Crossrail

Andrew Jones Excerpts
Monday 10th December 2018

(5 years, 11 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

The Government, the Mayor of London and Transport for London (TfL) have today 10 December 2018 confirmed a financing package to deliver the final stages of the Crossrail project and open the Elizabeth line to passengers.

Crossrail Ltd, a wholly owned subsidiary of TfL, announced in August 2018 that the opening of the Elizabeth line through central London would be delayed. Work is ongoing to identify the remaining works required to complete the infrastructure and then commence the extensive testing necessary to ensure the railway opens safely and reliably. Crossrail is a nationally significant infrastructure project which will add up to £42 billion to the UK economy and will transform travel in, to, and across London.

The Government remain committed to the rapid completion of the project, in a way that is fair to UK taxpayers, and that enables London—as the primary beneficiary of Crossrail—to bear the additional costs. Independent reviews into Crossrail Ltd’s assessment of ongoing funding requirements and governance arrangements are being undertaken by KPMG to ensure the right scrutiny and oversight are in place as the project enters its final phase.

The emerging findings of the KPMG reviews into Crossrail Ltd’s finances indicate the likely range of additional capital cost due to the delayed opening of the central section could be in the region of between £1.6 billion and £2 billion. That includes the £300 million already contributed by the Department for Transport and TfL in July 2018, leaving between £1.3 billion and £1.7 billion to cover the predicted additional costs of the project.

The Government, the Mayor of London and TfL have agreed a financial package to cover this. The Department for Transport will provide a loan of up to £1.3 billion to the Greater London Authority (GLA). The GLA intend to repay this loan via London’s Business Rate Supplement (BRS) and from the Mayoral Community Infrastructure Levy (MCIL). The GLA will also provide a £100 million cash contribution, taking its total contribution for this package to £1.4 billion.

As the final costs of the Crossrail project are yet to be confirmed, a contingency arrangement has also been agreed between TfL and the Department for Transport. The Department for Transport will loan TfL up to £750 million in the event that further finance is required for the project.

This combined financing deal will replace the need for the £350 million interim financing package announced by the Department for Transport in October 2018.

The combined total of the financing arrangements outlined above, means that the overall funding envelope for the project is now £17.6 billion.

Crossrail Ltd appointed Mark Wild as CEO on 19 November 2018. Mark is now conducting an extensive review of the remainder of the programme and will provide clarity in the New Year on the opening date of future phases. Crossrail Ltd are working to establish a robust and deliverable schedule to open a safe and reliable railway. This will also provide greater clarity on the level of additional funding required.

Furthermore, both the Department for Transport and TfL have recommended to the Crossrail Ltd Board that they appoint Tony Meggs as Chair. Tony Meggs was previously chief executive of the infrastructure and projects authority and Head of Government’s project delivery function, following a 30 year career in the private sector leading major projects at global, regional and local levels.

To further strengthen the Crossrail Ltd Board, the Department for Transport have accepted TfL’s nomination of Nick Raynsford as Deputy Chair. Nick is a former MP and served as Minister for London on two occasions between 1997 and 2003.

[HCWS1165]

Sector Deal

Andrew Jones Excerpts
Thursday 6th December 2018

(5 years, 11 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

As part of the industrial strategy, the Government committed to making the most of the UK’s strengths and to develop the infrastructure necessary to support this. The UK’s rail network supports people getting to work and training opportunities every day, enables businesses to access the talent they need to grow, and moves goods across the country and to our ports and airports.

The aim of this sector deal is to develop new, digital capabilities to support the railway in becoming an even stronger driver of economic growth and opportunity.

Sector deals bring the industry and the Government together in partnership to boost the productivity and earning power of specific sectors. The rail sector deal struck today follows ambitious sector deals with the life sciences, automotive, construction and artificial intelligence sectors.

The Government and rail industry have come together to agree a plan to increase efficiency, improve journeys and increase the sector’s capability to trade internationally. The deal was developed through close engagement with the UK’s world-class consulting engineering sector and wider rail supply chain, and with backing from the major train manufacturers in the UK. This engagement from the industry has been led by the rail supply and delivery groups, both of whom will be fundamental to delivering these ambitions.

The deal contains mutual commitments that will encourage innovation to improve passenger experience, provide the confidence necessary for investment in capital and skills, while reducing the cost to the taxpayer of state-of-the art digital rail control systems. Furthermore, the deal, through collaboration between train manufacturers and those providing services and running the network, will provide a common data platform. This will enable businesses to access highly useful data held within the industry in order to develop services and products to meet passengers’ needs. This deal also includes a pilot programme in the midlands to attract further diversity and skills into our growing railway, supported by the midlands engine, LEPs and other regional partners.

This deal will support the rail industry into the next phase of its development as a world-leading industry. I will place a copy of the document in the Libraries of both Houses.

[HCWS1148]

South Western Railway Franchise

Andrew Jones Excerpts
Wednesday 5th December 2018

(5 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

I congratulate the right hon. Member for Twickenham (Sir Vince Cable) on securing this debate. He covered a lot of ground and issues in his short speech, and he has brought insight and local knowledge. He is right, as are other hon. and right hon. Members, to speak up for the passengers they represent.

The South Western Railway franchise is enormous, handling more than 400,000 passengers a day who rely on its 1,700 services. Indeed, more than 110,000 passengers pass through Waterloo in the morning peak alone. It is fair to say that service levels have fallen short of expectations, as we all know. That was perhaps most keenly felt on Monday 19 November, when serious disruption was caused on the network by overrunning engineering works, which the right hon. Member for Kingston and Surbiton (Sir Edward Davey) was keen to highlight. Those overrunning works meant that Network Rail was not able to open a number of lines into Waterloo until after 9.30 am.

Colleagues have asked what action is being taken. Since then, Network Rail has taken action to bring more operational experience to its executive team, including with a change of managing director on that route. People are rightly frustrated and angry with the delays and cancellations, but I want to assure the House that bringing performance back to acceptable levels is our highest priority.

Ed Davey Portrait Sir Edward Davey
- Hansard - - - Excerpts

I just want to make sure that the Minister and the House understand that although it was a shocking performance on that Monday when the works were not completed on time, the cancellations and delays have been going on for more than 18 months. This has been a long, sustained period of shockingly poor management and shockingly dreadful services, which our constituents are suffering daily. I have 10 train stations in my constituency. Most of my constituents rely on these services, and they have to be put right. We need to hear from the Minister about the actions his Department will take to do that.

Andrew Jones Portrait Andrew Jones
- Hansard - -

Obviously I am coming on to that, but I wanted to highlight when the problems were at their most acute. I will press on now to make sure that some answers are given in the time available.

A key point is that South Western Railway and Network Rail understand the causes and have put a plan in place to turn performance around. The right hon. Member for Twickenham highlighted the report that was commissioned from Sir Michael Holden and his background as a senior figure in the rail industry. Sir Michael’s report highlighted that no one silver bullet will restore punctuality to previous levels. He cited the main cause for the decline as too little flexibility in the timetable, so that when things do go wrong, they go very wrong and it is difficult for the operator to get back on schedule. I think that is part of the problem that the right hon. Gentleman highlighted when he talked of a “concentration of misery”. It is a very tough thing for the operators to deal with. I visited the train operating centre in south Manchester a few days ago, when I witnessed a nine-minute delay in the Castlefield corridor having a consequential impact of 1,200 lost minutes through delay across the network of the north. We are talking about a network that is stretched taut, and there is little flex.

Sir Michael highlighted other causes: the intensively used, ageing infrastructure, and the ongoing industrial action, which is diverting management attention. Taken together, they have led to an unacceptable level of performance on the South Western Railway network. However, he also points out the potential performance improvement opportunities that a consistent suburban fleet would offer. South Western Railway identified that before the start of the franchise when it ordered a fleet of 90 modern trains. Those trains offer not only performance benefits but a range of features to improve customer journeys. This is an £895 million fleet to cover the entire suburban network, and it is due to enter service from late 2019.

Sir Michael makes 28 recommendations in his report for South Western Railway, Network Rail and the Department to take forward, and I am pleased to say that all have been accepted and are currently being progressed. A number of the recommendations are already complete, and all of his short-term recommendations will be complete by the end of this year.

