I have been asked by my right hon. Friend, the Secretary of State, to make this written ministerial statement. This statement concerns the application made by Transport for London under the Planning Act 2008 on 29 April 2016 for a proposed development known as Silvertown Tunnel.

The application will allow for the construction of a new twin bore road tunnel to pass under the River Thames, providing a new connection between the A102 Blackwall Tunnel southern approach and the Tidal Basin roundabout junction on the A1020 Lower Lea Crossing, London.

Under sub-section 107(1) of the Planning Act 2008, the Secretary of State must make his decision within three months of receipt of the examining authority’s report unless exercising the power under sub-section 107(3) to extend the deadline and make a statement to Parliament announcing the new deadline. The Secretary of State received the Examining Authority’s report on Silvertown Tunnel on 11 July 2017 and the current deadline for a decision is 11 October 2017.

The deadline for the decision is to be extended to 10 November 2017 (an extension of one month). This extension is to enable further consideration of the recent responses to the Secretary of State consultations on the scheme which relate to the updated UK plan for tackling roadside nitrogen dioxide concentrations published by Government on 26 July 2017.

The decision to set a new deadline is without prejudice to the decision on whether to give development consent.

[HCWS153]

HS2: Phase 2b Route (Manchester and Leeds)

Paul Maynard Excerpts
Wednesday 6th September 2017

(7 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr McCabe. I shall do my best to cram as much as I can into the remaining 10 minutes. The hour-long debates in this place are neither fish nor fowl, I have rapidly learned.

I thank my hon. Friend the Member for Eddisbury (Antoinette Sandbach) for doughtily providing her usual list of issues for me to consider. She is a firm champion of the people of Eddisbury, and I shall try to focus on her main concerns, but I want briefly to address some of the points made by the hon. Member for York Central (Rachael Maskell) from the Labour Front Bench. I agreed with much of what she said about economic investment and the need to ensure that things all join up. However, I must gently chide her on one key point: we have not stopped work on east-west links across the north. I met only the other week with both Network Rail and Transport for the North to talk about how they are bringing forward Northern Powerhouse Rail. I have always argued that HS2’s full potential will not be fully delivered unless we properly improve east-west links as well. It is not for me to determine the engineering solution that Network Rail will alight on for any particular line or stretch of line, but that work is ongoing—on a cross-party basis, as Transport for the North is also governed by Labour local government leaders across the north, who are also setting the objectives. That seems to me to be how things should be taken forward.

Rachael Maskell Portrait Rachael Maskell
- Hansard - - - Excerpts

Will the Minister give way?

Paul Maynard Portrait Paul Maynard
- Hansard - -

If the hon. Lady will forgive me, I will not; I am sure it will not be the last time we have the discussion, and I must give some time to the concerns of my hon. Friend the Member for Eddisbury. Her main concerns focused largely on some of the ground instability problems that we encounter in Cheshire, crossing the salt fields. As someone born and bred in Northwich I have been brought up on photos of houses that have collapsed because of subsidence, and have suddenly disappeared into the Bull Ring in the town centre. I am more than aware of those issues; but I reassure hon. Members that we are seeking to manage them actively.

HS2 has commissioned a specialist mining engineer, in consultation with the Cheshire Brine Subsidence Compensation Board, to undertake a study on the consultation route using available data such as those from the British Geological Survey, the salt industry and local authorities. Those light detection and ranging surveys have been completed by HS2 Ltd, identifying the wet rockhead features to which my hon. Friend referred near to the route, and will be considered with other LIDAR surveys. I think it is fair to say that between Crewe and Manchester every route option presents risks and issues. It is a matter of balancing those carefully and working out which offers the optimum solution. We carefully weighed those matters both in 2013, when we listened to concerns, and on the now-confirmed 2016 route. On our assessment those risks were more manageable on the latest version of the route. One of the key reasons for that was to avoid the gas storage caverns to which my hon. Friend referred. The route has been moved to better avoid salt brining and gas storage infrastructure, reducing underlying mining and geological risks during construction and operation. The route has also been raised to better allow for drainage and options for ground stabilisation. In terms of travel through Cheshire, other alternatives were looked at, including tunnelling options, but this was felt to be the best option of those on the table.

My hon. Friend the Member for Eddisbury referred to the report by TerraConsult. Its first report was taken into account before the November 2016 announcement, as was its second report before the July 2017 announcement. I further understand that HS2 Ltd is meeting on Tuesday 12 September with TerraConsult and Mid Cheshire Against HS2 on how HS2 Ltd came to make its recommendation on the alignment between Middlewich and Pickmere. Senior engineers with a background in geotechnical engineering will attend that meeting. I also understand that HS2, accompanied by engineers, is more than happy to meet my hon. Friend to discuss her concerns and is waiting to confirm a date with her office. Once she has had that meeting, I will still be more than happy to put myself—with my limited expertise—at her disposal also.

I recognise that this is a sensitive and complex section of the route. There is more work to be done to further assess geological risks and to provide suitable mitigations for them. HS2 Ltd plans to carry out early geotechnical investigation work in the mid-Cheshire area to gather more advanced survey information. We will continue to work with my hon. Friend to try to ensure that the best mitigation possible occurs.

I also want to touch briefly on my hon. Friend’s concerns about the siting of the depot at Wimboldsley and its proximity to the primary school. The re-siting of the rolling stock depot to Wimboldsley has taken into account both the potential risks of the previous site in Golborne, which saw the demolition of a grade I listed property, and the potential impacts in Wimboldsley. The site is strategically located on the HS2 network, south of the Manchester junction, so that it can receive empty trains from both the HS2 main line—from Preston and indeed further north—and the HS2 Manchester spur. It is also located at the point where the line deviates from the existing west coast main line, so it is also well placed to receive empty HS2 trains from Liverpool. Other locations around Basford and Crewe are less proximate to where empty trains from Liverpool and Manchester might be coming from.

While I understand that there will be impacts associated with the rolling stock depot, I very much welcome the fact that HS2 Ltd is in conversation with the headteacher at Wimboldsley Primary, and I hope that any outstanding concerns get fed into me as well, so that I am aware of them.

In particular, this proposal avoids direct impacts on the grade II listed buildings to which my hon. Friend refers and also proximity to sites of special scientific interest. I recognise that there are still concerns about the Leeds and Liverpool canal. Indeed, other canals were also mentioned. As someone born in mid-Cheshire, I have a great fondness for canals and want to ensure they do not suffer in this process.

