Oral Answers to Questions

Lilian Greenwood Excerpts
Thursday 28th January 2016

(8 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

No, I very much want to see Newcastle served. Those decisions are yet to be taken in full, but there is no reason why Newcastle should not be served on the east side of the HS2 spur.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

We welcome the decision to accelerate HS2’s construction to Crewe. However, the whole of phase 2 is crucial for the midlands and the north. We were told that Ministers would confirm the route by the end of 2014, but that target has now slipped by at least two years, prolonging blight for residents, creating uncertainty and scaring off investment. Does the Secretary of State agree that there must be no doubt about the Government’s commitment to phase 2? Does he further agree that were a Chancellor with a Cheshire constituency to terminate the route south of Manchester, that would be an abject betrayal of the northern powerhouse?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I agree with the first part of the hon. Lady’s question, but I have had no stronger support in promoting this scheme from any member of the Government than I have had from the Chancellor of the Exchequer, even though it affects his constituency. He has been very clear about the benefits it will bring not only to the north, but to the whole of the United Kingdom. To intimate that he is somehow against the scheme is wholly wrong. I said that I hoped to have the full scheme announced by the end of this year, but I left a bit of leeway in order to make announcements sooner if I possibly can, to alleviate the blight of certain areas affected, which might not be affected under the proposals now being worked on.

--- Later in debate ---
Claire Perry Portrait Claire Perry
- Hansard - - - Excerpts

I am sure that the hon. Lady will be relieved to know that all the Cobra discussions over Christmas on the immediate effects had strong transport representation. I went to Scotland and saw for myself with the SNP Minister for Transport the impact of scouring on the Lamington viaduct. That bridge has been there for over 100 years and has never been so damaged by a weather event. It is a tribute to the engineering work that is being done that the bridge will be secured and back open by 1 March. We treat such links with incredible importance.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

Two years ago, the Prime Minister stood on the ruins of the Dawlish sea wall and said:

“If money needs to be spent, it will be spent; if resources are required we will provide them”.

Now, we learn that Network Rail cannot even afford to fund a report on improving the south-west’s rail lines, putting millions of pounds of investment at risk. Yesterday, the Prime Minister could not say where that money would come from. I want to give the rail Minister a chance. Will she honour her right hon. Friend’s commitment and fund that study?

Claire Perry Portrait Claire Perry
- Hansard - - - Excerpts

I pay tribute to my hon. Friend the Member for Torbay (Kevin Foster), who raised this question with the Prime Minister. The hon. Lady really needs to sort out her facts. The Government spent £35 million on the Dawlish repair and opened the line in record time. We are spending over £400 million on transport investment in the south-west, unlike her party, which wanted to can two major roads. I am looking carefully—[Interruption.] Perhaps she would like to listen, rather than chunter. I am looking carefully at how we can fund this very small amount of money without in any way inhibiting the overall report that we are looking forward to seeing from this very important organisation in April.

Cost of Public Transport

Lilian Greenwood Excerpts
Tuesday 19th January 2016

(8 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

I beg to move,

That this House believes that the rising cost of public transport is adding to the financial pressures facing many households; notes that over 2,400 local authority-supported bus routes have been cut or downgraded since 2010; regrets that bus fares have risen by 26 per cent on average and regulated rail fares have risen by up to 38 per cent since 2010; further regrets delays to rail infrastructure projects including the electrification of the Great Western Main Line, the North TransPennine route and the Midland Main Line; notes with regret the decision by the Scottish Government to award the ScotRail franchise to a private operator, rather than exploring alternative options; calls on the Government to bring forward a buses bill as announced in the Queen’s Speech to enable the regulation of local bus networks; and further calls on the Government to rule out the privatisation of Network Rail and instead extend to franchised services the model of rail public ownership that delivered record passenger satisfaction scores on the East Coast Main Line.

I start by wishing the Secretary of State a happy new year, although that will not have been the sentiment that came to most commuters’ minds when they returned to work a fortnight ago. I am afraid it will have been cold comfort to be told by the Under-Secretary of State for Transport, the hon. Member for Devizes (Claire Perry), on the day that fares rose again, that the Government’s plan for passengers was to improve journeys for everyone. The chief executive of Transport Focus gave a more accurate assessment:

“In some parts of the country, given rail performance has been so dire, passengers will be amazed there are any fare rises at all.”

Hon. Members who attended the Southern Railway summit in this place yesterday, and most travellers, would not be able to reconcile the Minister’s statement with their own experience of increasingly overcrowded and unreliable carriages.

Chuka Umunna Portrait Mr Chuka Umunna (Streatham) (Lab)
- Hansard - - - Excerpts

Does my hon. Friend agree that Members on both sides of the House are fed up with excuse after excuse and broken promise after broken promise from Southern rail, and that what we now want to see is action taken against this operator?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

My hon. Friend is exactly right. I know that he and my other hon. Friends are holding Southern rail to account for its poor punctuality and poor passenger satisfaction. That underlines the need for reform of the railways.

Let us look at the facts. In 2010, the Conservative party said that it would

“relieve the pressure off both the fare-payer and the taxpayer”.

But what happened? Regulated fares rose by 25%. As a consequence, commuters from Birmingham to London are paying more than £10,000 for a season ticket for the first time. Worse still, Ministers bowed to lobbying from the train operating companies and restored “flex”—their right to vary prices by up to 5%, meaning that some season tickets have gone up by 38% since 2010, and a new Northern evening peak restriction hiked prices by up to an eye-watering 162%.

Jim Cunningham Portrait Mr Jim Cunningham (Coventry South) (Lab)
- Hansard - - - Excerpts

I am sure my hon. Friend will be aware that senior citizens, who might have business in London working for charities, are finding it very difficult to afford to come here unless it is outside peak times, and they are often unable to arrange meetings at times that would suit the off-peak periods. Does she understand that and have a view on it?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

My hon. Friend is quite right that it is indeed a concern that people who need to travel at peak times find it almost impossible to find an affordable ticket.

Bus fares have continued to rise, too—up by 26% on average, which is more than three times faster than wages. Some areas have seen much higher rises still. In the north-east, bus fares have consistently risen by 3% above inflation, and it is the non-metropolitan areas that have seen some of the steepest bus fare increases, including in the constituencies of many Conservative Members, with fares increasing by 27% on average.

Christian Matheson Portrait Christian Matheson (City of Chester) (Lab)
- Hansard - - - Excerpts

The problem with buses is not just bus fares; it is the fact that in rural areas, such as in Saughall or Guilden Sutton in my constituency, the privatised bus companies are simply withdrawing services because their profit margins are not big enough.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

My hon. Friend makes an important point. In many cases, it is hard-pressed local authorities that are trying to fill the gap, but of course with cuts it is increasingly difficult to do so.

