(9 years, 2 months ago)
Commons ChamberUrgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.
Each Urgent Question requires a Government Minister to give a response on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Three things need to happen to deal with the issues on Southern. The first is that we need much more joined-up working. Secondly, we will have to put more money into the Southern infrastructure, which is clearly under great stress. It is a very intensively used railway, and not enough has been spent on it over the years. Above all, we just need to get the workforce back to work. The bizarre thing is that the 10-coach train that I often take to Victoria in the morning has a driver and no guard, and it has been like that for years. Why on earth are the drivers and the guards on Southern putting the passengers through such enormous distress when no one is in danger of losing their job? It is shocking. I would like to hear one word of condemnation from the Labour party. Do we ever hear any condemnation of its union paymasters? The answer is no, not for a moment.
Heidi Alexander (Lewisham East) (Lab)
When Zac Goldsmith was standing as the Conservative candidate for Mayor of London, the Department for Transport was all for the idea of devolving responsibility for letting Southeastern’s franchise to TfL, but now that he has gone, the promise seems to have gone as well. Why are the Government jettisoning the practical improvements that could have been associated with devolution in favour of this political experiment?
The hon. Lady talks about political experiments; a political experiment would be implementing a business plan that I did not judge delivered substantial improvements to passengers, and that involved the biggest shake-up of the railways in the south-east since the 1920s. That is a risk that we do not need to take. We can deliver improvements through partnership, but we must remember that that partnership is not just about London; it is about Kent. It is a partnership that involves passengers on different parts of the routes. We need to design a franchise structure that delivers improvements for everyone.
(9 years, 4 months ago)
Commons ChamberMy hon. Friend is right to point out the connectivity benefits of Crossrail. I know that it has looked at the possibility of an extension through Harrow and Wealdstone, which he has been campaigning for, and into Hertfordshire, to join the west coast main line there. That was found by Crossrail, Transport for London and Network Rail to offer poor value for money, so we are not taking it forward at this time, but of course we always keep the issue under review.
Heidi Alexander (Lewisham East) (Lab)
As much as I would like my constituents to benefit from an expanded Crossrail network, geography makes that unlikely, so can the Minister with responsibility for rail tell me his assessment of Southeastern’s submission for additional rolling stock?
We always want to make sure that commuters in London, which is one of the most burdened parts of the network, have the best possible chance of having a reliable, predictable, punctual service, with a good chance of getting a seat. That is why we, contrary to what happened in the 13 years of Labour Government, are investing so many billions of pounds in new carriages across London and the south-east.
(9 years, 10 months ago)
Commons Chamber
Heidi Alexander (Lewisham East) (Lab)
On a point of order, Mr Deputy Speaker. Today the British Medical Association has announced that it plans to escalate the industrial action of junior doctors planned for 26 and 27 April. Can you advise me whether you have received any notification from the Department of Health about whether the Secretary of State for Health intends to make a statement to the House tomorrow, updating us on what action he will take to avert that industrial action and bring an end to the ongoing dispute?
I have had no notification that the Secretary of State is coming forward. However, the hon. Lady has got the matter on the record, and I am sure that people will be listening to the debate that is taking place at this very moment. Let us wait and see.
(10 years, 6 months ago)
Commons Chamber
Heidi Alexander (Lewisham East) (Lab)
17. One of the main frustrations of my constituents who use Southeastern trains is the number of occasions on which shorter trains than expected arrive at stations, resulting in acute overcrowding. Will the Minister commit to redeploying some of the Thameslink class 319 carriages to the Southeastern network to ease that problem?
Claire Perry
I commend the hon. Lady, who, unlike some of her colleagues, is an assiduous campaigner on the railways in her constituency. It is nice to see someone who really cares about the railways, rather than someone who simply reads out the Whips’ questions. [Interruption.] She is a Whip, as she points out, and this is her own question. She is right to focus on the issue of rolling stock, and she will be pleased to know that we have received a proposal for improving the rolling stock on that route, which we are now considering. I will take her suggestion into account.
The upgrade to junction 10 on the M27 has been profiled to start its preliminary work this year. The Government have contributed £14.9 million through the Solent local enterprise partnership growth deal to make up the shortfall of the scheme. In March, they also contributed £3.4 million in the second growth deal to support the local connections into the junction, and those works will start in 2015.
Heidi Alexander (Lewisham East) (Lab)
T2. The Davies commission predicted that 40 million passengers would use Gatwick by 2024, yet Gatwick says that it will reach that number this year. Who does the Secretary of State think is right on that point, and is he concerned that the Davies commission may have underestimated the economic impact of expanding Gatwick?
(10 years, 11 months ago)
Commons ChamberIt has been said, Mr Speaker, that I never disappoint, but I do sometimes surprise. I am delighted, therefore, to tell my hon. Friend that I will not merely update him on progress but can reveal that we will publish the feasibility study, a result of his efforts and our endeavour, immediately. I will let him have this report, which details exactly how we intend to move forward, shaped and informed by his efforts and those of his friends.
Heidi Alexander (Lewisham East) (Lab)
11. What recent assessment he has made of the adequacy of compensation payments to passengers for delayed rail travel.
The Parliamentary Under-Secretary of State for Transport (Claire Perry)
It is absolutely right for passengers to be compensated when their journeys are delayed. The Government have introduced tough new measures to ensure that that happens, and compensation payments across the network have increased sixfold since 2011. As the hon. Lady will know, we are introducing a 30-minute “delay repay” scheme on lines that have not already been making payments—as well as other enhanced compensation opportunities—during franchising negotiations and, when we can, during existing contracts. However, recent estimates by Passenger Focus suggest that only 12% of passengers who are delayed by 30 minutes or more go on to claim compensation. I am determined to address that, and, as operators will know, I believe that they need to do much more in this respect.