Antoinette Sandbach Portrait Antoinette Sandbach
- Hansard - - - Excerpts

indicated dissent.

Paul Maynard Portrait Paul Maynard
- Hansard - -

If my hon. Friend has further information on where she thinks there might be impacts, I will happy to look into it.

Furthermore, significantly less infrastructure is required at this location than if it were at Golborne. In particular, there is no need for a northern chord from Manchester out to the HS2 junction. That reduces the overall infrastructure development requirements in the area and, indeed, creates more space in the HS2 budget for other mitigation elsewhere on this stretch of the route.

In the remaining two and a half minutes, I will not be able to do justice to everything that my hon. Friend said, so I am more than happy to meet her. I recognise her points about ancient woodlands and about some of the lowland deciduous woodland in Cheshire. There are woods around Plumley, Smoker wood and woods around Lostock Gralam. I know that HS2 is very keen to ensure that when it does the environmental assessment, it can put forward how it intends to mitigate that loss of woodland. I urge Members to look carefully at that assessment when it comes out later in the year, because it will be full of information, and I am sure that local people will want to have their say on whether the mitigation is adequate.

I want to finish on the most important point. I apologise to the right hon. Member for Rother Valley (Sir Kevin Barron) that he will not get any look-in in what I am saying, because I have run out of time, but I am more than happy to meet him as well. I know that there is an outstanding meeting, and I will be keen to meet him. There is a wider point here about how HS2 engages and consults with local communities and how it processes need-to-sell applications. This is a difficult area, but it is impossible to build infrastructure of this scale without inconveniencing someone. The key test is whether those people who are being inconvenienced and asked to sell or leave their homes feel that they are being treated in a fair and proportionate manner.

I urge all Members here today who have specific cases to come to see me personally, as my hon. Friend the Member for Erewash (Maggie Throup) did. It is only by properly understanding those individual cases that I get a more holistic sense of whether the system is working or not. I noted the concerns that my hon. Friend raised about how some specific local circumstances make the existing package not always appropriate. I have heard that message and will ask officials to look more closely at Long Eaton in particular. If Members have a specific local issue, they need to let me see the detail, because there have been examples already where I have been able to exert influence. I expect HS2 to get this right, and that will be my final word on the matter at this stage.

Thameslink

Paul Maynard Excerpts
Wednesday 19th July 2017

(7 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Bailey. I congratulate my hon. Friend the Member for St Albans (Mrs Main) on securing this debate and presenting her case, as she always does, with great vigour and force; I expect no less from her. She is right to hold Ministers to account for the service on her railway.

Passengers expect a timely, punctual and reliable service, and when they do not get it, they are right to want to understand why, and what Ministers and the train operators intend to do about it. This has been a helpful debate on what is occurring with Thameslink, and I am grateful to both the hon. Member for Dulwich and West Norwood (Helen Hayes) and my hon. Friend the Member for Hertsmere (Oliver Dowden) for their contributions. There was also a sensible contribution from the shadow Minister, the hon. Member for York Central (Rachael Maskell). We may not agree on the final paragraphs of her speech, but I thought that much of what she said made great sense.

I am aware of how important it is that we deal with this issue. As I said, passengers want a service that they can rely upon, and if they cannot, that should be a concern for us all. The Thameslink service is vital for our country, not least because our capital city depends upon it. Reliability of services through central London is critical. It is one of Europe’s busiest rail routes, so it is right that passengers will see new stations—and better stations, in fact—new trains, new infrastructure and new systems to increase capacity, reduce crowding and provide better connections for passengers across London and the wider south-east.

A number of points have been made in the debate, but I want to focus first and foremost on answering the points made by my hon. Friend the Member for St Albans. I often find that these one-hour debates are neither fish nor fowl, and I want to give proper attention to the points made by the Member who secured the debate without ignoring the other points made. Normally I run out of time in that ambition, so if I do not manage to respond to all the points now, I ask Members to make sure that I reply to them all subsequently.

The first point made by my hon. Friend the Member for St Albans was about the impact of the new trains. Of course, people want new trains. It is right to point out that the new Thameslink trains have advanced technology; they are more spacious and modern by their very definition. We have contracted Siemens to deliver 115 of them overall. We have 37 currently in service, between Bedford and Brighton, on the Wimbledon loop and on services in Kent. We expect all Thameslink services to be served by Class 700 trains by October 2017.

Train performance on the brand-new trains is improving bit by bit every period, but I recognise that it has not been good enough. I have spoken to Siemens myself to urge improvement. I know that it is working very closely with GTR. With every software improvement we see a significant improvement, but it is worth bearing it in mind that this platform is a step beyond what Siemens has produced before with its Desiro platform. There will always be slightly more challenges with such a new piece of rolling stock, but we are seeing significant improvement over time, and I fully expect to see significant improvement in reliability over the coming weeks.

My hon. Friend the Member for St Albans gave a number of examples of where her constituents were not getting the service they desire. I have been hearing those tales about this GTR network since I started in this role last July, and that is what has inspired me to focus on trying to deliver the rail ombudsman that we had in our manifesto as rapidly as I can. That is making good progress. I want to ensure that passengers can get binding arbitration at the end of the day where they cannot secure the right outcome from their appeals. We do not want these situations to occur—far from it—but where they do, I want the passenger to feel empowered. That is why I wanted to ensure that we had passenger representation on the Gibb report panel, for example—to ensure that their voice was being heard.

I was fascinated to hear about the Train Suffragettes to whom my hon. Friend referred. I would be delighted if she could send me more of their ideas about how the service could be improved, and I would be happy to take on board as many of them as possible.

Oliver Dowden Portrait Oliver Dowden
- Hansard - - - Excerpts

I should also highlight Thamestink, which is the campaign group in my constituency. I would be grateful if the Minister could extend the invitation to that group as well.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I always risk creating extra work for my private office in inviting all submissions, wherever they are from, but I am more than happy to receive them and give them my full attention.