The right hon. Gentleman highlighted the success of the railways in increasing passenger numbers, which have reached a record high of 1.7 billion. So we are dealing with an industry that is trying to cope with the challenges of growth. In order to deal with that, changes have been made to lengthen platforms on the suburban routes to accommodate 10-car trains. That work is part of the £800 million Wessex capacity enhancement programme, which has also seen major works completed at Waterloo to lengthen the platforms there. I am not sure whether he is aware that starting from Monday 10 December the services from Reading or Windsor & Eton Riverside that call at Twickenham station are scheduled to arrive at one of the four former Waterloo International platforms, which are being brought back into full use. I am sure he will welcome that. It should help relieve some of the issues affecting punctuality, especially in the peaks, because there are periods when trains are waiting outside stations for platforms to become available.

The changes to be introduced through the new franchise by December 2020 will mean an increase in peak capacity of about 30% at Waterloo, so we are talking about more space and less crowding for passengers. However, it is also fair to say that the challenge faced by Network Rail to maintain its assets in a reliable condition gets harder—that was a point made in a number of interventions. I agree entirely that the effect of that has been felt by passengers.

The right hon. Gentleman asked whether we are investing; well, we certainly are. We are seeing one of the biggest investments in our railway’s history, with £48 billion to be spent by Network Rail in the next control period, which starts next year and will run until 2024. That funding will make a real difference to the passenger experience, because it will go far more towards maintaining and renewing the infrastructure—

Andrew Jones Portrait Andrew Jones
- Hansard - -

The right hon. Gentleman has had a very good run. Will he let me press on a little further?

In previous control periods, we have had a bias towards enhancements; this time it will be towards the maintenance and renewal of infrastructure and increasing reliability and punctuality. For South Western’s passengers, the Network Rail Wessex route will see funding increased by 20% compared with the past five years. Work will be taking place over Christmas and the new year, when Network Rail will be investing more than £148 million to improve the network throughout the country for a more reliable railway for passengers. Network Rail’s “team orange” will be out on the Wessex tracks replacing switches and crossings in the Waterloo area, strengthening bridges at Vauxhall and Guildford, and replacing track in the Westbury area. Are the Government acting? Yes, they are. Are the Government investing? Yes, they are.

The new franchise was highlighted—

Andrew Jones Portrait Andrew Jones
- Hansard - -

This will be the fourth intervention—come on!

Ed Davey Portrait Sir Edward Davey
- Hansard - - - Excerpts

I am extremely grateful to the Minister for giving way; he is being very generous. If he looks at the historical record of investment in the South Western Railway region—the Wessex region—he will see that it is shockingly low compared with the rest of the country. Although there is going to be a small increase, compared with the huge amounts being spent elsewhere the capital investment in the Wessex region is not good enough. Given the problems and the huge numbers of people in the area, will the Minister go away and consider the investment that is going to the region? It is simply not adequate.

Andrew Jones Portrait Andrew Jones
- Hansard - -

Every single Member of this House comes to me and says that every other area is being advantaged ahead of their own—

Ed Davey Portrait Sir Edward Davey
- Hansard - - - Excerpts

Look at the facts.

Andrew Jones Portrait Andrew Jones
- Hansard - -

I have obviously gone over the facts and we are looking at them, but the point is that we have a programme that is delivering new rolling stock and upgrading the maintenance budgets. It is the largest investment that any Government have made in our railways, so to suggest that the Government are not backing the railways is simply not true. I am just highlighting some of the new things that are coming in.

There were a few questions about the franchise. The winning bidder, First MTR, will be investing £1.2 billion over the course of the franchise. A significant part of that will go on the fleet of new trains that will provide services for the constituents of the right hon. Member for Twickenham and more widely across the suburban services. We expect there to be some significant improvements in passenger experience thanks to new and refurbished rolling stock and smart ticketing options, as well as improved wi-fi provision at stations and beyond.

The franchise performance was clearly of concern. With the new franchise, we have set challenging targets for performance, with a financial incentive that would reward the operator for exceeding those targets. As everybody has said and as we all know, performance is not at the levels that passengers rightly expect, and it is below the target levels in the franchise agreement. South Western Railway is now investing an additional £5 million across a range of initiatives to improve performance. Many of these initiatives are targeted at improving the fleet’s reliability and are designed to reduce instances of services being formed of too few carriages or cancelled.

The right hon. Member for Kingston and Surbiton asked about several issues, including declining performance, but let me first address disabled access on the line, which the hon. Member for Strangford (Jim Shannon) asked about. We are dealing with a Victorian rail infrastructure, and disabled access on parts of it is simply not good enough. I entirely agree with the hon. Gentleman’s point and hope he will understand that we are putting extra funding in between now and 2024. We have made nearly 2,000 stations throughout the country disabled-access friendly, but there is a long way to go and we need to keep up the pressure. The hon. Gentleman was clearly right.

Ruth Cadbury Portrait Ruth Cadbury
- Hansard - - - Excerpts

I accept that a large part of the problem with disabled access is to do with the physical infrastructure, but until that is dealt with, disabled access is dependent on the second staff member in the train being able to put out the ramp for wheelchair users. If the franchisee goes back on guaranteeing that second person on the train, disabled people will not be assured that they can get on and off the trains.

Andrew Jones Portrait Andrew Jones
- Hansard - -

The hon. Lady is clearly correct; there is a key role for staff on board trains and at stations in helping people on and off the trains, and that is entirely understood. I should perhaps point out that no staff are being removed from South Western Railway’s trains. There will be more guards on trains in future, not fewer. South Western Railway has been very clear from the outset that no one will lose their job and that every service will continue to have a guard rostered. That is the offer that South Western Railway has made, and it should be seen as excellent news for customers and for South Western Railway itself, but the point about the role of staff in helping people with mobility issues is entirely understood and well made.

The declining performance that the right hon. Member for Kingston and Surbiton highlighted predates what we are discussing—it has declined over a considerable number of years. I have gone back and reviewed performance and investment, and the point I would like to make is that we have a plan and we are investing at a record level. All of this will add to the future drumbeat of improved services, and passengers will notice the difference.

The right hon. Member for Twickenham mentioned the Williams review and asked whether it would include the Department for Transport. Yes, it will. It is looking at the structure of the industry. This industry has been one of remarkable growth since the privatisation, with 1 billion extra passenger journeys a year. The system has served us well, delivering more people on to our networks, but the question is whether the structure is right to take it on into the future. If we are asking that question very broadly, the review has to and does include the Department that has a key role to play.

The introduction of the new timetable in May was clearly very problematic, and the industry has apologised for it, as it certainly should have done. Passengers were vastly inconvenienced by it; it was a failure of performance. Lessons have been learned from it, and there has been a review. The head of the Office of Rail and Road, Professor Glaister, has published a report and we will hear more on his recommendations for the future very shortly. The key thing is that lessons are being learned. We are investing in new rolling stock and having a proper hard look at how we can deliver the railway that people need. Colleagues from across the House have been very clear in their expectations of the rail industry and of the Department, and we are making sure that those expectations will be fulfilled.

Question put and agreed to.

Rail Services: North Staffordshire

Andrew Jones Excerpts
Wednesday 28th November 2018

(5 years, 12 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

It is a pleasure to serve under your chairmanship, Sir David. I congratulate my hon. Friend the Member for Stoke-on-Trent South (Jack Brereton) on securing the debate. The speeches we have heard from Members on both sides make clear the ambition for the area, and we have had some very informed contributions detailing how that ambition might be delivered.

There have been some common themes, including the connectivity and, in particular, the capacity of the north Staffordshire rail line. That reflects historical under-investment in our railway. That accusation can be made against Governments of all colours over a considerable number of years, but I do not think it is an accusation that can be made against this Government. We are looking at the biggest period of rail investment since the Victorian era. Just next year, from April onwards, we will be starting what is called control period 6, which will bring a £48 billion package of investment—a record in British history and the biggest since the Victorian era. Nobody can accuse this Government of failing to recognise the importance of rail or of not matching that in our Budgets.

As all the contributions to the debate showed, we can all agree on the tremendous importance of the region, whether in terms of industrial growth, passenger growth, the opportunity that has been presented by HS2, or the importance of passengers reaching the HS2 hubs so that they can access that new service, right down to the rail user groups as well. Would I share in congratulating those groups? Yes, I most certainly would. Rail user groups up and down our country do fantastic work, whether it is looking after stations or promoting services. This morning, I was at Hadley Wood railway station in north London, meeting some of its rail user groups, which have taken on a significant environmental project. Those groups and their work have changed our national policy. I was there to launch the Department’s review, carried out by John Varley, of Network Rail’s vegetation policy—how to make our railway lines more environmentally friendly. Rail user groups of course have a big role to play.