The Secretary of State may remember when Ministers said at the start of the last Parliament that their cuts to bus funding would not impact on fares or service levels. Perhaps it was before the Secretary of State’s time. Almost six years on, however, the impact of the reductions to bus subsidy and local authority budgets is clear: more than 2,400 supported bus services have been altered, downgraded or withdrawn altogether. Supported, socially necessary bus services accounted for 24% of overall mileage in 2010. Last year, that had shrunk to 17%. The overall mileage of socially necessary services is down by 10% in the last year alone, and the number of transport authorities funding a young person’s concessionary travel scheme has fallen by 24%.

Bus services are used by every section of society, and we need a growing bus industry that can provide new routes to areas that are not currently served and provide people with as many options as possible for travel. We know that buses are particularly important to disabled people, older passengers, those on low incomes, young people and jobseekers. I am proud of the support that Labour introduced, including the concessionary bus pass, which provides a lifeline for pensioners and has kept many networks viable. Six years ago, the Prime Minister said that he would keep Labour’s free bus pass. Indeed, a year ago the Transport Secretary told this House that

“we have kept, and will keep, concessionary bus fares for older people.”—[Official Report, 22 January 2015; Vol. 591, c. 357.]

But what is the point of a free bus pass when there are no bus services left?

Craig Williams Portrait Craig Williams (Cardiff North) (Con)
- Hansard - - - Excerpts

Before I entered the House, I sat on the board as a non-executive director of Cardiff Bus. Is the hon. Lady aware that we had to get together as Welsh bus companies and threaten legal action against the Labour Welsh Government on the concessionary fare funding because it was a breach of contract?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

You do not want to talk about your own Government’s record on concessionary fares. [Interruption.]

Baroness Laing of Elderslie Portrait Madam Deputy Speaker (Mrs Eleanor Laing)
- Hansard - - - Excerpts

Order. The hon. Lady does not mean “you”, does she? She means “he”.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

The hon. Gentleman does not want to talk about the point at issue. He does not want to talk about what has happened to bus services here in England.

Anyone who searches the speeches and the statements of Conservative Ministers for references to fare rises on buses or cuts in routes will spend their time in vain.

None Portrait Several hon. Members rose—
- Hansard -

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I will make some progress, and then I will give way.

Bus passengers account for two thirds of public transport journeys, but the Transport Secretary mentioned them only once, in passing, in his speech at the Conservative party conference a few months ago. No doubt he will say that funds have been provided for local authorities to bid for support, and of course investment in cleaner, more efficient buses is welcome, but taxpayers will not realise value for money without reform. Fares have outstripped inflation and wage growth, and savings from the falling cost of fuel are not being passed on to passengers. Throughout the country, bus services are trapped in a vicious cycle in which fare rises dampen down demand and routes are then cut, triggering another round of cost increases.

There was a time when Ministers insisted that

“there have not been the cuts that the Opposition are so keen to talk up.”—[Official Report, 19 April 2012; Vol. 543, c. 485.]

However, when Transport Focus, the official watchdog, surveyed people who had been affected by the cuts, one person responded:

“I have one daughter who is disabled. They have cut her bus on a Sunday and in the evenings, so I can’t go and see her on a Sunday now.”

Another said that they

“Can’t see elderly parents in the evening and care for them as much when they probably need it the most. Can’t afford a taxi because not working at the moment and relied on the bus.”

One respondent simply said:

“I can’t see dad”

in a nursing home

“on a Sunday because there is no bus.”

Conservative Members may say that the Government cannot be held accountable for the operation of a deregulated market, and it is true that London was the only part of Britain that was excluded from the provisions of the Transport Act 1985, but the fact is that, across the country, buses continue to receive very high levels of public support. Of the industry’s costs, 41% are met by subsidy, and the Competition Commission found that genuine competition between bus companies, beyond occasional and disruptive bus wars, was rare. In too many areas the market does not provide comprehensive networks, forcing councils to fund additional services where they can still afford to do so, and placing an additional cost of more than £300 million a year on our hard-pressed local authorities. Nexus, the north-east transport authority, has only been able to maintain local services by drawing on its reserves, while also pursuing reforms that would allow it to deliver better services at a lower cost to taxpayers.

Andrew Percy Portrait Andrew Percy (Brigg and Goole) (Con)
- Hansard - - - Excerpts

Not everything that the hon. Lady is saying is incorrect, and obviously the position with bus services is very difficult, but it is a question of choices. The hon. Lady should consider what has been done by North Lincolnshire’s Conservative-controlled council. When we took control, it was able to reinstate the No. 37 bus, which had been cut by the previous Labour authority, and extend its services to Wroot and to Crowle. Labour-run Goole Town Council decided to cut the workers’ bus services so that it could pay for a bonfire once a year. So it is about choices. When local authorities are innovative, they can do what we have done in North Lincolnshire, and expand services.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

The hon. Gentleman should think about the powers that local authorities have to enable them to make effective choices on behalf of passengers, and that is what I intend to talk about.

While fares continue to rise and routes are cut, some of the biggest bus operators report profit margins of 13% or more on their operations outside London. What was the response of Conservative Ministers? For four years they ignored the calls for reform from Labour Members. I am proud of the fact that Labour has consistently championed the case for bus tendering, but Ministers rigged funding awards to exclude local authorities that pursued regulation, and, shamefully, they remained silent when councillors were subjected to appalling abuse and called “unreconstructed Stalinists” just because they were trying to deliver better services.

While the Treasury’s decision to accept the case for bus tendering is welcome in principle, as is the Transport Secretary’s Damascene conversion, we must question the sincerity of that commitment, and the test will come in the forthcoming buses Bill. Will the Bill make those powers available to all areas that want them, not just to authorities that have reached a devolution agreement? Will it contain measures to protect rural bus services, which are particularly important to those communities, and which have been hit by some of the highest fare rises in the country? Will it protect transport authorities from crippling compensation claims?

The Nexus quality contract scheme boards said that the authorities should have set aside up to £226 million to compensate existing operators for the potential loss of business. If those payments were replicated in Greater Manchester, the Sheffield city region and the north-east, a key northern powerhouse commitment would never get on the road—not to mention the effects on Cornwall and other areas that have sought bus-tendering powers.

The bus market is costing too much and is not delivering for passengers, and we have seen the same trend on our railways. Commuters’ fares have gone up by a quarter since 2010, with season tickets costing up to £2,000 more. Ministers restored the loophole known as flex, which gave the train companies the right to vary prices by up to 5% a year, meaning that the cost of some season tickets has risen by up to 38%, and evening fares in the north have been hiked by up to 162% at the direct insistence of the Department for Transport.

Lord McLoughlin Portrait The Secretary of State for Transport (Mr Patrick McLoughlin)
- Hansard - - - Excerpts

Will the hon. Lady remind the House how many years flex was not available for when the last Labour Government were in office? Am I correct in thinking that it was just one year—the year of the election?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

The Labour party scrapped flex permanently, and it was the Secretary of State’s Department that chose to reinstate it, as well he knows. It was only as a result of concerted pressure by Labour Members that this Government dropped it over the past two years.

As I was saying, evening fares in the north have been hiked by up to 162% at the Secretary of State’s direct insistence. The Department’s own McNulty review has warned that our fragmented railways have a ticketing system that

“is complex, often appears illogical and is hard for the uninitiated (and even the initiated) to understand.”