A number of hon. Members mentioned what is referred to in the industry as passenger information during disruption. It has been a major concern of mine that passengers may, at the breakfast table, consult their mobile phone, get one piece of information that their train is running, beetle down to the station to get the train and then discover that for some reason it has been cancelled. There are too many sources of information across the industry. The Office of Rail and Road has two key obligations under law. One is improving passenger information during disruption. I have asked it to look closely at how that is working across the south-east quadrant as a whole, because I have concerns about both GTR and Southeastern ensuring that we have consistent information. I accept that that is a key point, and it is one that I am taking up.

My hon. Friend the Member for St Albans has raised concerns both with me and with my right hon. Friend the Secretary of State about the Radlett freight interchange. Those representations were augmented today by my hon. Friend the Member for Hertsmere (Oliver Dowden). I genuinely recognise those concerns; that is why I want to ensure that the timetable is protected from the impact of the works. Network Rail has reassured my Department, just as it has reassured both my hon. Friends, that the work at Park Street has been planned to have minimum impact on passengers, as freight trains will run only outside peak times and overnight, but I recognise that the concerns remain and that there is a wish to have greater oversight of the detail of what is being planned. I suspect the best thing I can offer is to broker a meeting with Network Rail, with me present as well, and perhaps we can test some of those assumptions against what my officials and the Department are also aware of. That might be of assistance to my hon. Friend the Member for St Albans, so we will co-operate as best we can to try to find that reassurance.

My hon. Friend also mentioned overcrowding at St Albans station. We are extending the platform to accommodate 12-carriage trains as part of the Thameslink programme. GTR is working to deliver extended automatic ticket gates at platform 4, which I believe is called the Ridgmont entrance, by 2019. The main station building will also receive an enhanced retail offering, a larger concourse area to accommodate peak periods and associated platform furniture and shelter facilities to improve the station environment. I recognise that there remain capacity concerns at St Albans station. We are thinking through the implications of that for future rail control periods.

In terms of future Thameslink services and how they will benefit St Albans, it is a matter of improved peak frequency and more capacity between central London, St Albans and Bedford, with more peak services, new cross-London routes, and Thameslink services reinstated to serve London Bridge. I expect passengers to see more comfort benefits, with more than 3,000 standard-class seats into London St Pancras, which is 15% extra from today, particularly through using the 12-carriage trains.

Essentially, Thameslink is all about expanding capacity on a key commuter route. We are trying to deliver the trains and the infrastructure to enable that, with 24 trains an hour in the peak through the Thameslink core between Blackfriars and St Pancras, which is an additional nine trains in each direction.

Part of our focus is on making sure that we have the right infrastructure—not just track but signalling. My hon. Friend the Member for Hertsmere is right to identify that we need to make sure that signalling and timetabling are robust. We have a planning board, chaired by Chris Gibb, of Gibb report fame, and an assurance panel, chaired by another industry expert, Chris Green, double-checking the work that is going on to make sure it is reliable and will deliver the outputs that we seek.

To date, the Thameslink programme has delivered a new Blackfriars station connecting both side of the Thames. We have seen major enhancements at Farringdon, platform extensions on midland main line stations to allow longer trains and, as I said, 37 of the new class 700 trains. There are new maintenance depots at Three Bridges in Crawley and Hornsey in north London, and many hon. Members will be familiar with the new London Bridge station, two thirds of the concourse of which has been open since August 2016.

What else can passengers expect? The rest of London Bridge station will be open for business in early 2018. The new class 700 trains will start operating on Great Northern routes and on services in Kent and Sussex. Entire new journeys, such as Cambridge to Gatwick, will open up new journey options and connections for customers, including an interchange with the Elizabeth line services at Farringdon, which I think will transform how people approach travel options within London. Most importantly, from 2018 there will be services every two to three minutes through the central London core between Blackfriars and St Pancras International.

I recognise concerns about performance. We have seen performance steadily improving since the start of the year. When we are able to focus on improving the network, rather than just on industrial relations, we can deliver a real improvement in performance, working together with the drivers. The jump in public performance from 62% last December to a high of 85% this year reinforces that point, but I recognise that we need to do better—85% is still not good enough. We continue to have an immense amount of pressure on the network.

We are also looking carefully at the future Thameslink timetable. Journeys will be improved with better travel across the network, but modern track will make journeys more reliable and new trains will provide additional capacity. GTR has been actively seeking feedback from any interested parties on the timetable changes to make sure that they best match passenger need. The second stage of the consultation has just closed and we are looking carefully at what people are saying.

As I mentioned earlier, our Thameslink industry readiness board, chaired by Chris Gibb, is doing important work. Thameslink brings many other franchises on to its network, and the board is looking at making sure we maximise the potential for all aspects of the train network.

My hon. Friend the Member for St Albans mentioned delay repay, as did the shadow Minister. We have brought “delay repay 15” specifically into GTR as the first franchise to trial it, because we recognise the impact that the disturbances across the network as a whole have had. I share the concern that we need to explain more carefully that the impact of Thameslink is not just felt south of London. It is often hard to envisage how Thameslink is a regional service. What occurs north of London has an impact south of London and vice versa. It is worth highlighting, for example, that right-time presentation, as we call it—in other words, the right-time arrival of the train at the station—is rarely higher than 50% on services from the north of London going south through to Brighton. That indicates that problems in Brighton on trains going northwards also impact on punctuality and reliability, so investment in both sides of the central core is absolutely crucial.

We have improved delay repay, although I take on board the point about improving its delivery. We have to be careful about our terminology, as I have learned. Automated compensation is about improving the behind-the-scenes progress of individual train operating companies. It is about someone getting their compensation without doing anything to achieve it. That requires them to demonstrate that they have been on the train in question. They can either nominate their usual commuter train, in which case it can be automatic compensation, or, where they have not specified a train, they must prove that they were on the delayed train. There is sadly a risk of fraud, and we are talking about considerable sums of money from regular commuters, so there has to be that element of assurance.

I share the ambition of the hon. Member for York Central, which is why I have been pushing for delay repay to be rolled out as much as possible. Passengers have a right to expect it. We need to be much better at making people aware of it and confident about using it. I would rather, as my hon. Friend the Member for St Albans said, that there were no delays at all; then we would have a better service in the first place.

As I often mention, there is a £300 million investment in improvement across the Thameslink network. Not all of that is occurring south of London. Hon. Members may think this an issue just on the Brighton main line, but it is not. We are investing in additional land sheriff shifts to reduce trespass and railway crime across the entire length of the line, and there will be more use of predict and prevent condition-monitoring software and processes on the infrastructure. There will be additional incident response teams and embankment works at New Barnet. All of that is occurring north of London on the stretch that covers St Albans. Because of the point I made earlier about interaction, service delays, either north or south, inevitably have an impact on St Albans at some point.