Heidi Alexander
The right hon. Member for Mid Sussex (Sir Nicholas Soames), who is no longer in the Chamber, was entirely right to call for compensation for commuters who experience severe disruption because of the works at London Bridge. Overcrowding on trains from Lewisham is even more severe than normal, and is actually dangerous. How can a compensation regime that pays up only when services are delayed by 30 minutes or more be relevant to my constituents, who can barely get on to a train irrespective of whether it is late or not?
Claire Perry
I genuinely pay tribute to the hon. Lady, who is an assiduous campaigner for commuters in her constituency. It is very refreshing when Members in all parts of the House participate fully in the cross-party summits at which we hold the industry to account.
The hon. Lady is right. There is not adequate compensation under the scheme to cover the metro-style train journeys that many of her constituents take. As she will know, some operators which have similar service patterns, such as c2c, have introduced minute-by-minute refunds—or will be doing so—but I intend to continue to work on a compensation scheme specifically for those affected by the works at London Bridge.
(11 years ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Heidi Alexander (Lewisham East) (Lab)
It is a pleasure to serve under your chairmanship, Mr Hollobone. I thank you and the rail Minister for allowing my hon. Friends the Members for Lewisham West and Penge (Jim Dowd) and for Eltham (Clive Efford) to participate in the debate. I also thank the Minister for organising the session that we had with Network Rail and Southeastern last week—perhaps I should call it a grilling—which was much appreciated. I expect that she will have some idea of my concerns, but I am pleased to have the opportunity to put them on record.
The rebuild of London Bridge station is long overdue. It is a poor relation of King’s Cross, Paddington and Waterloo, but no less busy. I fully support the redevelopment of the station, but I am concerned about the impact of the latest phase of works on rail services and passenger experiences. I know there has been mayhem on Southern routes—my hon. Friend the Member for Lewisham West and Penge might speak about that—but I will focus my remarks on the Southeastern network, given its importance to my constituency.
The new timetable, which has been introduced as a result of the 18-month closure of four platforms at London Bridge, has caused havoc. With no Charing Cross trains stopping at the station, many Cannon Street services have been dangerously overcrowded. There have been reports of fights at stations on lines into London Bridge because people simply cannot get on to a train. The remaining operational platforms at the station have seen scenes of utter chaos due to the volume of people and last-minute platform alterations. What has always been a poor and overcrowded service is now abysmal and yet, as with every year, fares have gone up. How that can be justified when some people cannot even get on a train is beyond me. In my constituency, many trains are full when they arrive at stations and people are paying for a service that they can barely access.
What can be done and what do I want the Government to do? Commuters in south-east London are crying out for longer trains and better communication from the train operating companies. If we cannot find a way to ease the current problems, the Minister will need to look carefully at next year’s annual fare hike and ask herself whether it is acceptable. At the most basic level, we need extra carriages on the Cannon Street services. Those should not be pinched from other overcrowded services, but if any reasonable adjustment can be made, that should happen. Given that, on the Southeastern network, only Cannon Street services will stop at London Bridge for the next 18 months, every rush hour train into Cannon Street should be a 12-car train.
If we cannot get extra carriages immediately, we will desperately need the old Thameslink rolling stock when it becomes available towards the end of the year. Will the Minister guarantee that those old Thameslink carriages will end up on Southeastern services? Is it true that the current plan is to use the Thameslink carriages for services between Manchester and Liverpool? Will she review that, as well as looking at what can be done to source extra carriages in the interim?
Southeastern also needs another communications drive. Rather than waiting for frustrated passengers to work out alternative routes for themselves, a big communications effort is needed that prompts people into changing their journey patterns. It should set out all alternative travel options and ticketing arrangements.
I congratulate the hon. Lady on again securing a debate on rail transport in the south-east. She will agree that the redevelopment is a welcome investment in the infrastructure of our railways that will ultimately benefit her constituents and mine. I am pleased that she mentions communication. Does she agree that communication during this work is crucial? Southeastern has to get that right, but communication is something at which Southeastern has often failed in the past.
Heidi Alexander
I share the hon. Gentleman’s view. This is difficult, to be fair to Southeastern, but we need to find a way of raising awareness of the other tube and bus routes that people can use to travel to and from the London Bridge area. If extra buses are needed on some of those routes, they should be delivered. Transport for London has laid on extra buses for the No. 21 route from Lewisham, but is there a case for some express services from south-east London into London Bridge further to ease some of the overcrowding?
The past few weeks have reinforced my constituents’ long-held view that annual fare hikes are not justified. Will the Minister expect Southeastern customers to pay more for their travel next year, too? If the services continue to be abysmal, is it not reasonable to consider freezing Southeastern fares next January to reflect the huge inconvenience that so many are experiencing? The current compensation scheme for delays on Southeastern is almost meaningless to my constituents, as whether or not a train is on time is irrelevant if people cannot get on it.
I could say much more, but I am conscious that my hon. Friends wish to speak, so I will draw my remarks to a close. More capacity and better communication could help to ease the pressures on the Southeastern network. If that is not possible, fair and reasonable compensation should be considered. I look forward to the Minister’s response.
The Parliamentary Under-Secretary of State for Transport (Claire Perry)
It is a pleasure to have your train-related interventions from the Chair, Mr Hollobone.