[Mark Pritchard in the Chair]

I have listened carefully to representations about rail services and other matters, in particular about the services between Derby and Crewe. Overcrowding, especially during peak hours, is clearly a major problem, which has come about for a variety of reasons. Simple passenger growth along the line has been compounded by the need to take some trains out of service in order to carry out accessibility improvements, alongside the regular maintenance cycle. I fully recognise that that has compounded the problem, but it is anticipated that overcrowding will ease as the new rolling stock is procured or released from elsewhere in the network. I recognise that that has caused inconvenience to communities represented by colleagues in the Chamber, and I regret that.

We seek ways in which to improve services in future. The Department and Network Rail are fully engaged with Midlands Connect, which has recognised the importance of the north Staffordshire line in its transport strategy. The Government have committed £12 million to fund Midlands Connect to the end of the next financial year, with additional investment to further develop focused transport proposals throughout the midlands.

With that support, Midlands Connect plans to produce a strategic outline business case next year, to assess how service capacity and frequency might be improved significantly on the north Staffordshire line, including consideration of infrastructure upgrades such as improved signalling or alterations to level crossings, rolling stock improvements, and operational measures such as changes to stopping patterns. The business case will look at ways of doubling existing service frequency and reducing journey times by 20 minutes. Midlands Connect estimates that increasing service provision in that way could increase passenger demand on the line by 72%, which is a figure quoted earlier.

Investing in that corridor will complement the midlands rail hub proposals, which seek to increase capacity radically and reduce journey times across the region. The work to develop the scheme is supported by the Department, which has provided a further £5 million. The work is intended to double the frequency of services between Birmingham, Derby, Nottingham and Lincoln.

Further to that, as part of the strategic development corridor work, Transport for the North is reviewing options to improve connectivity in the Crewe to Derby corridor as part of its strategic transport plan. We fully recognise the need to invest in modern infrastructure to support better services—the two go hand in hand, which is why we have the biggest upgrade of the midland main line since it was completed in 1870, in an investment worth £1.5 billion.

Ambitious works to modernise and improve the railway at Derby station were recently completed. In fact, I am to visit it tomorrow morning, and am very much looking forward to doing so. That once-in-a-generation upgrade includes 17 km of new track, 55 new signals, 79 sets of points and nine new overhead gantries. The previous complex and inefficient track layout has been simplified to allow for more direct train movements to and through the station. We are not investing in our railway network purely because we want the network to be invested in; we are investing to increase capacity. It is all focused on passengers, who are at the heart of what we are doing.

The next East Midlands franchise is a piece of live work. Through our ambition and the invitation to tender, we intend to get new capacity coming on stream using some of the capabilities that we have been discussing. The invitation to tender published in June specifies an ambitious programme of benefits and improvements, including a brand-new fleet of longer, quieter, comfortable and more efficient bi-mode trains, which will provide additional seating and improved on-board facilities for long-distance services. The three bidders for the franchise are Abellio, Arriva and the existing provider, Stagecoach. On timing, we anticipate the announcement of the winning bidder in the spring, with services to commence in summer next year.

To focus on the Derby to Crewe corridor, the north Staffordshire line will benefit from increased capacity, which was at the heart of the comments made by my hon. Friend the Member for Stoke-on-Trent South. Trains will operate with at least one extra carriage to help to satisfy local demand. That will be supplemented by additional early and late services, and improved Sunday services. I cannot immediately promise the timing wanted by my hon. Friend the Member for Burton (Andrew Griffiths), but I undertake to take that question away, look at it and come back to him.

As my hon. Friend is aware, however, Ministers are not directly involved in assessing bids, which is a piece of work done anonymously inside the Department, with the information kept secure because it is market sensitive. Bidders have nevertheless been incentivised to enhance existing direct journey opportunities, including east-west connectivity or the Crewe to Derby service. Passengers will also benefit from high-quality wi-fi and mobile connectivity on trains and in stations.

I have attended many transport debates, but never before has a Member highlighted the ugliness of their station; normally Members talk up their local area. Due to the miracle of parliamentary wi-fi, I have had a look at Burton station. It is not an architectural masterpiece, I recognise that. My hon. Friend was kind enough to invite me to visit his constituency, and I would be delighted to do so. Perhaps we could visit the St Peter’s bridge of earlier discussions, as well as looking at the station. He also mentioned a local brew on the way—always a pleasant thought.

Smart ticketing will be another feature of our modern railway. Smart ticketing options will be introduced for leisure and business journeys, including fares that offer better value for money for passengers travelling regularly but less often than five days a week. The new franchise has specified exemplary passenger satisfaction targets for trains, stations, customer services and dealing with delays. The hon. Member for Stoke-on-Trent North (Ruth Smeeth) spoke about customer service, and I agree that we must have the highest levels of customer service on our railways. The East Midlands competition has attracted a strong field of companies, all of them determined to operate that vital franchise. The winning bidder will be the one that impresses the most, while obviously ensuring value for money and a good deal for taxpayers.

One particular feature of colleagues’ concern has been communication and collaboration between the different parts of our rail network, whether on the detail of the 12.11 and the 12.16 at Alsager, or on the services to London—which I believe will continue but, from May next year, are likely to go via New Street station in Birmingham. My hon. Friend the Member for Congleton (Fiona Bruce) highlighted a number of other questions, as have a lot of colleagues, and I will go through the record of the debate to ensure that I write to everyone with the detailed answers they sought. From May next year, however, she may at least expect an attractive service via New Street.

As part of our strategic vision for rail, the new franchise will introduce new ways of working that put passengers first. The historical separation of track and train, no longer suitable for the challenges of today’s intensively used railway, will end. In its place, we will introduce a new “one team” approach to embed shared incentives between Network Rail and the new operator that will ensure that passenger interests come first in all decision making. I hope that colleagues agree that the vision for the new franchise to serve the east midlands will ensure a service that is far more ambitious than that which it replaces, and will play a significant role in securing the long-term prosperity of the region.

HS2 has been mentioned by many colleagues in this debate. It is a fantastic project, and I look forward to it enormously. It will transform transport connections right across our country. Looking further ahead to its local impact, the second phase of HS2 will deliver considerable benefits for the region and has the potential to support growth right across the UK. Crewe is a key station for connectivity; HS2 will generate significant opportunities not just there but, because it is such a hub, for Wales, Cheshire, Warrington, the Wirral and the immediate area around Staffordshire. Crewe will be the hub that connects those areas, the north of England and the west coast main line. It will totally revitalise the area with new opportunities, bringing businesses, jobs and housing to the wider region. Through HS2 connections at Crewe, passengers will benefit from shorter journeys to London and vice versa, as well as improved cross-country journey times.

My hon. Friend the Member for Stoke-on-Trent South highlighted the importance as a key feeder of Longton station in his constituency. That is entirely understood. The question now is how we maximise the benefits that HS2 will bring. This is a £50 billion-plus scheme; right across the country, contracts will be won by engineering businesses to deliver this fantastic scheme. The project now is how we maximise the opportunities and minimise the disruption to local communities during the build. We should be in no doubt, however, that HS2 is a fantastic, exciting project serving more than the immediate area; it is important for the whole UK. I certainly want Stoke-on-Trent to be served by HS2.

There have been a number of comments on timetabling, ticket pricing, local delivery plans for Staffordshire and whether the line from Stoke to Stockton Brook will be reopened. The rail strategy published in November 2017 includes a section on exploiting opportunities to restore capacity lost under Beeching where that unlocks housing and growth. Any potential reopening would need to be supported via a strong business case to demonstrate an economic return. Who might be the best people to produce those plans? That would be local councils and local enterprise partnerships. They know their areas best; they need to decide which transport schemes will bring the most benefit. We will work very closely with LEPs and authorities to help them with that work. Any proposal must be brought forward in line with the rail network enhancement pipeline, but we are keen for capacity to be increased and we recognise that reopening closed lines will be a feature of rail’s future.

The transforming cities budget was highlighted; that is a significant opportunity. Stoke is one of 10 English city regions chosen to work with the Department to design innovative public transport packages to make it easier and quicker for people to get around. The hon. Member for Stoke-on-Trent Central (Gareth Snell) said that the journey from his home can take him up to 45 minutes; this fund is designed to help Stoke and other regions tackle some of their internal transport questions. They will be eligible for a share of up to £1.28 billion from the transforming cities fund and from funding as a future mobility zone. Each shortlisted region will have to develop its own plans, but regions are given some budget to help them make their bids.

I will go through the record carefully to see whether there are any questions I have not answered, but I have tried to answer as many as possible. I want to leave with hon. Members the message that we fully recognise the need for increased capacity on that service, as has been made extremely clear in this debate. The rolling stock needs to be improved. That improvement can help to unlock economic opportunity—that has been made clear by colleagues on both sides speaking with one voice on behalf of their region. That voice has been heard and I will do all I can to make the transport of the area much improved.