There is also an efficiency gap of up to 40% compared with the best performing European operators, which is wasting money that should be used to address the rising cost of travel and to fund investment.

At the last election we were promised part-time season tickets, and a pilot by Southern Railway found that they could save some commuters 50% of the cost of their travel. However, the smart ticketing programme that underpins the system is 78% over budget and delayed by three years, and there are rumours that it could be cancelled. Will the Secretary of State tell us today whether the south-east flexible ticketing programme is being dropped?

Ministers might claim that services are getting better for everyone, but I urge them to mind the gap between their rhetoric and reality. We all remember the Under-Secretary of State for Transport, the hon. Member for Devizes (Claire Perry), saying that rail passengers had to realise that they were paying

“fair fares for a comfortable commute”.

Stephen Hammond Portrait Stephen Hammond (Wimbledon) (Con)
- Hansard - - - Excerpts

In the Corbyn land of rhetoric, the hon. Lady seems to have forgotten that fares went up by 11% in the last year of the Labour Government alone. It is this Government who have frozen regulated fares for three years. Will she acknowledge that fact and make sure that she puts the truth on the record?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

If the hon. Gentleman looks at our record, he will see that rail fares increased only by the level of inflation or were actually cut in six of the 13 years that Labour was in power. Fares rose in some years, and that helped to fund investment. Under Labour, there was more investment in rail in real terms than under any previous Government. Under this Government, that link has been broken.

The Transport Secretary said that only commuters were paying regulated fares, and that unregulated fares could be “quite cheap”. Those comments are a world away from the frustrations endured by passengers every day on Southern and Thameslink, some of which were described in the House today by my hon. Friend the Member for Streatham (Mr Umunna). They reflect an increasingly overcrowded and unreliable network.

In 2009, the Conservative party’s rail policy review stated:

“Fare rises come with tacit Government approval and are often the direct result of the franchise process”.

Will the Secretary of State therefore explain why he intends above-inflation rises to resume after 2020, as his Department’s recent consultation on the East Anglian franchise makes clear? Passengers were always told that higher fares were necessary to pay for improvements, but under this Government that link has been broken. The electrification of key lines was first paused and then shambolically “unpaused” one week before the Conservative party conference, and those projects are now delayed by years.

That goes to the heart of public trust in the railways. Ministers and Conservative Back Benchers went into the last election on a manifesto that said that key improvements would be delivered in this Parliament, but information about the true state of those programmes was kept concealed within the Department. The Transport Secretary has said that he was not informed about the state of the electrification programme until after May, but why did he not pose searching questions within the Department in October 2014, when my predecessor, my hon. Friend the Member for Wakefield (Mary Creagh), challenged him to say

“which electrification projects will be delayed or cancelled”—[Official Report, 23 October 2014; Vol. 586, c. 1030.]

due to cost overruns on the great western main line?

Oliver Colvile Portrait Oliver Colvile (Plymouth, Sutton and Devonport) (Con)
- Hansard - - - Excerpts

I have one curious question for the hon. Lady: how is this all going to be paid for? Is it going to be borrowed or are we going to put prices up?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I shall deal with that very question later on in my speech, so the hon. Gentleman should listen attentively.

Why did the Transport Secretary not raise the alarm in the last Parliament when the estimated cost of electrifying the midland main line rose from £250 million to £540 million, and then to £1.3 billion? Why did he not do so when the cost estimates for great western electrification rose from £548 million to £930 million, and then to £1.7 billion? Of course, the estimate has now risen further still, to £2.8 billion. Why did he not act when the Transport Committee warned in January 2015:

“Key rail enhancement projects...have been announced by Ministers without Network Rail having a clear estimate of what the projects will cost, leading to uncertainty about whether the projects will be delivered on time, or at all”?

Will the Transport Secretary confirm that he commissioned a report on the state of the electrification programme, which was given to him in September 2014? This report has never been published, and a Freedom of Information Act request for a copy has been personally refused by a Minister in his Department. What did that report say, and what has he got to hide?

The truth is that the Department was clearly warned by Network Rail about the impending northern power cut. The company’s board discussed last March

“the decisions required jointly with the DFT”

regarding

“enhancement deferrals from June”.

Network Rail’s chief executive has confirmed to me:

“In mid-March 2015, Network Rail informed DfT that decisions may need to be made in the coming months about the deferral of certain schemes.”

If the Secretary of State really was not aware of what his own Department and Network Rail were doing, there is only one possible explanation: he made it clear that he did not want to know. He failed to take responsibility, and passengers are now paying the price.

We were told that 850 miles of track would be electrified before 2019, but now the Department is refusing to say how many miles of track will be electrified in this Parliament. Is it half the original target? Is it a quarter? Will the Transport Secretary confirm that by 2019 this Government would do well to realise the plans for electrification set out by a Labour Secretary of State, the noble Lord Adonis, a decade earlier?

Let me return to the cost of tickets.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I am not going to give way at the moment, because I want to make some progress. The Government claim they will not increase regulated fares above inflation, and we will hold them to that promise, but may I remind the Transport Secretary of his comments from two years ago, when he said that Labour’s fares freeze

“would cost £1.8 billion over the lifetime of the next parliament and be paid for by more borrowing and higher taxes.”

Given that the black hole in Network Rail's finances will be plugged by £1.8 billion-worth of asset sales and £700 million of additional borrowing, has not this Government’s ostrich-like approach to the railways resulted in what the Transport Secretary’s own party might call more spending, more borrowing, and more debt?

We need investment in our rail network, both in HS2 and in the existing railways. I am proud of the fact that we saw record investment between 1997 and 2010. Our Government invested more in the railways, in real terms, than any previous Government, addressing the chronic maintenance backlog, replacing thousands of unsafe, slam-door Mark 1 coaches and ending the appalling safety crisis created by the disaster that was Railtrack. I am concerned that the Government’s programme has come to resemble not the much heralded “biggest investment since the Victorian era” that we have heard so much about, but the ill-prepared 1950s modernisation plan that did so much damage to support for the railways.

As we come to make the case for additional investment, we need Ministers to own up to the challenges that the programme continues to face, but again and again, the message is the same: they did not know; they were not responsible; and they were not there. We could ask what exactly Ministers were doing instead of keeping improvements on track, because they were not keeping an eye on the franchising programme, which collapsed in 2012 costing taxpayers more than £50 million, or on the allocation of trains in the north, as the Secretary of State approved the transfer of new rolling stock from TransPennine to the south, triggering a capacity crisis that cost taxpayers another £20 million to resolve. It seems that their focus was solely on privatising East Coast, a successful public sector rail operator, which delivered record passenger satisfaction and punctuality scores—

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

No, I have already given way to the hon. Gentleman.

East Coast cut its fares in real terms in 2014 and reinvested all its profits in the service. As reported last week, it was delivering the best-ever service on the line in the weeks before it was sold. Instead of extending that successful model of public ownership to the other franchise services, the route was prioritised to be sold off. Worse, we now learn that Directly Operated Railways, East Coast’s parent company, has effectively been mothballed and its functions outsourced to companies with no experience of operating passenger services.