I congratulate the hon. Member for Lewisham East (Heidi Alexander) on securing this important debate. I also thank the hon. Members for Eltham (Clive Efford) and for Lewisham West and Penge (Jim Dowd) and my hon. Friends the Members for Dartford (Gareth Johnson) and for Hendon (Dr Offord) for participating. I also thank the participants in the important performance summit we held last week, at which MPs from across the House were able to quiz the Southeastern management team and Network Rail, and air concerns on behalf of their constituents. The Minister of State, Ministry of Justice, the right hon. Member for Bermondsey and Old Southwark (Simon Hughes), in whose constituency London Bridge station lies, has written to me with his concerns; he is attending an engagement to mark Holocaust memorial day and apologises for not being here.
As my final bit of preamble, I will say that I really welcome this debate and all interactions I have with hon. Members on the issue. The tone of these discussions is not ideological and we are not debating ownership of the railways; we are trying to work out how to get the best possible service from the current structure and investment. All of us are clear that it is passengers who matter on the railways. We are not moving boxes or units of capacity, but people, who are trying to get to work or get home to see their families. For me, it is vital that their interests are at the heart of this essential improvement work and, indeed, all investments in the railways.
As we all know—the hon. Member for Lewisham West and Penge alluded to this—we face two problems. One is decades of under-investment in many parts of our network, and in particular, in vital transport infrastructure such as London Bridge station. The other problem, if we can call it that, is the extraordinary growth in passenger numbers right across the country that has happened since privatisation. As the hon. Gentleman will know from his long history of using London Bridge, passengers have faced an almost 200-year-old station, with tangled access tracks and problems getting in and out. It is the poor relation to the other great London terminals, yet has some of the busiest platforms and intersections in Europe.
I think all Members welcome the decision to proceed with such vital investment even when economic times were tough. The £800 million invested at London Bridge, and the wider investment of almost £5 billion across the Thameslink network, will unblock the vital north-south bottleneck for our constituents. That investment will also deliver longer trains to provide more frequent and reliable services across London and the south-east.
The prize for London Bridge, in 2018, will be a world-class station that handles more trains, with 60% more capacity and all platforms accessible from the wonderful concourse we have heard about. I am told that the development is the most complex set of works ever undertaken on an operating station in the UK. In my view, it was the right decision to keep the station open during the works, given that 56 million people use it each year.
With such a mammoth engineering undertaking, some disruption is inevitable, but that disruption must be minimised for passengers, who must be kept in the loop as to what is happening. No one could say that either aim has been achieved for London Bridge users in the past few weeks, so what is happening? As we heard last week, there are some long-term service changes that were well known and, to pick up the point made by my hon. Friend the Member for Hendon, reasonably well publicised. Thameslink services are being diverted and Southeastern services to Charing Cross will run through until August 2016. When the Charing Cross services resume calling at London Bridge, the Cannon Street services will stop calling until 2018.
During those planned changes, everything has to be done to ensure that passengers know about the changes for their destinations. One part of that is to ensure that passengers can use their tickets on alternative routes. I am pleased that we have negotiated a £25 million deal with Transport for London to enable that. The hon. Member for Lewisham East made the sensible suggestion of running more express buses to try to offer a joined-up solution to serve passengers. I will certainly discuss that idea with TfL.
Another element it is vital to address is crowding at stations and on trains. I am aware that, as the hon. Member for Lewisham West and Penge said, there has been dangerous overcrowding on platforms 1 and 2 at London Bridge. That is being addressed right now. Southeastern and Network Rail are freeing up space for passengers, trying to move them more dynamically along the platforms and providing additional “next train” indicators so that people do not lump together in one place before surging at once to get on a train.
At Lewisham station, in the constituency of the hon. Member for Lewisham East, Southeastern and Network Rail are also making changes to mitigate the crowding at peak times as people move between the Cannon Street and Charing Cross services. They are extending public announcement systems along the length of the platforms so that people can hear what is happening, putting up extra passenger information screens and generally trying to help passengers to get the information they need so that they can move smoothly through the station. That work is under way, and it will be complete by February. Additionally, the operators are moving existing retail units and British Transport police accommodation to make more space for passengers, and that work will be complete by July.
The key, however, is for the operator and Network Rail to put in place a timetable that delivers capacity and space when people need them. Since 12 January, a new timetable has been in place across the Southeastern network, and that includes the changes at Charing Cross. The timetable has been designed to maintain journey opportunities. To answer the point from the hon. Member for Eltham, there was planning regarding the likely changes in the timetable, and there were capacity increases for the services being put on to Cannon Street.
What is happening, however, is that passengers are still working out the best way to make their journeys, and the situation is very fluid. We know, anecdotally, that Charing Cross services are quieter than anticipated and that Cannon Street services are very busy. Southeastern says it is operating the maximum number of trains per hour into and out of Cannon Street at peak times, and there is no space for extra services, but it has put in longer trains, providing higher capacity into Cannon Street, with 8,000 additional spaces in the morning peak and 13,000 in the evening peak.
Heidi Alexander
What percentage of the trains into Cannon Street in the rush hour are formed of 12 cars?
Claire Perry
I will find out for the hon. Lady and let her know.
I am told by Southeastern that all its rolling stock is in passenger service—that goes back to the hon. Lady’s point about potential new capacity. Lengthening services into Cannon Street would therefore require a reduction in the number of carriages on other routes—for example, services to Charing Cross or Victoria. That is possible, but I should emphasise that today is the 12th working day since the new timetable started. Every day, passengers are changing their journeys. The operators have asked—I think this is sensible—for a month to review what the passenger flow looks like, so that timetabling and service lengths can, potentially, be amended.