South Eastern Rail Franchise

Andrew Jones Excerpts
Tuesday 27th November 2018

(5 years, 12 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

Thank you very much, Mr Hollobone. The world of transport provides a wonderful array of images.

I thank my hon. Friend the Member for Bromley and Chislehurst (Robert Neill) for securing this debate and for being a champion for his constituents and the users of this important franchise, which, as he said, has been operated by Govia since 2006. It is the third largest of all the departmental franchises. There were more than 450,000 passenger journeys per day in the first quarter of this year, so we are dealing with a railway of scale.

The franchise agreement between the Department and train operators includes key performance benchmarks —they all do—to ensure that the franchise delivers with passengers at its heart. I do not think that claim could be made consistently throughout the history of British railways. That is our objective, and that is how I will approach the whole industry.

Despite what my hon. Friend said—I look forward to receiving that dossier, as I am keen to hear direct feedback—Southeastern’s performance, as we measure it, is consistently above the average for London and the south-east. Of course, that should never be a cause for complacency. One should always try to improve, and the Department has regular conversations with Govia.

Robert Neill Portrait Robert Neill
- Hansard - - - Excerpts

I anticipated that the Minister would make that point. Will he consider one point? Many commuters on the line firmly believe that the statistics are skewed by, for example, changes to the timetable, which actually lengthen the journey time to give more dwell time between the stations so as to avoid penalties. They feel that there is an element of questionable counting. Once we have sorted this issue out, will he sit down with us to get a common view of how the statistics are calculated? People are beginning to lose faith in some of them.

Andrew Jones Portrait Andrew Jones
- Hansard - -

I understand that, but it is important to have a set of statistics that give us comparable data from franchise to franchise over time so we can measure performance. Dwell times obviously influence journey lengths, and they are nearly always to do with how quickly people are able to get on and off changes at a platform. That is to do with the capacity and the popularity of the network. I will look at the statistics. I want a set of customer statistics that we can trust so we can hold the rail companies to account. My job is to speak up for the passenger. We are spending a huge amount of public money, with £48 billion of investment in the next control period, which starts in April, so we need to focus that to ensure we deliver for passengers, including those represented by my hon. Friend.

We have talked about the new franchise, which has been designed with a specification to ensure that Southeastern joins up with the new Thameslink routes across Kent. That will ensure the best possible service for passengers, in terms of services, space on trains and reliability.

Questions have been asked about the timing of the award of the franchise. It will be made not this week, but in the new year. I will keep all colleagues who are served by the franchise posted on the timing. The reason for the delay is that the evaluation of the agreement for the next franchise has taken longer than anticipated because we wanted to ensure that passengers get the best deal possible.

I completely share my hon. Friend’s view that we need reliability. The new franchise recognises the importance of reliability to passengers. As such, bidders must jointly appoint an alliance director with Network Rail, who will be responsible for overseeing joint teams, including one focused solely on performance. That individual is expected to be the single public face of the railway to its passengers. The point about communication in the industry was made clearly. We all know that it has broken down at times, but this is a positive move to address those concerns. Bidders are being asked to work with Network Rail to develop proposals for a digital traffic management system to allow more trains to recover from minor delays and still meet the published timetable.

All those measures are expected to deliver a railway that is more reliable and accountable to the passenger. If my hon. Friend is interested, I would like to invite him to join me on a visit to the Kent Integrated Control Centre at Blackfriars—not too far away—to see the excellent joint working that is already going on between Southeastern and Network Rail. It will be enhanced and built on in future franchises. He may wish to consider that; we can discuss it outside this debate.

The specification for the new franchise is intended to allow room for an additional 40,000 passengers in the morning rush hour by December 2022. It is designed to tackle the crowding levels and uncomfortable conditions on services today.

Tracey Crouch Portrait Tracey Crouch
- Hansard - - - Excerpts

The introduction of High Speed 1, which runs through my constituency, has helped to alleviate the pressure on the branch lines. In fact, it has been so successful that we have managed to get it to stop at Snodland, around which there has been a vast amount of house building, and it has been enormously popular. I raised the issue with the Minister’s predecessor, but there are now concerns that, as part of the new franchise, High Speed 1 will no longer stop at Snodland. Given that there is a delay in announcing the next franchise, will the Minister meet me to discuss how we can ensure my constituents in Snodland are still served by an incredibly successful and important part of the South Eastern franchise?

Andrew Jones Portrait Andrew Jones
- Hansard - -

I will of course be delighted to meet my hon. Friend. We will set up that meeting promptly.

The hon. Member for Erith and Thamesmead (Teresa Pearce) and others asked how we will deliver more capacity. It will be through longer trains. The new trains will be able to carry more passengers because we are increasing the number of the longer 10 and 12-car trains at the busiest times. First-class accommodation will be converted to standard class on commuter services to increase space for passengers further. That builds on the point that this is a hugely busy and hugely successful commuter line.

Incremental changes are being sought to today’s timetable that will deliver a more operationally robust daily plan. For example, we are reducing instances where services must cross at congested track layouts, such as those at Lewisham, which are a significant cause of passenger delay. The intention is that the next franchise will deliver a more regular service where possible. The key thing we are trying to get across is that this is about predictability and reliability. I know full well that passengers need a service they can rely on, and that is our plan.

Hon. Members will be interested to know that Sunday services will be enhanced and will be comparable to the level of service on Saturdays—a significant increase from today. There will be a Sunday service on the Bromley North branch for the first time in a considerable number of years. I hope that is of interest to my hon. Friend the Member for Bromley and Chislehurst and the constituents he serves. Services on the Medway line will also be improved, and an additional two trains per hour will run to Ashford via Tonbridge outside the peaks. That will allow Hastings services to miss some stops to improve journey times. I know from my visit to Hastings that that is a key passenger aspiration.

A significant amount of work is being done to deliver an enhanced railway. It is clear that travellers are impatient to see the new services. I fully understand that. We are focused on placing the passenger at the heart of everything we do and working with the existing management of the franchise to maintain and improve its performance before the new franchisee is announced.

The new franchise will offer the passenger very significant benefits. I have urged my officials to ensure we get those benefits as soon as possible. Everybody is impatient for them; that is certainly a message that I have taken from this debate. I thank my hon. Friend and all colleagues who have contributed to the debate. Their contributions have been heard and understood, and we will take them on board as we work to make this rail franchise better.

Question put and agreed to.

Oral Answers to Questions

Andrew Jones Excerpts
Thursday 22nd November 2018

(6 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

The South Western Railway performance review was published on 10 September 2018. It was independently chaired by Sir Michael Holden, and SWR and Network Rail are already working to implement its conclusions. My right hon. Friend the Secretary of State and the former rail Minister met representatives from South Western Railway and the Network Rail Wessex route on 24 October to review their progress in implementing the performance review. They are on track to complete delivery of all the recommendations in that review, a number of which are already complete, and all short-term recommendations will be complete by the end of this year.

Ranil Jayawardena Portrait Mr Jayawardena
- Hansard - - - Excerpts

May I welcome my hon. Friend’s return to the Front Bench? Although my constituents will welcome the review, they are furious about the terrible disruption across South Western Railway on “mayhem Monday” this week, with seemingly no contingency plans and diabolical communication. Will my hon. Friend ensure that South Western Railway and Network Rail are held to account and made to learn lessons from this week’s mess, especially given the planned Network Rail engineering works this Sunday?

Andrew Jones Portrait Andrew Jones
- Hansard - -

That incident was utterly unacceptable—there is no question about that—and I am not surprised that my hon. Friend’s constituents are furious about it. The Secretary of State spoke to Andrew Haines, chief executive of Network Rail, at 7 o’clock on Monday morning, and he made clear his dissatisfaction with the incident and demanded action. Network Rail has started an independent investigation to look at how the work was planned and delivered, and how the resulting disruption was managed. It has already made management changes, and new leadership on the Wessex route will start next week. South Western Railway also has lessons to learn, and it must review its communications with its customers. That part is critical and it failed on Monday. It must do far better.

Desmond Swayne Portrait Sir Desmond Swayne (New Forest West) (Con)
- Hansard - - - Excerpts

Welcome back, but—I have had some pretty miserable experiences on that train line, but they are as nothing compared with how ghastly it must be to be rail Minister. Does my hon. Friend think that that might have contributed to his predecessor’s resignation?