We will continue to deliver that £300 million until December 2018, when we cease the current control period. We will need to invest further in control period 6, and we will be making future announcements about how that spending will be allocated. We are committed to doing what is needed to bring this stretch of track up to the standards required to deliver timely and punctual rail services.

I will try to make a bit of progress, because I recognise that I have not covered any of the points made by the hon. Member for Dulwich and West Norwood. I am not sure whether the shadow Minister had time to be briefed on this before she arrived here, but there will be talks tomorrow at the Department involving GTR, ASLEF and, I think, the RMT—I am not sure whether that is precisely correct. Hopefully, that will be an opportunity to have the discussion the hon. Lady is aiming for.

I do not think anyone disagrees that having a second person on board is a bad thing. We have been able to have a second person on board across the network where GTR is in operation. That is a good thing in my view. The issue will be the circumstances in which a train may depart if someone is not available. That is the narrow point that was in dispute in the past, and perhaps tomorrow will be the chance to resolve that—we will have to wait and see.

The hon. Member for Dulwich and West Norwood made a number of perfectly relevant suggestions. I am not sure I can do them justice in two minutes, but if it would be helpful to her I would like her to come to see me and my officials to go through them in more detail. I am aware of schemes such as the expansion of Loughborough Junction and Camberwell, and she deserves a better response than me saying, “We will look at it.” If she gets in touch, I will be more than happy to meet her. I know the Secretary of State met the Mayor yesterday and had constructive discussions.

On the hon. Lady’s point about resilience, we are already seeing greater resilience through a re-diagramming of services. Part of the problem is drivers joining and leaving a service as it passes through the GTR network. By simplifying the diagrams with the agreement of the drivers, we can make for a more resilient service by ensuring that that interruption is reduced.

I noted the points made by my hon. Friend the Member for Hertsmere. We should not overlook the fact that GTR was criticised in the Gibb report—as was the Department. We saw penalties imposed on GTR last week, which will go towards improving the network. This is not just about trade unions, GTR or the Department; it is about an entire ecosystem, as some have pointed out. I heard my hon. Friend’s point about car parking, and I know the rail delivery group is looking at that. The passenger’s experience begins when they decide to make a journey, and that includes car parking.

Vertical integration is moving according to plan. We have already seen some of the benefits for this franchise of getting Network Rail and GTR to work more closely together and of continuing to work with TfL on the Oyster zone, which should help my hon. Friend’s constituents in particular. One highlight of the last week was the rail delivery group’s announcement of new statistics on right-time arrivals at stations, which I urge all hon. Members to have a look at.

If there is anything I have missed, I ask Members to get in touch. We will keep Members informed—

Oral Answers to Questions

Paul Maynard Excerpts
Thursday 13th July 2017

(7 years, 4 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
James Duddridge Portrait James Duddridge (Rochford and Southend East) (Con)
- Hansard - - - Excerpts

14. What steps his Department is taking to simplify ticketing information for rail passengers.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

Passengers are frustrated by the lack of information they get when choosing their ticket. The problems can be deep-rooted, but when I started as rail Minister I wanted to make rapid progress. I have been working with industry, the regulator and consumer groups, having launched an action plan on fares and ticketing. We are getting on with the job of delivering the many, many proposals contained therein.

Damien Moore Portrait Damien Moore
- Hansard - - - Excerpts

Does the Minister agree that if rail franchises do not adopt a more transparent ticket price system voluntarily, the Government should step in to ensure that rail passengers are offered the best value for money?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We certainly recognise that fares revenue is crucial to funding the day-to-day operation of the railway. I agree that all franchises should listen to passengers, and ensure that their fare structures are both fair and logical, as well as keenly priced, to support the many passengers who rely upon them.

James Duddridge Portrait James Duddridge
- Hansard - - - Excerpts

Southend has two train lines and multiple stations within the Southend boundary. Would it not be simpler if the same ticket could be used on both lines, which would be good for residents and visitors alike? It would clear things up for visitors, allowing them to do journeys into Southend and then pop in somewhere else on the way back to London.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I agree that Southend’s beauties merit a journey by all passengers, wherever possible. We are seeing rapid technological change on the railway. The growth in smart ticketing and the various ticket media within a relatively short period will enhance the possibility for passengers to experience the flexibility to which my hon. Friend refers. I am looking forward to working with the industry on driving that technological change to make that vision a reality.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I call the Chair of the Transport Committee, Lilian Greenwood.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - - - Excerpts

The ticketing information in which passengers are most interested is the price. Since 2014, commuter rail fare increases have been capped to the retail prices index, but in an answer to me yesterday, the rail Minister said that that fares policy is “under review”. Next month’s inflation figures will determine the cap for January 2018. If the Department reverts to the old formula, fares could rise by 5% or more, pricing many off the railways. Next week, when the Secretary of State announces his investment plans for control period 6, will he pledge that the improvements that passengers need will come at a price they can afford?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I suppose that I should start by welcoming the hon. Lady to her new position, although she has started to prognosticate already about what may or may not occur in the future. We have no intention of seeking to raise fares in the way that she describes, and it is not an appropriate path to go down. We always seek to put passengers first. We are continuing to maintain the cap at the moment, but we keep policies under review at all times. She should not read more into that than is actually there.

Philip Hollobone Portrait Mr Philip Hollobone (Kettering) (Con)
- Hansard - - - Excerpts

9. If he will ensure that work to strengthen the Kettering rail bridge (a) starts and (b) is completed to schedule.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

Network Rail has announced that the A6013 Northampton Road, from Northfield Avenue mini roundabout to Lake Avenue, will be closed between 24 July 2017 and 4 Sep 2017. Network Rail is confident that the work will begin and finish as scheduled, and we are in regular contact with Network Rail in regard to this work.