Claire Perry
I assure the hon. Gentleman that I and my officials are in constant contact with the operator, and we are encouraging it to do whatever it needs to with the rolling stock to try to alleviate the crowding that is happening as service patterns change. I would hate to think, if there is excess crowding on shorter journeys, that the management was not fully aware of it and not working actively to alleviate it.
Let me briefly mention the point about new rolling stock. The hon. Member for Lewisham East is right that there is potential in the next couple of years for some rolling stock. I have checked, and about 100 class 377 units provide capacity for approximately an additional 10,000 passengers. She is right that some are already committed to go to other parts of the country—that is the way, as she knows, the cascade system works—but the stock is potentially available to come on to the franchise. We have asked Southeastern to consider all available opportunities to look at this, demonstrate the business case and really push on trying to get the additional capacity. I agree with all hon. Members that that is something we would need to do over the medium term.
Heidi Alexander
This is really the key issue because it is essential, given all the disruption, that there is, if people will pardon the pun, some light at the end of the tunnel in the form of longer trains. What proportion of that Thameslink rolling stock has not been allocated to other parts of the country and is still up for grabs?
Claire Perry
I do not know and I am not sure—I will need to check whether the information is commercially confidential—but, like the hon. Lady and other hon. Members present, I share the aspiration to reward commuters. As the hon. Member for Eltham pointed out, today we have the results of the passenger satisfaction survey. Commuters are clearly very unhappy with the services they are getting. These people are going to and from work and paying for season tickets to do so. They expect a better service.
May I touch on the point about fares that the hon. Member for Lewisham East made?
Claire Perry
If the hon. Gentleman will forgive me, I want to make this point, because it is important. The hon. Member for Lewisham East will be aware that, until recently, fares on this franchise were rather inflation busting and measures of up to RPI plus 3 plus flex were permitted. That has been scrapped, so now passengers on this franchise, like passengers right across the country, are benefiting from this Government’s decision to freeze fares in real terms—RPI plus zero for last year and this year—and to scrap the flex, which meant that additional fares could also go up by 2%. [Interruption.] The hon. Lady says that that is not enough, but it was a bold decision to take, particularly at a time when family budgets are stretched.
I will make a quick comment, if the hon. Member for Lewisham West and Penge will allow me, about Southern, because I know it is important for his constituency. Southern’s performance currently is inexcusable, and I will make that point, as I expect other hon. Members to make it, at the performance summit we are holding next week. Network Rail’s infrastructure problems are causing many of the difficulties with the timetable along the line. I expect Network Rail and Southern to sort that out as soon as possible.
Let me make a couple of general points in conclusion. We have to learn lessons, because we are continuing to do this work at London Bridge until 2018. It is vital that whatever went wrong after Christmas—not enough communication and not enough modelling of the platform flows—is addressed, because we will be asking a lot from passengers. Let me put on the record my thanks to passengers for their tolerance at a time of great disruption. We are very aware that we are disrupting people’s lives, but the prize is a much better service and a station that is much more fit for purpose.
I am grateful to the hon. Members in the Chamber and others across the House for ensuring that all parties involved in the reinvention of London Bridge remain really aware of passenger concerns. My officials are in daily contact with Southeastern and Southern. We are all focused on the need to minimise inconvenience and maximise communication to passengers. There are constraints on what we can do, and there are years of work ahead, but I am determined that the unprecedented investment that we are making right across the country will be seen and felt as benefits for passengers as soon as possible.
Heidi Alexander
On the services that will run on the Thameslink route once the work at London Bridge has been completed, can the Minister guarantee that the lines out to south-east London that run through Lewisham and onwards will have extra capacity—longer trains?
Claire Perry
I will double-check the timing of that; it is part of the Thameslink programme. It is an addition, as the hon. Lady knows, to bring more rolling stock and longer trains right across the network, but I will check.
(11 years ago)
Commons Chamber
The Parliamentary Under-Secretary of State for Transport (Claire Perry)
The hon. Gentleman knows that the consultation is being looked at on a Great Britain-wide basis and specific exemptions are indeed made for local service and delivery issues. I encourage him to continue eloquently to make the case for the existing exemption in his neck of the woods.
Heidi Alexander (Lewisham East) (Lab)
The rail Minister will know that, due to the rebuild of London Bridge station, overcrowding on Southeastern services into Cannon Street has reached dangerous levels. What was previously a poor service is now utterly abysmal. What immediate action will she take to ensure that every rush hour train into Cannon Street is formed of 12 cars, and can she guarantee that the old Thameslink rolling stock, which will become available towards the end of the year, will be used to increase capacity on those services?
(11 years, 3 months ago)
Commons Chamber
Heidi Alexander (Lewisham East) (Lab)
Ministers will know that the growth in rail usage in recent years is unevenly distributed across the regions. London has seen the highest growth and the most journeys, which has a knock-on impact in the form of overcrowded trains. What percentage of national investment in rolling stock and infrastructure will go into London commuter services over the next decade?
The Parliamentary Under-Secretary of State for Transport (Claire Perry)
I do not have those numbers directly to hand, but I am sure the hon. Lady will be reassured to know that under this Government the overall transport infrastructure spend outside London is higher than it was under the last Labour Government. I shall instruct my officials to see whether we can get the data on rolling stock, but I am sure that she, like me, will welcome the fact that the £40 billion we are spending across the country is benefiting all parts of the country. If I could just—
(11 years, 9 months ago)
Commons Chamber
Heidi Alexander (Lewisham East) (Lab)
I am aware that the Minister is not in his place. I am told that he is in a car on his way here. I just hope that he is not on a Southeastern train.