Andrew Jones Portrait Andrew Jones
- Hansard - -

That question is flawed, Mr Speaker. There is nothing ghastly at all about being the rail Minister, and I cannot understand where my right hon. Friend is coming from. I think the reasons for my predecessor’s departure are already documented elsewhere.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

The Minister’s portfolio grows by the day. He previously served the House and the nation with distinction as the Parliamentary Under-Secretary of State for buses, so from bus to rail really is an impressive CV, it has to be said. [Laughter.] Well, it is.

--- Later in debate ---
Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - - - Excerpts

6. What recent discussions his Department has had with Southeastern on (a) timetabling and (b) performance standards.

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

The franchise agreement between the Department and train operators includes key performance benchmarks. The Department monitors each train operator against those levels, and that includes regular meetings with their senior management team at which performance figures are scrutinised and challenged. A range of enforcement mechanisms are available to the Department in the event of non-compliance.

Matthew Pennycook Portrait Matthew Pennycook
- Hansard - - - Excerpts

Given their experience in recent years, many of my constituents are looking to the next operator of the Southeastern franchise to significantly improve timetabling performance. With that end in mind, will the Minister—whom I warmly welcome to his post—confirm that the Department still expects to announce the winning bidder this month and reassure passengers that the start of the new franchise will not be delayed?

Andrew Jones Portrait Andrew Jones
- Hansard - -

The level of performance management in that area is 91.2%, which is high across our railways. I will write to the hon. Gentleman with full details of the answer that he has requested.

Clive Efford Portrait Clive Efford (Eltham) (Lab)
- Hansard - - - Excerpts

I congratulate the Minister on taking up his post. My constituents could be forgiven for thinking that new Rail Ministers turn up more frequently than Southeastern trains.

Public performance measures are currently below their 2010 level. They are running below their target and are not due to reach it until 2025. Does that not show that privatisation is not working for my constituents, and it is time that Southeastern was brought under public control and the Mayor of London?

Andrew Jones Portrait Andrew Jones
- Hansard - -

I would just highlight to the hon. Gentleman that the railways are carrying significantly more passengers. On his privatisation point, privatisation has turned around our railways: after decades of decline under British Rail, we have seen passenger numbers grow from 750 million to 1.7 billion. We have one of the most intensively used, fastest growing and safest railways in Europe. Privatisation is the answer.

Kelvin Hopkins Portrait Kelvin Hopkins (Luton North) (Ind)
- Hansard - - - Excerpts

7. What decisions on railway investment he plans to make as a result of the recent east coast main line route study.

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

The Department is investing up to £780 million to upgrade the east coast main line from 2019. The works are to be completed in the early 2020s and will enable faster, more frequent journeys with more seats. Building upon those works, the east coast main line route study has identified a broad range of investment choices. We are working closely with Transport for the North, Network Rail and High Speed 2 Ltd to assess which enhancements should be taken forward.

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

In 1990, British Rail ran an express train from King’s Cross to Edinburgh with track cleared of other traffic in 3 hours and 30 minutes, including a two-minute stop at Newcastle. This was less time than planned for HS2, and with some additional four-tracking and two rail flyovers, the east coast main line could run regular 140 mph services in such times, and with the existing stock. Will Ministers look positively at such investment, as first proposed long ago by British Rail?

Andrew Jones Portrait Andrew Jones
- Hansard - -

The key point to make is that we are carrying significantly more passengers on the east coast main line, and this investment will enable it to deliver faster and more frequent journeys with more seats between London and Edinburgh.

Martin Vickers Portrait Martin Vickers (Cleethorpes) (Con)
- Hansard - - - Excerpts

I welcome the Minister back to the Dispatch Box. He will know from his previous time in the Department of my campaign for better train services into northern Lincolnshire, particularly a direct service from King’s Cross. May I invite him to visit northern Lincolnshire and to travel by train—a wonderful experience—and meet the major businesses in the area who have joined my campaign?

Andrew Jones Portrait Andrew Jones
- Hansard - -

I always enjoy my visits to north Lincolnshire and will happily take up my hon. Friend’s invitation.

Martin Whitfield Portrait Martin Whitfield (East Lothian) (Lab)
- Hansard - - - Excerpts

As the Minister will be aware, the east coast main line goes through my constituency of East Lothian. Can he confirm that, following this review, the stations at East Linton and Reston in my neighbouring constituency are still on task to be reopened?

Andrew Jones Portrait Andrew Jones
- Hansard - -

My right hon. Friend the Secretary of State is already in discussions on this very issue, and we will get back to the hon. Gentleman with detailed answers.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I call the hon. Member for Luton South (Mr Shuker) to ask Question 8. He is not here.

--- Later in debate ---
Richard Graham Portrait Richard Graham (Gloucester) (Con)
- Hansard - - - Excerpts

14. What criteria his Department uses to assess train operating company requests for derogations from franchise obligations.

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

A derogation is a deferral of a contracted obligation. Requests for derogations are assessed by considering the operator’s reasoning on why delivering as contracted is not possible and the impact of the proposed deferral. Derogations will not be agreed if requested retrospectively.

Richard Graham Portrait Richard Graham
- Hansard - - - Excerpts

I am grateful to the rail Minister, who will know that, in its 2017 franchise award, CrossCountry’s intercity service was required to make two additional stops a day in the city of Gloucester, once the Network Rail works at Filton Bank are completed at the end of this year. Will the Minister celebrate his return to the Department for Transport by saying when this derogation will come to an end and when the operator will deliver those two additional services a day?

Andrew Jones Portrait Andrew Jones
- Hansard - -

My hon. Friend is a long-standing campaigner on this issue. He is right to say that we want to see the services in the franchise resumed. The derogation was granted in March, and I know he has met my predecessor to discuss this issue. The works at Filton Bank are progressing, but this is a complex project. It is firmly on my radar, but perhaps I may ask him to meet me so that we can review the project and I can update him.

Stephen Hepburn Portrait Mr Stephen Hepburn (Jarrow) (Lab)
- Hansard - - - Excerpts

15. What recent steps his Department has taken to improve road safety on the A19.

--- Later in debate ---
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

The Secretary of State has regular discussions with the Mayor of London covering a variety of subjects, including progress on delivering Crossrail.

Alex Burghart Portrait Alex Burghart
- Hansard - - - Excerpts

There have been reports in the media that Transport for London’s finances are in trouble. Crossrail reaches out into my constituency, with stations at Brentwood and Shenfield. Is the Minister concerned by these reports, and will this affect the delivery of Crossrail?

Andrew Jones Portrait Andrew Jones
- Hansard - -

TfL’s finances are a matter for the Mayor of London, and Crossrail is a 100%-owned subsidiary of TfL. It is becoming clearer how the Mayor’s policies are causing long-term problems with TfL’s finances, but the Government will continue to work with TfL as joint sponsors to oversee Crossrail’s delivery of the new railway as soon as possible.

Bob Blackman Portrait Bob Blackman (Harrow East) (Con)
- Hansard - - - Excerpts

What discussions has my hon. Friend had with the Mayor of London about the funding that the Department for Transport provides to London for Crossrail?

Andrew Jones Portrait Andrew Jones
- Hansard - -

I know that the conversations involving the Secretary of State are extensive. I have not personally had any yet, as this is day 6, but I intend to pick up on those conversations in order to support my right hon. Friend the Secretary of State.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

Order. Just before we come to topical questions, I want to advise the House of a change in the order of business. After topical questions, we were due to have an urgent question on Bombardier, followed by the business question. In fact, what is now going to happen is that after topical questions we will have the business question, and after that there will be a ministerial statement on Bombardier. I have agreed to a request for such a change to be made. The rationale for it is not something that I need to go into now, but I am advising the House so that colleagues can make their preparations accordingly.

--- Later in debate ---
Mark Menzies Portrait Mark Menzies (Fylde) (Con)
- Hansard - - - Excerpts

T6. Following our summer of severe service disruption that saw Northern rail cancel more than 12,000 services, will the Secretary of State meet me to discuss how we can ensure that it does not happen next year? More importantly, though, can we also discuss the building of the South Fylde line, which will see the doubling of the service from once an hour to every half an hour, as it will be a huge boost to the Fylde coast?

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - -

We have been very clear that disruption following the introduction of the May timetable was entirely unacceptable. I would, of course, be very happy to meet my hon. Friend to discuss his proposals and the work that is under way to ensure that we minimise the risk of disruption for future timetable changes.

Chris Elmore Portrait Chris Elmore (Ogmore) (Lab)
- Hansard - - - Excerpts

Ministers will be aware of the work that is being carried out by Bridgend County Borough Council, me and my Assembly Member to try to close the Pencoed level crossing following safety concerns. Network Rail is now agreeing to regular meetings to try to progress the closure. It tells me that it needs more funding from the Department for Transport. Wales Office officials have now agreed to attend these three-monthly meetings to be able to progress the closure and improve infrastructure. Will Ministers now agree to their officials attending these meetings so that we can make some progress on closing this dangerous level crossing?

