because of the lead-in, this project is very much a result of the work of the previous Labour Government and of Phil Hope, the then MP for Corby?
I would just add that this Government have tripled investment in roads, whereas I seem to remember that in 1997, when the Blair Government came to power, there was a moratorium on building roads. I look forward to coming to Corby. I think I will be calling in at Newark on the way home.
7. What progress his Department has made on its study of proposals to dual the remaining single carriageway sections of the A1.
There are no specific improvements to journey times and passenger capacity currently planned on the Waterloo to Weymouth line. However, the rail investment strategy requires additional capacity into Waterloo to meet extra demand of 9,700 passengers in the morning peak period by 2018. This could benefit the Weymouth line.
I thank my hon. Friend for that rather disappointing response. Will he explain why we are going to spend a fortune in taxpayers’ money speeding up the journey times between London and Birmingham when those journeys are already 50% faster than those between Southampton and London?
In every part of the country that I travel to, I am told that there are capacity constraints, but there is no simple solution to the problem. I am aware that the journey time from Christchurch into London is two hours and 10 minutes, which is longer than my journey from York to King’s Cross. Of course, the problem is often that faster services have fewer stops. For example, the fastest train on this line does not stop at Christchurch.
More people now travel through Waterloo in three hours every morning than through Heathrow in an entire day, but train services to the south coast remain painfully slow, as has been mentioned. Will the Secretary of State commit to looking into ways by which travel times, particularly to Portsmouth, can be reduced and services speeded up, because it is affecting business investment in our region?
As additional capacity is provided at Waterloo, which is the busiest station in the country with almost 100 million passengers per year, that will allow more flexibility further afield, but this is part of the problem of addressing the tremendous increase in passenger ridership that has occurred since privatisation.
9. What plans he has to set up an HS2 skills academy.
11. What assessment he has made of the level of availability of spare parts for the rail network.
Rolling stock spares are a matter for the train operators. They are required to have arrangements in place to maintain their leased trains so that they can deliver the performance level defined in their franchise agreement. I am aware of the specific problem of replacement wheels on my hon. Friend’s line.
Services on the Felixstowe to Ipswich line were disrupted for a number of reasons, one of which was the lack of availability of wheel sets around the entire network. I recognise that this is a matter for the rail companies to sort out themselves, but I hope that the Department can have a word with strategic partners, including with leasing companies and manufacturers.
Abellio Greater Anglia is well aware of the problem and has given us assurances that it is on top of it. The bad weather not only caused flood damage to some units, but caused a number of cases where brakes locked up and caused flats on the wheels so, instead of being able to re-profile the wheels perhaps six times during their life at 150,000-mile intervals, some of them were damaged beyond repair, which meant that there was a short-term shortage of those components.
Another important part of the rail infrastructure is the overhead wire system. When will the Minister take action to ensure the improvement of overhead wires on the east coast main line to avoid disruptions to services, of which I am sure he is well aware, given his journeys to London?
As somebody who uses the east coast main line regularly, I am aware that we have regular problems with overhead lines. If a line is brought down by a fast moving train, it can take some considerable time to repair. That is in marked contrast to the performance of High Speed 1, where we had no disruption, despite the bad weather over the winter, and we can expect similar very high levels of performance from High Speed 2.
13. What assessment he has made of the adequacy of the amount of time allowed for pedestrians to use pedestrian crossings.
Local councils are responsible for setting pedestrian crossing timings with reference to the guidance walking speed of 1.2 metres per second. The Department is conducting a review of traffic signing legislation, and once that is complete will consider the need to update the guidance.
Having rushed across many roads to get here in time for this question, I thank the Minister for his answer. Will he carry out that review as quickly as possible? The legislation has not been looked at since the 1950s and a recent review suggested that three quarters of elderly people struggle to cross the road before the signals change. Will he please look into the matter urgently?
I certainly will. We are reviewing the situation. The green man is an invitation to cross. When the green man is extinguished, there is still time to cross. The updated puffin crossings have movement detectors, which allow extra time to be given. We are looking at other types of crossing as well, which will further improve the situation.
14. What financial assistance he is providing to local authorities for the repair of potholes.
The Government are blocking an EU directive that bus drivers should have disability awareness training. In January, the Minister promised me a review in March, but in response to a later question he seemed to back off that promise. With my letter on this to his Lords colleague at the end of March still unanswered, when will the Government keep his promise to the House and stop letting disabled people down?
I will certainly ensure that the hon. Gentleman receives a reply to his letter. I am somewhat surprised that he has not had one already, but I will find out what has gone wrong. As we discussed in Westminster Hall recently, the voluntary approach is working very well with over 75% of drivers having this sort of training, which is important to ensure that disabled people have equal access to all forms of transport.
T3. I wonder whether my right hon. Friend has had the opportunity to travel on the M1 between Leeds and Sheffield recently. It is a pig of a journey due to a 17-mile stretch of roadworks with a 50 mph enforced speed limit. I recognise the need for those roadworks, but is there any reason why they cannot be done in stages to improve the experience for motorists?
I have indeed travelled on that section of the M1 and it does seem to go on for ever. However, I am assured by the Highways Agency that doing the work in this way will incur a time saving of two thirds compared with doing it in stages. When we do such work, which includes replacement of steel central barriers with concrete ones, it improves repair time and over the long term will certainly improve road performance.
T2. East Coast’s current operator, Directly Operated Railways, was barred from bidding for the east coast franchise. The Secretary of State presumably welcomes the bid from Eurostar-Keolis, which is largely owned by French state railways. Is it not time to change policy and to allow Directly Operated Railways to bid for franchises?
T4. The proposed Congleton link road will help to boost the economy across the east Cheshire region, relieving not only local town congestion, but that along the M6, both of which are frequently described as chronic. It will also improve access to and from Crewe station. Will the Minister consider making Government funding available to fund this vital link road project?
I understand that the Cheshire and Warrington local enterprise partnership has submitted a bid for local growth fund funding to support the Congleton link road as part of its strategic economic plan. We are currently assessing the plans and bids submitted by every LEP in England and we hope to be able to make an announcement in July.
T5. Mr Shah and other wheelchair users in my constituency will be disappointed by the Minister’s response to my hon. Friend the Member for Blackpool South (Mr Marsden) in relation to the disability awareness training for bus drivers under EU regulation 181/2011. They tell me that drivers simply say, “Sorry mate, the lift is not working” or “the ramp is not working.” Sometimes they drive by with their thumb down and ignore them. Only 28% of drivers have received such training. When will the Minister get on and act on the regulation?
I say gently to the hon. Gentleman that his assiduity is not in question, but his ability to distinguish between a substantive and a topical question in terms of length perhaps is.
We feel we should take the voluntary route, but I certainly understand the problem. Indeed, one of my noble Friends at the other end of the corridor told me that they sometimes have to put somebody outside to flag down a taxi so that a disabled Member of the other place can then get into it. It is not just about training and awareness; it is about the attitude of taxi drivers, which cannot be instilled through training.
T6. From Gargrave to Embsay and from Masham to Ripon, communities across Skipton and Ripon are concerned about cuts to rural bus services. What more can Ministers do to work with the most rural parts of our communities on buses? Will they look very favourably at North Yorkshire county council’s bid to the sustainable transport fund, which closes later this month?
As a North Yorkshire Member myself, I am aware of some of the changes to rural bus services that are affecting my constituents as well as my hon. Friend’s. The fact remains that, outside London, 44% of the fare box that goes to bus operators is provided through various subsidies. We need to be more intelligent in targeting the services that people, particularly pensioners, use in rural areas.
Earlier this morning in Westminster, the Freight Transport Association launched its excellent 2014 logistics report. One policy area success that has eluded successive Governments is in the promotion of coastal shipping. What are the Government doing in this regard?
Does the Secretary of State share my profound concern that roadside recovery operators working on our motorways have been instructed that they must continue to work when they have asked for a lane closure, even for safety reasons, but the Highways Agency has refused that closure? This is putting people’s lives at risk. Will he order an urgent inquiry and put an immediate stop to this dangerous practice?
I thank the hon. Gentleman for raising that matter. It is the first time it has been brought to my attention, and I will certainly have a conversation with the Highways Agency. Our smart motorways schemes make it much easier to close lanes and move traffic, so it should not be a problem on those sections of road. I will get back to the hon. Gentleman with the reply I receive.
Order. We are time constrained, but a short one-sentence question will suffice.
(10 years, 7 months ago)
Commons ChamberI apologise for my slightly late arrival at the Dispatch Box, Madam Deputy Speaker. Perhaps that was rather apt, given the subject we are discussing.
I congratulate the hon. Member for Lewisham East (Heidi Alexander) on securing this debate on Southeastern services. At the very outset, I want to make the point that the rail franchising system and the way in which the Government engage with private sector operators is all about improving rail services for people, not some ideological opposition to state provision. In practice, the system has been shown to deliver in many parts of the country. As we have seen during the period since privatisation, rail usership has doubled from 750 million to 1.5 billion. Of course, that is part of the problem: as more and more people use rail services in this country, the overcrowding on trains and the problems of squeezing more and more trains on to what is by and large a Victorian network is a real challenge that I know frustrates commuters daily.
As the hon. Lady has contributed so fully to previous discussions in the House—for example, the debate in February secured by my hon. Friend the Member for Dartford (Gareth Johnson), who I note has joined us in the Chamber—some of my points will sound familiar. I hope that she will forgive that repetition, but I will cover some of her questions from the last debate, particularly on overcrowding and passenger compensation.
I thank the hon. Lady for her invitation to join her on the train to Lewisham. I suggest that I can do better than that, as I have a member of staff who lives on that very line, and I get a daily update about the problems of getting a seat on the train. Indeed, when she moved slightly further away from the centre of London, she said, “Although it’s a longer journey, at least I can get a seat.” It is something of an indictment of that particular service that people see living further away as a good idea, because they can get a seat before the train sets off. I am made aware of some of the daily trials and tribulations; indeed, I also sometimes get excuses about why she sometimes arrives at work late.
Let me first state that this Government are committed to continuing the strong growth in rail travel experienced over recent years. We have invested billions of pounds in railway infrastructure, and we have set out our plans to continue to do so. The Thameslink programme is one of those key investments, and we are committed to funding and delivering it in its entirety. On completion in 2018, it will virtually double the number of north-south trains running through central London at peak times. It will deliver 1,140 carriages of high-capacity next generation rolling stock, in addition to about 600 new carriages that will be provided as part of the Crossrail project. That represents a significant enhancement to the capacity of the entire UK rail network. That might be no consolation to people in Lewisham, but it shows that we recognise the problem and are investing not only in new infrastructure, but in new rolling stock.
I was aware of discussions about the new Thameslink franchise that could have meant that some services would call at stations such as Lewisham. I wonder whether the Minister can update me on whether there is any chance of some Thameslink services being routed through Lewisham, instead of along the more traditional routes, and on whether that could add capacity to our part of the network.
I am afraid that I cannot give the hon. Lady any news on that subject. However, as it has been raised on the Floor of the House, I know that officials will be keen to revisit it to see what potential there is. In her contribution, she spoke about the potential for improving services on the Catford loop. However, the system is by and large operating at capacity, particularly at peak times in the morning and evening. In fact, it is operating at more than capacity given that many people cannot get a seat on their train.
The key headline indicator for rail performance is the public performance measure, which measures the percentage of services that arrive within five minutes of their timetabled time. From April 2013 to March 2014, the Southeastern network achieved a disappointing PPM score of 89%. That is 3.8 percentage points below the target agreed between Southeastern and Network Rail. I note the point that the hon. Lady made about aggregation, which means that those figures may hide worse performing parts of the network. She mentioned that High Speed 1 has a good punctuality record. That is a good reason why we should be building brand new rail infrastructure in this country. It does not have the same problems, such as those related to bad weather, that we see on parts of the creaking Victorian network.
PPM is the responsibility of Network Rail and the train operating companies, and a failure by one or both will cause the PPM to fall. To assess where the blame for the declining PPM lies, it is necessary to consider performance against the delay minute targets agreed between Network Rail and Southeastern. In general terms, Network Rail is responsible for approximately two thirds of the delay minutes across the UK rail network, with the train operating companies accountable for the remainder.
The performance of Southeastern over the past 12 months was 6% adrift of its cumulative delay minute target. That 6% represents an additional 16,000 delay minutes over its target of 271,000. Network Rail, on the other hand, finished the year more than 50% adrift of its targets, which represents 200,000 delay minutes above its target of 400,000. The results of both Network Rail and Southeastern are clearly influencing the downward PPM trend, with Network Rail’s performance having by far the greatest impact.
What is being done to improve Network Rail’s performance? First, it is important to acknowledge that safety must remain the highest priority. Network Rail’s performance in that regard has ensured that the UK has one of the safest, if not the safest, railways in Europe. That said, Network Rail’s rapidly increasing share of delay minutes shows that its performance has simply not been good enough and must improve.
It would be remiss of us to ignore the impact that severe and unprecedented weather has had on its operational performance, and the inevitable delays that that has caused. Since October last year, the severe weather has led to landslips, flooding and vegetation issues—I presume that that means the wrong kind of leaves—all of which have impacted heavily on the service that Southeastern has been able to deliver. To take one example, passengers using the Hastings line endured closures and disruption between December 2013 and March 2014 owing to multiple landslips. Although it is fair to put Network Rail’s performance into perspective, extreme weather should not be allowed to mask underlying issues and risk factors that could have been controlled or at least mitigated. In other words, the weather is not an excuse for everything.