We are left in the absurd position of divesting our in-house railway expertise at precisely the moment that several franchises and contracting competitions appear to be in doubt. Now, on top of the damage already done, the Government are seriously considering privatising Network Rail. They have already tested the theory to destruction with Railtrack. A sell-off of Network Rail will put profit before passengers and risk dragging us back to the worst excesses of privatisation. I say to the Transport Secretary: do not go down this road. We know how it ends and we on the Labour Benches will oppose it all the way.

May I say how disappointing it was that the Scottish National party in government not only issued a conventional franchise for ScotRail, but passed up the opportunity to invite a public sector bidder for the contract? The franchise was awarded a full month after Gordon Brown, the former right hon. Member for Kirkcaldy and Cowdenbeath, made it clear that, on the forthcoming Smith agreement, enforced rail privatisation will be no more and the right to include a public sector option is currently before Parliament in the Scotland Bill. Labour urged the Scottish Government at the time to postpone the competition, but that call was rejected.

Callum McCaig Portrait Callum McCaig (Aberdeen South) (SNP)
- Hansard - - - Excerpts

I thank the hon. Lady for so kindly giving way. I am pleased that she is addressing this part of the motion. I feel that the request is particularly ironic given that she talked about the powers that local government in England should have. The Scottish Parliament, and indeed the Scottish Government, do not have such powers. What she and her party are encouraging is the Scottish Government to break the law. Will she explain why that is the case?

Baroness Laing of Elderslie Portrait Madam Deputy Speaker (Mrs Eleanor Laing)
- Hansard - - - Excerpts

Order. Before the hon. Lady answers the intervention, may I say that she has been very courteous in taking a lot of interventions—and it is indeed good to have a lively debate—but this debate has less than an hour and a half to run? The hon. Lady has spoken for some 25 minutes, and I am sure that she will be aware that there are many other people who wish to speak.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I will move towards finishing my speech, Madam Deputy Speaker.

It is a pity that the hon. Gentleman did not refer to the fact that the Labour Government fully devolved the ScotRail franchise, or that it was Labour that secured the change to the Railways Act 1993 through the Smith commission. The invitation to tender for the ScotRail franchise, issued by the SNP Government, said:

“Transport Scotland reserves the right to alter the timetable or the process, or to terminate this process at its sole discretion.”

There we have it. It was entirely in the Scottish Government’s power to wait until the 1993 Act could be amended, but they chose not to do so. There is nothing in the 1993 Act or in the ScotRail invitation to tender that prevented them from delaying the competition until section 25 of that Act was amended. It is regrettable to see the inaccurate amendment tabled by SNP Members.

It falls to Labour to set out the case for reforming our transport services and addressing the rising cost of public transport. It is what Labour is doing in local government, winning concessions from Whitehall. It is what my right hon. Friend the Member for Tooting (Sadiq Khan) will do as Labour’s Mayor of London by putting bus and rail passengers first. We must play our part in Parliament too, and I urge Members to support the motion today.

Airports Capacity

Lilian Greenwood Excerpts
Monday 14th December 2015

(8 years, 9 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

I thank the Secretary of State for advance sight of his statement, but it should not have fallen to him to announce that the Prime Minister has broken the clear promise he gave to the House in July, when he said:

“The guarantee that I can give…is that a decision will be made by the end of the year.”—[Official Report, 1 July 2015; Vol. 597, c. 1473.]

So, my first question is simple: why is not the Prime Minister explaining his own U-turn?

My time to respond is very limited due to the brevity of the Secretary of State’s statement, but I want to register our protest against the Government’s decision to announce their new position in the press. The Secretary of State said that,

“when an announcement is to be made, I will make it in the House.”—[Official Report, 10 December 2015; Vol. 603, c. 1135.]

Instead, we got a last-minute note from our essay-crisis Prime Minister explaining why he could not meet his own deadline. That shambolic announcement on Thursday has rightly been condemned by businesses and by hon. Members on both sides of the House.

We need a new runway in the south-east, but the environmental concerns have been known since July, so what has the Secretary of State been doing in the past six months? The Government’s announcement was such a shambles that he could not tell us basic information about the new environmental and mitigation work. What are the areas he believes still need to be addressed and were not adequately covered by the Airports Commission? Who will be leading that work? What are the terms of reference and when will it report?

If the Secretary of State cannot answer those basic questions, is it not confirmation that the Government have abandoned everything but the pretence of following due process and that the Prime Minister broke his promise because he has put avoiding a by-election in Richmond Park ahead of the national interest?

Turning to another issue raised by the statement, the Government have always said that the Sub-Committee’s recommendations would be subject to a full Cabinet discussion. Has that discussion taken place or have the Secretary of State’s colleagues been left as much in the dark as the rest of the House?

Finally, what steps will the Secretary of State now take to address the blight and uncertainty that this latest politically motivated delay will cause?

Oral Answers to Questions

Lilian Greenwood Excerpts
Thursday 10th December 2015

(8 years, 9 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

A very useful debate took place last Friday and commitments were given to have further discussions on this important issue. I will ensure that those discussions take place and that we try to address some of the issues. Local authorities already have a lot of powers, however, if they wish to use them.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

The closure of roads and rail lines in recent days is a timely reminder of the strain extreme weather events place on transport networks. We all remember the flooding at airports in 2010 and 2013, the loss of the Dawlish seawall and, as the Secretary of State said, the heroic response of Network Rail’s orange army. So will the Secretary of State explain why the Dawlish resilience options report, due last month, has not been published? What assurance can he give that the lessons of previous periods of disruption have been learned?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

We always look to learn from experience and that is the case with the Dawlish repairs and the work that has been done by Network Rail to ensure that the line is secure for future use. Excessive weather conditions such as those that we saw last weekend put extra pressure on the network. One of the most important things, however, is ensuring that the network continues to operate safely.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I hope that we do learn from experience. The hon. Member for Inverness, Nairn, Badenoch and Strathspey (Drew Hendry) had a little go at this, and I am going to give the Secretary of State another chance. On airport expansion, the Prime Minister told this House in July:

“The guarantee that I can give…is that a decision will be made by the end of the year.”—[Official Report, 1 July 2015; Vol. 597, c. 1473.]

Employers have been clear that the Government should bring forward the decision they promised, but fear a further politically motivated delay. Was the Prime Minister making a clear pledge—no ifs, no buts—or are residents who live near Heathrow and Gatwick about to be subjected to yet more blight and uncertainty?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I will not take any lectures from the Labour party on planning infrastructure. Labour was woeful at it and did very little of it. The simple fact is that we now have a Government who are more committed to infrastructure than the Labour Government were for 13 years. The simple fact is that when an announcement is to be made, I will make it in the House.

High Speed 2

Lilian Greenwood Excerpts
Monday 30th November 2015

(8 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Urgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.