Andrew Jones Portrait Andrew Jones
- Hansard - -

I thank the hon. Gentleman for his question. I have to say that I am not immediately familiar with that particular level crossing, but I will, of course, look into it and get back to him with the answer.

None Portrait Several hon. Members rose—
- Hansard -

Oral Answers to Questions

Andrew Jones Excerpts
Thursday 5th July 2018

(6 years, 4 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

Andrew Jones—I call Mr Jones.

Andrew Jones Portrait Andrew Jones (Harrogate and Knaresborough) (Con)
- Hansard - -

You normally call me Andrew Jones, Mr Speaker.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I did say Andrew Jones.

Andrew Jones Portrait Andrew Jones
- Hansard - -

I beg your pardon.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

Know thyself, man. Well done.

Andrew Jones Portrait Andrew Jones
- Hansard - -

Thank you. May I first welcome today’s announcement of an HS2 depot in Leeds, which is welcome news for the northern powerhouse? The A59 at Kex Gill is an important trans-Pennine route, and its closure is impacting on residents and businesses in my constituency. Will my right hon. Friend meet me to discuss what support the Government can provide to North Yorkshire County Council to carry out works on that site, including its potential re-routing?

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I say gently to the hon. Member for Harrogate and Knaresborough (Andrew Jones) that one of his most endearing qualities is his gentleness and modesty. However, he should not be quite so modest—he is, after all, a distinguished former Parliamentary Under-Secretary of State with responsibility for buses, and that was a motivational factor in my calling him to ask a supplementary at Transport questions.

Haulage Permits and Trailer Registration Bill [Lords]

Andrew Jones Excerpts
Tuesday 26th June 2018

(6 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Tom Brake Portrait Tom Brake
- Hansard - - - Excerpts

I thank the hon. Gentleman for that intervention. As it is on the subject of borders, which is what we are debating, it is an entirely appropriate intervention. It gives me the opportunity to point out that the same Secretary of State often refers to the advantages of the border between Norway and Sweden. Again I am not sure whether he has visited that border. Maybe he has. If he has, he will have found on his visit that some of the border points are inconveniently shut at certain times of the day and night. He will also have discovered that one of the factors that Swedish business often cites as being a major constraint on doing trade with Norway is the fact that the border is not in fact frictionless. So there is a bit of a problem in terms of the Secretary of State, but I am sure he has now been on many fact-finding missions and has increased his knowledge of the subject on which he speaks.

Andrew Jones Portrait Andrew Jones (Harrogate and Knaresborough) (Con)
- Hansard - -

The right hon. Gentleman talked about the causes of Operation Stack in 2015. There were two causes, neither of which was the one he identified, so I would not want him to be inadvertently misleading the House. The causes were the migrant crisis affecting the operation of Eurotunnel and the French ferries going on strike. It was very clear at the time that those were the causes. Ministers were all over it. It was not as he is suggesting. I am sure it is appropriate, and he will be grateful, that we have been able to put the record straight.

Tom Brake Portrait Tom Brake
- Hansard - - - Excerpts

I am very happy to put the record straight as far as I am concerned and the record as far as I am concerned is that, when I visited the port authorities and talked to them about the 15-mile tailback, they were very clear in telling me that that occurred as a result of two French police officers not turning up for their shift.

Andrew Jones Portrait Andrew Jones
- Hansard - -

indicated dissent.

Tom Brake Portrait Tom Brake
- Hansard - - - Excerpts

The hon. Gentleman can shake his head, but he should perhaps talk to the port authorities and find out from them what the cause of that particular delay was. That is the information I have had. They are the ones in charge of the port and, frankly, I would have thought that they knew what they were talking about. I am happy to give way if he disagrees with me.

Andrew Jones Portrait Andrew Jones
- Hansard - -

The causes were very clear. I was the Minister at the time who had responsibility for Operation Stack. I went down and met with people who were operating it and dealing with the problems. What the causes were was extremely clear. The right hon. Gentleman is just plain wrong.

Tom Brake Portrait Tom Brake
- Hansard - - - Excerpts

I am afraid that we will have to disagree on this matter. If the hon. Gentleman wants to raise the issue with the port authorities, from whom I got this information, I recommend he does so. That is what they told me. However, we can have an argument about whether that particular incident—there has been more than one Operation Stack—was or was not caused by migrants through the tunnel, which is some distance from the port of Dover, or alternatively by two French police officers not turning up, but what is indisputable is the point that Airbus, BMW, Honda and Siemens have been making in the past few days: the Government are at risk of creating major problems for them in terms of their just-in-time operations because of whatever the Government are planning—if only we knew what they were planning on future customs arrangements. Added to that, the Government are causing those businesses huge uncertainty, which probably explains why investment in the car industry has dropped by half in the last 12 months.

--- Later in debate ---
Andrew Jones Portrait Andrew Jones
- Hansard - -

I want to say a few quick words in support of the Bill and the sector. The road haulage industry is hugely important to the United Kingdom. It does the heavy lifting of goods around our country and because it works so well and so smoothly, it is frequently taken for granted.

There are 320,000 HGV drivers employed in the UK, and in terms of the workforce, that goes up to around 2.5 million when we include the broader haulage and logistics industry. Road haulage is the main means of moving goods around the UK and it plays a huge role in our exports. Over 3.5 million road goods vehicles left the UK for Europe last year. We have been talking about the implications for exporting. The goods that we rely on, our food and drink, and the stock for our nation’s high streets—much of what we export—are moved by trucks and the workforce that drives them. Those goods are stored in warehouses and managed by the logistics teams who ensure that they are where we need them when we need them.

The Bill deals with a critical part of the UK economy and is about making sure that whatever happens in our Brexit negotiations, the Government will be able to deliver a smooth Brexit. This Bill is about preparations that may never be needed—indeed, I hope they are not. We do not know what the deal will be, so while the negotiations are progressing, it is right for the Government to plan for different eventualities. It is about creating the capacity to develop background systems, and about doing so in collaboration and consultation with the industry. We saw that with the addition in the House of Lords of a consultation clause, which was very positive. We have liberalised access for haulage and the Government are working to maintain that, but it is right to have the contingency, which is what the Bill is about.

I have experienced the sector both as a Minister and prior to that, in my working career, and I know just how important is to have smooth operation and a successful future for this critical part of the UK economy. The Government are to be commended for planning ahead and taking the necessary precautions for whatever Brexit may bring. That is why I will support the Bill; I urge everyone to do so.

Airports National Policy Statement

Andrew Jones Excerpts
Tuesday 5th June 2018

(6 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

As the hon. Lady will find when she reads the updated NPS document, that latter point is one of several recommendations from the Committee that we have addressed, and we have added additional information to the NPS.

On the hon. Lady’s comments about access to the airport, I have just given a firm commitment that we should deliver a package as broad as that to support this. One Select Committee recommendation was to strengthen the wording about western and southern rail access, and that has happened; we are very committed to both of those. This is a broad-ranging package that will transform surface access to Heathrow.

Andrew Jones Portrait Andrew Jones (Harrogate and Knaresborough) (Con)
- Hansard - -

I welcome my right hon. Friend’s statement. Does he agree that as Heathrow is the UK’s hub airport and this expansion will bring forward new routes, improved connectivity to Heathrow will bring important benefits to the people and economy of Yorkshire and other parts of the northern powerhouse?

Lord Grayling Portrait Chris Grayling
- Hansard - - - Excerpts

I completely agree with my hon. Friend. One of the disappointments recently has been a reduction in the number of flights from Leeds Bradford airport to Heathrow. Creating more capacity at Heathrow will create greater competition and allow new entrants to regional markets, and will allow some of the routes that have not been there in recent years to reappear.

Northern Rail Timetable Changes

Andrew Jones Excerpts
Thursday 24th May 2018

(6 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
William Wragg Portrait Mr Wragg
- Hansard - - - Excerpts

I thank my hon. Friend for that intervention. There is surely no north-south divide in this situation.

The fault of the services, as I will explain, can be traced back to significant delays to the Network Rail upgrade works on the electrification of the Manchester to Preston via Bolton route. That has had a knock-on effect on Northern’s ability to run its timetable properly. Network Rail is ultimately the Government’s responsibility. What are Northern rail, Network Rail and the Department for Transport going to do to urgently solve the problem so that people can get into Manchester in the morning for work, so that pupils can get to school, and so that people can get home again?