Southeastern recently referred Network Rail to the Office of Rail Regulation to highlight its poor performance with regard to trees on the track, landslips and engineering possession overruns. The ORR held a formal review of Network Rail’s performance in March in the presence of Southeastern and Network Rail’s senior management teams. At the review and in subsequent communications, Network Rail accepted that performance on the Southeastern network had fallen below acceptable levels of late, and it has provided assurances that performance will be improved—
Encouragingly, Network Rail has already reviewed its management of engineering possessions and taken action to implement new processes designed to overcome identified weaknesses in planning and delivery.
Although Network Rail’s recent performance on Southeastern’s network has been unsatisfactory, investment through Network Rail has not been neglected by the Government. In control period 5—2014 to 2019—Network Rail will deliver a £38 billion programme to help transform the busiest parts of Britain’s rail network. That programme takes forward the plan set out by the Government in their rail investment strategy published in 2012.
Southeastern is currently performing within its contractual benchmarks for “cancellations”, “train capacity” and “delay minutes”, and has done so for the duration of its franchise. The Department monitors those benchmarks regularly and, in the event of a breach, swift and appropriate action will be taken. The hon. Lady raised Southeastern’s compensation scheme and overcrowding at the last debate in February. I shall now deal with those points in turn.
On passenger compensation, Southeastern’s official compensation scheme is called Delay Repay. Under Delay Repay, all passengers are entitled to claim compensation for each delay of more than 30 minutes, whatever the cause. There are no exclusions for delays outside the control of the train operator, such as those caused by Network Rail, or even outside the rail industry, such as those caused by vandalism or cable theft. Delay Repay is more generous than the previous compensation regime, and allows compensation to be claimed as follows: 50% of the single fare for delays of 30 to 59 minutes; 100% of the single fare for delays of more than 60 minutes; 100% of the return fare for delays of more than two hours.
Southeastern has paid out millions in Delay Repay compensation over the past 12 months, dwarfing payments made the previous year and showing increasing passenger awareness. It is certainly a way of concentrating the operator’s attention on shortcomings in that area. In addition, given the ongoing disruption on the Hastings line, and in recognition of the loss of service to season ticketholders, Southeastern decided to compensate those passengers with £50 Marks and Spencer vouchers. When the line opening was again delayed owing to a further landslip, Southeastern chose to further compensate season ticketholders with cheques ranging from £100 to £250. Those were commendable actions by Southeastern that it was not contractually required to make.
Overcrowding is a persistent issue on that and other lines, and from the passenger counts it collects, Southeastern is aware of services that are over-capacity and require strengthening. The Department encourages train operating companies to increase train length on overcrowded trains where it can reasonably do so without causing greater problems elsewhere on the network. Until additional rolling stock is introduced, increasing capacity will depend on Southeastern’s ability to deploy effectively its rolling stock to meet demand.
I am aware that Southeastern is looking into the possibility of running 12-car trains in the London metro area, but that is subject to the successful completion of power supply upgrades, as well as ongoing work to ensure the safe deployment of driver-only operation at stations. I understand that Southeastern is working with Network Rail to resolve those issues as a matter of priority. On additional rolling stock, we are in discussions with Southeastern to determine whether an affordable solution exists to augment its fleet by the end of 2017. Those discussions are ongoing, as part of the direct award negotiation.
The hon. Lady will know that the Department is currently negotiating a four-year direct award contract with Southeastern from October 2014, in accordance with the re-franchising programme. Those points will be familiar following her debate in February, but I consider the enhancements to be of considerable benefit to passengers and worthy of repetition. The new Southeastern franchise has been purposefully designed with customer satisfaction at its core. For that reason, an innovative performance regime has been included, which contractually requires operator-funded investments where National Rail passenger survey targets are not met. In addition, a financial incentive regime will be linked to the standard operator benchmarks of “delay minutes”, “cancellations” and “train capacity”. Attaching financial reward to customer satisfaction and operational performance is an essential element of the new franchise. This is designed to drive passenger benefits and, ultimately, continued strong growth in rail travel.
By which date will 12-car trains on the Southeastern network call at any station in my constituency in the morning rush hour?
As I said, discussions are ongoing, so I cannot give the hon. Lady a precise date. I hope that she will be reassured that it is an issue of great importance to the operator. Given the incentives, and the penalties that non-performing companies will incur, it is in the company’s interests to improve services and meet those key performance indicators.
Making performance more transparent is a further key aim of the new franchise. While Southeastern currently reports an average public performance measure by monthly period, in the new franchise it will be required to publish PPM data by route, in addition to its overall PPM average, which answers the point the hon. Lady made about individual performances being masked by the best performing services such as HS1. We will also be discussing with Southeastern what other information can be published about customers’ experience of using its services. I hope that she will engage with that process and let Southeastern know which indicators she wants it to focus on. I suspect that overcrowding is probably the issue that most affects customers after delays. There is compensation for delays, but that does not help customers in overcrowded trains, especially in bad weather.
My expectation is that increased transparency will help passengers make better informed travel decisions, as well as allowing the operator and Network Rail to target improvement strategies on the worst performing routes. Greater transparency will also enable the Department to challenge more effectively the operator’s delivery.
The hon. Lady mentioned the platform 4 gate at Lewisham station. I have to admit that I was not aware of that problem, which is due to engineering works, but I will certainly look into it and see that it is addressed. She also touched on the extension of the contract through direct award. As with all direct awards, this is a necessary step to achieving a manageable and deliverable franchise schedule for both the market and the Government. We continue to monitor the performance of Southeastern very closely.
Southeastern’s operational performance has been relatively good in the last 12 months, although it remains 6% off its delay minute targets. For the first period in the new rail year, it is ahead of its targets. Southeastern continues to work with industry partners Network Rail to improve performance for passengers, and has recently called and attended a formal review of Network Rail’s performance.
The massive investment being made by the Government in the Thameslink programme will improve services for the whole of the south-east of England, with 40% more capacity on services between Sevenoaks and the Thameslink core, via the Catford loop. However, in the short term, the Thameslink programme will cause significant disruption at London Bridge station. We believe that certainty of ownership and a stable partner will help better to manage the services for passengers during this period.
In summary, operational performance has declined sharply on the Southeastern network since October last year, and I agree that this is not acceptable. I expect to see improvements now that the Office of Rail Regulation has conducted its formal review, and Network Rail has provided commitments to Southeastern. There is also room for improvement in Southeastern’s performance, given that it was 6% off its delay minute targets by year end in March 2014. It has, however, made a strong start to the new rail year, with delay minute performance for the latest period in April ahead of target.
I hope that, by outlining some of the Department’s plans for the four-year direct award period, I have shown that the Department is committed to driving real improvements in transparency, performance and customer satisfaction. I am grateful to the hon. Lady for her continued interest in the Southeastern franchise, and for bringing this debate to the attention of the House.
Question put and agreed to.
(10 years, 7 months ago)
Written StatementsI can today inform the House that the Department for Transport has launched a public consultation on proposed changes to the Traffic Signs Regulations and General Directions 2002. The consultation will close on 10 June 2014.
These proposals represent significant changes to the existing regulatory regime, arising from the recommendations of a broad range of stakeholders as part of the traffic signs policy review. The proposed changes include: reductions in sign lighting requirements; measures to help improve road user understanding, reduced sign clutter and a range of improvements for cyclists.
To supplement the consultation process. Officials have scheduled a series of industry seminars to be held around Great Britain during May.
The successor regulations will come into force in early 2015.
(10 years, 7 months ago)
Written StatementsIn October 2013 the Government began a period of public consultation on proposals for transforming the Highways Agency into a Government-owned company.
Today I am publishing the Government’s response to this consultation. This document summarises the main views and issues raised by respondents on the consultation questions and explains the Government’s final decisions made as a result of the views provided.
Following the broadly positive response to most of the proposals we consulted on, today’s publication confirms our intention to:
Set up the Highways Agency as a Government-owned strategic highways company—with the legal powers and duties to manage and run the roads, appointed by licence from the Secretary of State for Transport which sets clear conditions about how the company must act.
Put in place a robust system of governance for this company—giving the road operator the flexibility needed to operate, manage and enhance the strategic road network effectively, while ensuring clear accountability to the Secretary of State, Parliament and road users. We intend to make drafts of the governance documentation, including licence, the framework agreement and the articles of association, available over the summer to support the legislative process.
Establish—for the first time—a “road investment strategy” which will detail the performance standards the company will achieve and an investment programme it will deliver over the next five years. We will publish this before the end of the year.
Set up new, discrete units within Passenger Focus and the Office of Rail Regulation—to represent the interests of all those who use and rely upon the strategic road network, and to monitor the efficiency and performance of the company.
This change represents a clear break from short-term thinking and the stop-start culture that has characterised the sector in the past, enabling the operator to deliver the biggest ever upgrade of our road network while saving the taxpayer at least £2.6 billion over 10 years.
It will put in place the structures, commitments and relationships to support a more ambitious infrastructure programme, and allow the strategic highways company to operate more like the best-performing infrastructure companies in other sectors. It will allow Government to adopt a more strategic role in managing the road network, meaning those running the roads day to day can be better held to account for the services they deliver, ensuring that the roads are run responsibly and in the public interest.
We believe these reforms will deliver significant benefits to road users and to the country as a whole, including:
a longer term investment programme, which is vital for the many companies who help plan, build and maintain our roads who can start thinking about the skills and equipment needed well in advance;
enabling delivery of national road infrastructure fit for the 21st century, to support jobs and growth up and down the country;
providing road users with a better quality service;
driving down the cost of improvements;
creating a more transparent system with clearer accountability;
ensuring effective scrutiny and a stronger voice for road users.
Transforming the Highways Agency is an essential component of success in delivering these benefits. It will give the road operator the ability to develop a more business-like approach, attract and retain skilled staff and to deliver more efficiently—as proposed by Alan Cook in his 2011 review.
Taken together, these reforms will provide a strong, certain framework for managing our roads. It will strengthen accountability, drive efficiency and increase transparency. It will also create far more certain conditions for investment, enabling the supply chain to gear up for the Government’s ambitious plans for the future. This will support the economy, promote jobs and skills and ultimately transform the quality of our national infrastructure. We look to move to the new model with minimal disruption.
A copy of the Government’s response to the consultation will be placed in the Libraries of both Houses. The document is available at:
https://www.gov.uk/government/consultations/transforming-the-highways-agency-into-a-government-owned-company
(10 years, 7 months ago)
Commons ChamberThank you, Mr Speaker. I am also the Minister for phase 1 of HS2.
I beg to move motion 3,
1. That the Bill be committed to a Select Committee.
2. That the following Members be appointed as members of the Select Committee: Mr Henry Bellingham, Sir Peter Bottomley, Ian Mearns, Yasmin Qureshi, Mr Robert Syms and Mr Michael Thornton.
3. (1) That there shall stand referred to the Select Committee
(a) any Petition against the Bill presented by being deposited in the Private Bill Office between 29 April 2014 and the closing date (inclusive), during the hours specified in a notice published by the Private Bill Office, and
(b) any Petition which has been presented by being deposited in the Private Bill Office during such hours and in which the Petitioners complain of any amendment as proposed in the filled-up Bill or of any matter which has arisen during the progress of the Bill before the Select Committee, being a Petition in which the Petitioners pray to be heard by themselves or through Counsel or Agents.
(2) The closing date for the purposes of sub-paragraph (1)(a) is-
(a) in a case where the Petition is that of a local authority (except a parish council) or a business, 16 May 2014, and
(b) in any other case, 23 May 2014.
4. That, notwithstanding the practice of the House that appearances on Petitions against an opposed Private Bill be required to be entered at the first meeting of the Select Committee on the Bill, in the case of any such Petitions as are mentioned in paragraph 3(1)(a) above on which appearances are not entered at that meeting, the Select Committee shall appoint a later day or days on which it will require appearances on those Petitions to be entered.
5. That any Petitioner whose Petition stands referred to the Select Committee shall, subject to the Rules and Orders of the House and to the Prayer of that person’s Petition, be entitled to be heard in person or through Counsel or Agents upon that person’s Petition provided that it is prepared and signed in conformity with the Rules and Orders of the House, and the Member in charge of the Bill shall be entitled to be heard through Counsel or Agents in favour of the Bill against that Petition.
6. That in applying the Rules of the House in relation to parliamentary agents, any reference to a petitioner in person shall be treated as including a reference to a duly authorised member or officer of an organisation, group or body.
7. That the Select Committee have power to sit notwithstanding any adjournment of the House, to adjourn from place to place and to report from day to day the Minutes of Evidence taken before it.
8. That three be the Quorum of the Select Committee.
With this, we shall discuss the following:
Amendment (b), at end of paragraph 3(1)(b), insert:
‘(c) any other Petition, which, while initially not conforming to the rules for Petitions, has been resubmitted within seven days of the Petitioner receiving notice and explanation of any defect in their Petition,’.
Amendment (c), leave out paragraph 3(2)(a) and (b) and insert ‘10 June 2014.’.
Amendment (d), at end of paragraph 3(2)(b), insert
‘3A. For the purposes of petitioning on the Bill, electronic deposit of petitions shall be permitted.’.
Amendment (e), at end of paragraph 3(2)(b), insert
‘3B. For the purposes of petitioning on the Bill, the £20 fee shall be waived.’.
Amendment (f), at end of paragraph 3(2)(b), insert
‘3B. For the purposes of petitioning on the Bill, electronic money transfer for payment of petitioning fees shall be facilitated.’.
Amendment (g), in paragraph 5, after ‘in conformity with the Rules and Orders of the House’, insert
‘and shall be given six weeks’ notice of the date on which the Committee shall hear their Petition’.
Amendment (h), at end of paragraph 5, insert:
‘5A. That each Petitioner whose Petition has been referred to the Select Committee shall be consulted on whether they wish to be heard at Parliament or in the parliamentary constituency in which they reside, and that the Select Committee shall seek to accommodate all requests to be heard in the relevant parliamentary constituency.’.