Philip Hollobone Portrait Mr Hollobone
- Hansard - - - Excerpts

The Northampton Road railway bridge is located right next to the busiest road junction in Kettering town centre. The junction will be closed for six weeks and will cause major disruption to the town. The frustration of local residents will at least be partly assuaged if the Minister could reassure all of us who live in Kettering that he is at least actively considering proposals to reinstate the half-hourly mainline train service north from Kettering, which will go over the repaired bridge in the new franchise.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I recognise why my hon. Friend’s constituents would have concerns, having seen a similar closure in my own constituency and the issues and problems that that has caused. I have also heard his observations and views on the extra services that he wishes to see from Kettering. We will shortly be launching a consultation on the new east midlands franchise and I am sure that his request will figure prominently in our thinking on what we do next on that franchise.

Sharon Hodgson Portrait Mrs Sharon Hodgson (Washington and Sunderland West) (Lab)
- Hansard - - - Excerpts

10. What steps his Department is taking to promote the use of liquefied natural gas as an alternative to diesel fuel.

--- Later in debate ---
Esther McVey Portrait Ms Esther McVey (Tatton) (Con)
- Hansard - - - Excerpts

13. Whether he plans to expand the rail network in Cheshire.

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

We are investing more than £1 billion in the great north rail project to transform rail travel for passengers across the north of England. In addition, we are supporting local enterprise partnerships and Transport for the North in progressing their priorities for investment in new stations and upgraded infrastructure.

Esther McVey Portrait Ms McVey
- Hansard - - - Excerpts

I am grateful to the Minister for his reply, and I want to impress on him the urgency of getting the mid-Cheshire rail link and the Manchester airport western link. Our population is expanding, businesses are increasing in size and the local plans will mean tens of thousands of new homes in the area. This cannot be catered for on the local roads and High Speed 2 will not be an answer. Will the Minister commit to support these schemes and come to meet me and the Mid Cheshire Rail Users Association?

Paul Maynard Portrait Paul Maynard
- Hansard - -

First, let me welcome my right hon. Friend back to her place in this House. It is good to see her here again. As a regular commuter to school on the mid-Cheshire rail line, from Cuddington to Hale, I am all too aware of the attractions of reopening the line to Middlewich. I am more than happy to meet her and local campaigners, and it is really important that all local transport authorities and local enterprise partnerships are supportive of such projects. I am sure that in her early days as the Member for Tatton she will work with those groups to make this a reality.

Lord Hanson of Flint Portrait David Hanson (Delyn) (Lab)
- Hansard - - - Excerpts

The Mersey-Dee Alliance, which includes the Cheshire West and Chester local authority, has a growth deal bid that includes rail improvements and the Chancellor indicated in his Budget that that might get some support. Can the Minister say whether any money has been given to the Department for Transport, in particular to improve the links between Crewe and Chester and on to north Wales?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We certainly recognise that our decision to take HS2 to Crewe by 2027 opened up a range of possibilities for improving connectivity into north Wales, considering the potential outcomes that passengers might want in terms of improved capacity, improved service frequency and so on. We are looking forward to doing more work on the Crewe hub and seeing what potential is unlocked by development at Crewe. Hopefully that will benefit not just Cheshire but north Wales.

Bill Esterson Portrait Bill Esterson (Sefton Central) (Lab)
- Hansard - - - Excerpts

One pound is spent per person on transport infrastructure in Cheshire and the north-west for every £7 spent per person in London and the south-east. Can we have our extra £6 per person, please, to spend on things such as rail and road links to the port of Liverpool, which will help jobs and growth across the north-west?

Paul Maynard Portrait Paul Maynard
- Hansard - -

We are always looking to ensure that we balance our investment across the country over time. I know that during my time on the Select Committee on Transport we looked very carefully at the relevant regional transport spending figures and what they do and do not tell us. We could have a very lengthy answer to this question, but that would displease you, Mr Speaker, so I point out once again the £1 billion investment across the north to improve rail infrastructure, including in the hon. Gentleman’s area.

Tim Loughton Portrait Tim Loughton (East Worthing and Shoreham) (Con)
- Hansard - - - Excerpts

15. When he plans to publish his proposals for the upgrade of the Lancing to Worthing section of the A27.

--- Later in debate ---
Michael Tomlinson Portrait Michael Tomlinson (Mid Dorset and North Poole) (Con)
- Hansard - - - Excerpts

T5. For the first time in 45 years, there is a commercial rail service between Swanage and Wareham in my constituency, thanks to the dedication and hard work of the volunteers and members of Swanage Railway. What assurances can the rail Minister give that he will support our rail heritage and ensure that this trial becomes a permanent success?

Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I am pleased to hear what is happening on Swanage Railway. I have met the all-party group on heritage rail, and it is always good to hear examples of where heritage rail can work with main line operators, although I agree that that has to be done safely. We are looking to build on more franchise agreements when there are sensible schemes that we can support.

--- Later in debate ---
Vicky Ford Portrait Vicky Ford (Chelmsford) (Con)
- Hansard - - - Excerpts

T8. Chelmsford is one of the busiest commuter stations in the country, but Chelmsford commuters have experienced frequent and significant delays. Will the Minister please provide an update on what actions are being taken to counter these delays?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am sorry to hear of the delays that are being experienced by my hon. Friend’s constituents. Clearly we have had a period of very hot weather, which does impact on rail reliability, and speed restrictions do help to protect overhead line equipment. I met the industry forums just this week to discuss what lessons can be learned about repeated periods of hot weather and how we can best protect critical infrastructure, and I hope the decisions they now move on to take can start to improve reliability.

Kerry McCarthy Portrait Kerry McCarthy (Bristol East) (Lab)
- Hansard - - - Excerpts

When the Chancellor came to Bristol in May, he refused to confirm whether electrification of the Great Western line into the city centre would go ahead. Will the Transport Secretary confirm whether it has been deferred, as we were told last year, or has it really been ditched?

Esther McVey Portrait Ms Esther McVey (Tatton) (Con)
- Hansard - - - Excerpts

T9. A number of my constituents are deeply concerned about the impact of High Speed 2—particularly residents in Ashley, who came to see me in a surgery last week. I am sure that you, Mr Speaker, will be pleased that I am not going to go through every point they raised with me, but could the Minister meet me to go through every concern they had?

Paul Maynard Portrait Paul Maynard
- Hansard - -

At the same time as we meet to discuss the mid-Cheshire line, I will be more than happy also to discuss some of the issues with the HS2 phase 2b route, which goes through my right hon. Friend’s constituency.