The greatest—but by no means only—problem with the new timetable relates to the glaring gap in the morning rush-hour commuter service to Manchester. The service originates in Buxton and picks up passengers from Hazel Grove station, as well as from Woodsmoor and Davenport stations, which are just outside my constituency boundary but still used by a great number of my constituents. The train service is vital for people to get to work.

The new timetable, which came into effect this week, removed the two most popular peak-time trains: the 7.50 am and 8.01 am from Hazel Grove station, which went on to call at Woodsmoor and Davenport. That leaves a glaring hole. The new timetable has three trains in the space of half an hour between 7.9 am to 7.35 am, but then nothing calls at those three stations until just after 8.20 am. As I said, Hazel Grove no longer has the 7.50 am or 8.01 am service, and the 37-minute gap between 7.35 am to 8.12 am is far too long at that time of the morning.

Hazel Grove does fare slightly better, because an East Midlands train does call there, but it does not stop at later stations. Woodsmoor now has a 45-minute gap in service between 7.38 and 8.23, and then there is nothing until after 9 am. Similarly, Davenport has a 45-minute gap in service between 7.40 and 8.25, and then nothing until after 9 am.

The changes are having a massive effect on people’s ability to get into Manchester before 8.30 am. Oddly, from 9 am, the services resume to three an hour—at 10, 20, and 35 minutes past respectively. That is obviously a better service, but it comes too late for people to get into Manchester for work, and the situation is causing massive disruption. Many commuters are faced with the choice of being late for work because of taking a later train, or being forced to take an earlier train only to arrive at their place of work unreasonably early.

The change in the time of the arrival of the train from Buxton from 8.04 to 7.38 causes problems for local schools. For example, many pupils at Stockport Grammar School used the 8.04 service. The new timetable will have a significant effect on parents having to co-ordinate dropping off their children in the morning and arranging suitable childcare.

It is not only the gap in services that is causing the problem. The loss of two train services means that the same numbers of passengers are forced into fewer trains, so when a train does arrive, passengers have to stand in cramped conditions—they do not even have the privilege of a seat. People are in effect paying a premium rate to travel at that time although there are actually more regular services off-peak.

The situation was already bad with the 7.50 and 8.01 services, as they were generally quite overcrowded. One commuter even told me that last week their train had to be met by an ambulance at Piccadilly station because a passenger had passed out due to a combination of the hot weather and cramped conditions.

These changes will have a damaging and hurtful impact on the family and professional life of many of my constituents. Sadly, the view I hear from residents is that they have the impression that Northern, the Department for Transport and Network Rail do not care about passengers. There is extreme anger. The two words that have appeared most often in the dozens of letters and emails I have received on the subject have been “ridiculous” and “unacceptable”, and I must agree.

It is not just the weekday morning service that has been impacted, as the Sunday timetable also changed. It sees the last train to Romiley in my constituency from Manchester Piccadilly moved from 22.20 to 21.45, so the service runs 35 minutes earlier. That means people are no longer able to use the service after visiting Manchester on a Sunday evening, particularly if they are going to theatres and concerts as most events finish at 10 pm or later. The 22.20 train was already too early as passengers usually had to leave events so that they could make the last train home. Now there is absolutely no chance of people getting the last train at 21.45. Again, the situation is ridiculous and unacceptable.

I know that the Government are working hard to rebalance the economy and to support northern cities such as Manchester and the conurbation through the northern powerhouse strategy. Getting commuter train timetables right is essential for that. The impact of poorer services—cancelled trains, uneven timetables, less available rolling stock and overcrowding—will spill out from the rail network and on to our roads. The upshot will be that people are forced back into their cars. Money was recently invested at Hazel Grove station on a new multi-storey car park to encourage train travel, but now the morning service is so poor as to put passengers off. As the Minister knows—I have raised this many times in this House—the A6 corridor from my constituency into Manchester is one of the most heavily congested roads in the country, so a modal shift from rail back to road is not the direction in which we ought to be heading.

Andrew Jones Portrait Andrew Jones (Harrogate and Knaresborough) (Con)
- Hansard - -

My hon. Friend is spot on in identifying the cause of the challenges faced by Northern rail with the implementation of the new timetable: the delay caused by electrification on the Manchester-Bolton-Preston line, which has had huge consequences. He has articulated the impact on his constituents incredibly clearly, but this is also happening in other parts of the franchise, including across the Pennines on the Leeds-Harrogate-York line. Does he agree that it is critical that Network Rail works with the Northern franchise holder and the Government, and keeps colleagues informed so that we know where we are? Does he agree that it should conclude the work as early as possible while planning appropriately? This is about planning to get more people off the roads and on to the railways.

William Wragg Portrait Mr Wragg
- Hansard - - - Excerpts

My hon. Friend’s assessment is correct. We cannot get into a situation in which the buck is simply passed from one organisation to the other. It is clear that people need their commuter trains, and that is the end of the story as far as I am concerned.

This whole affair is clearly a great disappointment for Northern rail passengers, who need and deserve a proper service. However, I fear it could also detract from otherwise welcome and long-awaited improvements such as electrification, the 1,300 extra train services introduced across the Northern rail network, and the replacement of the uncomfortable, creaking and quite frankly detested Pacer trains, which I am assured is still on track.

Northern rail has been responding to customers by saying there is nothing it can do about the new timetable. It explains that the timetable is not the result of any decision made by Northern rail, but that it is, as my hon. Friend suggested, delays encountered by the Bolton electrification project, which is of course being delivered, albeit rather slowly, by Network Rail, that have had an effect on the timetable bidding process.

When Northern rail bid for the May 2018 timetable back in autumn 2017, it planned to include services in what has now become known as “the gap”, but those services were rejected by Network Rail, which has the ultimate say on the timetable. Such rejections are not uncommon in a timetable negotiation process, and in the normal course of things, the train operator would have negotiated with Network Rail to move services around a little to make sure all the services could fit in.

During the negotiation period, however, Network Rail announced that the electrification programme from Manchester to Preston via Bolton would not be ready in time for the May changes, which brings the delay to the completion of the project to two years. In the short term, the situation has severely affected plans to increase services and capacity across the Northern network.

Northern rail received the notification in January 2018. To be fair, that was incredibly late in the process, given that it normally takes at least six months to build a new timetable. Northern rail’s timetable planners have been working solidly on the new timetable since then, but have not been able to fit services into the gap.

To make matters worse, Northern rail had to build its timetable around those of other operators that had already had their timetables agreed by Network Rail. Just as airlines have to secure runway slots, rail operators have to bid for platform space at stations for their trains. The problem for Hazel Grove, Woodsmoor and Davenport services is congestion at Manchester Piccadilly.

The morning peak into Manchester, as could well be imagined, is incredibly congested, with many other operators bringing people in from right across the country and the wider region. It will be even busier from May, with TransPennine Express services coming into Piccadilly and heading to Yorkshire.

I have no doubt that Northern rail wanted to run services in the gap but, due to how congested things are at Piccadilly, it seems that that is just not possible. Apparently no more services will fit in. If Northern rail had been advised three months earlier of the delays to the Bolton project, there is every chance that it would have been able to maintain the existing peak service and build a better new timetable, if not one as good as it was. Regrettably, Northern rail did not have that chance.

When I met Northern rail’s regional director in April to discuss these issues, I said it was unacceptable for passengers to be deprived of morning services, particularly given the substantial gap in the timetable. I made it clear that the proposals will cause considerable inconvenience to all commuters. Following that meeting, the regional director undertook to make representations to Network Rail to see whether a compromise could be found.

There has been one glimmer of success in this whole affair. Residents close to Rose Hill station in Marple contacted me about the hour gap in the outbound evening service between 5.09 pm and 6.10 pm from Manchester Piccadilly, which had arisen because Network Rail had, bizarrely, scheduled a maintenance train to be on the line at the time. However, following my meeting with Northern, it agreed to run a 5.34 pm departure in the new timetable to provide an extra evening service. That is a small bit of good news. I was pleased to be able to work with Friends of Rose Hill Station on this, and I wish to place on the record my thanks for all its hard work.

Northern rail is placing the blame for this sorry situation on Network Rail. As Network Rail comes under the control of the Department for Transport, I am looking to the Government at least to bang heads together and hold these organisations to account.