Amendment (i), at end of paragraph 5, insert
‘5A. The Committee shall visit each parliamentary constituency on the proposed route to look at the route so proposed.’.
Amendment (j), in paragraph 8, leave out ‘three’ and insert ‘four’.
Motion 4—High Speed Rail (London - West Midlands) Bill: Instruction—
That it be an Instruction to the Select Committee to which the High Speed Rail (London - West Midlands) Bill is committed to deal with the Bill as follows—
1. The Committee shall, before concluding its proceedings, amend the Bill by
(a) leaving out provision relating to the spur from Old Oak Common to the Channel Tunnel Rail Link, and
(b) making such amendments to the Bill as it thinks fit in consequence of the amendments made by virtue of sub-paragraph (a).
2. The Committee shall not hear any Petition to the extent that it relates to whether or not there should be a spur from Old Oak Common to the Channel Tunnel Rail Link.
3.–(1) The Committee shall treat the principle of the Bill, as determined by the House on the Bill’s Second Reading, as comprising the matters mentioned in sub-paragraph (2); and those matters shall accordingly not be at issue during proceedings of the Committee.
(2) The matters referred to in sub-paragraph (1) are:
(a) the provision of a high speed railway between Euston in London and a junction with the West Coast Main Line at Handsacre in Staffordshire, with a spur from Water Orton in Warwickshire to Curzon Street in Birmingham and intermediate stations at Old Oak Common and Birmingham Interchange, and
(b) in relation to the railway set out on the plans deposited in November 2013 in connection with the Bill in the office of the Clerk of the Parliaments and the Private Bill Office of the House of Commons, its broad route alignment.
That these Orders be Standing Orders of the House.
Amendment (a), after paragraph 1(b), insert:
‘(c) making such amendments to the Bill as are necessary to provide complete protection to any areas of outstanding natural beauty, classified ancient woodland, sites of special scientific interest and national monuments.’.
Amendment (b), at end of paragraph 1(b), insert
‘1A. The Committee shall consider whether the statutory and non-statutory provisions for compensation available to those who may be injuriously affected by the exercise of the powers conferred by the Bill merit any change.’.
Amendment (e), in paragraph 2, leave out from ‘whether’ to ‘Link’, and insert
‘the spur from Old Oak Common to the Channel Tunnel Rail Link referred to in the Bill; but the Committee is not prevented by this instruction from hearing any Petition relating to the need for the Bill to:
(a) include an alternative to the spur;
(b) facilitate the provision at a later date of the spur; or
(c) facilitate the provision at a later date of an alternative to the spur, by reason only that (a), (b) or (c) shares some of the same characteristics as the spur or would encompass facilitation of the spur referred to in the Bill.’.
Amendment (c), leave out paragraph 3.
Amendment (d), at end of paragraph 3(2)(b), insert:
‘4. The Committee shall comment on and report to the House for its consideration any issue relating to the environmental impact of the railway transport system for which the Bill provides that is raised in a Petition against the Bill, including whether alternative or additional environmental protections and mitigations should in the Committee’s opinion be further examined.’.
[Relevant document: Thirteenth Report from the Environmental Audit Committee, on HS2 and the environment, HC 1076.]
Motion 5—High Speed Rail (London - West Midlands) Bill: Carry-Over—
That, notwithstanding the practice of the House, the following provisions shall apply to proceedings on the High Speed Rail (London - West Midlands) Bill:
Suspension at end of this Session
1. Further proceedings on the High Speed Rail (London - West Midlands) Bill shall be suspended from the day on which this Session of Parliament ends (“the current Session”) until the next Session of Parliament (“Session 2014-15”).
2. If a Bill is presented in Session 2014-15 in the same terms as those in which the Bill stood when proceedings on it were suspended in the current Session–
(a) the Bill so presented shall be ordered to be printed and shall be deemed to have been read the first and second time;
(b) the Bill shall stand committed to a Select Committee of the same Members as the members of the Committee when proceedings on the Bill were suspended in the current Session;
(c) any Instruction of the House to the Committee in the current Session shall be an Instruction to the Committee on the Bill in Session 2014-15;
(d) all Petitions presented in the current Session which stand referred to the Committee and which have not been withdrawn, and any Petition presented between the day on which the current Session ends and the day on which proceedings on the Bill are resumed in Session 2014-15 in accordance with this Order, shall stand referred to the Committee in Session 2014-15;
(e) any Minutes of Evidence taken and any papers laid before the Committee in the current Session shall stand referred to the Committee in Session 2014-15;
(f) only those Petitions mentioned in sub-paragraph (d), and any Petition which may be presented by being deposited in the Private Bill Office and in which the Petitioners complain of any proposed additional provision or of any matter which has arisen during the progress of the Bill before the Committee in Session 2014-15, shall stand referred to the Committee;
(g) any Petitioner whose Petition stands referred to the Committee in Session 2014-15 shall, subject to the Rules and Orders of the House and to the Prayer of that person’s Petition, be entitled to be heard in person or through Counsel or Agents upon the Petition provided that it is prepared and signed and in conformity with the Rules and Orders of the House, and the Member in charge of the Bill shall be entitled to be heard through Counsel or Agents in favour of the Bill against that Petition;
(h) the Committee shall have power to sit notwithstanding any adjournment of the House, to adjourn from place to place, and to report from day to day Minutes of Evidence taken before it;
(i) three shall be the Quorum of the Committee;
(j) any person registered in the current Session as a parliamentary agent entitled to practise as such in opposing Bills only who, at the time when proceedings on the Bill were suspended in the current Session, was employed in opposing the Bill shall be deemed to have been registered as such a parliamentary agent in Session 2014-15;
(k) the Standing Orders and practice of the House applicable to the Bill, so far as complied with or dispensed with in the current Session, shall be deemed to have been complied with or (as the case may be) dispensed with in Session 2014-15.
Suspension at end of this Parliament
3. If proceedings on the Bill are resumed in accordance with paragraph 2 but are not completed before the end of Session 2014-15, further proceedings on the Bill shall be suspended from the day on which that Session ends until the first Session of the next Parliament (“Session 2015-16”).
4. If a Bill is presented in Session 2015-16 in the same terms as those in which the Bill stood when proceedings on it were suspended in Session 2014-15–
(a) the Bill so presented shall be ordered to be printed and shall be deemed to have been read the first and second time;
(b) the Standing Orders and practice of the House applicable to the Bill, so far as complied with or dispensed with in the current Session or in Session 2014-15, shall be deemed to have been complied with or (as the case may be) dispensed with in Session 2015-16; and
(c) the Bill shall be dealt with in accordance with–
(i) paragraph 5, if proceedings in Select Committee were not completed when proceedings on the Bill were suspended,
(ii) paragraph 6, if proceedings in Public Bill Committee were begun but not completed when proceedings on the Bill were suspended,
(iii) paragraph 7, if the Bill was waiting to be considered when proceedings on it were suspended,
(iv) paragraph 8, if the Bill was waiting for third reading when proceedings on it were suspended, or
(v) paragraph 9, if the Bill has been read the third time and sent to the House of Lords.
5. If this paragraph applies–
(a) the Bill shall stand committed to a Select Committee of such Members as were members of the Committee when proceedings on the Bill were suspended in Session 2014-15;
(b) any Instruction of the House to the Committee in the current Session or in Session 2014-15 shall be an Instruction to the Committee on the Bill in Session 2015-16;
(c) all Petitions presented in the current Session or in Session 2014-15 which stand referred to the Committee and which have not been withdrawn, and any Petition presented between the day on which Session 2014-15 ends and the day on which proceedings on the Bill are resumed in Session 2015-16 in accordance with this Order, shall stand referred to the Committee in Session 2015-16;
(d) any Minutes of Evidence taken and any papers laid before the Committee in the current Session or in Session 2014-15 shall stand referred to the Committee in Session 2015-16;
(e) only those Petitions mentioned in sub-paragraph (c), and any Petition which may be presented by being deposited in the Private Bill Office and in which the Petitioners complain of any proposed additional provision or of any matter which has arisen during the progress of the Bill before the Committee in Session 2015-16, shall stand referred to the Committee;
(f) any Petitioner whose Petition stands referred to the Committee in the first Session of the new Parliament shall, subject to the Rules and Orders of the House and to the Prayer of his Petition, be entitled to be heard in person or through Counsel or Agents upon the Petition provided that it is prepared and signed and in conformity with the Rules and Orders of the House, and the Member in charge of the Bill shall be entitled to be heard through Counsel or Agents in favour of the Bill against that Petition;
(g) the Committee shall have power to sit notwithstanding any adjournment of the House, to adjourn from place to place, and to report from day to day Minutes of Evidence taken before it;
(h) three shall be the Quorum of the Committee;
(i) any person registered (or deemed by paragraph 2(j) to be registered) in Session 2014-15 as a parliamentary agent entitled to practise as such in opposing Bills only who, at the time when proceedings on the Bill were suspended in Session 2014-15, was employed in opposing the Bill shall be deemed to have been registered as such a parliamentary agent in Session 2015-16.
6. If this paragraph applies, the Bill shall be deemed to have been reported from the Select Committee and to have been re-committed to a Public Bill Committee.
7. If this paragraph applies–
(a) the Bill shall be deemed to have been reported from the Select Committee and from the Public Bill Committee; and
(b) the Bill shall be set down as an order of the day for consideration.
8. If this paragraph applies-
(a) the Bill shall be deemed to have been reported from the Select Committee and from the Public Bill Committee and to have been considered; and
(b) the Bill shall be set down as an order of the day for third reading.
9. If this paragraph applies, the Bill shall be deemed to have passed through all its stages in this House.
Other
10. The references in paragraphs 1 and 3 above to further proceedings do not include proceedings under Standing Order 224A(8) (deposit of supplementary environmental information).
11. That the above Orders be Standing Orders of the House.
Amendment (a), in paragraph 2(i), leave out ‘three’ and insert ‘four’.
Amendment (b), in paragraph 5(h), leave out ‘three’ and insert ‘four’.
Motion 6—Positions for which additional salaries are payable for the purposes of section 4A(2) of the Parliamentary Standards Act 2009
That the Chair of the select committee appointed to consider the High Speed Rail (London - West Midlands) Bill is specified for the purposes of section 4A(2) of the Parliamentary Standards Act 2009.
Yesterday the House voted comprehensively in favour of the principle of a high-speed railway between London and the west midlands. Today we turn to the practicalities of how the parliamentary process for the High Speed Rail (London - West Midlands) Bill will work. We have four motions before us this afternoon. The first is a motion to establish a Select Committee to hear petitions against the Bill; the second is an instruction to that Committee to clarify the principle of the Bill for its purposes; the third is a motion to allow the Bill to be carried over into the next Session, and also into the first Session of the next Parliament in 2015-16; and the fourth allows the payment of a salary to the Chair of the Select Committee, in the same way as for any other Select Committee Chair.
The second motion refers the Bill to a Select Committee of six members, as nominated in the motion. The motion also sets the period in which petitions against the Bill need to be submitted to be heard by the Committee. The period starts today and concludes on 16 May 2014 for petitions from local authorities, other than parish councils, and businesses.
Having spoken with the Public Bill Office earlier, I understand that the petition period starts tomorrow, not today, because there was some query about the length of the debate on Second Reading of the hybrid Bill.
If that is the case, I stand corrected. The petition period will then be extended by an additional day. I had not been made aware of that by the House authorities. Of course, the way the petitions are controlled and the way the Committee carries out its work is a matter for the House; it is not one over which Ministers can have any influence.
The period closes on 23 May 2014—or perhaps 24 May—for members of the public, parish councils and other groups or organisations. Such an approach of having different periods for different types of petitioner is standard for hybrid Bills, having been used for the Channel Tunnel Rail Link Act 1996 and the Channel Tunnel Act 1987. That allows 16 days and 23 days respectively for petitions, which is longer than most other hybrid Bills to date.
My hon. Friend and I go back a long way, and I know him to be a true Yorkshireman who will look after money well. On a practical point, where does the £20 fee for petitions go, what is it used for and can it be presented only in cash, or can payments by cheque or credit card be accepted?
That will be a matter for the House authorities, but I am sure that it would be acceptable to pay the £20 in cash. I know that one of the amendments refers to electronic payments and tabling, which we will resist. The money will ultimately go to the taxpayer, as the House is a taxpayer-funded authority. We do not believe that a fee of £20 would be prohibitive for any organisation or individual seeking to petition the Committee.
Can the Minister explain why there is a £20 fee? HS2 Ltd, which is spending hundreds of millions of pounds on consultants, does not have to make any contribution to the cost of running the House, so why should individuals? Certainly, for some of the individuals in my constituency who will see their homes demolished, £20 is a rather large part of their weekly income.
HS2 itself has spent considerable taxpayer funds on trying to mitigate many of the environmental implications of the line, which might well head off petitioners. Indeed, I was speaking with representatives of the Ramblers Association only the other week, when we went on a 10-mile ramble in my constituency. They told me that they were hopeful that, because of the engagement with HS2, they might not have to petition, as their concerns had been answered. HS2 has been engaging with a number of potential petitioners, including local authorities, to try to allay some of their concerns and fears without the need to petition. That money has been well spent in addressing those issues.
Does the hon. Gentleman not think that it would antagonise the public more if, when their house was threatened with demolition, they were charged £20? Does he not see that that could have an adverse effect?
We do not believe that the £20 fee is prohibitive. Of course, if some of the amendments were agreed to today, we could have a situation in which e-petitioning was allowed, and at the same time no fee was payable, and we could find the work of that Committee being frustrated by large amounts of electronic petitioning, perhaps done in a vexatious way designed to hinder the progress of the Bill, rather than to improve it, as the petitioning process is designed to do.
Could such complaints from a number of sources be combined and presented with one £20 note, or would a £20 note have to be submitted for every person involved?
