Maria Eagle Portrait Maria Eagle (Garston and Halewood) (Lab)
- Hansard - -

Britain’s railways face a major capacity challenge in the years to come. That was why, when we were in government, Labour proposed Britain’s first new north-south rail line for more than 100 years. We remain convinced that the project is essential, as is completing the wider rebuilding of our rail network that began under the last Government to reverse the damage caused by decades of under-investment before 1997. Doing nothing is not an option because the existing network is fast reaching the limits of its capacity.

Attempting to upgrade the existing main lines could deliver some, but nowhere near all, of the additional capacity that will be needed in the decades to come, and yet the cost would still be great, as would the disruption to passengers and freight. It would mean that we had learned nothing from the experience of carrying out a major upgrade of the west coast main line while attempting to keep it in use. After a decade of inconvenience and disruption, and almost £10 billion spent, the job was finally completed, but it delivered nowhere near the benefits that will come from a new north-south rail line. By building a new line that extends from London to Manchester, Sheffield and Leeds, we can relieve the pressure not just on the west coast, but on all three existing north-south main lines.

It is vital that we are clear about why the scheme is necessary. Those of us from all parts of the House who support the new line need to be better at communicating why the investment is essential. The new north-south rail line is necessary to deliver a major increase in capacity on our rail network. That is why we cannot afford to delay the delivery of this project any longer.

Dan Byles Portrait Dan Byles
- Hansard - - - Excerpts

The hon. Lady has just said that the project is supported by Members from all parts of the House. She knows that I do not support it. What would she say to Labour councillors in my constituency who consistently call this a Conservative project and imply that it is not a Labour one?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I would not agree with that, except in the narrow sense that the project is being taken forward by a Conservative-led Government at present. The Secretary of State and I understand that, on both sides of the House, not everybody is in favour of the project. The genuine concerns that people have need to be heard and we will listen to them in detail.

There will be significant benefits in addition to the new capacity that the line will offer. It will enable the introduction of much faster high-speed trains than can be deployed on the existing network. Journey times between our towns and cities will be cut, significantly in many cases. By building the line, we can help to rebalance the economy between London and the south-east and the rest of the country.

It is worth understanding the extent of the reduction in journey times that will be achieved. The journey from London to Manchester that currently takes two hours and eight minutes will be cut by an hour to just one hour and eight minutes. Sheffield will be just one hour and nine minutes from London, compared with the current two hours and five minutes. Leeds to London will take just one hour and 22 minutes, which is a reduction from the current journey time of two hours and 12 minutes.

Crucially, the journey times to destinations beyond the new line will be reduced. I am not sure that that is always understood. It will take just three hours and 38 minutes to get from London to Edinburgh, instead of the current four hours and 23 minutes. I look forward to being able to get home to Liverpool in a little over an hour and a half. It is not yet widely understood that high-speed trains will run off the new line on to existing track, serving communities across the country. It will be possible to get on a train in at least 28 of our towns and cities, including nine of the UK’s 10 biggest conurbations, and begin a journey that will use the new line. We need to communicate better the extent to which the whole country will benefit from this investment.

The development of stations along the new line will provide major opportunities for regeneration and jobs, in addition to those created through the construction of the line itself. With fast inter-city services moved to the new rail line, capacity will be freed up on the existing main lines for new commuter services, further improving connectivity between our towns and cities further north, and generating opportunities to shift freight from road to rail. The line will deliver a credible alternative to short-haul flights and, therefore, the opportunity to reduce the emissions that contribute to climate change and free up capacity at airports in the south-east that could better be used to open new routes to emerging markets.

We remain convinced that a new north-south rail line is needed. It is the right priority for investment and it is right that we make the decision to proceed.

Chris Kelly Portrait Chris Kelly (Dudley South) (Con)
- Hansard - - - Excerpts

The hon. Lady talks about the communities that will be served by the proposed high-speed rail line, but what about ticket prices? Will it not just serve the type of people who work in professional services, such as lawyers and accountants, who will be able to travel at high speed on company expenses rather than out of their own pockets?

Maria Eagle Portrait Maria Eagle
- Hansard - -

The hon. Gentleman raises a legitimate concern, which was probably not helped by the Secretary of State’s predecessor, the right hon. Member for Runnymede and Weybridge (Mr Hammond), referring to HS2 as “a rich man’s toy”. Consideration of pricing arrangements will help to alleviate some of those concerns.