In conclusion, I would like to ask the Minister a number of questions. How can this terrible service represent value for money for commuters? Does he agree that the time has come for Transport for the North, the regional transport body, to conduct a formal assessment of whether Northern rail is in breach of its performance targets, as set out in its franchise agreements? If that is determined to be the case, what action can Transport for the North take? What are the reasons for the further delay to the biggest infrastructure project necessary for Northern’s modernisation—the electrification of the Manchester to Preston route via Bolton—which has caused this mess up of the timetabling process? What assurances can he give that this work will not be further delayed? Do passengers really have to wait six months for the next timetable review, or can the Minister promise today to get things moving much more speedily? I am determined to keep working constructively with all concerned to get the urgent improvements to rail services that my constituents deserve, and I very much look forward to hearing the Minister’s reply.

--- Later in debate ---
Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

My hon. Friend neatly segues me on to my next topic. His point is well landed and well taken account of, and it will undoubtedly feed back to colleagues and officials, but as he will be aware, it does not require a PhD in cryptology or the detective skills of a Sherlock Holmes to realise that I am the Roads Minister and therefore will not be giving direct instructions to officials in this regard. Nevertheless, I shall ensure that due regard is taken of the point that he raises, and rightly so. For that reason, I may be a little less crisp on the detail than some of my colleagues on the rail side would be, but I assure all Members that their considerations will be heard and taken account of.

As my hon. Friend the Member for Hazel Grove will know, Northern is now running hundreds more services compared with last week. Clearly, there is an upside to this situation as well as a downside. By 2020, there will be more than 2,500 extra services a week with room for 40,000 extra passengers, and these will be, by and large, faster and more comfortable journeys, with new and direct services across the north and beyond. Indeed, this week’s timetable change, although we have properly and appropriately focused on the negative feedback that has occurred, has also been one that has delivered an extra 1,682 train services a week across the network.

As I have said, the Department for Transport is monitoring the situation very carefully. My colleagues have made it clear that if these teething problems are not resolved in the coming days, they will hold the industry to account—not merely the operators, but Network Rail itself, which is, I am afraid, at the heart of the problems that we have at the moment.

The beginning of the week, as my hon. Friends have noted, was a challenging time for customers of Northern and the TransPennine Express, and operators have appropriately apologised for the disruption. It is sometimes forgotten that they were upfront—perhaps not upfront enough—about the kind of disruption that they were expecting and the scale and the number of the changes. It is also right to note—the Secretary of State noted this himself earlier today—that many thousands of railway staff are working flat out to deliver the benefits of this enormous investment programme, and we should be celebrating their efforts. No one, least of all I or my colleagues, or indeed any Member of this House, wishes to see passengers face disruption, let alone on the scale that has been identified in the specific cases that have been picked out today. We understand the frustration that many have felt with this week’s service. The hope is that passengers will become a little more understanding as these initial issues are addressed and as the wider benefits start to feed through.

As colleagues across the House will know, in this case, the franchises are managed by the Rail North Partnership jointly on behalf of the Department and Transport for the North. I am assured that the team, which is based in Leeds, has been closely monitoring the situation and liaising with both operators. There is a timetable recovery plan against which Northern expect to be monitored by the Rail North Partnership team. In response to my hon. Friend’s question, I would not be surprised if a slightly more formal process of internal assessment were set up.

It is absolutely right for passengers to be compensated if they are affected by disruption. I hope that it is understood across the House that the Department has, with some effectiveness, worked with train operators to promote passengers’ awareness of their compensation rights. Rail passengers are now more willing and more able than ever to demand and to receive, without undue disruption to their own timetables or cost, the compensation that they are due. Figures published for 2016-17 showed that more than £73 million was paid out to successful claimants—an increase of 63.8% on the previous year.

Both Northern and TransPennine Express operate this delay repay compensation scheme, which allows rail passengers to claim compensation for each delay of more than 30 minutes or more whatever its cause. There are no exclusions for weather or for other delays outside the control of the rail industry. One suspects that quite a lot of this compensation will spike as a result of the experience that we have had over the past few days.

In the case of multi-modal tickets, delay repay compensation is payable for delays that occur on the rail element of journeys covered by these tickets. Of course, the train operating companies and the relevant local transport authorities remain responsible for this policy. The Department has worked very closely with the train operators to make those compensation claims as swift and as simple as possible, including through online claim forms, smartcards and online apps.

Let me turn now to the timetable. Northern has planned for some time to introduce these changes in two phases—one in December 2017 and the other in May 2018, with the latter being larger and more relevant. These were supposed to be underpinned by planned line speed improvements and electrification of the route between Manchester and Preston. Again, my hon. Friend the Member for Hazel Grove, in a very incisive analysis, put his finger on the central problem, which was that this electrification did not take place on schedule and that had all of these knock-on effects, and of course, in a network, knock-on effects themselves have knock-on effects and the result creates further disruption.

The effect of the delays to the completion of the Manchester to Preston upgrade meant that Northern had to move some of its service enhancements to a later date. Further service enhancements for Northern and TransPennine Express are planned for introduction from the end of this year through until 2020. I am sure that colleagues will be working closely with the operators to ensure that they are put in place with minimum disruption. As a result, although the operators will be delivering an increase of 1,300 new services a week from May 2018, 900 services a week—disappointingly for customers—will not be delivered until the infrastructure is ready. Once that happens, it will be a further improvement.

It became apparent in the early part of this year that the electrification process would not be completed on schedule. My hon. Friend rightly targets the question whether enough notice was given at that time. This required a lot of rethinking and rejigging by Northern. Although we are in the midst of significant operational challenges, I am afraid to say that it is appropriate to recognise that they have not yet ended. Once wishes that it were not so, but there may still be some further localised service disruption. In a way, that is to be expected with any new timetable, but it is all the more regrettable given the current circumstances. Northern has assured us that it will continue to do everything it can to make certain that there is minimal service disruption and to keep customers informed. Officials in the Department have focused on ensuring that customers know that timetables are changing.

I will not go further than my hon. Friend in addressing the specific issues that he has experienced in his constituency and on the Buxton and Hazel Grove line into Manchester Piccadilly. He has done a good and accurate job of bringing these issues to the forefront of the House’s attention. It is worth pointing out, however, that we will continue to see further improvements over time.

In Greater Manchester, Northern will begin to operate two trains an hour between Buxton and Manchester Piccadilly, significantly increasing the capacity on one of the most popular lines into the city. There will also be six trains an hour on weekdays between Rochdale and Manchester Victoria, as well as an hourly Sheffield to Manchester Piccadilly service every day. In Merseyside and Cheshire, Northern has made it clear that it will operate two weekday trains every hour between Southport and Manchester Victoria, two morning peak services from Southport to Alderley Edge via Manchester Piccadilly and two evening peak services from Alderley Edge to Southport via Manchester Piccadilly. A host of other changes and improvements have been put in place.

Andrew Jones Portrait Andrew Jones
- Hansard - -

My hon. Friend is quite right to highlight the frequency improvements and particularly the upgrade of the rolling stock, with the removal of the Pacers. In the context that the franchise is improving and has ambitious long-term plans—I ought to own up that I was a Minister at the time of the franchise renewal so am slightly marking my own homework—we are talking about identifying the blockage that is stopping the benefits being delivered. Can he take back to the Department and all relevant officials the message that we need a concentrated effort on removing that blockage, with the completion of the electrification works, to allow the significant benefits of the new franchise ambitions to be delivered for the people of the north?

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

My hon. Friend is absolutely right. That point is all the more forceful from someone with his experience and terrific track record in the Department, and officials and those in the industry will take it properly seriously.

If we look more widely, the position remains in many ways extremely positive. The Government will have spent more than £13 billion between 2015 and 2020 on improving and modernising transport in various forms across the north. We are building HS2—the first new north-south railway in this country for over a century—and will be providing better journeys through the new Northern and TransPennine Express franchises, albeit once the current disruption has settled. We are also investing well over £1 billion in improvements through the Great North rail project. As has been mentioned, Northern and TransPennine Express trains will be brand new or completely refurbished, and all Pacer trains will be gone. All that is to be welcomed.

Again, I thank my hon. Friend the Member for Hazel Grove and all colleagues for the contributions they have made. Once this present phase has been completed, passengers on Northern rail will benefit significantly through some 1,300 extra services a week and rail users will have many things to be hopeful about for the future—not just brand-new trains but improvements to stations as well to service quality. The Minister of State, my hon. Friend the Member for Orpington (Joseph Johnson), has spoken to the chief executive of Transport for the North and the Mayor of Greater Manchester to underline his and the Department’s commitment to improving performance for passengers. We continue to work closely with rail companies to drive down cancellations, and to support Network Rail and the wider industry in delivering these significant improvements. I suggest that those are all things for which we will ultimately be very grateful.

Question put and agreed to.