Each Urgent Question requires a Government Minister to give a response on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

The truth is that anything I say about HS2, as far as my right hon. Friend is concerned, will not be met with any kind of favour whatever. She has made her opposition perfectly clear. I believe HS2 is absolutely essential for the long-term economic interests of the United Kingdom, particularly our northern cities, and that is why it is right to go ahead. I do not dismiss those people directly affected and who, as a result, have trouble with a major infrastructure project taking place, but I am aware of no major infrastructure project that has received universal support at the time of its construction. That support is usually found afterwards. In fact, plans for the very first railway line to be built between Birmingham and London were defeated in the House of Commons because the canals were considered to be perfectly adequate.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

I congratulate my hon. Friend the Member for Stoke-on-Trent Central (Tristram Hunt) on securing the urgent question. He has campaigned constantly to secure benefits from HS2 for his constituency, and I echo his statements on the importance of Handsacre junction and the existing network.

Labour supports HS2, and we want to make sure that sections of the route can be delivered ahead of schedule, including to Crewe, especially after Ministers’ delays have left the Bill running 18 months late. However, the paper published today raises new questions, alongside some belated answers. Will the Secretary of State explain why Manchester Airport station has still not been fully confirmed? Does he agree that it would be a body blow for the northern powerhouse if Manchester airport was not served by HS2? Why will HS2’s exact route and station locations, including in the east midlands, not be finalised until late 2016? To put it another way, why will it have taken the Government over six years to confirm their plans for high-speed rail in the midlands and the north?

The Government previously said that they would consider accelerating construction of the Leeds to Sheffield part of the eastern leg. Is that still on the table, and what consideration, if any, has been given to accelerating the west midlands to east midlands section of phase 2?

On cost, an increase was announced in the comprehensive spending review from £50.1 billion to £55.7 billion. Will the Secretary of State confirm that this increase is simply a result of recasting HS2 from 2011 prices to 2015 prices, or are there other components to the cost rise?

Finally, Labour amended HS2’s planning legislation to ensure that cost increases or underspends are reported. The Secretary of State’s Department had said that the first such report was due in autumn 2015. Why has that report now been delayed? When will we see it? Does he agree that the Government must keep the costs of this vital project under constant scrutiny?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I shall answer the hon. Lady’s last question first: I have published the documents today. She pointed out that HS2’s cost has risen to £55.7 billion, which, she is absolutely right, is the costing at 2015 prices, whereas the other costing was at 2011 prices. That is the reason for the increase. During this spending review, HS2 will equate to 0.14% of GDP, so it is not over-burdensome on the Government’s overall spending.

The hon. Lady asked about the other stations. I am pleased that there now seems to be a consensus, which was lacking until fairly recently, on where the east midlands station should go. I hope to say more about that next year, but points raised in the consultation have thrown up issues that need to be addressed, which is why I have said today that I hope to confirm the rest of the route for the east side by late 2016. Manchester Airport station comes under the qualification I just made about the consultation, but these issues are discussed in the document I have published today.

The hon. Lady also said that the Bill was 18 months late. The people serving on the Bill are doing an exceptionally good job, and I do not regard it as 18 months late; I regard it as on time, according to the timetable set out by the former Secretary of State under the last Labour Government, who published their plans only nine months before the general election.

Aviation Security

Lilian Greenwood Excerpts
Thursday 5th November 2015

(8 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

I am grateful to the Secretary of State for giving me advance sight of his statement. I echo the condolences that he articulated, and I know that those sentiments will be shared by the whole House. Let me also place on record the Opposition’s support for the prompt precautionary action taken by the Government yesterday. There can be no doubt in these circumstances that the safety of British citizens must be the highest priority.

I understand that the Secretary of State is necessarily constrained in respect of the information that he can give the House today, but will he tell us when his colleagues in other Departments will update the House on the matters involved? Given that the Government believe that the Metrojet flight may have been deliberately targeted, will he reassure the House on how he reached the conclusion that there was no threat in the wider Sharm el-Sheikh resort? Will he also update the House on when he expects the security review of Sharm el-Sheikh airport to conclude, and can he give any further information on the possible new long-term measures he referred to in his statement?

It has been reported that up to 20,000 UK citizens and nationals are currently in Sharm el-Sheikh. Do the Government have their own estimate? What consular support are the Government providing to UK citizens and nationals who are currently in Egypt, and will the Secretary of State ensure that consular services remain available outside the resort? What steps is his Department taking to ensure that regular and prompt updates are provided at UK airports and by airlines and tour operators that serve Sharm el-Sheikh?

Given the level of cross-departmental work involved, what arrangements will be put in place to provide individuals with a simple process for seeking official assistance? Will the Secretary of State clarify how Members of this House can most effectively raise their constituents’ cases with the Government?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I thank the hon. Lady for the Opposition’s general support. She is absolutely right that the decision was not taken lightly; it was taken after careful consideration of the details that the Government had received.

The hon. Lady asked about numbers. It is estimated that there are 20,000 in the Sharm el-Sheikh area, but that is not a specific, accurate figure and there will be some people there who are not on package holidays and the like. We have a consul team, which is being expanded, at the airport and available to give the sort of information she wants. Also, obviously, the contact details of the Foreign Office are available to all Members of Parliament.

The hon. Lady asks how we will keep the House updated. I will give further consideration to that. As I said, I hope to see some flights leaving tomorrow, but that will not include people flying out to Sharm el-Sheikh; it will be people being brought back home. We are in discussions with the airlines at this very moment about the implications and the safety measures we will take, and those meetings are ongoing. I will look at ways of keeping her and other colleagues in touch.

Oral Answers to Questions

Lilian Greenwood Excerpts
Thursday 29th October 2015

(8 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - - - Excerpts

The toll levels are currently set by the concessionaire, Severn River Crossing, to repay the construction, finance, maintenance and operations costs. We are expecting the costs to have been recovered early in 2018, and at that point the concession will end and the crossings will revert to the UK Government. We are currently working on what the future of tolling might be. I have heard what my hon. Friend has said and I will keep him updated on progress.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

We will shortly hear whether the north-east plans for local oversight of bus services are recommended for approval. We on this side of the House have always supported Labour’s councillors on Tyne and Wear, including when they were subjected to appalling abuse over this issue. I welcome the Minister’s late conversion to the cause of bus tendering, but does he agree that the powers in the buses Bill must be available to all communities that want them, including in rural and isolated areas?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

May I start by welcoming the hon. Lady to her position? She knows what is going to come next: I have been doing this job for a little over three years and this is the fourth shadow Secretary of State I have seen. Shall we just say we will see whether there are more to come?

The hon. Lady sort of asserts that she knows what is in the buses Bill. Considering that it has not yet been published, I am interested to know how that has been achieved, but the simple point is—we are being very open about this—that there will be extra opportunities for areas where elected mayors are put in place, and they can take advantage of them.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I was hoping for a straight answer to a straight question, but let us try again. With more than 2,000 routes lost or downgraded and fares up by 25% since the last round of spending cuts, will the Secretary of State today rule out any plans to slash support for buses even further in the forthcoming spending review?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I am not in a position at this stage to announce what the spending review will be. I am afraid that the hon. Lady, like every other Member of the House, will need to wait until the spending review is announced by my right hon. Friend the Chancellor of the Exchequer on 25 November. I hope that is a very straight answer.