Maria Eagle Portrait Maria Eagle
- Hansard - -

I will give way once I have answered the hon. Member for Dudley South (Chris Kelly).

The Opposition believe strongly that the north-south rail line will be a properly integrated part of our entire rail network. It should not be seen as separate from it. That also goes for pricing and ensuring that people can afford to use it.

Khalid Mahmood Portrait Mr Mahmood
- Hansard - - - Excerpts

Does my hon. Friend agree that this project will have a huge economic benefit to places such as Birmingham and the west midlands? In my constituency, we have a company from the United Arab Emirates that was originally going to settle in London. It provides 20 jobs in Birmingham, a figure that will go up to 80 by the end of the year. The company is asking for better transport links, so that employees can commute as fast as possible. That will provide better jobs and training for our people in the midlands.

Maria Eagle Portrait Maria Eagle
- Hansard - -

My hon. Friend makes a good point and I agree with him.

Brian Binley Portrait Mr Brian Binley (Northampton South) (Con)
- Hansard - - - Excerpts

Is not the truth of the matter that High Speed 2 will release capacity on the west coast main line? Has the debate not recognised the importance of freight, which is growing at more than 10% per year on rail? Does that not come into the discussions we are having today?

--- Later in debate ---
Maria Eagle Portrait Maria Eagle
- Hansard - -

My goodness, I find myself in total agreement with the hon. Gentleman.

Despite the importance of this project, there has been a real lack of drive from Ministers—I am not necessarily talking about the Secretary of State—in taking the decisions and delivering the action needed to make it a reality. The former Labour Transport Secretary Lord Adonis set up HS2 Ltd as long ago as 2009. By August of the same year, he had already confirmed plans for a new north-south rail line because he was a high-speed Secretary of State. Nothing has moved anywhere near as fast at the Department for Transport since he left, except the revolving door that has meant I am facing my third Transport Secretary since the election. I hope very much that the Government reshuffle that is rumoured to be on the cards does not deliver yet another change. I am sure that the right hon. Gentleman will agree with me on that.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I hear what the hon. Lady says, but she should look at the average length of service of Labour Secretaries of State for Transport—they were also fairly rapid through those doors.

Maria Eagle Portrait Maria Eagle
- Hansard - -

It is starting to worry me, when I contemplate my political future, that the average length across the parties of Secretaries of State for Transport appears to be somewhat on the short side. I hope that the right hon. Gentleman, while his Government are still in office, and I can increase the average length of time served.

Angus Brendan MacNeil Portrait Mr MacNeil
- Hansard - - - Excerpts

Will the hon. Lady give way?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I will make a little progress and then give way to the hon. Gentleman.

The fact is that it is only now, four years on from Lord Adonis’s initial action, that the Government are introducing the legislation required to enable money to be spent in advance of construction. The legislation needed to actually begin construction is still nowhere in sight. The Secretary of State’s own departmental plan continues optimistically to claim that Royal Assent on the hybrid Bill will be secured in May 2015, yet in The Times at the weekend he could not be any more confident than to say, “I hope it will.” I know he does not want to admit it, but is it not the truth that there is absolutely no prospect of securing Parliament’s approval for phase 1 before the next election?

Despite its inclusion in the Queen’s Speech, Ministers cannot even guarantee a Second Reading for the hybrid Bill in this Session, leaving just one year to secure its passage through both Houses. It took two years and one month to take the hybrid Bill for High Speed 1 through Parliament, and Crossrail took three years and five months. Neither of those schemes was on the scale, or came with as much controversy, as this new rail line. The Government’s inaction in the past three years requires them to rush the Bill at the end of this Parliament. The National Audit Office has warned that this compressed time scale poses even greater risks to the project:

“Faster preparation for the bill may increase the extent of petitions to Parliament which may make it less likely that royal assent is granted by the planned date of May 2015. It may also divert the Department and HS2 Limited from focusing on the deliverability of the design.”

With construction due to begin in January 2017, less than two years into the next Parliament, Ministers know full well that they are now cutting it very fine indeed.

The fact that Royal Assent will no longer be achieved for phase 1 in this Parliament raises the question of why the new line was split into two Bills in the first place. We all know that that decision was taken to ensure that at all costs Conservative MPs did not have to go into the next election with pressure from their constituents to vote against it. The Government have failed to achieve that goal, and have completely unnecessarily opted for two hybrid Bills, when taking the proposals forward as one scheme would have provided greater certainty and ensured that there was no doubt about the Government’s commitment to the whole north-south line, as Ministers claim.