Southeastern runs virtually all the rail services that serve my constituency, providing links to a range of central London stations as well as out to Kent. There are seven stations in my constituency: Hither Green, Blackheath, Lee, Grove Park, Catford Bridge, Catford and Beckenham Hill. There are four railway lines, three of which converge at Lewisham station.
Although Lewisham station, which sits on the border of my constituency and that of my right hon. Friend the Member for Lewisham, Deptford (Dame Joan Ruddock), has the docklands light railway, my patch of London remains untouched by the tube map. Extending the Bakerloo line to Lewisham might be the long-term aspiration of many of us, but for the time being the trains operated by Southeastern are one of the key ways in which my constituents get about.
I am conscious that a list of seven stations and four train lines may lead people to think that my constituency is well served by rail links. On the face of it, it is well served, but the reality for many of the 37,000 people in Lewisham who use the trains to get to and from work every day is grim: hot, horrendously overcrowded, late and slow trains, with a hefty price tag to boot. I am not prone to exaggeration, but I honestly believe that in this country we transport cattle better than some of my constituents.
Just last month, I was contacted by a constituent who told me that he had seen
“2 people collapse in the last 10 days due to overcrowded and overheated trains”.
This problem is very serious, and if the Minister had been present, I would have invited him to join me one morning to experience the problem for himself. Trains arriving at stations such as Hither Green and Blackheath at any time between 6.30 and 9.30 in the morning are already full. My constituents squeeze themselves on if they are lucky; if they cannot, they wait for the next train. I apologise, Madam Deputy Speaker, for being graphic, but people literally start their working day stuck in one another's armpits.
The journey to London Bridge should take between 10 and 12 minutes, but routinely takes between 20 and 30 minutes. There is often a constant stream of tweets from Southeastern, usefully providing the information that a train that was supposed to have eight cars will instead have six or four cars.
To add insult to injury, year on year we are paying more and more for the pleasure. An annual season ticket on Southeastern for zones 1 to 3, a point-to-point ticket that allows travel only from one station to another, now costs £976. It has gone up by £216 since 2010—a 28% increase in four years. Travelcards, which allow onward use of the tube and bus network, cost considerably more. The rising cost of those tickets has massively outstripped the negligible changes that people have seen in their pay packets and it makes a very significant dent in household budgets.
I have lived in the Lewisham and Hither Green area for the past 12 years. In that time, platforms have become noticeably busier, and that is borne out by statistics compiled by the Office of Rail Regulation. In 2002-03, Lewisham was the 55th busiest station in the country, and there were 3.6 million entries to or exits from the station that year. In 2012-13, the last year for which data are available, that number more than doubled to 8.2 million, with a further 1.7 million interchanges, making it now the 38th busiest station nationwide. That is significant growth.
That pattern is repeated at all other local stations and is consistent with the regional breakdown of growth in rail usage, which shows that growth in London is markedly greater than anywhere else in the country. To put that in a national context, Lewisham is a busier station than Newcastle, Nottingham or Southampton; it is comparable to a station like Sheffield. When we talk about increasing capacity on our rail network, we must not forget places such as Lewisham which are neither part of the affluent commuter belt nor on London’s tube map.
I congratulate the hon. Lady on securing this debate on an issue that she has spoken out about in the past. Does she agree that although poor reliability may be Southeastern’s main failing, it is compounded by the poor communication with the commuters who are her constituents and mine?
Heidi Alexander
I do agree. In part, the problem is reliability, but one of the main issues that I want to focus on is the degree of overcrowding that we experience on our train services.
The case for tackling overcrowding on my part of the rail network is irrefutable. The problem is getting worse and is likely to deteriorate further if urgent action is not taken. Thousands of new homes are planned in places like Lewisham and Catford over the next few years, and it goes without saying that future residents will need to be able to get around. They will need to be able to get to work and to get back from other parts of London at weekends. Basically, they need a decent railway service to live their lives.
The population of Lewisham continues to grow. Despite asking various parliamentary questions on this subject, I am at a loss to understand when commuters in my constituency are going to see longer trains. All I know is that, according to an answer I received on 8 April, the Under-Secretary of State, the hon. Member for Wimbledon (Stephen Hammond), who is the railways Minister, does not think there is demand for longer trains on all services. Beyond that, I am afraid that I cannot get much sense out of the Department or Southeastern.
Currently, no 12-car trains serve stations in my constituency during the rush hour, but there should be such trains. Platforms have been extended. I suspect that millions of pounds has been spent on doing that job, although again, despite my asking parliamentary questions, the Department cannot tell me how much has been spent and refers me to Network Rail. When I have asked Network Rail, it has not got back to me. We have spent money on lengthening platforms but we do not have longer trains to stop at them. It is almost as good as the one about the aircraft carriers with no aircraft to use them. Surely in difficult economic times we should not be wasting expenditure in this way—we should be reaping benefit from it.
In the written answer I received from the Minister at the beginning of April, I was told that a study would be done in 2016 and that some capacity enhancements may be forthcoming from 2019. That is at least five years away. It is simply not good enough. The Minister is currently in the process of negotiating a new “direct award” contract with Southeastern. Following the mess that the Government have made of letting franchises elsewhere in the country, they have put on hold the letting of the new Southeastern franchise, deciding instead to award a series of shorter, directly awarded contracts. Is there no way in which they could negotiate longer trains on some services calling at stations in my constituency sooner than 2019? Could some trains not start closer into London?