I can allay my hon. Friend’s concerns. Yes, a group of people can petition together and only one fee is payable. The people who petition can appear at the Committee, and they can be represented by an agent or by a number of people from that group. I do not feel that the fee is prohibitive. It is set by the House and has not increased since 1988. It is a matter for the House to administer these costs, not a matter for the Government. Members might like to raise the question with Mr Speaker, as it is a House matter.
On a matter for which the Minister may be responsible, how long does he expect the Committee to sit? When does he expect its life to end?
We have already made it clear that we do not expect the Committee to conclude its work, which must be done thoroughly and in a way that we believe responds adequately to concerns raised in petitions. The Secretary of State indicated that he expects it to continue after the next general election, which is why there is a double carry-over motion before the House. That means that the Committee can continue its work not only into the next Session of this Parliament, but beyond the general election. It is a matter for the Committee how it organises its work and how it considers the petitions. That is not a matter for me as the Minister.
I think the Minister just said that he does not expect the Committee to conclude. In other words, it will go on for ever and ever. That is what the motion allows for, yet later today we will be asked to contribute to the pay of the person who is to chair the Committee. We are going to be paying this person in perpetuity, yet it seems that the Minister has nothing to account for.
Any motions passed in the House today can be amended in future by the House. If, for example, the Committee was not sitting and it was felt that the Chairman therefore did not deserve his fee, that could be revisited by the House. In view of the precedents of previous hybrid Bills, we believe that the period of time needed will take us past the next general election—I hope not far past the next general election, but given the number of petitions that we expect and the work that the Committee will have to carry out, it has the possibility of sitting during the recess to try to improve the speed at which it can carry out that work. This is a reasonable way of going forward and of giving that Committee the resources and the time it needs to do its job thoroughly.
I have almost forgotten what I was going to ask after that rather lengthy—but welcome—contribution to the debate. The Minister has already said that the Committee that we are appointing—we are naming the members of the Committee in the motion before the House—will continue after the general election. It is quite clear that this is providing a safe berth for a Conservative Member of the House. When we win the general election next May, will the Committee membership and the chairmanship automatically change party?
The membership of the Committee is a matter for the House. When after the next election we have a majority Conservative Government, if necessary we could revisit that. It is a matter for the House. We are voting on it today and there is nothing written in stone today that cannot be changed in future by a further motion put before the House and voted on.
The motion sets out that anyone who submits a valid petition is entitled to be heard by the Select Committee, either in person, or through a parliamentary agent or counsel. The motion gives some latitude to organisations petitioning to authorise different officers as their representative before the Select Committee, should they need to do so. The motion provides for the Committee to meet during recess should it wish to do so, and also to hold its hearings away from Parliament if it so wishes. I know that one of the amendments tabled refers to its meeting in other parts of the country. It would be for the Committee to decide if it would be useful to do so.
However, our hope is that people will not feel the need to petition. HS2 Ltd has produced a significant number of information papers which are published on its website. These attempt to address the key concerns that people have about the project, such as the impacts of construction and noise. I encourage hon. Members and their constituents to read those papers, as this might stop unnecessary petitions.
It is established practice that the Select Committee cannot hear petitions against the principle of the Bill. That principle was agreed by the whole House on Second Reading yesterday, and it would not be appropriate for a Select Committee to consider changes that might undermine the decision made by the whole House. This instruction, therefore, sets out the principle of the Bill for the Select Committee: the provision of a high-speed railway between Euston and a junction at the west coast main line at Handsacre in Staffordshire, with a spur from Water Orton in Warwickshire to Curzon Street in Birmingham. The principle also includes the intermediate stations at Old Oak Common and Birmingham Interchange located near the airport, and the broad route alignment set out in the plans and sections deposited with the Bill. This principle should give the Committee sufficient scope to address the issues of petitioners without sacrificing the desired capability of the railway to give the benefits expected.
The instruction also addresses the Secretary of State’s decision to remove the HS1 link. The removal of the link was agreed as part of Second Reading yesterday. The instruction, therefore, requires an amendment to be made to remove the link and then treats the Bill as though the link were not included in the principle. Therefore, there is no need for people opposed to the link to petition against the link, as it will be removed. It is also not possible for the Committee to hear petitions in favour of a link, in the same way as it is not possible for the Committee to hear petitions in favour of an extension to Newquay, for example, or anywhere else. That is beyond the principle of the Bill.
I agree that it should not be for the Committee to devise an alternative link, but can the Minister clarify whether the Committee could hear petitions for passive provision, which would future-proof the project if a link were deemed desirable at a future date?
The hon. Lady makes a very good point. Indeed, there is already passive provision in the first phase to allow the Heathrow spur to be constructed, should it be decided to go forward in that way. From an engineering perspective, it would be very expensive and disruptive to try to join that link. Similarly, in relation to the passive provision for the HS1 link, it is ultimately for the Committee to decide whether or not a petition should be heard. The Committee may choose to hear petitions relating to a future link not being precluded, but the work of the Committee is about the railway before it and it cannot get bogged down considering the merits of links that may or may not happen.
Much as I welcome the dropping of the preposterous HS2-HS1 link, as do all the people whose lives would have been ruined by it, in view of the fact that until about three weeks ago HS2 was saying that there was no possibility of dropping the link, no one in the area believes a word that HS2 says. I warn the Minister of that. The motion says that the Committee shall not hear a petition if it relates to the link. That is fine, because the link has been dropped. Supposing that, after the Committee stage had concluded, the House as a whole decided to reinstate the link; would people then be allowed to petition? If not, they would think they were being swindled by officialdom, as would indeed be the case.
I hope that, following the decision to scrap the link, I have a few more friends in Camden than before. If the Committee were to decide to make changes to the Bill that affected potential petitioners who were not affected before, there would be another opportunity for them to petition, and a similar period would be allowed for that to happen.
Let me underline that for a whole variety of reasons that I will not go into but the right hon. Gentleman will understand, we do not believe that the HS1-HS2 link represents value for money or that it is practical. There are all sorts of logistical problems. From a security perspective, the journey would have to be designated as international because we could not have a situation where some people on the train had gone through passport control and some had not. There might be rather frugally minded Yorkshiremen such as me who decided that, rather than buy a through-train ticket to Paris, they would buy two tickets and make the short stroll between Euston and St Pancras, or get the underground, or even use some other means such as a travelator, which could transport people quickly and easily between those two locations.
I am pleased to hear the Minister refer to a travelator for efficient and easy travel. He said that the HS1-HS2 link would be an international route and everyone would have to go through passport control. Will he consider the possibility of domestic services regarding a future link? Research from Greengauge 21, paid for by Kent and Essex county councils, among others, suggests that demand for those services would be very substantial and potentially much higher than for international travel.
I thank my hon. Friend for making that point. However, having analysed this carefully and brought in Sir David Higgins, who did the work for us and has a wealth of experience in major projects of this sort, we concur with him that the link does not represent value for money and we have therefore scrapped it; the House voted last night to do so. Although there may be an opportunity for the hybrid Bill Committee to consider passive provision so as not to obviate any potential future link, it is certainly not in our plans at the moment—nor, having heard the comments of Opposition Front Benchers, would Labour wish to press for it, should there be, God forbid, a change of Government at the next election.
About 20 years ago, I chaired the Committee on the hybrid Croydon Tramlink Bill. At that time, we accepted that there could be changes to the Government’s proposals and recommendations could be made. Is the Minister saying that no changes are going to be allowed if people want to introduce a spur or different forms of link?
I am saying that if the hybrid Bill Committee proposed changes that the Government agreed to, there would be a further opportunity for people who are directly affected by those changes to petition. The Bill cannot be changed in a way that affects people without their getting a second bite of the cherry, because they may not have considered petitioning in the first place.
The hon. Gentleman is getting himself back on to my Christmas card list, from which he was rejected last night. Are the Government completely closed to the idea of a different, better HS1-HS2 link than the one we rightly rejected last night?
Any link between HS1 and HS2 is not part of the Bill that was before us last night or the provisions we are considering today, and we as a Government are certainly not planning to look at it in the near future. This project will be in operation for many centuries, we hope, and who knows what might happen in future? At the moment, the Government’s position is absolutely clear: we have abandoned the link—we voted on that in the House last night—and we do not wish to revisit it. We will be looking into making it easier to get across from Euston to St Pancras. Although it is not a long walk and there is an underground train service, there may be better ways of dealing with the situation, and HS2 is looking into that.
I will not pre-empt what I have to say when I move my amendment, but will the Minister clarify what he meant when he talked about passive provision and referred to Heathrow? Is he saying that passive provision is already in existence, or would it have to be made?
The passive provision for the Heathrow spur is included in the first phase. That is because if the spur goes ahead—it is already part of the second phase that is being consulted on—breaking into the line to put in a link would be very expensive and disruptive. The spur—the passive provision for the Heathrow link—is part of the first phase. We are consulting on the second phase, part of which is the Heathrow spur.
I must point out that the first phase of HS2 includes a very good connection to Heathrow airport via Old Oak Common, with up to eight trains an hour and 11 or 12-minute journey times. That is a very good way of getting to Heathrow and to other stations served by Crossrail. Old Oak Common is currently a little-known backwater, but very soon, I promise, it will become as famous as Waterloo, St Pancras or Victoria stations and be an integral part of this country’s and this capital’s transport system.
May I make this clear? The passive provision for Heathrow is already in place, and passive provision to provide for a potential HS1-HS2 link could be put into the legislation as it is now. It would have to be put in because it is not there by virtue of the Heathrow passive provision, and it could not be added by dint of the Committee deciding to do so.
Yes, I think the hon. Lady has got it right. There is an opportunity, should anyone wish to take it, to petition the Committee to put in some passive provision for a future connection. We have commissioned HS2 Ltd and Network Rail to look at options for better connecting the rail network to HS1, but any conclusions that require powers would not be taken forward in this Bill.
On the carry-over motion, hybrid Bills can be carried over Prorogations because Standing Order 80A does not apply. This is a completely standard part of the process for hybrid Bills, as they generally take longer than public Bills.
Is one study taking place or two? There is the question whether we have a travelator-type arrangement to connect Euston and St Pancras for passengers going from HS1 to HS2, but is there a separate question of how we connect HS1 to the broader railway network, which may be a case of a train-in-a-tunnel HS1-HS2 link for the future?
Those are two separate matters that are mutually exclusive. We are looking at whether better provision can be made for the short journey between Euston and St Pancras for those who wish to continue their journey internationally, or indeed to use King’s Cross or St Pancras for domestic journeys. A separate process is going on whereby HS2 Ltd and Network Rail are looking at how we can better improve the connectivity of HS1. That is being done in the light of the decision to abandon the HS1-HS2 connection, which was very popular in places such as Camden.
The Channel Tunnel Rail Link Bill was carried over two Prorogations. The Crossrail Bill was carried over two Prorogations and a Dissolution for a general election. The House is due to prorogue shortly for the Queen’s Speech—
I haven’t a clue. Even when I was in the Whips Office, we did not get to hear about that.
Because of the Fixed-term Parliaments Act 2011, we know with a degree of certainty when Parliament will be dissolved for the next general election. Although we had hoped that the hybrid Bill would secure Royal Assent before the next general election, I am clear that in all likelihood it will not do so.
The Select Committee that was appointed to consider the Crossrail Bill had 10 members, so why has the Committee under discussion got only six and, therefore, a different quorum of three?
To be absolutely honest with the hon. Gentleman, many people who volunteered to consider the Crossrail Bill did not realise what a commitment it would be. We have found six Members—some of whom have been volunteered—who are prepared to put in the time and commitment to do this, and I think we will be well served by them. We are very grateful to them for putting their names forward. It would be a big ask to find a large Committee to do this work, given the large amount of time those Members will have to take out of the other parliamentary duties they carry out on their constituents’ behalf. We are very grateful that they are volunteers rather than pressed men.
As I understand it, this is a general debate about all the issues, as encapsulated in the motions and the various amendments. Next week will be my 30th year in Parliament and, having spent a lot of my previous life dealing with hybrid and other Bills, I entirely concur with my hon. Friend on the burdens involved in the privilege of being given the opportunity to take such an active part in the Select Committee stage. Does he accept that there is recognition in one of the Bill’s schedules for property bonds, and does he agree that the Select Committee should take that issue into account when it decides what kind of compensation should be paid?
It would be inappropriate for me to comment on the compensation package at this stage, given that consultation is still taking place, but we recently announced a package that I believe to be generous, particularly in rural areas. It also has to be fair to the taxpayer, who will ultimately pick up the bill, and the compensation is in marked contrast to that which other people around the country might receive if a bypass, new railway spur or goods marshalling yard were to be built in their area.
The carry-over motion reflects the certainty provided by the Fixed-term Parliaments Act 2011. It allows the Bill to carry over into the fourth Session of this Parliament and the first Session of the next. That will avoid the need unnecessarily to use up the House’s time with another carry-over motion later in the year when it is clear to everyone when the general election will take place and that this Bill will not have secured Royal Assent by that point.
The motion provides for suspension of the Bill from the end of the Session, but that will not prevent the depositing of petitions after Prorogation should it precede the end of the petitioning period. The motion also provides for the continuity of the membership of the Select Committee and maintains any instructions given to the Committee by this House, the standing of roll B agents and all the elements of whatever progress the Bill has made from each Session into the next. In providing for carry-over into the next Parliament, the motion caters for the fact that the Bill could have reached a range of different stages by that point. In each case, the motion provides that the progress made up to the end of the fourth Session be carried over into the next Parliament.