Angus Brendan MacNeil Portrait Mr MacNeil
- Hansard - - - Excerpts

Harvard Business Review says that there are about 40 mega-regions in the world that straddle national borders. They contain about 18% of the world’s population, 66% of its economic activity and 86% of the world’s patents. In these islands, we have two such mega-regions: south central England and the central belt of Scotland. Professor Richard Florida of the university of Toronto says that linking these regions helps global aggregate prosperity. When would the hon. Lady like to see high-speed links between these two UK mega-regions?

Maria Eagle Portrait Maria Eagle
- Hansard - -

We cannot get any further north than Leeds and Manchester until we have got to Leeds and Manchester. That is a constraint, but I hear what the hon. Gentleman says.

Andrew Bridgen Portrait Andrew Bridgen
- Hansard - - - Excerpts

The hon. Lady talks with great enthusiasm about HS2. Will she reassure the House that Her Majesty’s Opposition’s support for HS2 will continue up to and beyond the next general election? The support of the Government in this case is, I believe, rather like the support given by the rope to the hanged man.

Maria Eagle Portrait Maria Eagle
- Hansard - -

The hon. Gentleman is speaking in hope rather than expectation. I know his own personal concern about the scheme and I understand his point, but I can be clear with the House that Labour supports getting on with building this north-south line.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I am grateful to the hon. Lady for giving way. I am also grateful to her and the Secretary of State for being so understanding about the problems the scheme will cause to my constituents and my constituency. Does she agree that, in spending in excess of £50 billion minimum on such a scheme, one would expect it to connect effectively to HS1 and Heathrow? Is it not right to say that going ahead with this project and looking at the phase 1 route at this stage before Sir Howard Davies’s review into airport capacity is putting the cart before the horse?

Maria Eagle Portrait Maria Eagle
- Hansard - -

It is fair to say that there are concerns about connectivity and what is happening at the southern end, but it is also fair to say that the Government of the day must decide. It is reasonable for the Opposition to raise issues, but, with projects over multiple Parliaments, we must accept, as an Opposition, that we are not quite as well resourced as the Government of the day to come up with well-thought-through alternatives. The Government of the day have to make the decisions, but it is fair enough for opponents and supporters of the scheme to raise issues, recognising that, if the project is ever to be delivered, the Government of the day must decide on the way forward.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - - - Excerpts

Will my hon. Friend give way?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I will do, and then I would like to make a little progress.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - - - Excerpts

I did not quite catch my hon. Friend’s answer to the hon. Member for Na h-Eileanan an Iar (Mr MacNeil), who asked about taking the line north of Leeds and Manchester. Will she confirm that we would wish to see the high-speed services and line taken north of Leeds and Manchester in due course? It is not just a question of speed, however; it is also a question of capacity, because, as she pointed out, the construction of high-speed lines further south will free up capacity on existing lines, but that will lead to capacity problems if all the high-speed trains end up going on the existing lines further north.

Maria Eagle Portrait Maria Eagle
- Hansard - -

I understand my hon. Friend’s point, and the one I made in response to the earlier intervention was simply that we had to get to Leeds and Manchester before we could go further. Work is going on—led by the Department, I think—looking at the prospects for further phases, if one wishes to put it that way, after we have got to Leeds and Manchester.

The delays over the past three years are no surprise, given that the Department has been promising to publish a transport strategy ever since the election, but has yet again delayed it until later this year. The failure to deliver progress on this new railway line could not be a better example of what happens when one decides on a transport strategy towards the end of a Parliament, rather than at the beginning. It means major transport decisions—for example, how we connect the new rail line into Britain’s hub airport at Heathrow—are not being taken forward in an integrated way. That is entirely a consequence of ducking the big questions on aviation for the whole Parliament and of the Government’s decision, which we believe to be wrong, to tell the Airports Commission not to report until after the next election.

It is not just the rapidly slipping timetable that raises alarm bells and worries those of us who support this project. The National Audit Office wrote:

“We identified three areas of risk to the Department’s effective governance of the High Speed 2 programme:… Underdeveloped governance and programme management… Insufficient resources in the Department’s High Speed 2 team”

and

“Inadequate stakeholder management”.