High Speed Rail (London - West Midlands) Bill

Lilian Greenwood Excerpts
Tuesday 15th September 2015

(9 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

I thank the Minister for his kind words and for providing advance sight of his statement. It is a true honour to take up the post of shadow Secretary of State and I pay tribute to my predecessor, my hon. Friend the Member for Barnsley East (Michael Dugher). He did an excellent job on behalf of passengers and road users and was never afraid to stand up for their best interests. I am sure that he will perform admirably in his new role shadowing the Department for Culture, Media and Sport at a critical time for that brief.

As a supporter of HS2, I am glad to have the opportunity to speak for the first time in my new role in this debate. I extend the gratitude of my party, and I am sure of the whole House, to my hon. Friends the Members for Bolton North East (Mr Crausby) and for Preston (Mr Hendrick) and the hon. Member for The Cotswolds (Geoffrey Clifton-Brown) for stepping up and joining the Committee. It has now heard several hundred petitions and there is general agreement that it is making both swift and fair progress. It is performing a vital role, improving and refining the project, and its work would not be possible without the professionalism of the Clerks and the contributions of petitioners, including Members of this House. They all deserve our thanks.

I know that a number of Members’ constituencies are affected by the proposals contained in these changes and it is important that they have time to address the Minister, so I shall keep my remarks brief.

We do not seek to obstruct the passage of these provisions, because some of the changes will reduce planning blight for petitioners and provide some measure of certainty for those who live along the route. They also provide an important mechanism for implementing the instructions of the Committee and the outcome of negotiations with petitioners, such as those on the longer Chilterns tunnel.

I know that a number of hon. Members have concerns, and I shall make way for them shortly, but before I do so I want to put some questions to the Minister about the revised proposals for Euston station. They can only be described as a partial proposal for redevelopment. It is clear that the Government and Network Rail have yet to develop an integrated plan for Euston which is, as I am sure Members on both sides the debate will agree, restricted by its inadequate design and compares poorly with the neighbouring terminal stations of King’s Cross and St Pancras. Yet last year the Chancellor said:

“I’m thinking that maybe we should go for a really big redevelopment of Euston. There is a really big opportunity for jobs and for housing in the area.”

Does the Minister believe that these proposals live up to those aspirations, or is this another case of the Chancellor’s rhetoric on rail being rather better than the reality?

The Minister said that it is for Network Rail to bring forward proposals on the development of the remaining station, yet Network Rail’s capacity to plan and deliver major upgrade projects is under exceptional scrutiny, not least in connection with the eagerly awaited Shaw, Bowe and Hendy reviews. What assurance can he offer the House that Network Rail is in a position to fulfil the function that he has set out today, and that it will not be blown off course in the coming months as a result of Government or regulatory action?

It is difficult to see how a high-speed extension to Euston can be planned in a manner that provides the maximum assurance for taxpayers’ money if there is no corresponding plan for the existing station. Surely we need an integrated solution for Euston. I would be grateful for an assurance from the Minister that the plans debated today will in no way inhibit the later replacement of the 1960s station.

Andrew Bridgen Portrait Andrew Bridgen (North West Leicestershire) (Con)
- Hansard - - - Excerpts

The hon. Lady started by saying that she supports HS2, but can she confirm, for the House’s information, whether the new leader of her party is, because he has voted against it in the past?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

My right hon. Friend the Member for Islington North (Jeremy Corbyn) has said that he supports investment in high-speed rail, and so do I. I am sure that Members on both sides of the debate would agree that the specific proposals can be improved further. Indeed, that is the subject of today’s debate.

Residents of Camden face years of disruption as a consequence of the proposals outlined today. The disruption might now be less intense than originally proposed, but the construction period will be prolonged. What consideration has been given to the feasibility of conveying construction materials by rail, as has happened during the Crossrail development, rather than by road, in order to reduce the impact on residents?

Furthermore, and incredibly, this is the fourth proposal for Unison—[Interruption.] The fourth proposal for Euston, I mean. [Interruption.] It was a Freudian slip. That is along with all the uncertainty that this situation has caused for local residents. The situation is clearly inadequate. It is vital that the Department, Network Rail and HS2 Ltd work as closely as possible with Camden Borough Council and campaigners to find a solution that works both for the railway and for local residents. Speaking as an observer of previous discussions over the past three years, I am not convinced that every effort has been made to date.

My right hon. Friend the Member for Warley (Mr Spellar), who is no longer in his place, noted that it was suggested in the press at the weekend that the overall number of platforms at Euston might be reduced. Careful planning to manage the disruption to existing services is essential, and contingency measures such as diverting commuter services into Crossrail should be considered. But I note that the lack of capacity on the west coast main line is also a constant and enduring source of delays and cancellations. Has there been a fundamental change in the Government’s policy, or will there still be a net gain in the number of platforms at Euston?

A number of compensation schemes have been established for people who live along the planned route, some of which have been withdrawn, and awareness of others appears to be low. The HS2 residents commissioner has said:

“It is vital that those who are eligible for the Government’s property compensation and assistance schemes get clear information and know what they are entitled to.”

Will the Minister set out for the House what support is available to residents, including those who live outside the rural support zone? When the House debated the second set of additional provisions in June, I cited the Committee’s pre-election report, which stated:

“The incoming Administration should make an early decision on whether to proceed with Phase Two and, if it decides to proceed, quickly finalise the Phase Two route.”

The precedents set by the Government and the Committee for phase 1 are of direct relevance to phase 2, particularly on compensation.

Some three months on, the Government’s position is no clearer. We have been told that they will set out the way forward on phase 2 later this year, but of course that is not the same thing as confirmation of the route. I urge the Minister in the strongest possible terms to return to this House, I hope before the end of the year, to provide some clarity on phase 2 and the introduction of the relevant legislation.

I noted that the Minister said that these changes would result in some small cost variances. I would be grateful if he could tell the House the net cost impact of the changes proposed in the motion.

We remain supportive of the additional provision process, and indeed of this important project. I assure the House that the Opposition will subject the Bill to line-by-line scrutiny when it enters that Committee stage.

--- Later in debate ---
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

With the leave of the House, I will make a few remarks in response to the debate.

The fundamental point of the debate is to allow petitions to be submitted to the hybrid Bill Committee, so, while many of the points are perfectly reasonable ones to make, they should be directed to the Committee for it to consider and then, if necessary, make recommendations on. That said, the hon. Member for Nottingham South (Lilian Greenwood) made some points I need to address, particularly about how Euston station can be developed. We are all in awe of the development of King’s Cross and St Pancras stations and the regeneration of the surrounding area. People used to go to King’s Cross for all the wrong reasons; now they go for the right reasons. It is a great place to be.