As the House is aware, the Chairs of departmental Select Committees are paid for the additional responsibilities the role brings, as allowed under section 4A(2) of the Parliamentary Standards Act 2009. The role of the Chair of a hybrid Bill Select Committee is no less demanding —indeed, in some cases it may be more demanding—and the Chair of the Crossrail Select Committee was paid a salary equivalent to that of a departmental Select Committee Chair. The motion allows the Chair of the HS2 Select Committee to be paid an equivalent salary, and I am sure the House will agree that that is appropriate, given the significant responsibility the role carries.
In conclusion, I commend the motions to the House. HS2 is a vital national project and it is important that we make swift progress. However, it is equally important to ensure that those affected by the railway have appropriate opportunity to have their say. I believe that the motions strike the right balance. They establish a Select Committee with the flexibility to hear and deal with the concerns of those directly and specially affected, but they do not import unreasonable delay. Everyone wants certainty—petitioner, promoter and the general public—and I believe that the motions provide that certainty and that they will allow people to have their say, have their issues addressed and get on with their lives. I think that everyone in the House wants to see that, and I hope they will support the motions.
The hon. Gentleman makes a valid point, which extends the point that I am making without labouring it. The members of the Select Committee will bring common sense and the view of the Member of Parliament to the Committee, but they will still have to rely on the people who have the expertise to take them through the detail.
I thank my right hon. Friend for giving way today. The advice that the Committee takes and the expertise that it chooses to draw on will be a matter for the Committee itself. Of course, the expertise of HS2 will be available to the Committee, should it wish to avail itself of that. Many of the petitioners may well be experts, in particular the environmental non-governmental organisations that wish to petition. I do not think that there will be a shortage of offers of advice to members of the Committee. However, that is a matter for them as they conduct their work and not for Ministers.
I am grateful for that intervention. I am using this debate as a vehicle to raise these questions. They might not all be directed at the Front Bench, but I am raising them in this forum because I see no other opportunity for Members to raise them. I take on board what the Minister has said.
I have learned that making a presumption about this project is always dangerous. I, too, would have presumed that, but I also would have presumed that when engineering experts asked for the calculations and costs associated with the tunnelling that was being promoted by HS2 Ltd, they would have been made freely available. The reply has always been that they are commercial in confidence, and I am trying to get around that, because it is important to ensure that the Committee has access to the costs. I am sure that my right hon. Friend would support me on that, but I would not make the mistake of presuming.
On amendment (i), I want to know how often the Committee will sit. I appreciate that it could sit through the recess, and I am grateful that the motion states that it may adjourn from place to place. I believe that it will need to visit the areas affected and publish the details of its sittings, and it should confirm when and how there will be public access to its meetings.
I would also like to know whether Committee members will fly the whole route of phase 1 of HS2. When I was looking at what National Grid was doing across Wales when it was building the gas pipeline, I found it of great advantage to go up in a helicopter and look at the work along the whole route. While I am on the subject, I must say that National Grid did a fantastic piece of work in negotiating with more than 80 landowners with very little trouble. It also did fantastic environmental reinstatement work across some sensitive land, including the Brecon Beacons national park. I was impressed with its operations, and I wish I could say that I had been as impressed with HS2’s negotiations with property owners and landowners so far.
On amendment (c), the petitioning process will be open from tomorrow at 10 o’clock. The Minister will know that we have to get our facts right, and the parliamentary website, in a section entitled “How and where do I present my petition?”, states:
“Petitions will be accepted from 10am to 5pm on 30 April—not on 29 April”,
as the Minister said earlier,
“as the House will not consider the petitioning motion setting the petitioning dates until the afternoon of 29 April.”
There is some useful information on the Parliament website under the title “FAQs on the High Speed 2 Hybrid Bill”, and I recommend that anybody who is watching these proceedings and wishes to petition has a look at that excellent document, which the Clerks of the House have produced.
Is three weeks really long enough for the petitioning process? May the House have confirmation that if I receive any petitions in my office in Amersham, I can seal them in an envelope with the £20 cheque or payment and then bring them here for the convenience of my constituents? Will handing them over to staff of the House in that way be sufficient, and will I be able to get a small receipt so that I can confirm to my constituents that that has happened?
There has been some confusion about the deadlines for petitioning. I should like the Minister to make it absolutely clear that town councils have the same deadline as parish councils, 23 May, whereas there is an earlier date for county and district councils.
I will give way to the Minister, and I would also like to know why county and district councils have been given a week less. The reason is not obvious to me, but maybe I am just missing something.
May I confirm to my right hon. Friend that town councils are in fact parish councils? The councils that do not have the longer deadline are borough and district councils.
I am most grateful. Does the Minister also want to tell us why there is a week’s difference in the deadlines? Why could we not just have one deadline?
We are just following previous practice. My right hon. Friend will be aware that many local authorities have been preparing their petitions for many weeks and months, so the focus on the timeline for delivering them is rather a spurious argument. The project has been known about for many months and years, and she will know that many petitions have already been prepared.
That is all well and good, but the process is complex and I was just seeking to simplify it by having one closing date rather than a tortuous process of two dates. Frankly, I would have thought that we should set new precedents on such a large issue rather than rely on old ones.
No one would be more delighted than I would be if the Committee concluded its work by the next general election. However, in the likelihood that it will not, the motion will facilitate its work to carry on past the election.
I understand that. I cannot say that I would want the Committee to conclude it work before the general election, but to rule it out at this early stage and give the impression that the Government have given up on it, is not a particularly good tactic.
I welcome the opportunity to speak in this debate as the right hon. Member for Holborn and St Pancras. I think some people think that the St Pancras part of the constituency name refers to the station, but it refers to the parish of St Pancras, which has two St Pancras churches. We also have three major main line stations: St Pancras, King’s Cross and Euston. The history of what has been proposed for those stations over the years has to be borne in mind by anyone considering the current proposals. Ministers need to understand the background.
I have never questioned the integrity of the Ministers and I tell people that I do not question their integrity, but everyone questions the integrity of the officials that they have had to deal with over the years. The background is that the first proposal for a channel tunnel link to London was for it to terminate at a concrete box under King’s Cross station. We were told that there was no possible alternative to it; that it was “perfection”. Eventually, that daft idea was abandoned. An idea was then taken up—I was the first person to put it forward—for St Pancras station to be used as the channel tunnel link terminus. When I first suggested it, sneering remarks from all sorts of railway aficionados were the result. In the end, it went ahead and it has worked very well, as I think everyone accepts. Although it involved problems for local people, they went along with it because they could see the merits of it, both from their point of view and from everyone else’s.
Similarly, the recent improvements at King’s Cross were welcomed by virtually everyone, including the council, me and local organisations. That is not the case with Euston. We still need clarification to satisfy people in my constituency. When the proposal for the channel tunnel link was first put forward, I said to officials that it would need a great deal of engineering work to make it work and that that would be very troublesome for the people adjacent to the part of the line above ground. They said, “No, no, it won’t need major engineering works.” When I said that at a public meeting, one of the consultants—not an official—came along and said, “Oh no, no; we can assure everyone it won’t need major works.” Lo and behold, it was eventually accepted that major engineering works would be needed, because some new factors had arisen, including the need to widen the route. Somebody who thinks they can put a line across Camden town for an additional service without widening the route ought not to be allowed to advise the Government or anyone else.
Time and again, people said the proposition was ridiculous and they were sneered at and snarled at, as I am sure my hon. Friend the Member for Nottingham South (Lilian Greenwood), who speaks from the Front Bench, would confirm. I very much welcome the position taken by her and our hon. Friend the Member for Wakefield (Mary Creagh), as do people in my constituency, that we do not accept that the link is a good idea. It is a bad idea and it should, without a shadow of a doubt, be wiped out altogether. That is why I could not possibly support amendment (e), in the name of my hon. Friend the Member for Birmingham, Edgbaston (Ms Stuart), which would raise the possibility of the damn thing being revivified. I could not bear the thought of that.
The other point I would like to make, before I come to all the amendments, is that the procedure that we are talking about is archaic, difficult for human beings to cope with and ridiculous. We might compare it with a public inquiry into a similarly large proposition, where people have the opportunity to make representations without having to engage with an A4 page of all sorts of archaic rubbish and ridiculous language before actually getting round to putting their point, and without time limitations on submitting their petitions, which are then vetted to see whether they are valid. For what might be described as normal human beings—or, for that matter, small businesses, which do not have a great secretariat or legal advisers and suchlike—the time limits proposed are already too short and ought to be extended. In relation to businesses, I have a query for the Minister that I hope he can clear up. As I understand it, the restaurants in Drummond street will, because they are businesses, have the short deadline for submitting their petitions. Is that right?
The small businesses along the route—shops or, indeed, farms—can petition either as businesses, in which case they will have the short deadline, or as individuals, in which case the longer deadline will apply. I hope that clarifies matters.
The next question is this: does the business restriction apply to the association of businesses in Drummond street? The Minister might not know the answer to that—I would not necessarily expect him to know that.
I stand to be corrected by wiser authorities than me, but an association would be in the same category as businesses, some of the non-governmental organisations and larger local authorities. However, members of an association could collectively petition as individuals and then delegate one of their representatives or parliamentary counsel to speak on their behalf.
I am grateful for that clarification, but I am sorry about the direction of it.
I entirely share the hon. Gentleman’s views about that. I am glad that Camden council is organising workshops for individuals and small businesses and making its best efforts to ensure that their petitions are in order and, in some cases, that the £20 is handed over and logged, and then passed to me, so that I can personally hand it in, in the hope that their petitions will be valid.
That leads me on to the £20 fee. It is said, generally speaking, that it is not a deterrent. Well, if it is not a deterrent, why do we have it? People do not have to pay a £20 fee to give evidence at a public inquiry. The fee will raise quite a trivial sum. Even if thousands of people submit petitions, at £20 each, the fee will not raise any worthwhile amount of money for the House of Commons. If the fee is not a deterrent, why do we have it? I think it will be a deterrent for the worst-off. As the right hon. Member for Chesham and Amersham (Mrs Gillan) said, it is a fifth of a single pensioner’s pension, which is a lot of money for a pensioner—or some pensioners, anyway—to find. Whatever the outcome in this case, the whole hybrid Bill approach needs to be looked at. We talk about modernising, and by God there is some modernising needed for this hybrid procedure.
That takes me back to the instruction that the Committee
“shall not hear any Petition to the extent that it relates to whether or not there should be a spur from Old Oak Common to the Channel Tunnel Rail Link.”
No one trusts the processes involved, so there is something that is still not clear to me. I am sure the Minister is trying to get the truth out, but to return to the proposition that I was trying to explain earlier, let us suppose that the Committee complies with that instruction—as it must—and cannot reintroduce the proposal for a spur from HS2 to HS1, but the matter returns to the House after the Committee has looked at it and made all its recommendations. As I understand it, the House could then reinstate the link, if it wanted to. If it did, would there be any procedure to enable petitions from those affected? If not, in effect we are banning people’s petitions from being examined now, while they might not be able to petition later if there were a further proposition.
To clarify, if any changes that result from the Committee responding to petitions affect people who were not affected previously, a new petitioning period would be triggered. People who were then affected could petition, so they should not be frightened that something could be slid under the door without their having the opportunity to petition.
I understand that; my question is this. Let us suppose the matter comes back to the House and the House as a whole wishes to change things in some way that affects people. Will those affected then have the opportunity to petition against those changes?
I will correct this if it is not right, but my understanding is that if that happened—there are no plans anywhere at all to do that; I must make it clear that we have scrapped the link—that would initiate the whole process again. It would be a new process and a new Bill, and there would be a new hybrid Bill Committee, but that is not the situation. I therefore hope that the right hon. Gentleman can allay the fears of his constituents, in that we have indeed abandoned the HS2-HS1 link as part of this project and the petitioning process could not resurrect it, because it is not within the scope of the Bill before us.
I thank the Minister for that; I am 99% reassured.
As the Minister knows, the Bill’s proposals for Euston have been abandoned—or are to be abandoned—and are to be replaced. The engineering and other studies have only just commenced. My next question to the Minister is whether he can confirm that when the new proposals for Euston are formulated, they will be subject to the usual procedures requiring HS2 to produce a new environmental statement, that there will be opportunities for people to respond to it and that people will then be able to submit new petitions against the new proposals that the Government wish to include in the Bill. Am I right about that?
I shall comment on that when I sum up at the end, so that I do not misinform the right hon. Gentleman. I rather suspect, however, that I will be able to reassure him that that is the case.
I welcome that reassurance.
I am particularly concerned, too, about the statutory and non-statutory provisions for compensation. Outside London, some people whose homes will not be demolished but whose property and general lifestyle will be adversely affected by a railway perhaps 50 yards away will be compensated, which I think is right. The situation in my constituency, however, is that people whose homes are 5 yards away from the line or 5 yards away from 10 years of engineering works will get no compensation. I hope that the Minister, the Department and HS2 Ltd are aware that the immediately preceding Director of Public Prosecutions, Sir Keir Starmer, has given us an opinion that the procedure followed in respect of my constituency is actually in breach of the law. I therefore hope that at least the House will have an opportunity to review it, even if the Committee cannot. I view it as strange that we are talking about a Committee supposedly looking at mitigation and compensation that is apparently not allowed to look at compensation. That needs to be revised.
My last but one point is that I very much support the amendment tabled by my hon. Friend the Member for Stoke-on-Trent North (Joan Walley), the Chair of the Environmental Audit Committee. I hope that the Government, as well as our Front-Bench team, will go along at least with the spirit of it.
My final point is about the amendment tabled by my hon. Friend the Member for Birmingham, Edgbaston. I believe that if we are to have a High Speed 2, it is ludicrous for it not to be connected to High Speed 1. That does not mean that it makes any sense whatever to have the HS2-HS1 link that was originally proposed, which was crackers in practically every aspect and certainly does not go to the right place. I agree with those who believe that there needs to be a connection—and the best place to receive that connection, if that is the right word for it, is Stratford.