Daniel Zeichner Portrait Daniel Zeichner (Cambridge) (Lab)
- Hansard - - - Excerpts

When the Conservative manifesto was published, there was no mention of Crossrail 2. Will the Minister tell us whether that was by accident or design? When does he plan to make a decision on the business case?

Chris Gibb Report: Improvements to Southern Railway

Paul Maynard Excerpts
Tuesday 4th July 2017

(7 years, 4 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

Thank you, Madam Deputy Speaker. It is a pleasure to serve under your chairmanship for the first time in your new role. I also welcome the hon. Member for York Central (Rachael Maskell) to her place as a new shadow Minister. Having had to face the Transport Committee on this very issue on day two of my job, I know the challenge of taking up this complex issue at short notice, and the hon. Lady has acquitted herself well in her performance at the Dispatch Box. I thank all right hon. and hon. Members across the Chamber for participating in this helpful debate today, particularly those whose constituencies are on the line of route—whatever party they represent—who have worked so hard to support their constituents and deal with the impact of the disruption over the past months.

I believe that we have to continue to apologise to all those passengers who have been affected by the disputes and the disruption. We have heard many Members speak eloquently today about lives that have been disrupted, jobs that have not been a success and people who have been unable to get the treatment they need. We have heard so many examples, and my hon. Friend the Member for Lewes (Maria Caulfield) spoke most eloquently about the impact on her constituency.

It is worth reflecting on why we asked for this report in the first place. The hon. Member for Hove (Peter Kyle) seemed to suggest that I should have sufficient knowledge of these matters to know precisely what was wrong immediately. I think we can all agree that Mr Gibb was a powerful and persuasive performer when he met the all-party parliamentary group on Southern rail, and I brought him in precisely because, in my early days in this role, I wanted to understand what the real issues on the network were. We were having an epidemic of finger-pointing, and I wanted someone with a lifetime’s experience on the railway, in whom everyone on all sides had confidence, to come in and analyse the situation. I think that that is what Mr Gibb has done, and I was surprised to hear some Opposition Members express surprise that he had sought to meet representatives of GTR. I do not think he could have written a proper report without doing so.

It is worth restating the central finding of the report, which is that, were it not for the actions of the unions, passengers would have experienced a much better service. Ultimately then, the quickest and surest path to improvements on Southern is for the unions to refrain from their intransigence. Members on both sides have said that many factors lie behind the poor performance on Southern, and yes, there are lessons for the Department, but one thing is abundantly clear: when the service is not subject to industrial action, performance improves because of the actions that Mr Gibb has recommended.

Peter Kyle Portrait Peter Kyle
- Hansard - - - Excerpts

The Minister is quite right to say that the service has improved over the past six months when industrial action has not been running. However, in the previous two years, service levels were falling without any industrial action taking place. The central finding of the Gibb report is that we need another £1 billion in the next period after this funding agreement. Will the Government provide it?

Paul Maynard Portrait Paul Maynard
- Hansard - -

I will come to that in a moment. The hon. Gentleman has spoken sensibly on this issue, as did the hon. Member for Luton South (Mr Shuker). They both made thoughtful contributions to the debate. I will do my best to answer all the points that have been raised, but I doubt that I will succeed in the eight minutes remaining. I will do my best to write to anyone I miss.

Tim Loughton Portrait Tim Loughton
- Hansard - - - Excerpts

I am grateful to the Minister for taking my intervention. I did not speak earlier because I missed most of the debate. I would just ask him to mention one thing that was not covered. We made a manifesto commitment to customers to establish a railway ombudsman to ensure that the operators are properly penalised when they provide a rubbish service, so that customers do not have to jump through all sorts of hoops to get the compensation to which they are entitled.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am glad that my hon. Friend mentioned that. It was indeed a manifesto commitment, and it is my personal crusade. I am determined to ensure that we bring it in, partly because of what I have seen for myself in dealing with the issues on Southern. I have had meetings today and—as they always say at the Dispatch Box—I will have further meetings in due course. I believe that this proposal is on track, and we hope to deliver it as soon as possible. I am sure that it will be welcomed across the House.

We have talked about some of the wider pressures on the network. The £300 million investment that we announced in January was a specific response to many of Mr Gibb’s recommendations, but I recognise that more will be needed. The hon. Member for Kilmarnock and Loudoun (Alan Brown), who spoke for the Scottish National party, asked about the speed with which it would be spent. We made it clear from day one that it would be spent up to the end of control period 5—that is, until December 2018. That money is being spent at the moment, in addition to the £20 million he referred to. It is, for example, being spent on replacing old tracks, points and signalling. That is not just a matter of replacing bits of old kit; it will result in 15% fewer delay minutes and a more reliable and resilient railway.

There are other examples. My hon. Friend the Member for Croydon South (Chris Philp) showed interest in high output ballast cleaning, and I can happily share with him that that is about replacing the ballast on the track. One might think that it is just a matter of cosmetics—not at all. Not only does it provide a smoother journey, but it reduces the number of temporary speed restrictions that increase perturbation on the network and make it harder to adhere to the timetable. Some £17 million has been spent on vegetation clearance, which may also appear to be a matter of cosmetics, but two of the five most recent incidents in the last control period that caused significant delays were due to trespassing. There is a clear link between vegetation management and the likelihood of trespassing on the railways, and that causes delays on the railways.

My hon. Friend the Member for Wealden (Ms Ghani) mentioned the Uckfield electrification. We are well aware of that project, and we are looking at it closely to ensure that we have the best possible business case. My hon. Friend the Member for Lewes referred to BML2, and I know that the Secretary of State has met with the group and is urging it to carry on its work. Others have mentioned issues at stations. A particular finding about Victoria of Mr Gibb’s is that we need single station leadership, much like that being developed at London Bridge. A problem at stations is when train operating companies and Network Rail are all trying to make different decisions at the same time. We need single station leadership at our major termini.

We also recognise—I recognised it on day two at the Transport Committee—that the number of drivers at the start of the franchise was inadequate. We needed to understand why that was. Some of it was down to unexpected departures—fine—but I wanted to be clear about what procedures the Department had in place to ensure that any franchise handover involved adequate driver numbers. I am delighted that we now have over 322 drivers in training across the GTR network, but it takes 18 months to train a driver adequately with the route knowledge they need to operate safely on the network. I look forward to those drivers being part of the GTR network, reducing the reliance upon overtime and reducing the impact of any ASLEF overtime ban.