We need such regeneration around Euston, although I recognise the points about there not being quite so much spare land around there. It is important that we work with Network Rail and Transport for London to co-ordinate the approach. Our Euston proposal is fully compatible with the redevelopment of the remaining Network Rail station and has been developed with Network Rail and TFL. The improvements to the underground station at Euston will be transformational. When the new Victoria development opens, we will get a taste of how a new state-of-the-art underground station can help commuters and particularly of how the tidal flows of people need not conflict in the way they often do in other areas. On project delivery, Sir Peter Hendy and his team are looking at how Network Rail can work more effectively.

The hon. Lady mentioned excavated material being removed by rail. Extended construction at Euston station will allow more excavated material to be removed by rail, as there is capacity to do so. We will work to maximise what can be taken out by rail. The fewer trucks the better for noise and congestion and for the safety of pedestrians and cyclists. I am a London cyclist myself. We know that, sadly, heavy construction vehicles are often involved in accidents. Despite the prowess and training of drivers and the modification of vehicles, accidents still occasionally happen. I can also confirm that there are no changes to the compensation schemes. The scheme in urban areas, compared with country areas, recognises the character of those areas and the effect that construction and development can have, particularly on property prices and people.

The hon. Lady asked about the net cost of the changes. I can confirm that the net cost is zero. The overall cost of phase 1 remains £21.4 billion at second quarter 2011 prices. Any changes that add costs simply draw down the contingency not set aside for that purpose. We always knew we would need to draw down the contingency—for example, to meet the cost of the Chiltern tunnel extension, the cost of which was more than £40 million, at second quarter 2011 prices, excluding the contingency. I hope I have reassured the House that the project is deliverable within budget.

The hon. Lady also asked whether we would return to the House to provide clarity on phase 2 and legislative plans. I can confirm that the Government will outline the way forward for phase 2 before the end of the year, including confirmation of the plans for legislation.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

The Minister says that the Government will announce the way forward. Is that the same as confirming the line of route?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

On phase 1, the line of route is certainly becoming much closer to being confirmed, but on phase 2 there is obviously a lot more work to be done with local authorities and leaders of the great cities of the north, as we call them, to ensure that we get that right. Some criticism has been voiced today that we keep coming back with new changed proposals, but it is important that we react to the points that people make, as the Committee reacts to petitions, for example. We have reacted to ensure that we can deliver a state-of-the-art station at Euston and minimise the impact on local people during the construction phase.

My right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) mentioned the supplementary environmental statement. Let me repeat that for Camden it will be available from tomorrow for consultation until 6 November, while the consultation period on the AP4 area will commence in mid-October—I cannot give an exact date—and will run for six weeks.

The hon. and learned Member for Holborn and St Pancras (Keir Starmer) talked about the phased approach and how that would certainly mean disruption for a longer period, but we need to consider disruption not only to the residents affected by vehicles, noise, dust and so forth, but to the commuters who use the station. Delivering the project in the way we have outlined today will mean having more capacity through that station. I am pleased to reassure Members that some of the coverage at the weekend about reductions in platform space is not correct. There will be an opportunity to make sure that we keep the passengers going through.

As I mentioned in an intervention, Old Oak Common will become one of this country’s most important stations—it will be as well known as King’s Cross, Victoria and Waterloo. Indeed, at least 30% of the passengers will alight there to get on to Crossrail and then to a number of locations around London. As for other areas where it might be quicker to go through Euston when the line is complete, passengers will be able to use Old Oak Common as a connection. To come to Westminster, for example, it will take only three minutes longer via Old Oak Common than it would be via Euston. Many people may get used to Crossrail and like to use the new facilities.

The hon. and learned Member for Holborn and St Pancras, and indeed the hon. Member for Hampstead and Kilburn (Tulip Siddiq), mentioned the provision of social housing. It is important, particularly in the more deprived areas of our capital, to have good social housing provision. We have already committed to replacing lost social housing at Euston. We have purchased the Netley development and we are funding the construction of more social housing in the area—all with the aim of ensuring that social tenants are required to move only once.

The hon. and learned Member for Holborn and St Pancras also asked why the whole station would not be ready by 2026. If we look at the project—phase 1 to Birmingham and phase 2, the Y section—we find that capacity will not be needed until later for additional trains coming from Leeds and Manchester, and many other trains will start their journey further north in Scotland.

I think I have covered a number of the points raised. The ability to divert into Crossrail will be maintained, as my hon. Friend the Member for Milton Keynes South (Iain Stewart) made clear. As for the environmental statement, there will be an ability to prioritise local needs. The hybrid Bill does not take powers for over-site development, which will all be subject to the normal local planning process, so it will need to conform to the local planning strategy. I am sure that there will be tremendous opportunities at Euston for other development in the area, which will capitalise on the new station.

Finally, I come to the Euston arch. I can tell Members that the Secretary of State is very keen to see the resurrection of the Euston arch. We think we know where the bits are. The Euston Arch Trust aims to re-form the arch, and it is for that trust to bring it forward through a local planning application. We have a location for the new Euston Square gardens for the arch to come forward. Personally, I wonder whether a holograph might be even better, but I can certainly confirm that the Secretary of State is very keen to see the arch resurrected.

Oral Answers to Questions

Lilian Greenwood Excerpts
Thursday 16th July 2015

(9 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I can certainly debunk that. It was made clear that once we got rid of the Pacers, they would be replaced by new trains, and that is what is in the invitation to tender, which is being looked at as far as the returns back to the Department for Transport are concerned. I hope to have more to say about that before the end of the year. This is a pause, and I am very much looking forward to Sir Peter’s report. It is his first day today, and I will be finding out shortly when he intends to give me that report.

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

Network Rail knew that northern powerhouse projects would be paused in March. Either the Secretary of State was told before the election that decisions would have to be made in June, or he was not, which means that one of two men must be guilty of abject negligence and failing to admit the truth to voters—the chief executive of Network Rail or the Secretary of State. Which one is it?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I told the hon. Lady when I was asked about giving a pause, and that is when I came to the House. Mark Carne has been doing a fantastic job trying to upgrade the railway while at the same time delivering a railway service for the passenger, which is very important. He described it as “open-heart surgery”. I pointed out when I went before the Select Committee back in March that there were problems with trans-Pennine electrification. That is why the ITT for Northern Rail was deliberately worded so that diesel trains would be in service on that particular line, because it was thought that electrification might have to slip.

Southern Railway (Performance)

Lilian Greenwood Excerpts
Wednesday 8th July 2015

(9 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Lilian Greenwood Portrait Lilian Greenwood (Nottingham South) (Lab)
- Hansard - -

It is always a pleasure to serve under your chairmanship, Mr Turner.

I begin by congratulating the right hon. Member for Arundel and South Downs (Nick Herbert) on securing this important debate. As we have heard in a number of powerful contributions, the declining performance of Southern is clearly a cause of major frustration and, at times, real anger for the millions of commuters and occasional travellers who rely on its services. Even after hitting ever lower ebbs, Southern’s performance has continued to deteriorate further.