The criticism that Ministers failed sufficiently to resource the team in the Department will be familiar to anyone who has followed the fiasco over the collapse of the Government’s rail franchising programme. The NAO has warned that there is

“a high risk that it may have insufficient skilled staff in the areas of procurement, corporate finance, rail technical and programme management.”

Yet again, the reckless way in which the Department was reorganised after the election and the scale of cuts to key staff have put a major project at risk.

The Government have finally, belatedly, appointed a new director general for HS2 as well as a new senior management team, which is welcome news, but is it not extraordinary that, just as with the west coast main line fiasco, it took so long for a senior responsible owner to be identified for the project? No wonder the Major Projects Authority has rated the delivery of the new rail line as amber/red. That should have been a clear warning to Ministers to take its concerns seriously, not simply dismiss them as irrelevant.

To be fair to the Secretary of State, there was one bit of good news in the otherwise highly critical report from the MPA. It found that

“the Department has strengthened its working relationship with HM Treasury.”

That is very sensible indeed, particularly in the light of the NAO’s concerns about the budget for the project. It has called the Department’s use of a precise estimate of £16.3 billion for the cost of phase 1 of the scheme as “unwise”, as I think we have discovered today. It said that an honest figure would be between £15.4 billion and £17.3 billion, so I welcome the fact that the Secretary of State has today given updated figures. I am sure that he will continue to do so, as he has undertaken to do.

The NAO was also unable to verify the Department’s claim that the £1.5 billion savings recommended by Infrastructure UK could be delivered. Work apparently only began on identifying those savings in September. The House needs to be told whether the savings have now been locked in. The NAO also raises doubts about the Department’s claim that phase 1 will result in reduced operating costs on the existing network of £3 billion over 60 years. This is on the assumption that fewer long-distance services are likely to run on the west coast main line, but because the Department has not set out any revised service patterns it is difficult to see how such a precise and neat rounded figure has been generated.

The Government should also be clear that the £42.6 billion cost of completing the north-south line as far as Leeds and Manchester does not include the £7.5 billion cost of the trains to run on the line. The Secretary of State has made that clear today. These factors are an essential part of the project, and they ought to be included in the estimates in future.

Worryingly, the National Audit Office also claims:

“The Department has not included VAT in its cost estimates or affordability assessments”,

and warns that

“HS2 Limited will be liable for VAT at 20 per cent on almost all of its spending.”

Ministers need to confirm that the Chancellor and Her Majesty’s Revenue and Customs have agreed that the VAT will be reclaimable. If that will not be the case, that should also be accurately reflected in the budget.

The NAO also warns that, even with the additional £3 billion capital spending from 2015-16 that has been confirmed today, there is a risk that the project

“may restrict the ability to fund other capital projects across government”.

It goes on to warn:

“We estimate that there could be a gap in affordability of £3.3 billion spread over the four years from 2017-18 to 2020-21, which are the peak spending years for phase one.”

The Secretary of State will, I think, have negotiated something in that respect, but he must make it clear, when he can, that the settlement he has reached with the Chancellor—the details of which we might get tomorrow—has closed that funding gap in full. It would be unacceptable if the Department’s failure to plan the spending needed for this scheme were to result in any cuts or delays to the vital upgrading on the rest of the network. That includes the rolling programme of electrification and new inter-city trains, both of which have already been delayed or scaled back under this Government.

Finally, on the budget for the scheme, there is already a creeping increase in spending from the allocation set for this Parliament in the 2010 spending review. The Minister of State, Department for Transport has admitted to me in a parliamentary answer that the budget for the current spending period has been revised upwards from £773 million to around £900 million. That is worrying in the context of the legislation we are debating today, which will effectively give Ministers a blank cheque from Parliament to spend on the scheme. I am sure that the Secretary of State will keep Parliament fully apprised of where the money is going.

In addition to the delays and the criticisms of the budget, serious concerns have also been expressed about HS2 Ltd. It was initially set up to advise Ministers on the route for the new north-south line, but the Government have expanded its role to include building support for the scheme and then delivering it, despite the fact that HS2 Ltd has faced criticism for the way in which it has engaged with communities along the route, with local authorities and with MPs. The fact is that it has not proved to be an effective advocate for the scheme.

The NAO has issued a warning on this, too, saying:

“The programme has a complicated governance structure. This is because the Department aims to preserve some independence for its development body, HS2 Limited, while also maintaining effective governance.”

