I congratulate the right hon. Member for Twickenham (Sir Vince Cable) on securing this debate. He covered a lot of ground and issues in his short speech, and he has brought insight and local knowledge. He is right, as are other hon. and right hon. Members, to speak up for the passengers they represent.
The South Western Railway franchise is enormous, handling more than 400,000 passengers a day who rely on its 1,700 services. Indeed, more than 110,000 passengers pass through Waterloo in the morning peak alone. It is fair to say that service levels have fallen short of expectations, as we all know. That was perhaps most keenly felt on Monday 19 November, when serious disruption was caused on the network by overrunning engineering works, which the right hon. Member for Kingston and Surbiton (Sir Edward Davey) was keen to highlight. Those overrunning works meant that Network Rail was not able to open a number of lines into Waterloo until after 9.30 am.
Colleagues have asked what action is being taken. Since then, Network Rail has taken action to bring more operational experience to its executive team, including with a change of managing director on that route. People are rightly frustrated and angry with the delays and cancellations, but I want to assure the House that bringing performance back to acceptable levels is our highest priority.
I just want to make sure that the Minister and the House understand that although it was a shocking performance on that Monday when the works were not completed on time, the cancellations and delays have been going on for more than 18 months. This has been a long, sustained period of shockingly poor management and shockingly dreadful services, which our constituents are suffering daily. I have 10 train stations in my constituency. Most of my constituents rely on these services, and they have to be put right. We need to hear from the Minister about the actions his Department will take to do that.
Obviously I am coming on to that, but I wanted to highlight when the problems were at their most acute. I will press on now to make sure that some answers are given in the time available.
A key point is that South Western Railway and Network Rail understand the causes and have put a plan in place to turn performance around. The right hon. Member for Twickenham highlighted the report that was commissioned from Sir Michael Holden and his background as a senior figure in the rail industry. Sir Michael’s report highlighted that no one silver bullet will restore punctuality to previous levels. He cited the main cause for the decline as too little flexibility in the timetable, so that when things do go wrong, they go very wrong and it is difficult for the operator to get back on schedule. I think that is part of the problem that the right hon. Gentleman highlighted when he talked of a “concentration of misery”. It is a very tough thing for the operators to deal with. I visited the train operating centre in south Manchester a few days ago, when I witnessed a nine-minute delay in the Castlefield corridor having a consequential impact of 1,200 lost minutes through delay across the network of the north. We are talking about a network that is stretched taut, and there is little flex.
Sir Michael highlighted other causes: the intensively used, ageing infrastructure, and the ongoing industrial action, which is diverting management attention. Taken together, they have led to an unacceptable level of performance on the South Western Railway network. However, he also points out the potential performance improvement opportunities that a consistent suburban fleet would offer. South Western Railway identified that before the start of the franchise when it ordered a fleet of 90 modern trains. Those trains offer not only performance benefits but a range of features to improve customer journeys. This is an £895 million fleet to cover the entire suburban network, and it is due to enter service from late 2019.
Sir Michael makes 28 recommendations in his report for South Western Railway, Network Rail and the Department to take forward, and I am pleased to say that all have been accepted and are currently being progressed. A number of the recommendations are already complete, and all of his short-term recommendations will be complete by the end of this year.
The right hon. Gentleman highlighted the success of the railways in increasing passenger numbers, which have reached a record high of 1.7 billion. So we are dealing with an industry that is trying to cope with the challenges of growth. In order to deal with that, changes have been made to lengthen platforms on the suburban routes to accommodate 10-car trains. That work is part of the £800 million Wessex capacity enhancement programme, which has also seen major works completed at Waterloo to lengthen the platforms there. I am not sure whether he is aware that starting from Monday 10 December the services from Reading or Windsor & Eton Riverside that call at Twickenham station are scheduled to arrive at one of the four former Waterloo International platforms, which are being brought back into full use. I am sure he will welcome that. It should help relieve some of the issues affecting punctuality, especially in the peaks, because there are periods when trains are waiting outside stations for platforms to become available.
The changes to be introduced through the new franchise by December 2020 will mean an increase in peak capacity of about 30% at Waterloo, so we are talking about more space and less crowding for passengers. However, it is also fair to say that the challenge faced by Network Rail to maintain its assets in a reliable condition gets harder—that was a point made in a number of interventions. I agree entirely that the effect of that has been felt by passengers.
The right hon. Gentleman asked whether we are investing; well, we certainly are. We are seeing one of the biggest investments in our railway’s history, with £48 billion to be spent by Network Rail in the next control period, which starts next year and will run until 2024. That funding will make a real difference to the passenger experience, because it will go far more towards maintaining and renewing the infrastructure—
The right hon. Gentleman has had a very good run. Will he let me press on a little further?