I am grateful to my hon. Friend for making that point, because he is not only a dedicated member of our Select Committee, but an incredibly knowledgeable one. The fact that we had so much evidence about the failure to map areas and the huge gaps in information shows how unfit for purpose the environmental assessment has been so far.
The hon. Lady is aware that in some cases we did not have access to land because the landowners would not give us that access. If they then petition, they can, presumably, bring forward the information as to the effect on the particular environmental habitat they are concerned about.
I am grateful to the Minister for that, and I absolutely agree with what he says. Indeed, we heard evidence from the Country Land and Business Association that there has not been the proper access to be able to survey, and without a survey and audit we cannot go on to monitor, mitigate and do all these other things. The issue at the heart of this is that that has not been done, yet we are being told—or I imagine we will be told—that we do not need my amendment because we already have Standing Orders 27 and 224A. They, however, go up only as far as Second Reading and do not continue through the work of the Select Committee. We have a huge gap in knowledge and people all over the country want to have cast-iron assurances that all the land that needs to be surveyed has been surveyed. That has not been done yet, and if we do not give a sufficiently flexible remit to the Select Committee, how is it going to deal with what has not already been done?
Although people will have opportunities to petition on this aspect, and that petitioning will now be coming forward at great haste, my amendment seeks to address the issue of who is going to take responsibility for the consequences of those petitions. So far we have had a summary of issues that people have raised and a commitment to consult on those, but we have not had a proper procedure of impact assessment to address how we deal with those issues that are raised. I would like the Minister to say how that will be addressed.
We could also have the situation that happened to me when we had a Regional Select Committee in Barnsley town hall. When one member had to pop out to answer a call of nature, the Committee had to suspend. If we had a bigger quorum, that could happen and that would be rather embarrassing for the Committee.
I am grateful to my hon. Friend the Minister for the tactful way in which he makes his point. I am almost certain that the Committee on the King’s Cross Bill, which had only four members, had a quorum of three. That put a strain on the Committee, particularly when situations arose such as the one that he describes.
I also do not share the concern of my right hon. Friend the Member for Chesham and Amersham, expressed in her amendment, about the ability to carry over the Committee into a new Parliament. I think that this is the appropriate time in which to make that point and enshrine it in the rules governing how the special Committee will work. In many ways, it would look rather ridiculous not to have that provision, given that we all know—because of the Fixed-term Parliaments Act 2011—that we will have an election at the beginning of next May.
I am also not so concerned about the fact that, after the election, for a variety of reasons, there might be some changes to the Committee’s membership. There are many examples of changes of personnel in Public Bill Committees, which do equally significant work in studying line by line some very important legislation. Sometimes, if it is the wrong time of year or of the cycle, Ministers taking a Bill through Committee can suddenly disappear and be replaced. The strength of this House is that the sum total of knowledge that Members bring to subjects and Committees means that there would not necessarily be the problem and hiatus that my right hon. Friend the Member for Chesham and Amersham fears. Of course, she is right that mechanisms must be there to assist the Committee, in an independent manner, to brief Members who, for whatever genuine reason, have been unable to attend a sitting.
I was also interested in my right hon. Friend’s amendment about the Committee going out to areas that will be affected by HS2. That is an interesting concept. It brings closer to the public the workings of Parliament, particularly on a matter that is so sensitive because it has such an impact on people’s lives. Raising that in an amendment is extremely valid as we all seek to make Parliament more relevant and closer to the people we represent. However, that must ultimately be a matter for the Committee to determine when it forms and decides how to conduct its business.
The right hon. Gentleman makes a very good point. In fact, the blight applies from the moment people are made aware that construction sites will be located next to their properties. Since March 2010, people have been waiting for over four years and are unable to sell, so we know that construction works have exactly the same impact on the need to get on with their lives.
I hope that I can allay some of my right hon. Friend’s fears by explaining how the Committee can address issues about the compensation package. Let me state for the record that anyone “directly and specially”—the wording used in the Bill—affected who feels that the available compensation does not address the impact on them is free to petition the Committee and ask for additional compensation. The purpose of the Committee is to hear these petitions, but not to review the national compensation code.
I think that is a very valuable outcome, because it helps Members to understand that we can assist individuals and groups in our constituencies who are blighted by the construction works but ineligible for compensation in preparing a petition to which we can lend our names. Although we cannot petition as MPs, we can lend our support to such petitions. I think that everyone affected by the project has learned something important today.
That brings me to an important remark made by the Minister’s predecessor, my right hon. Friend the Member for Chelmsford (Mr Burns), when he took through the paving Bill. He frequently stated that compensation would be fair and generous. With regard to construction compounds, at the moment no fair or generous compensation is available. I hope that the House will understand why I lent my name to amendment (b) to motion 4.
The next amendment to which I shall speak briefly as a member of the Environmental Audit Committee is the important one that takes the recommendations of the inquiry by the Select Committee and turns them into an instruction to the Select Committee when it takes the hybrid Bill through Parliament to pay close attention to the environmental consequences and to the Government’s stated aspiration to be the greenest ever, and to give expression to that through something new in law—biodiversity offsetting. The key words in amendment (d) to motion 4 are
“alternative or additional environmental protections”,
because there is more than one way of providing environmental protection, and we should seek to do that to the highest possible standard. That aspiration is shared by the National Trust.
In the natural environment White Paper published during my time as Secretary of State, we set down a clear commitment to achieve net gain. Overall, we are going backwards in terms of loss of species and loss of habitats. Inevitably, this large infrastructure project will result in the loss of habitats, because it will be necessary to dig up green spaces and displace species, some of them vulnerable, from those areas. I urge the Minister to take seriously the exhortations of my friend, the Chairman of the Environmental Audit Committee, the hon. Member for Stoke-on-Trent North (Joan Walley), and to give the House an undertaking that should something come up during the Select Committee stage which pertains to environmental protections, the Government will make time on Third Reading to enable us all to debate those significant points. I hope the Minister will be able to give me that undertaking later today.
Finally, I shall speak in support of the hon. Member for Birmingham, Edgbaston (Ms Stuart), who has led the charge from the west midlands over the importance of not precluding the link between High Speed 1 and High Speed 2, which is all-important for the west midlands and regions outside London. The regions—not just the west midlands, but the east midlands, the north-west and the north-east—were all led to believe when High Speed 2 was first mooted in 2010 that there would be through-trains. That is undoubtedly what other non-London-based Members such as me will have mentioned to our constituents at the time, as part of the expectation of what HS2 will deliver. There is not a little disappointment about the fact that that is to be precluded from inclusion in the hybrid Bill as it stands.
To me it is unacceptable that in the 21st century an American passenger can land at Birmingham international airport, clear customs, get on a high-speed train by which they aspire to arrive on the continent, have to get off on the east side of Euston station and schlep their luggage in our rather indifferent weather to St Pancras station, pass immigration control again, and board another train to the continent. I am convinced that in the 21st century we can do better than that.
Inextricably linked to the question of the link is the Euston problem. Euston is a problem, but it was clear from the paving Bill that there is more than one model for solving the problem. In defence of the right hon. Member for Holborn and St Pancras (Frank Dobson), the difficulty for his constituents is that every time we publicly change that model, more and more properties are blighted by that effect.
We in the west midlands are keen to see a through link. For us that is integral to the project. As I mentioned yesterday, Birmingham airport will be 31 minutes from London on High Speed 2. If there is a stop at Old Oak Common, as the Prime Minister observed on visiting Birmingham international airport and opening its extended runway, he could get to Birmingham airport from Notting Hill as quickly as he could get to Heathrow. The under-utilised runway at Birmingham would become competitive given that faster running time, but much of the competitive benefit is lost if the interchange to a high-speed service by train to the continent is not achievable. I urge the Government to heed this very important point, which is not just about the west midlands.
I thank right hon. and hon. Members for their contributions to this important debate. I do not know whether other constituency MPs often feel frustrated, as I do, that many processes such as planning inquiries and the operation of health trusts and other bodies seem to be beyond the control of us as elected Members. In this case, the hybrid Bill Committee at least means that the process will happen within Parliament.
I thank the hon. Member for Nottingham South (Lilian Greenwood) and her boss, the shadow Secretary of State, for the co-operative way in which we have been able to work together. It has been a little bit like Christmas day on the western front, but no doubt when we have Transport questions next Thursday the howitzers will start to roar again across the no man’s land between the two Dispatch Boxes.
Hybrid Bills come along rarely, and changes to their rules and procedures seem to be even rarer, so it is important that these motions receive the House’s full consideration despite the fact that, as my right hon. Friend the Member for Chelmsford (Mr Burns) said, they might seem arcane. Members have raised important issues about the Select Committee stage of the process, and I will address the amendments to the motions. I hope that I will allay many of the fears that have been raised, and that none of the amendments will be pressed.
I turn first to the points that the hon. Member for Hayes and Harlington (John McDonnell) made about the Heathrow link. I reassure him that Transport and Works Act orders can be applied only to extensions of under 2 km, so the Heathrow spur, which would be much longer than that, cannot be authorised in that way. I hope that sets his mind at rest.
We would need a very good lawyer to get that passed.
I was interested to hear that the hon. Member for Birmingham, Edgbaston (Ms Stuart) came from Bavaria. I think a socialist in Bavaria is a very rare breed indeed. She talked about passing a provision for the HS1 link. As I said, it is ultimately for the Committee to decide whether a petition should be heard, and it may choose to hear petitions suggesting that a future link should not be precluded. Its work is on the railway proposal before it, and it cannot get bogged down in considering the merits of links that may or may not happen, but it could certainly consider ruling out any future provision should it choose to do so.
The hon. Member for Stoke-on-Trent North (Joan Walley), who chairs the Environmental Audit Committee, made a number of points about the environment, and I share her ambition to ensure that the environmental impact of the project is minimised. Of course, she is aware that we published a 48,000-page environmental impact report. I recognise the Environmental Audit Committee’s intention, and we are seeking to have no net loss of biodiversity. It is a hugely ambitious scheme, equal to that on any comparable project worldwide. We are building 140 miles of railway, and in biodiversity terms, it will be as though it were not there. In many cases, of course, there will be biodiversity gains. As I think I mentioned to the Committee, in some places where there is arable farming and monoculture we will put in something better than the current oilseed rape or wheat crops, which have little biodiversity and offer little in the way of habitat.
Does the Minister agree that what the Government and HS2 Ltd intend to do is one thing, but the instructions to the Select Committee on the Bill are a slightly different thing? I would be grateful if he addressed how the Select Committee can be given the flexibility in its remit that it needs.
The Committee will certainly be able to examine how measures in the Bill and the project will affect individual petitioners, and non-governmental organisations and other groups will also be able to petition. The overall scheme itself will not be under consideration, however, because it was decided last night.
I reassure the hon. Lady that I am not being dragged kicking and screaming into giving environmental reassurances, and I am keen for us to leave something for future generations. I am very aware of the problems of trying to restore ancient woodland. Unfortunately, 36 hectares of ancient woodland will have to be removed, and we are doing what we can to try to replace that. We cannot replace ancient woodland straight away, but we can do whatever possible to ensure that it regenerates and, in the fullness of time, replace that environment. Indeed, there may be other opportunities. For example, as research goes on to produce ash trees that will be resistant to the big problem of ash dieback that is starting to develop in this country, there will be a good opportunity, as we carry out tree planting, to ensure that there is a new generation of ash trees to replace those lost because of that terrible disease.
A point was raised about having time on Third Reading to discuss feedback on environmental issues from the Select Committee. Is the Minister able to offer some kind of commitment on that?
Certainly, regarding the hon. Lady’s amendment I can reassure her that that base is already covered. The introduction of Standing Order 224A, which she referred to, means that the amendment is unnecessary as it essentially copies part of the instruction given to the Crossrail Bill Committee at a point when there was no Standing Order 224A. The instruction to that Committee was to ensure that any environmental information in petitions that related to the principle of the Bill and therefore could not be heard by the Committee was reported to the House on Third Reading when the principle of the Bill was reconsidered. I hope that that allays her fears.
Standing Order 224A means that the amendment is not required because it introduces a process of consultation for any supplementary environmental information provided at the Select Committee stage. All consultation responses are summarised by an independent assessor in the same way as they have been for the environmental statement consultation. If a petition includes environmental information that does not touch on the principle of the Bill, it is wholly within the scope of the Committee to consider that. If the Committee considers that some reasonable and practical mitigation could be introduced to address the issue, it will amend the Bill to do so. That is a key part of its role and its conclusions will be included in its special report.
What expertise and capacity will be available to the members appointed to the Select Committee to assist them in that?
Obviously, within the limitations of the resources made available by the House to the Committee, it can enlist whatever expert advice it wants, just as the hon. Lady’s Committee will have advisors who give it expert and scientific advice and so on. That is a matter for the Committee, but I hope it will enlist the best advice to assist it in its work. Indeed, many of the environmental NGOs that produce petitions might themselves be providing what they consider to be expert advice, and it will be up to the Committee to consider how much weight to give it.
We must also comply with directives such as the habitats directive. As a Member for five years of the European Parliament’s environment committee, I was involved in many such directives. Even if some aspects of the project do not come within the scope of the petitions, we must comply with environmental protections that we have agreed at European level.
The Minister mentioned that there would be an independent assessor. Who will that be, and will the Government make use of agencies such as Natural England to provide the kind of advice that the Chair of the Environmental Audit Committee suggested would assist the Bill Select Committee in its work?
I am not aware that an assessor has been appointed, and neither do we need to appoint one at this stage. Therefore, I am not able to tell my right hon. Friend who it would be, but under the definition of the word “independent” it would be a person not connected to any vested interest.