As we have heard, performance has been significantly better when we have not been facing industrial action. Back in December, it was as low as 62% on the PPM measure, but it is now at 82.5%. That is positive, but it came about only because so many of Mr Gibb’s recommendations have already been put in place. Many people referred to the benefits of smart ticketing. I constantly urge GTR to do more with its key and keyGo smart cards, and I look forward to that benefiting constituents, particularly those in Lewes, soon.

The hon. Member for Nottingham South (Lilian Greenwood) mentioned the Thameslink programme, and my understanding is that many journeys on the East Midlands Trains franchise will be significantly shorter due to the new Thameslink timetable. That is why Mr Gibb is continuing in his role for the Department and is looking at the Thameslink readiness board, ensuring that all the different actors work together in that complex interaction, which will deliver a significant enhancement to the railway. I look forward to sharing more information with the hon. Lady. Mr Gibb’s willingness to chair the Thameslink readiness board is a sign that an approach to rail where we use expert knowledge and bring it to the table ensures that both Network Rail—many Opposition Members seem to forget that it is publicly owned—and train operating companies point in the same direction and have aligned incentives. She also briefly talked about level crossings, which I take seriously. We must ensure that the Law Commission proposal does what it seeks to achieve, but we also want to address safety around level crossings more widely—not just how we close them more quickly.

We will continue to do all that we can to try to bring an end to the dispute. We have no magic wand, but some evidence that a resolution can be reached is that ASLEF and GTR met for 32 days and managed to reach agreement on two occasions. That proves that things can be done without a Minister having to sit in the room. They are actually grown-ups, and they can reach agreement.

Paul Maynard Portrait Paul Maynard
- Hansard - -

I am afraid that I have already given way.

In conclusion, a lot has gone on already, but there will be a lot more to do. There is far more to do to ensure that all passengers get the timely, punctual and reliable service that they deserve on this railway. My Department will work hard to ensure that that happens. I thank everyone for their participation today.

Question put and agreed to.

Resolved,

That this House has considered the Chris Gibb Report: Improvements to Southern Railway.

Crossrail: Annual Update

Paul Maynard Excerpts
Thursday 29th June 2017

(7 years, 4 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I am pleased to report that earlier this month, the first new class 345 train entered passenger service on the TfL rail line between Shenfield and Liverpool Street. Although the trains were due to enter service in May 2017 some of the testing, assurance and approvals took a little longer than originally expected. The successful introduction of the train marked the first stage of the five-staged Crossrail opening strategy1. The service will be named the Elizabeth line when the central section opens in central London from December 2018.

Stage 2 of the Crossrail opening strategy, which will see TfL rail services operating with the new trains between Heathrow terminals 2, 3 and 4 and Paddington (high-level station), is due to start from May 2018. A major step forward in delivering this new service was the installation of new digital signalling in the Heathrow tunnels in April 2017. Testing and commissioning of the new signalling system is now under way, ahead of the new trains commencing testing later this year.

I am pleased to report the Crossrail project’s health and safety indicators demonstrate strong performance over the year with all the key indicators exceeding the corporate objectives for the year 2016-17.

In the past year significant progress has been made across the project. The Crossrail programme is approaching 85% complete. In the central tunnel section all platforms have now been completed, track installation is over 90% complete, power and ventilation installation have reached 70% and 30% complete respectively, and installation of platform edge screen doors has commenced at Bond Street and London Paddington. Architectural finishes are being applied and escalator and lift installation has commenced across the central stations. Testing of the new central section infrastructure and systems will commence by the end of 2017, with the new central section stations being completed during 2018.

The critical works for the stabling facility at Ilford depot were completed in May 2017, to support the introduction of new trains into passenger service. Further work at Ilford depot to support stage 4 (Paddington to Shenfield) opening continues and is expected to be delivered by May 2019. Works continue at Old Oak Common depot to support stages 2 and 3 (Paddington to Abbey Wood).

Major surface works were delivered by Network Rail on the existing rail network this year. During the Christmas 2016 blockade an unprecedented level of works were successfully delivered on the Great Western and Anglia railways. These works included the entry into service of the new Acton dive-under and the Stockley flyover, both of which will improve capacity and reliability between Heathrow and Paddington. Christmas 2016 also saw the start of the remodelling of tracks at Shenfield, which was completed during May 2017.

Manufacturing of the new trains is progressing. Trains will be progressively introduced over the next few months, with 11 in service by autumn, replacing just over half the existing train fleet. In preparation for the operation of the Elizabeth line services a purpose-built facility has been commissioned to simulate the operation of passenger services and ensure key components and software are tested. The Crossrail integration facility is an essential element to support the next stages and success of the Crossrail opening strategy.

Training of the new operations workforce is well under way. Drivers are familiarising themselves with the new trains and route. There are now circa 700 apprentices who have gained experience across the project. Crossrail’s purpose-built training facility, the tunnelling and underground construction academy, has now become part of Transport for London and will continue to offer apprenticeships and training to support the next generation of skills for rail and tunnelling projects.

The Crossrail board forecast that the cost of constructing Crossrail will be within the overall £14.8 billion funding envelope (excluding rolling stock costs). Cost pressures are increasing across the project and Crossrail Ltd is identifying and implementing initiatives to deliver cost efficiencies until completion in 2019. Crossrail’s joint sponsors (Department for Transport and Transport for London) will continue to meet regularly with Crossrail Ltd to ensure that the project is being effectively managed and will be delivered within funding and on schedule.

During the passage of the Crossrail Bill through Parliament, a commitment was given that a statement would be published at least every 12 months until the completion of the construction of Crossrail, setting out information about the project’s funding and finances.

In line with this commitment, this statement comes within 12 months of the last one, which was published on 30 June 2016. The relevant information is as follows:

Total funding amounts provided to Crossrail Ltd by the Department for Transport and TfL in relation to the construction of Crossrail to the end of the period (22 July 2008 to 29 May 2017)2.

£10,860,539,046

Expenditure incurred (including committed land and property spend not yet paid out) by Crossrail Ltd in relation to the construction of Crossrail in the period (30 May 2016 to 29 May 2017) (excluding recoverable VAT on land and property purchases).

£1,636,471,000

Total expenditure incurred (including committed land and property spend not yet paid out) by Crossrail Ltd in relation to the construction of Crossrail to the end of the period (22 July 2008 to 29 May 2017)(excluding recoverable VAT on land and property purchases).