In previous control periods, we have had a bias towards enhancements; this time it will be towards the maintenance and renewal of infrastructure and increasing reliability and punctuality. For South Western’s passengers, the Network Rail Wessex route will see funding increased by 20% compared with the past five years. Work will be taking place over Christmas and the new year, when Network Rail will be investing more than £148 million to improve the network throughout the country for a more reliable railway for passengers. Network Rail’s “team orange” will be out on the Wessex tracks replacing switches and crossings in the Waterloo area, strengthening bridges at Vauxhall and Guildford, and replacing track in the Westbury area. Are the Government acting? Yes, they are. Are the Government investing? Yes, they are.
The new franchise was highlighted—
I am extremely grateful to the Minister for giving way; he is being very generous. If he looks at the historical record of investment in the South Western Railway region—the Wessex region—he will see that it is shockingly low compared with the rest of the country. Although there is going to be a small increase, compared with the huge amounts being spent elsewhere the capital investment in the Wessex region is not good enough. Given the problems and the huge numbers of people in the area, will the Minister go away and consider the investment that is going to the region? It is simply not adequate.
Every single Member of this House comes to me and says that every other area is being advantaged ahead of their own—
I have obviously gone over the facts and we are looking at them, but the point is that we have a programme that is delivering new rolling stock and upgrading the maintenance budgets. It is the largest investment that any Government have made in our railways, so to suggest that the Government are not backing the railways is simply not true. I am just highlighting some of the new things that are coming in.
There were a few questions about the franchise. The winning bidder, First MTR, will be investing £1.2 billion over the course of the franchise. A significant part of that will go on the fleet of new trains that will provide services for the constituents of the right hon. Member for Twickenham and more widely across the suburban services. We expect there to be some significant improvements in passenger experience thanks to new and refurbished rolling stock and smart ticketing options, as well as improved wi-fi provision at stations and beyond.
The franchise performance was clearly of concern. With the new franchise, we have set challenging targets for performance, with a financial incentive that would reward the operator for exceeding those targets. As everybody has said and as we all know, performance is not at the levels that passengers rightly expect, and it is below the target levels in the franchise agreement. South Western Railway is now investing an additional £5 million across a range of initiatives to improve performance. Many of these initiatives are targeted at improving the fleet’s reliability and are designed to reduce instances of services being formed of too few carriages or cancelled.
The right hon. Member for Kingston and Surbiton asked about several issues, including declining performance, but let me first address disabled access on the line, which the hon. Member for Strangford (Jim Shannon) asked about. We are dealing with a Victorian rail infrastructure, and disabled access on parts of it is simply not good enough. I entirely agree with the hon. Gentleman’s point and hope he will understand that we are putting extra funding in between now and 2024. We have made nearly 2,000 stations throughout the country disabled-access friendly, but there is a long way to go and we need to keep up the pressure. The hon. Gentleman was clearly right.
I accept that a large part of the problem with disabled access is to do with the physical infrastructure, but until that is dealt with, disabled access is dependent on the second staff member in the train being able to put out the ramp for wheelchair users. If the franchisee goes back on guaranteeing that second person on the train, disabled people will not be assured that they can get on and off the trains.
The hon. Lady is clearly correct; there is a key role for staff on board trains and at stations in helping people on and off the trains, and that is entirely understood. I should perhaps point out that no staff are being removed from South Western Railway’s trains. There will be more guards on trains in future, not fewer. South Western Railway has been very clear from the outset that no one will lose their job and that every service will continue to have a guard rostered. That is the offer that South Western Railway has made, and it should be seen as excellent news for customers and for South Western Railway itself, but the point about the role of staff in helping people with mobility issues is entirely understood and well made.
The declining performance that the right hon. Member for Kingston and Surbiton highlighted predates what we are discussing—it has declined over a considerable number of years. I have gone back and reviewed performance and investment, and the point I would like to make is that we have a plan and we are investing at a record level. All of this will add to the future drumbeat of improved services, and passengers will notice the difference.
The right hon. Member for Twickenham mentioned the Williams review and asked whether it would include the Department for Transport. Yes, it will. It is looking at the structure of the industry. This industry has been one of remarkable growth since the privatisation, with 1 billion extra passenger journeys a year. The system has served us well, delivering more people on to our networks, but the question is whether the structure is right to take it on into the future. If we are asking that question very broadly, the review has to and does include the Department that has a key role to play.
The introduction of the new timetable in May was clearly very problematic, and the industry has apologised for it, as it certainly should have done. Passengers were vastly inconvenienced by it; it was a failure of performance. Lessons have been learned from it, and there has been a review. The head of the Office of Rail and Road, Professor Glaister, has published a report and we will hear more on his recommendations for the future very shortly. The key thing is that lessons are being learned. We are investing in new rolling stock and having a proper hard look at how we can deliver the railway that people need. Colleagues from across the House have been very clear in their expectations of the rail industry and of the Department, and we are making sure that those expectations will be fulfilled.
Question put and agreed to.