When we started this debate my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) touched on the Major Projects Authority report. As we have heard many times from the Dispatch Box, the MPA does not routinely publish its reports on the major projects it scrutinises, and a founding block of the effective function of the MPA is the confidential nature of the reports it produces and the way it can be used as a tool within government to ensure that projects are delivered efficiently.
I understand what the Minister is saying and it is absolutely accurate. What I asked was whether, for the purposes of examining the project in detail, we could treat the Committee members as Ministers and give them confidential access to the MPA reports, so that they can fully see the risks that have been identified by the very body set up by the Government to scrutinise such projects.
The work of the Committee will be done in public and I would be very nervous about giving confidential information of any sort to it. That would not be appropriate. The report that my right hon. Friend refers to is from 2011, so its relevance erodes by the day. I really do not think that it would bring anything to the Committee’s work.
My right hon. Friend mentioned electronic payments, and identified that Parliament’s website has much useful information for petitioners. This includes the information that payment can be made by cash or cheque, and by credit and debit cards except, I am told, American Express.
I am grateful to the Minister for giving way; it is good to be able to have a proper debate. He refers to the MPA report being from 2011, but he must appreciate that the costs being used on the project are also 2011 costs. He says that the Committee will sit in public and so he would be nervous about giving its members confidential material. Does that also mean precluding Committee members from having access to the financial information and financial calculations made by HS2 Ltd on, for example, tunnelling activities?
The Committee already has the budget before it. I do not want to add anything to what I have said already.
My right hon. Friend talked about further instructions to the Committee. It is the case that further instructions to the Committee can be made only by a motion in the House. The Government believe that these instructions are correct and we have no plans to change them.
The Minister is on weak ground if he does not make the MPA report available to Committee members and if the Committee does not have access to something so significant. Virtually every Select Committee I have ever been on has, at some stage or other, talked to Ministers and been shown confidential documents.
I am sure that were the Committee to make a request for either this type of report or commercially confidential material it will be considered at that time, but at this stage the Committee has not been formed and no such request has been made.
The right hon. Member for Holborn and St Pancras (Frank Dobson), as we heard from his contribution, is a man ahead of his time. His predictions have come to pass—at least the ones that he referred to; he may have made other predictions that have not. I would be keen to have dinner with him at one of the restaurants at Euston and see the problem first hand. Maybe I should go incognito; I suspect he is so well known he could not go incognito. As a fellow Yorkshireman, I suspect that there may be a problem at the end of the meal when we have to decide who is going to pay.
I am very happy to take up that invitation. As a fellow Yorkshireman, I suggest we go at lunchtime when there is a brilliant buffet that costs a lot less than eating in the evening.
How could I refuse such an invitation?
The right hon. Gentleman asked whether we could confirm that any new Euston proposals would require a new environmental statement, consultation and petitioning period. The answer is yes. A consultation would be required by Standing Order 224A. The change would then be subject to a new petitioning period.
The right hon. Gentleman also talked about petitioning by business associations. I think I can go further than I did in my intervention. A business is defined in the terms of this measure as an organisation that exists to make money for its owners. A business association would not seem to meet this definition and so would have the longer deadline. I suspect that if he found a different lawyer he would probably get a different result, but that is the position of this Government at this Dispatch Box and I hope those associations will be reassured by that.
My right hon. Friend the Member for Meriden (Mrs Spelman) talked about the green belt. The Bill includes powers for local authorities to approve plans and specifications for the railway, which should ensure that any structures in the green belt are designed sympathetically.
This debate has been an important stage in the progress of this Bill for phase 1. I hope I have explained why many of the amendments are superfluous to the effective operation of the Committee.
I may have missed the Minister’s—very brief—response to my amendment.
The hon. Lady’s amendment was about the link. I made the point that it would be possible to petition to ensure that a link was not obviated, but the link itself, whichever route it might take, was not covered. Therefore, in the same way that we have provision for the Heathrow spur in phase 1, it would be possible to petition to ensure that the construction of phase 1 would not rule out any future link. I thought that was one of the very first points I made—if the hon. Lady was paying attention then.
I have paid great attention to everything the Minister has said, both today and yesterday, and I cannot remember hearing the word “Stratford” come from him at the Dispatch Box. Given that I have listened to every word he has said, I am hoping I will be able to add him to my Christmas card list, as he now gives Stratford some confidence.
I am certainly happy to mention Stratford, but Stratford is not within the scope of the Bill at this stage. I made it clear in my opening remarks that this is about constructing a railway from Euston to Birmingham, with the intervening stations and other works, and not, at this stage, about including Stratford. In fact, the Bill does not include Stratford, so perhaps she should get to work on her policy people in the Labour party. I am sure they will be beavering away, busy writing their manifesto, and she might be able to be slightly more persuasive.
It is interesting, because people in Sheffield were keen to make the point to me that they wanted phase 2, which is not within the scope of this Bill, to go into Sheffield city centre, because a station was needed there. I am now being told that stations are needed way out. The idea that we could be served by Stratford and Old Oak Common, without the need for a city centre station, is the exact opposite of what I heard in Sheffield.
Is the hon. Gentleman aware that the Olympic games were held in Stratford in 2012? The idea that Stratford is “way out” shows that he is himself a little distanced from the reality of what London is. Stratford offers interconnectivity through the rail networks in the east of England and to the north. It also offers economic opportunity. The idea that we will be wandering down roads with our suitcases in the rain shows the limit of his imagination. I would ask him gently—because I like him very much—whether he would reconsider his position.
The hon. Lady makes some very good points, I am sure. I would merely make the point that the distance from Meadowhall station, outside Sheffield, to the centre of Sheffield is less than the distance between Stratford and the centre of London. It is interesting that when we talk to cities such as Nottingham, Sheffield and others that are served by parkway stations rather than city centre stations, they see the importance of having a station in the city centre. However, I understand the point she makes about Stratford.
Should the House approve the motions, the matter will move to the Select Committee to start hearing the petitions of those affected by the scheme. This is a crucial moment in the process and one that many have waited many years for. I therefore believe that the House has an obligation to ensure that we swiftly progress to that point. I believe that the motions as drafted provide a fair and reasonable framework for both petitioners and the Committee. As I have said, I do not believe that the proposed amendments would add to the Committee’s ability to hear petitioners or progress its work effectively. Indeed, in some cases the amendments seem to work against the interests of the petitioners and should be rejected. Indeed, as I read them, many of the amendments gave me the impression that they were designed to frustrate the Committee’s work, rather than facilitate it, but maybe that was one of the objectives.
I am moving to my conclusion. My right hon. Friend was not very generous yesterday, but I will not reciprocate.
No, I was not very generous yesterday; the Minister is right, but it was because I was trying to leave enough time for others to speak in the debate. Let me say to the Minister that none of my amendments was intended to delay. There is a four-hour limit on the debate and the amendments were tabled in good faith to try to elicit more information from the Government. Once again, I remind the Minister that people have been abused in the process to date and I do not want him to continue that from the Dispatch Box.
I merely make the point that if amendments were designed to waive the fee for petitioning while at the same time encouraging electronic petitioning, that could be used by some who seek to frustrate the Bill rather than to work with the Committee, using the provisions as a way of preventing the Committee from carrying out its work.
I commend the motions to the House and urge Members to vote in favour of them and against the amendments.
Order. I understand that the right hon. Member for Chesham and Amersham (Mrs Gillan) does not intend formally to press any of her amendments. Is that correct?
(10 years, 7 months ago)
Written StatementsI am pleased to inform the House that my right hon. Friend the Deputy Prime Minister has announced today the key elements of a comprehensive package of measures to support ultra-low emission vehicles (ULEVs) between 2015 and 2020. This follows the announcement by the Chancellor of the Exchequer in the 2013 spending round that the Government will make £500 million available to support ULEVs in this period.
The outline package of measures confirms the UK Government’s strong commitment to making the UK a premier location for the design, manufacture and adoption of ULEVs. It aims to provide a long-term, stable and comprehensive policy framework backed by a significant funding commitment. The package gives certainty on grant support for consumer incentives, provides funding for vital infrastructure, recognises the importance of other vehicle sectors including buses, taxis and HGVs and provides guaranteed funding for ULEV-specific R and D. It also encourages innovative measures from cities to turn their areas into exemplars for ULEV take-up.
Key elements include:
At least £200 million for the continuation of the plug-in car grant, with the grant cap remaining at £5,000 per car until a review in 2017, or the first 50,000 vehicles, whichever is the sooner;
£100 million for ULEV-specific R and D;
£35 million for a new city scheme competition, to support flagship cities in introducing innovative local measures;
£20 million for ULEV taxis;
£30 million for low-emission buses;
£32 million for infrastructure including rapid chargers;
£31 million for other ULEV types including vans; and
£4 million for HGV gas refuelling infrastructure.
I can confirm that the Government are also seeking to adopt a flexible approach. Not all the £500 million funding is allocated here, and minimum allocations are given which could be extended to reflect market conditions. Many elements of the package, including the consumer incentives, are also subject to securing the necessary state aid approvals from Europe.
More information on the package can be found at, www.gov.uk/olev and further detail will be made available by autumn 2014.
(10 years, 7 months ago)
Commons ChamberIt is a pleasure to follow the hon. Member for Wythenshawe and Sale East (Mike Kane). Perhaps, for once, we will vote in the same Lobby. I want to express my gratitude and that of other Government Members from the north to the Labour leaders of the great cities of the north for the impact that they have had on the shadow Front-Bench team over the past few months.
Last year, my neighbours and hon. Friends the Members for Blackpool North and Cleveleys (Paul Maynard) and for Wyre and Preston North (Mr Wallace) sat down with Virgin Trains to consider the possibility of providing a direct train from London to Blackpool, with a stop at Poulton station, to assist the regeneration of Blackpool and Fylde. That would have an impact on my constituents in Fleetwood and on the constituents of my hon. Friend the Member for Wyre and Preston North. Virgin said that it could put on two direct trains a day to Blackpool, which would have changed the whole situation. However, when we got to Network Rail, we were told that no room existed on the west coast main line for those direct trains. The capacity issue is having an impact now—not in a few years time. It has prevented those trains from running.
Does my hon. Friend agree that the point that he is making applies equally to Shrewsbury, which has had similar problems in getting a path down the network?
I agree absolutely with the Minister.
To be fair, the amendment recognises the need for extra capacity from the north to the south. I am grateful to the supporters of the amendment for that. I accept their criticism of the fact that the project does not start in Manchester or Leeds. That makes it a funny hybrid amendment, but perhaps a hybrid amendment to a hybrid Bill is fitting. The amendment then seems to say that everything can be done with the existing line. As I have pointed out, that line is already at capacity. As hon. Members from across the House have mentioned, the last time we attempted to upgrade the west coast main line, there were more than 10 years of overruns and we had different figures for the costs, which were about £10 billion. As people who use that line know, it is still not finished. If anybody was travelling on Saturday night, as I was, they would know that there are still more problems around Watford. In the summer there had to be improvements north of Warrington, which again caused delays on the line. It is simply impossible.
Other hon. Members have mentioned a suggestion that I made a couple of years ago about having double-decker trains, but apparently that is not practical given the bridge situation and so on. Those things have been considered, and we are left with a need for a new line. If we are going to build a new line, presumably it must be the latest development; I am sure that we—except for the enthusiasts, perhaps—would not want to build a line with steam trains on it at the moment.
I will oppose the amendment and support the Bill, even though I represent Lancaster and Fleetwood, which is not directly affected by this issue. Interestingly, if we consider High Speed 1 and the new Javelin trains that go from King’s Cross to Folkestone and use the high-speed line and transfer at Ashford to the normal “classical” line as I think it is referred to, I can see that there could be massive improvements in terms of the impact on stations north of Manchester, and indeed north of Crewe if we get there in the short term. We will enjoy those benefits because we will have trains travelling on both lines and improved connectivity.
For me the biggest reason for HS2, which has been mentioned by other Members, is the coalition Government’s promise when we got elected to do something about the widening north-south divide. That divide got wider and wider in the 13 years before we were elected and we said that we were going to do something about it. We have started to do something, and I accept that railways are not everything. We have started to do something about roads, and for the first time we have an M6 link road around Lancaster to Heysham. A scheme promised in the 1930s is now being built by this Government. The extension of broadband will be massively important in the north-west, but we must also deal with railway capacity, and it seems to me that there is no available alternative but this project.
My hon. Friend the Member for Warrington South (David Mowat) said that we should not go ahead with this scheme and compared it with London, but I find amazing the argument used by some that in London we can spend £6 billion on Thameslink—still not finished, by the way—and £15 billion on Crossrail 1. We are now proposing to spend £16 billion on Crossrail 2, and apparently those projects will have massive impacts on the London economy. Great, they will, but then I am told by some hon. Members that a high-speed line to the north will have minimal impact in terms of regeneration. What is good for one city is good for other cities and beyond, and we must rebalance the situation in terms of spend and connectivity.
As many Members have said, we need this debate literally to get moving at high speed, and as my right hon. Friend the Member for Chelmsford (Mr Burns) said—I totally agree—we should not delay the Bill, which is what this hybrid amendment seems to be about. We should support the Bill and then go on to debate High Speed 3 to Glasgow and Edinburgh, and possibly High Speed 4 to Cardiff, and get on with truly uniting this Kingdom.
The debate has highlighted not only the need for HS2 but the importance of getting it right. This is a scheme that will play a vital role in creating the necessary conditions for economic growth, but that does not mean we should press ahead unchecked. We must be clear about the impacts and act responsibly in addressing them by providing appropriate mitigation for any adverse environmental consequences, and fair compensation for those affected by the new railway.