I would be really grateful if the Minister could explain the issue. Is it the availability of rolling stock? Is it an unwillingness on the part of Government to fund longer trains? Is it that when he looks at overcrowding statistics for services into London he thinks that there is not a problem on services run by Southeastern? If it is the latter, I would urge him to speak carefully to his civil servants about how the standard definitions of overcrowding —passengers in excess of capacity, otherwise known as PIXCs—are calculated. My understanding is that the calculations include an allowance relating to what is deemed to be an acceptable number of people standing in addition to those sitting. The excess passengers figure comes on top of that and, given that my constituents experience the most crowded 20 minutes of the journey, I am not sure that those PIXC scores will paint a realistic picture of the levels of overcrowding experienced by commuters who live in my constituency.
I also understand that Southeastern amalgamates its performance data for all of its services, including its High Speed 1 services from the channel tunnel, which may also skew overall performance scores. Does the Minister look at disaggregated data for each of the different types of Southeastern routes?
The hon. Lady is doing a very good job of standing up for her constituents who use the Southeastern service, which is also used by my constituents. Will she join other Kent and south London MPs in calling for the disaggregation of data as part of the new franchise agreement?
Heidi Alexander
I would be happy to join hon. and right hon. colleagues in calling for that. It needs to happen before the new franchise is let. Could we see it in the direct award contracts that the Department will be letting, I think, this summer?
I think you will have probably sensed my frustration, Madam Deputy Speaker, but I am not the only one who feels strongly about the issue. I speak on behalf of a very significant number of my constituents. Sadly, it comes as little surprise to me that the national passenger survey and surveys by organisations such as Which? put Southeastern at the bottom of the train operating company league table. I suspect that much of my constituents’ dissatisfaction is driven by experiences of overcrowding and a general sense that the service offered is woeful value for money. It also relates, as the hon. Member for Dartford (Gareth Johnson) has said, to a lack of clear, reliable, real-time information when there are cancellations and delays.
I know that Southeastern has requested an official review by the rail regulator of Network Rail’s performance, as not all problems relate to things in Southeastern’s control. I understand that, but there needs to be better communication with the travelling public and a sense that Southeastern is not just constantly trying to shift the blame to someone else. It would be useful if the Minister provided an update on the official Office of Rail Regulation review.
It would also be useful if the Minister provided his latest thinking on what should happen come 2018. Given poor performance and the fact that Southeastern’s parent company, Govia, received £82 million in Government subsidy last year, is he satisfied that the current franchising system is delivering the best deal for the taxpayer?
We know that the Government are reluctant to do a root-and-branch review of the structure of railways in the UK, presumably because they are concerned that it may throw up pragmatic solutions that go against the grain of their ideology. The public, however, want to know that if they are paying exorbitant sums for their travel, they are getting the best possible bang for their buck.
Could Transport for London, for example, become the franchising authority for Southeastern in future? Experience in south London with the London Overground has been positive, and TfL will soon become the franchising authority for some Greater Anglia services. Why do not the Government want to do the same for Southeastern?
I am conscious of the fact that this debate started earlier than usual and I would like to take a few more minutes to pick up on two issues relating to Southeastern services and connectivity: the Catford loop line and access arrangements at Lewisham station.
Many local people share an aspiration for four trains an hour to stop on the Catford loop. I am told that such a service could be introduced without detriment to other existing services. I have asked Ministers about this before and have been told that the detailed specification for services in a new Southeastern franchise has yet to be decided. However, given this interim period of four years before any new franchise, is there any possibility of upping the number of stopping trains on the Catford loop?
May I ask the Minister to revisit my correspondence with his predecessor, who is now the Secretary of State for Northern Ireland, about Southeastern’s determination to keep the platform 4 gate at Lewisham station permanently closed? If we want people to use the railway instead of their cars, stations need to be as easily accessible as possible. Although I understand Southeastern’s desire to tackle fare dodging by having a fully gated station, that makes no sense when the next station stops are not gated. With a significant regeneration scheme now under way next to Lewisham station and access arrangements reduced as a result, the platform 4 gate issue has taken on new importance. Even if it cannot be reopened permanently, might a temporary relaxation be allowed for the duration of the construction works on the adjacent development project?
I realise that I have been down in the detail of rail provision in my constituency, but these are important matters for many of those I represent.
London is a fantastic city to live and work in, but it is let down by its failing rail network. I am afraid to say that I am not sure that Ministers seem willing or able to intervene, let alone to learn lessons and correct the system. The result is that existing train operating companies are limping on, with passengers feeling voiceless and out of pocket. Put simply, when we ask people to pay sky-high fares for their travel, they should at least get a half-decent service.
I apologise for my slightly late arrival at the Dispatch Box, Madam Deputy Speaker. Perhaps that was rather apt, given the subject we are discussing.
I congratulate the hon. Member for Lewisham East (Heidi Alexander) on securing this debate on Southeastern services. At the very outset, I want to make the point that the rail franchising system and the way in which the Government engage with private sector operators is all about improving rail services for people, not some ideological opposition to state provision. In practice, the system has been shown to deliver in many parts of the country. As we have seen during the period since privatisation, rail usership has doubled from 750 million to 1.5 billion. Of course, that is part of the problem: as more and more people use rail services in this country, the overcrowding on trains and the problems of squeezing more and more trains on to what is by and large a Victorian network is a real challenge that I know frustrates commuters daily.
As the hon. Lady has contributed so fully to previous discussions in the House—for example, the debate in February secured by my hon. Friend the Member for Dartford (Gareth Johnson), who I note has joined us in the Chamber—some of my points will sound familiar. I hope that she will forgive that repetition, but I will cover some of her questions from the last debate, particularly on overcrowding and passenger compensation.