The facts are stark: just 83% of trains were on time in the past year—the worst annual punctuality rate in 15 years. Only 70% of trains were on time during the morning peak, when thousands of commuters struggle to find a seat on increasingly expensive and overcrowded trains. The 6.35 am train from Caterham to London Victoria was reckoned to be one of the most overcrowded trains in the country at the time of the last surveys in 2013, with more than 200 passengers left standing. One in 20 trains were cancelled or seriously late. The operator reports some improvements in recent months, but overall, Southern missed its punctuality targets by almost 5%—the most significant gap between target and performance of any operator—which helped to trigger the regulator’s current investigation of Network Rail’s performance in 2014-15. Famously, of course, the 7.29 am train from Brighton to London Victoria did not run to time on one single day last year.

It is therefore not surprising that passenger satisfaction has fallen. As the right hon. Member for Arundel and South Downs said, overall satisfaction is down by 10% since 2010. Among commuters, less than a quarter of passengers say that they are getting value for money for their fares, which have risen by 23% on average since 2010, as my hon. Friend the Member for Dulwich and West Norwood (Helen Hayes) noted.

This is a world away from the standards that passengers expect and deserve, and we have all seen the disgraceful scenes at London Bridge station. The closure of tracks and platforms may be an unavoidable consequence of the £6.5 billion Thameslink project, but the poor management of London Bridge station and the lack of information provided to passengers during periods of disruption are inexcusable.

We also have to look at how Network Rail and the train operators work with one another. Even after it was known that tracks would be taken out of service, the decision was taken to run 22 trains an hour during the peak period. As Network Rail and Govia later admitted,

“we have discovered that this number is not feasible.”

At a time when the planning of rail projects is under intense scrutiny, it is clear that that lack of adequate preparation cannot be allowed to happen again. Network Rail and Southern have produced a recovery plan, about which I will say more later. I know that the Minister has been meeting the responsible parties, but the Government’s involvement must be judged on the results that it yields, not just the number of meetings that are held.

Claire Perry Portrait Claire Perry
- Hansard - - - Excerpts

As always, the shadow Minister is saying a lot of things that I entirely agree with, and I am looking forward to addressing those points. However, will she join me in condemning the rail unions, who are determined, across London and across the network, to maximise disruption at a time when we all should be working together to deliver the best possible service for our customers?

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

I agree that it would be very unfortunate if industrial action went ahead, because I know that it would cause extra disruption to passengers. However, as Government Members said, the way to avoid that is to get back round the negotiating table and talk about the issues at stake.

When the Minister replies today, I hope that she will give hon. Members an update on the progress that has been made against the short and medium-term goals in the recovery plan. When we look at the wider problems facing Southern, it is important to identify where responsibility lies. In spite of the best efforts of its engineering staff, Network Rail has not consistently provided reliable infrastructure services on this route over the last year, and indeed the regulator has identified Southern as a franchise where

“punctuality and reliability is below expectations”.

I note, however, that 31% of delays were attributed to the operator during the last year, so it does not escape blame. It is clearly for Southern to address issues such as the cleanliness of trains and the provision of information to passengers—including about delays, cancellations and compensation—but there are also areas in which the Government are directly accountable for the treatment of passengers. I will move on to that issue in the time remaining.

It is often asserted that Ministers exercise influence through the franchising process, but Southern will cease to function as a traditional franchise by the end of the month, when it will join Thameslink and Great Northern under a single, combined management contract. As the hon. Member for Reigate (Crispin Blunt) noted, that contract gives the Department and Ministers significant new powers over the operator, including in relation to the setting of fares. Last year, the Government confirmed their intention to remove gradually cheaper “Thameslink only” tickets on the Brighton main line from 2016. The cost difference for annual season tickets to London was as much as £664. At the time, the Minister said:

“When we move from two operators to one on the line…fares will be gradually equalised.”

Will the Minister confirm that that is still the Government’s position, and will she set out what level of fare rises commuters will face when they return to work in January? Or has the policy had to be abandoned as a consequence of the Government’s last-minute decision to adopt Labour’s policy of scrapping the unfair flex loophole?

Claire Perry Portrait Claire Perry
- Hansard - - - Excerpts

That you introduced—that Labour introduced.

Lilian Greenwood Portrait Lilian Greenwood
- Hansard - -

That was introduced under privatisation.

We have heard today that compensation arrangements need to be improved. The Minister has previously indicated that she is willing to consider an automated system for awarding compensation when services are more than two minutes late. That would certainly be welcomed by passengers, but it is worrying that the introduction of such a system appears to be explicitly tied to the franchising process. Does that mean that Southern passengers could have to wait until the early 2020s, when the next franchise will be awarded, before enjoying that benefit?

Equally, the Government could take action now to require train companies to provide cash compensation, in contrast to the inflexible national rail vouchers that cannot be used online. Our understanding is that the Secretary of State could make that change by authorising a revision to the national rail conditions of carriage. Will the Minister confirm that that is the case, and if so, why that authorisation has not yet been given?

Similarly, the Minister’s colleague, the Under-Secretary of State for Transport, the hon. Member for Harrogate and Knaresborough (Andrew Jones), said that part- time season tickets—if they are ever created—will be implemented through franchise awards. Does that mean that Southern passengers could face a wait of at least six years before accessing those products, even though part-time season tickets could save some commuters hundreds of pounds a year?

Another issue, which is clearly of particular interest to a number of hon. Members, is the possible devolution of some routes to Transport for London. London Overground, as has been said today, has transformed services elsewhere in the capital, and significant investment is going into the recently devolved routes to Cheshunt, Enfield Town and Chingford. Southern’s punctuality, as my hon. Friend the Member for Dulwich and West Norwood highlighted, is poorest on its south London metro routes, so there is real interest in TfL taking over management of those services. What consideration has the Minister given to those proposals? Has she had any recent discussions with TfL on the devolution of those routes, either in whole or in part?

If Southern is to accommodate growing demand, further infrastructure improvements are likely to be necessary. The operator is running 700 more trains a day than the route carried 20 years ago, across some of the most complex and congested sections of the national rail network. There appeared to be cause for celebration in March, when the Chancellor promised

“a feasibility study into Brighton Main Line 2, speeding up journeys and relieving congestion”.

However, the Budget document itself mentioned only

“a further study into reopening the Lewes to Uckfield rail line”

and not into the whole of Brighton main line 2. Will the Minister say a bit more about whether the scope of that study will extend to the whole project or not?

I come to my final point. The recovery plan that I mentioned earlier stated that the quality of signalling equipment was

“under review, with the potential for investing in enhancements being assessed.”

However, the reality is that the status of Network Rail’s whole investment programme is now unclear and is unlikely to be clarified before the end of the year. Ultimately, better services will require investment in improved infrastructure, but Network Rail is facing enormous cost pressures on its enhancement, renewals and maintenance budgets. Will the Minister confirm today that while passengers face delayed and cancelled trains, rising fares and cramped carriages, essential measures to improve their journeys are now in jeopardy?