Let me summarise how we respond to those crucial issues. First, we have been clear about the cost. It is a considerable investment but it is spread over 10 years, delivering benefits over decades, perhaps for centuries, as the Victorian network continues to deliver. This is also a project that will stand the test of time, and it is not at the expense of other investment, as we have heard. It is alongside high levels of investment in roads, in the existing rail network and in local transport schemes. This is one part of a rounded transport strategy.
It is incumbent on us to ensure that the scheme sticks to its schedule and budget, so that taxpayers get value for money, and they will. To assist us, we have recently appointed leading experts, Sir David Higgins and Simon Kirby, to lead the delivery and construction of the scheme. Following his recent review, Sir David confirmed that the scheme is on track for construction to begin in 2017.
Secondly, unfortunately it is not possible to construct a project such has this without having some impacts on the environment. However, since the very beginning, identifying those impacts and developing proposals for appropriate mitigation have been key priorities. We have carried out environmental assessments and proposed mitigation measures. We are committed to no net loss of biodiversity, as I explained to the Environmental Audit Committee recently, and we are replacing habitats for wildlife. We are generally tunnelling under rather than travelling through the Chilterns area of outstanding natural beauty, and we are integrating the railway into the landscape, hiding much of it from view. We are incorporating natural and man-made barriers to reduce noise and vibration, and we have set binding commitments to control the impacts of construction. On all of that we have consulted extensively. We have taken on board suggestions for improving the scheme, and before the Easter recess, the House received an independent report summarising consultation responses to inform its decision tonight.
Thirdly, I come to the measures to support those properties that may be affected, as raised by my hon. Friend the Member for Stone (Mr Cash) and others. People living near the proposed route are understandably worried. They deserve generous assistance and they will receive it. We have already helped more than 100 households under the exceptional hardship scheme, and we have now launched an express purchase scheme for land safeguarded for phase 1, helping owner-occupiers to sell quickly and with less fuss, regardless of whether their property is needed for HS2. [Interruption.] They get the full, unblighted open-market value of their property, plus 10%, plus reasonable moving costs, including stamp duty. [Interruption.]
Order. Conversations are going on on both sides of the House. I want to hear the Minister, as I am sure do all Members’ constituents. Minister Goodwill.
Later this year, we will launch an enhanced need-to-sell scheme to help owner-occupiers who need to sell their property but cannot because of HS2. I stress that there is no distance test to pass in this case. We will also launch a voluntary purchase scheme giving owner-occupiers in rural areas up to 120 metres from the line the choice to sell their property and receive its full unblighted market value. We will also consult on offering them a new choice of a cash alternative, and we will consult on new home owner payments for owner-occupiers in rural areas between 120 and 300 metres from the line to help share more of the expected economic benefits of HS2 with rural home owners, not just helping those who want to move, but also those who need to stay in their homes. We appreciate that for some no amount of money or help will be enough, and we do not pretend that these proposals will satisfy everyone, but we believe that they are fair and represent the best possible balance between properly helping people and providing value for money for the taxpayers.
I come now to some of the comments made in the debate. I thank Her Majesty’s loyal Opposition for their support. It was their idea after all. As a fellow Yorkshire MP, the shadow Secretary of State recognises the benefits to the north, and we also agree that the project should be delivered in a cost-effective way. Indeed, another Yorkshire MP, the shadow Chancellor, agrees with us that it is absolutely right—possibly for the first time. The shadow Secretary of State is correct in holding us to our word on the environmental mitigation included in the scheme. She asked me about the response to the HS2 phase 2 consultation. We will respond in the autumn and make further decisions following that.
The shadow Secretary of State also mentioned resilience in the south-west and we will certainly not ignore other parts of the country. I was recently in Dawlish and saw the work carried out there. I also drove on the A30 and A303 in the west country between Stonehenge and the Blackdowns, which is an important route, as mentioned by my hon. Friend the Member for Plymouth, Sutton and Devonport (Oliver Colvile).
Who could not have been impressed by the enthusiasm of my hon. Friend the Member for Skipton and Ripon (Julian Smith) for HS2 and for the advantages for God’s own county? He said that Yorkshire could aspire to have a second London, but I think we could do better than that.
My right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) is a stalwart campaigner on the behalf of her constituents and raises concerns about the cost of the project. She cannot have it both ways. One reason why costs have increased is the unprecedented environmental mitigation, including the more than nine of the 11 miles of the line in her constituency that is in either a tunnel or a cutting. She is perfectly entitled to her own opinion of the project, but she is not entitled to her own facts.
I thank the hon. Member for Liverpool, Riverside (Mrs Ellman), the Chair of the Transport Committee, for her support. I see the Select Committee as a critical friend and look forward to its future reports.
My right hon. Friend the Member for Chelmsford (Mr Burns) drew attention to the struggle to build projects such as HS1, which spanned generations, and the need to reduce overcrowding by not only increasing capacity on the new north-south railway, but also freeing up capacity on existing lines for passengers and freight.
The right hon. Member for Holborn and St Pancras (Frank Dobson) welcomed the scrapping of the HS1-HS2 link, but not much else.
I can assure my hon. Friend the Member for Lichfield (Michael Fabricant) that the excavated material from the tunnel in the Chilterns will not be disposed of in his patch.
The hon. Member for Blackley and Broughton (Graham Stringer) outlined the advantages for Manchester and the north-west, as did the hon. Member for Stalybridge and Hyde (Jonathan Reynolds), and drew attention to historical objectors to rail projects. I was reminded that the east coast main line would have gone through Stamford were it not for Lord Burghley’s interests in the coaching industry. Instead, the line went through a little-known place called Peterborough and look at the benefits it brought there. The hon. Member for Blackley and Broughton said that the quicker we do this, the better, and I say “Hear, hear.”
The hon. Member for Solihull (Lorely Burt) outlined the advantages to Birmingham and its airport, and I heard her concern about the properties of the National Trust, with which we are working to protect the setting of Hartwell house.
The right hon. Member for Blackburn (Mr Straw) described how HS2 will bridge the north-south divide, as did my hon. Friend the Member for Lancaster and Fleetwood (Eric Ollerenshaw).
I understand the concerns of my right hon. Friend the Member for Eddisbury (Mr O’Brien) about construction in his constituency. He suggested that double-decking could be a solution, but that would not only be just a stop-gap but result in years of weekend engineering closures and replacement buses on the west coast main line.
For their supportive comments, I thank the hon. Member for Wythenshawe and Sale East (Mike Kane) and my hon. Friends the Members for Northampton South (Mr Binley), for Calder Valley (Craig Whittaker), for Redditch (Karen Lumley), for Rossendale and Darwen (Jake Berry), for Warrington South (David Mowat), for Cleethorpes (Martin Vickers) and for Pudsey (Stuart Andrew), who stressed the importance of the project to Leeds.
The right hon. Member for Birmingham, Hodge Hill (Mr Byrne) supports the scheme, but I understand his concerns about the Washwood Heath maintenance depot.
I agree with the hon. Member for Vauxhall (Kate Hoey) that it is wrong to brand people with genuine concerns about the line’s impact as nimbys.
Tonight the House faces a great decision, one of national importance that will profoundly affect the way our economy develops for generations. The House must be satisfied with the need for HS2, and it must be satisfied that the appropriate measures are in place to deliver the scheme in a sustainable way, both economically and environmentally. HS2 will help drive this country forward. It will create new capacity and enable better use of existing transport corridors. It will join up our great cities and strengthen our economy. As a result, it will help open up opportunities currently held back by lack of investment. Along the way, it will be subject to careful, detailed scrutiny. Tonight’s vote is an important step in taking HS2 forward and I urge right hon. and hon. Members to support the Bill for phase 1.
Question put, That the amendment be made.
(10 years, 7 months ago)
Commons ChamberI am grateful to my hon. Friend the Member for North Thanet (Sir Roger Gale) for securing this debate about the future of Manston airport. In recent years, the increasing demand for commercial air travel has heightened the need to improve the capacity and efficiency of UK airports. This is absolutely essential to meet the Government’s commitment to maintain the UK’s aviation hub status.
In the 2013 aviation policy framework, we recognised the crucial role that regional airports play in providing airport capacity and the vital contribution they can make to the growth of their local economies. Indeed, I prefer to refer to them as local international airports, rather than just regional airports. We are therefore determined that the UK continues to benefit from the services that regional airports offer, and we welcome the ambition of those that are investing in their infrastructure, increasing accessibility and facilitating more services to more destinations.
I am aware of Manston airport’s proud history, which can be traced back to the first world war. It also played a crucial role in world war two, first in supporting troops during the Dunkirk evacuation and then by playing a front-line role during the battle of Britain and providing vital air support during the D-day landings. During the war, the length and width of the runway were improved, meaning that it can now handle the largest jets, such as the new Airbus A380. Manston was even identified as a contingency runway for landings of NASA’s space shuttle programme. It was after the war and during the 1960s that the airport began to be used by commercial airlines and enjoyed relatively steady commercial air operations for several years. That allowed many people in the area to experience their first foreign holiday. However, services and passenger numbers declined steadily from the 1970s onwards, as charter operators moved to larger airports with better surface transport connections. In recent years, Manston has struggled to attract and retain consistent air passenger services, and there have been periods when the airport has had no regular services.
I am aware that Manston airport’s owners have begun a consultation with staff regarding the airport’s future, and I recognise concerns about the impact its possible closure could have on the local and regional economy. I hope that a resolution can be achieved which sustains the commercial viability of Manston airport to keep it as a going concern. I welcome the news that my hon. Friend held the first meeting of the Manston working group earlier today. The meeting brought together representatives from Thanet district council, Kent county council and the local enterprise partnership, and was supported by Departments to explore options for the airport’s future. I commend his tireless work in this regard, but whatever the result of efforts to secure such a resolution, the Government are unable to intervene directly, as we believe that UK airports and airlines operate best in a competitive and commercial environment. It is therefore for individual airports to take decisions on matters of future economic viability.
KLM’s decision to discontinue the route between Manston and Amsterdam will undeniably impact the profitability of the airport. The route was the airport’s main source of passengers and offered a connection with KLM’s international services through the airline’s Schiphol hub. The remaining passenger services offered by the airport are mainly summer charter services, and will likely offer limited air traffic. I am aware that Manston also serves as a destination for air cargo operations, as well as a number of aviation maintenance, repair and overhaul, and airframe breaking and spares recovery businesses, which operate on the airport site. As with airports, airlines must take commercial decisions regarding the routes they operate according to what is in their best interests. It is not possible for the Government to compel airlines to operate certain routes.
There have been additional concerns about the closure of the airport and the possible loss of the Lower Airspace Radar Service—LARS—unit, an information service used by some airspace users. Although closure would result in a gap in the LARS system, it would be no larger than elsewhere in the UK. More importantly, the loss of the system would not be seen as a safety-critical issue. We have been assured by the Civil Aviation Authority that the London Flight Information Service provides an appropriate alternative, and the CAA has stated that it would not support the retention of an airport or air traffic unit for LARS provision, particularly as it is unclear how costs would be covered.
As I said earlier, the UK’s aviation sector is overwhelmingly in the private sector and operates in a competitive international market. The Government support competition as an effective way to meet the interests of air passengers and other users. I restate our determination that the UK continue to benefit from the contribution that regional airports can offer. The Chancellor recently announced that applications will now be allowed for start-up aid for new air routes from UK regional airports. To be eligible, airports must handle fewer than 5 million passengers per annum and meet new European Union state aid guidelines. The Department for Transport is working with the Treasury to determine how the funding process will operate in practice, and over this summer will develop guidance for those organisations seeking to make applications for supporting air routes. Should Manston airport be eligible, we would encourage it to apply for this funding.
As hon. Members will be aware, the independent Airports Commission, chaired by Sir Howard Davies, was established to identify and recommend options to maintain this country’s status as an international hub for aviation. In preparing its interim report, the commission undertook a detailed assessment of the UK’s future aviation demand and connectivity requirements. The commission's interim report, published in December 2013, details its shortlist of long-term options for further study to increase airport capacity along with recommendations for the short term to make the best use of our existing infrastructure.
The commission has explained in the materials supporting its interim report why the expanded use of Manston airport was not selected as an option for further consideration. It concluded that Manston’s distance from London and other significant population centres meant that it was unlikely to be able to play a substantial role in meeting future passenger demand in London and the south-east in the long term, although I did hear what my hon. Friend had to say in relation to transport times as opposed to distance.
The commission also recognised that, in the short and medium term, Government do not have effective levers to redistribute traffic to less congested airports such as Manston, even if it were desirable to do so. The Government are carefully considering the recommendations in the interim report and intend to publish a response to the short-term recommendations shortly. All the shortlisted long-term options will now be the subject of more detailed analysis and consultation by the commission. To protect the integrity of the process, the Government will not comment on any of the shortlisted options.
My hon. Friend also raised the issue of landing and take-off slots in relation to freight. The allocation of slots is governed by EU airport slot regulations, which prescribe the allocation, transfer and exchange of slots at London Heathrow and other “co-ordinated” airports in the UK—that is, those airports where capacity is shown to be insufficient to meet all actual or planned airline operations.
Any decisions about how airlines use the slots allocated to them at busy airports like Heathrow are a commercial matter for those airlines to determine, and that includes freight slots. The European Commission looked at recasting the slot regulation in 2011 as part of the “better airports” package, but progress stalled in late 2012 owing to issues with other aspects of the package. However, the European Commission hopes to reinstate the slots element of the “better airports” package within the European presidency’s transport agenda, and my officials will continue to engage with the process to ensure that the UK aviation sector's interests are fully represented.
Once again, I thank my hon. Friend for securing this debate. The Government are committed to improving the capacity and efficiency of UK airports to maintain the UK's aviation hub status. Though fully aware of the importance that regional airports play in this, the Government are unable to intervene directly in the case of Manston. It is ultimately the responsibility of the airport owner to determine whether or not it is commercially viable.
Question put and agreed to.