By divorcing the scheme from delivery of the investment in the existing rail network, there is a risk that we will not focus on the need to create a fully integrated single rail network. It makes no sense that Network Rail is, in effect, having to mirror some of the work of HS2 Ltd, including appointing staff of its own to work on the scheme and having to lobby HS2 Ltd to ensure that decisions are taken in a way that does not have a negative impact on the wider network.

It is increasingly clear that a better option would be to transfer responsibility for the planning and delivery of the new north-south rail line to Network Rail. That would reduce duplication and cost while better enabling the integration of investment in the existing network and the new line. The hopelessly inadequate plans for connecting the new north-south line with HS1 are a good example. The focus of the debate on this issue has been on whether there would be any demand for services from the continent to go further north than London. We should surely not turn our backs on the opportunity to end unnecessary and environmentally damaging short-haul flights, but the real case for getting the connection right involves the opportunity to run the excellent Javelin trains that served us so well during the Olympics further up the country, instead of simply between the coast and the capital.

Angus Brendan MacNeil Portrait Mr MacNeil
- Hansard - - - Excerpts

According to the latest Government figures, Scotland has 8.4% of the UK population but provides 9.9% of the taxes. In effect, Scots will be paying for 9.9% of the new high-speed rail development, so it is disappointing that neither the Secretary of State nor the hon. Lady can give the House a date, an ambition, a target or a hope of when it might reach Scotland.

Maria Eagle Portrait Maria Eagle
- Hansard - -

I do not accept the hon. Gentleman’s premise that there will be no benefit to Scotland before the high-speed rail line gets there at some time in the future. It is clear that it will benefit from the project.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - - - Excerpts

Does the hon. Lady agree that, if we are going to spend this large amount of money on HS2, we should get the maximum benefit from it? At the moment, it is planned to connect HS2 with HS1 only by a rather tortuous single-rail route, but there is a better, double-rail solution available. Would it not make more sense to fully integrate HS1 with HS2?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I have a great deal of sympathy for the hon. Gentleman’s point. It makes no sense to me at all that passengers from the south-east should have to change trains in north London to reach towns and cities in the midlands, the north and up to Scotland. We do not see this connection as an optional extra that can be delivered in a patch-and-mend way; it needs to be re-thought.

Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

Is my hon. Friend aware that HS2 is saying that it wants to use the north London line for the link because

“it is assessed to have less construction risk than a tunnel”?

Is she aware that the man from Bechtel who masterminded the successful channel tunnel link and the refurbishment of St Pancras decided to do a double-bore tunnel from Barking to St Pancras because is was “less risky” to have such a tunnel than to use the north London line. Who would my hon. Friend trust on that?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I would undoubtedly trust my right hon. Friend—there is absolutely no doubt about that. The points made by both the hon. Member for The Cotswolds (Geoffrey Clifton-Brown) and my right hon. Friend illustrate the concern and controversy that remain about this issue. I believe that a solution should be devised that can minimise the impact on communities in Camden while ensuring that we do not miss a perfect opportunity to redevelop Euston in the right way for the long term. I believe that the Government should keep looking at that.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I am really grateful to the hon. Lady for giving way, because our speeches are being restricted to only six minutes in the main debate, so it will be hard to say everything that has built up over four years in those six minutes. From what she is saying, am I right to understand that her party might look at a different route for HS2, as the very point she is making about connectivity to HS1 and to Heathrow leans towards another route that was originally in the set of proposals—one that was not chosen by this Government?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I do not think it fair to assume that if I had the Secretary of State’s role after the next general election, I would tear everything up. I have made it clear that when there are projects that run across Parliaments, it is important to co-operate and to understand that decisions have to be made. We will, however, have to see where we are by the time we get to the next election. I would certainly want to take every opportunity to make sure that the nation gets the best possible outcome from the money spent. As I say, we shall have to see where we are at that time. I am not interested in delaying going forward with what I believe to be a tremendously important scheme.

The Government must also be clear, following the successful judicial review, about how they intend to change the compensation scheme for households affected by the building of the line. The judge found that the consultation process was unfair, that not enough information had been provided and that the criteria for compensation options were not adequately explained. This failure has caused unnecessary added stress to those affected by the scheme, during what is obviously a very difficult time for them and their families.