£10,886,978,000

The amounts realised by the disposal of any land or property for the purposes of the construction of Crossrail by the Secretary of State, TfL or Crossrail Ltd in the period covered by the statement.

Nil



The numbers above are drawn from Crossrail Ltd’s books of account and have been prepared on a consistent basis with the update provided last year. The figure for expenditure incurred includes monies already paid out in relevant period, including committed land and property expenditure where this has not yet been paid. It does not include future expenditure on construction contracts that have been awarded.

Notes

1Crossrail’s opening strategy introduces services in five phases to gradually increase the number of services. The phases are:

i. May 2017—The new rolling stock is introduced on existing suburban services between Liverpool Street and Shenfield.

ii. May 2018—The Heathrow Connect service will cease and Crossrail will operate a stopping service between Heathrow terminal 4 and Paddington high level which from this date will double in frequency to four trains per hour.

iii. December 2018—Crossrail services commence in the central tunnel section between Paddington low level and Abbey Wood.

iv. May 2019—Crossrail services commence between Paddington low level to destinations on the Great Eastern route (Shenfield).

v. December 2019—Full Crossrail services between Reading, Heathrow and Paddington in the west to Shenfield and Abbey Wood in the east.

2The total funding amounts provided to Crossrail Ltd by the Department of Transport and Transport for London refers to the expenditure drawn down from the sponsor funding account in the period 22 July 2008 and 29 May 2017. Included within the amount is £642,959,962 of interim funding that has been provided to Network Rail to finance the delivery of the on-network works. This amount is due to be repaid to Crossrail Ltd by 30 September 2017.

[HCWS17]

Rail Franchising

Paul Maynard Excerpts
Thursday 22nd June 2017

(7 years, 5 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Paul Maynard Portrait The Parliamentary Under-Secretary of State for Transport (Paul Maynard)
- Hansard - -

I am pleased to inform the House that we have today published the shortlists of companies that will bid for the new West Coast Partnership franchise which will launch the first services on HS2, and the next South Eastern franchise.

The House will be aware that passenger numbers have more than doubled since privatisation of the railways 20 years ago and our country’s railways need to adapt and change to be able to cope with this and future demands. This Government are committed to revolutionising our railways through innovation and investment to transform passengers’ experiences and ensure our railways work for everyone.

This is an exciting time for both franchises, which are changing to ensure passengers are at the heart of their services. The winner of the WCP franchise will be expected to work with HS2 Ltd to launch the first services on HS2, taking advantage of the extra space it will provide for commuters on the west coast main line. The winner of the South Eastern franchise will need to work as one team with Network Rail to ensure passengers experience better journeys and provide longer trains with more space.

West Coast Partnership Franchise

The West Coast Partnership will be responsible for services on the west coast main line from April 2019 and will design and run the initial HS2 high-speed services between London and Birmingham from 2026.

The shortlist contains bidding consortia which sees UK rail network experts working in partnership with companies that operate high-speed railways around the globe, supported by businesses which have an excellent track record in customer services.

They are:

First Trenitalia West Coast Ltd, a joint venture between First Rail Holdings Ltd and Trenitalia SpA;

MTR West Coast Partnership Ltd, a joint venture between MTR Corporation (UK) Ltd and Guangshen Railway Company), with the following key sub-contractors: Deloitte MCS Ltd, Panasonic Systems Europe, Snowfall AB, Trainline.com Ltd and WSP Parsons Brinkerhoff; and

West Coast Partnership Ltd, a joint venture between Stagecoach Group plc, Virgin Holdings Ltd and SNCF C3).

The West Coast Partnership will support growth and better services on the west coast main line while helping to ensure HS2 becomes the backbone of Britain’s future railways. This will create more seats for passengers, improve connections between our great cities, free up space on existing rail lines and generate jobs and economic growth throughout the country.

The winning bidder will collaborate with HS2 Ltd to design, launch and operate the initial HS2 services and deliver the transition of the timetable on the west coast main line as it is revised to take advantage of the extra capacity provided by HS2. There are significant benefits in bringing the two projects closer together to ensure the best outcomes for passengers both before and after the start of the HS2 services.

The new operator will also be expected to work closely with local transport authorities, Transport Scotland and the Welsh Government to ensure passengers receive the excellent experience they demand from the west coast main line.

South Eastern Franchise

The South Eastern franchise is one of the busiest franchises in the UK, running almost two thousand services every weekday. We want passengers to be at the heart of everything that the new operator does, enjoying modern, spacious trains on a more punctual and reliable service. We will listen to what passengers say in the current public consultation, and we will seek to make changes and improvements only with their support. We will create more space for passengers in the peak commuting times including by running longer, more modern trains in and around London.

Other ambitions for this franchise include:

increasing the reliability of trains by using the latest technology while reducing delays by encouraging the operator to work closely with Network Rail;

improving passenger compensation arrangements and supporting smart ticketing; and

improving customer service, with staff able to respond quickly and effectively, including during disruption.

The new franchise will also complement the completion of two major enhancement schemes—Thameslink and Crossrail—providing passengers with more trains, more destinations, and significant improvements in reliability and performance. The winner of the next South Eastern franchise will be required to optimise the value of these investments for passengers.

The shortlisted bidders for the South Eastern rail franchise competition are:

The franchise applicant, South Eastern Railways Ltd, is currently a wholly owned subsidiary of Abellio Transport Group Ltd. If awarded the franchise it would become a subsidiary of South Eastern Holdings Ltd, a joint venture between Abellio and the consortium of East Japan Railway Company and Mitsui & Co., Ltd;

London and South East Passenger Rail Services Ltd, a wholly owned subsidiary of Govia Ltd;

Stagecoach South Eastern Trains Ltd, a wholly owned subsidiary of Stagecoach Group plc; and

Trenitalia UK Ltd, wholly owned by Trenitalia SpA.

The public consultation seeking views and priorities for the new South Eastern franchise runs until June 30. The new franchise is planned to start in December 2018.

New companies enter the market

I am also pleased to inform the House that two companies have applied for a pre-qualification questionnaire passport to allow them to enter the bidding process. These firms are now eligible to express an interest in all upcoming rail franchise competitions until September 2019.

Amey Rail Ltd

SNCF-C3

[HCWS1]