I thank the hon. Lady for her invitation to join her on the train to Lewisham. I suggest that I can do better than that, as I have a member of staff who lives on that very line, and I get a daily update about the problems of getting a seat on the train. Indeed, when she moved slightly further away from the centre of London, she said, “Although it’s a longer journey, at least I can get a seat.” It is something of an indictment of that particular service that people see living further away as a good idea, because they can get a seat before the train sets off. I am made aware of some of the daily trials and tribulations; indeed, I also sometimes get excuses about why she sometimes arrives at work late.
Let me first state that this Government are committed to continuing the strong growth in rail travel experienced over recent years. We have invested billions of pounds in railway infrastructure, and we have set out our plans to continue to do so. The Thameslink programme is one of those key investments, and we are committed to funding and delivering it in its entirety. On completion in 2018, it will virtually double the number of north-south trains running through central London at peak times. It will deliver 1,140 carriages of high-capacity next generation rolling stock, in addition to about 600 new carriages that will be provided as part of the Crossrail project. That represents a significant enhancement to the capacity of the entire UK rail network. That might be no consolation to people in Lewisham, but it shows that we recognise the problem and are investing not only in new infrastructure, but in new rolling stock.
Heidi Alexander
I was aware of discussions about the new Thameslink franchise that could have meant that some services would call at stations such as Lewisham. I wonder whether the Minister can update me on whether there is any chance of some Thameslink services being routed through Lewisham, instead of along the more traditional routes, and on whether that could add capacity to our part of the network.
I am afraid that I cannot give the hon. Lady any news on that subject. However, as it has been raised on the Floor of the House, I know that officials will be keen to revisit it to see what potential there is. In her contribution, she spoke about the potential for improving services on the Catford loop. However, the system is by and large operating at capacity, particularly at peak times in the morning and evening. In fact, it is operating at more than capacity given that many people cannot get a seat on their train.
The key headline indicator for rail performance is the public performance measure, which measures the percentage of services that arrive within five minutes of their timetabled time. From April 2013 to March 2014, the Southeastern network achieved a disappointing PPM score of 89%. That is 3.8 percentage points below the target agreed between Southeastern and Network Rail. I note the point that the hon. Lady made about aggregation, which means that those figures may hide worse performing parts of the network. She mentioned that High Speed 1 has a good punctuality record. That is a good reason why we should be building brand new rail infrastructure in this country. It does not have the same problems, such as those related to bad weather, that we see on parts of the creaking Victorian network.
PPM is the responsibility of Network Rail and the train operating companies, and a failure by one or both will cause the PPM to fall. To assess where the blame for the declining PPM lies, it is necessary to consider performance against the delay minute targets agreed between Network Rail and Southeastern. In general terms, Network Rail is responsible for approximately two thirds of the delay minutes across the UK rail network, with the train operating companies accountable for the remainder.
The performance of Southeastern over the past 12 months was 6% adrift of its cumulative delay minute target. That 6% represents an additional 16,000 delay minutes over its target of 271,000. Network Rail, on the other hand, finished the year more than 50% adrift of its targets, which represents 200,000 delay minutes above its target of 400,000. The results of both Network Rail and Southeastern are clearly influencing the downward PPM trend, with Network Rail’s performance having by far the greatest impact.
What is being done to improve Network Rail’s performance? First, it is important to acknowledge that safety must remain the highest priority. Network Rail’s performance in that regard has ensured that the UK has one of the safest, if not the safest, railways in Europe. That said, Network Rail’s rapidly increasing share of delay minutes shows that its performance has simply not been good enough and must improve.
It would be remiss of us to ignore the impact that severe and unprecedented weather has had on its operational performance, and the inevitable delays that that has caused. Since October last year, the severe weather has led to landslips, flooding and vegetation issues—I presume that that means the wrong kind of leaves—all of which have impacted heavily on the service that Southeastern has been able to deliver. To take one example, passengers using the Hastings line endured closures and disruption between December 2013 and March 2014 owing to multiple landslips. Although it is fair to put Network Rail’s performance into perspective, extreme weather should not be allowed to mask underlying issues and risk factors that could have been controlled or at least mitigated. In other words, the weather is not an excuse for everything.
Southeastern recently referred Network Rail to the Office of Rail Regulation to highlight its poor performance with regard to trees on the track, landslips and engineering possession overruns. The ORR held a formal review of Network Rail’s performance in March in the presence of Southeastern and Network Rail’s senior management teams. At the review and in subsequent communications, Network Rail accepted that performance on the Southeastern network had fallen below acceptable levels of late, and it has provided assurances that performance will be improved—
Heidi Alexander
By which date will 12-car trains on the Southeastern network call at any station in my constituency in the morning rush hour?
As I said, discussions are ongoing, so I cannot give the hon. Lady a precise date. I hope that she will be reassured that it is an issue of great importance to the operator. Given the incentives, and the penalties that non-performing companies will incur, it is in the company’s interests to improve services and meet those key performance indicators.
Making performance more transparent is a further key aim of the new franchise. While Southeastern currently reports an average public performance measure by monthly period, in the new franchise it will be required to publish PPM data by route, in addition to its overall PPM average, which answers the point the hon. Lady made about individual performances being masked by the best performing services such as HS1. We will also be discussing with Southeastern what other information can be published about customers’ experience of using its services. I hope that she will engage with that process and let Southeastern know which indicators she wants it to focus on. I suspect that overcrowding is probably the issue that most affects customers after delays. There is compensation for delays, but that does not help customers in overcrowded trains, especially in bad weather.
My expectation is that increased transparency will help passengers make better informed travel decisions, as well as allowing the operator and Network Rail to target improvement strategies on the worst performing routes. Greater transparency will also enable the Department to challenge more effectively the operator’s delivery.