It is simply not possible to take forward a project of national importance on this scale without causing a significant impact on some communities and on some people’s lives, but the obligation on all of us is to do what we can to mitigate that impact and to act fairly in terms of compensating people for the loss of property and value that they suffer. Ministers must now act quickly to bring forward a new, fair scheme and ensure that it is communicated clearly and transparently.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - - - Excerpts

Do the Opposition therefore support the concept of a property bond that would try to improve on the blight that is experienced by so many people?

Maria Eagle Portrait Maria Eagle
- Hansard - -

I am willing to support anything that can properly, fairly and reasonably compensate people in a way that still meets the obligation to be reasonable with taxpayers’ money. I would thus be happy to look at the details of the scheme, as I think the Secretary of State has said he is, too. I think we have a particular obligation to treat those affected as fairly as we possibly can and within as speedy a time scale as possible.

Clive Betts Portrait Mr Betts
- Hansard - - - Excerpts

I would like to mention a point raised with the Secretary of State a while ago. Asking people to make a sacrifice for the good of the country—that is effectively what we are asking the people whose homes are to be demolished to do— and saying to them, “This is the value of your property now and you can have 10% extra for the loss of your home” is really not adequate compensation. We should be able to do a bit better than that for people who are being forced to move home through no fault of their own and no choice of their own.

Maria Eagle Portrait Maria Eagle
- Hansard - -

That is an important point. Such action could, indeed, lead to other benefits, if it meant that matters were settled earlier than they would otherwise have been. I believe that some European countries do as my hon. Friend suggests, and end up building their lines rather more quickly than we seem to manage to.

Ministers must now engage in a debate about the eventual cost of using the new north-south line, because that goes to the heart of the question of what kind of railway we believe in. There have been fears about the issue ever since the former Transport Secretary, the right hon. Member for Runnymede and Weybridge (Mr Hammond), started talking about rich men’s toys.

Kwasi Kwarteng Portrait Kwasi Kwarteng (Spelthorne) (Con)
- Hansard - - - Excerpts

I think it important to put on record the fact that the phrase “a rich man’s toy” was presented to my right hon. Friend the Member for Runnymede and Weybridge (Mr Hammond), who is now Secretary of State for Defence. He did not demur, but it is not a phrase that he generated. I happen to have been a member of the Transport Committee at the time. I think it important for us to clear this matter up before the hon. Lady starts accusing my right hon. Friend of making that comment.

Maria Eagle Portrait Maria Eagle
- Hansard - -

I think every Member of Parliament realises, given the present state of journalism in this country, that if a phrase is presented to one and one does not demur, it is quite legitimate to say that that is what one agrees with. I understand the hon. Gentleman’s point.

I hope that Ministers will agree with Labour’s vision of a new railway line that is fully integrated with the existing network, and whose fares are fully regulated. That is the line for which we will all be paying, and its use must therefore be affordable for many people, not just for a few at the richer end of society.

It is disappointing that Ministers have so far shown little interest in ensuring that this significant investment delivers real opportunities, especially for our young people. Labour has made it clear that every £1 billion of investment in the scheme should deliver 1,000 apprenticeships, and I hope that the Government will make the same commitment to apprenticeships and to our young people. Ministers must learn the lessons of the Thameslink procurement. Those trains are now to be built in Germany. It is perfectly possible, within EU rules, to ensure that public investment delivers jobs and apprenticeships where they are desperately needed, here in Britain. Every other EU country manages to do the equivalent through its own train procurement. The new line must deliver British jobs and growth, not only after its completion but during its construction, and that must include the manufacturing of the trains.

It was a Labour Government who first set out the ambition for a new high-speed north-south railway line to address the capacity issue on our rail network while also cutting journey times between our towns and cities, and the case for making this scheme a reality remains strong. Indeed, it is all the more necessary at a time when the Government’s economic failure has meant a failure to deliver the growth that the country so desperately needs. The progress made over the last three years, since Ministers inherited the project, has been disappointing, but it retains cross-party support. We will support the Bill today, but we urge the Government to get on with the hybrid Bill as soon as possible. We want to see the enthusiasm and commitment from Ministers that are necessary to make a major project on this scale become a reality.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I must now announce the result of a Division deferred from a previous day. On the motion relating to the town and country planning regulations, the Ayes were 281 and the Noes were 185, so the Question was agreed to.

[The Division list is published at the end of today’s debates.]