The hon. Lady mentioned the platform 4 gate at Lewisham station. I have to admit that I was not aware of that problem, which is due to engineering works, but I will certainly look into it and see that it is addressed. She also touched on the extension of the contract through direct award. As with all direct awards, this is a necessary step to achieving a manageable and deliverable franchise schedule for both the market and the Government. We continue to monitor the performance of Southeastern very closely.
Southeastern’s operational performance has been relatively good in the last 12 months, although it remains 6% off its delay minute targets. For the first period in the new rail year, it is ahead of its targets. Southeastern continues to work with industry partners Network Rail to improve performance for passengers, and has recently called and attended a formal review of Network Rail’s performance.
The massive investment being made by the Government in the Thameslink programme will improve services for the whole of the south-east of England, with 40% more capacity on services between Sevenoaks and the Thameslink core, via the Catford loop. However, in the short term, the Thameslink programme will cause significant disruption at London Bridge station. We believe that certainty of ownership and a stable partner will help better to manage the services for passengers during this period.
In summary, operational performance has declined sharply on the Southeastern network since October last year, and I agree that this is not acceptable. I expect to see improvements now that the Office of Rail Regulation has conducted its formal review, and Network Rail has provided commitments to Southeastern. There is also room for improvement in Southeastern’s performance, given that it was 6% off its delay minute targets by year end in March 2014. It has, however, made a strong start to the new rail year, with delay minute performance for the latest period in April ahead of target.
I hope that, by outlining some of the Department’s plans for the four-year direct award period, I have shown that the Department is committed to driving real improvements in transparency, performance and customer satisfaction. I am grateful to the hon. Lady for her continued interest in the Southeastern franchise, and for bringing this debate to the attention of the House.
Question put and agreed to.
(11 years, 11 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Mr John Denham (Southampton, Itchen) (Lab)
It is a pleasure to serve under your chairmanship, Sir Roger, and I congratulate the hon. Member for Dartford (Gareth Johnson) on securing such an important debate. I want to look at some of the fundamental issues relating to the financing of rail and commuter services. Governments of any party face major challenges in trying to bring a fair and just approach to rail fare financing in the south-east. As I am sure the shadow Minister, my hon. Friend the Member for Nottingham South (Lilian Greenwood), will set out, until the Chancellor was forced to act last summer, commuters faced a series of above-inflation fare increases.
It is worth looking at some of the figures. I have looked at the increases in train fares—season ticket prices—highlighted by Passenger Focus on a number of south-eastern routes. Sadly, my constituency is not included, but a number of others are. The increases in fares are compared with the increase in wages of the people living in the relevant areas. For example, in Gillingham in Kent—not too far from the hon. Member for Dartford—in the year from January 2010 to January 2011, the cost of a season ticket rose by 8.3% and wages by 2.1%. The following year, season tickets rose by 6% and wages by just 1.2%. In the next year, season tickets went up by 4.2% and wages by just 0.2%. In the year up to January 2014, season tickets went up by 3.1% while wages went up by just 0.7%.
A similar pattern is repeated across the south-east. In Portsmouth, from January 2010 to January 2011, fares went up by 7.2% and wages by just 2.1%. Fares went up the following year by 6.1%, but wages by just 1.2%. In 2012-13, season tickets went up by 4.2% and wages by 0.2%. In the past year, fares have gone up by 2.7% and wages by just 0.7%. Right across the south-east, year after year, we have had increases in season ticket prices that massively outstrip the real increases in wages earned by our constituents and many others in the region.
The annual season ticket from my constituency in Southampton is now more than £5,200, and commuters have faced many additional costs. I have not checked it on any websites, but I use the station and, as I recall, the parking charge at Southampton airport parkway has gone up from £10 to £14 a day in just the past three years. That is, of course, outside the regulated system; costs are being piled on to commuters wherever we choose to look.
It is easy just to list statistics and say that there is a problem, but we must look at some of the railway financing fundamentals that are driving the increases. We have a good opportunity to do that this morning. I take an unashamedly south and south-eastern view of the problem. The system operates in ways that are particularly unfair for our constituents in the south-east, and we must be prepared to face up to and challenge that.
What are the essential financing issues? We must look at two flows of money. The first is the money paid by the train operating companies—that is, the passengers who travel on their trains—to the Treasury. Some companies, almost all clustered in the south-east, are paying substantial amounts of money out of their fares in payment to the Government. In other parts of the country, it is the other way around: a subsidy goes from the Government to the train operating companies and their passengers. The second flow of money is the grant that train operating companies receive from Network Rail to train companies.
We must look at each flow in turn, and when we do we see an extraordinary situation. As I said, my constituents in Southampton pay £5,200 a year for a season ticket. For every mile they travel—every single mile from Southampton to London and from London back to Southampton—they are paying 8.7p to the Treasury. That is the highest rate in the country, but they are by no means the only set of passengers paying substantial amounts to the Treasury—not towards the cost of their rail service—for every mile that they travel.
These figures are from 2012-13, because this debate came up suddenly and I did not have a chance to see whether Passenger Focus has updated its analysis. The following figures were accurate in December. Passengers on Southern were paying 7.9p per mile to the Treasury; First Capital Connect passengers, 8.2p per mile; c2c passengers, 2.7p per mile; and for Greater Anglia, feeding into London from the other side, passengers were paying 5.5p per mile to the Treasury. Those train operating companies, clustered around the south-eastern commuter services, are between them paying more than £1 billion to the Treasury through such contributions. South West Trains paid £314 million, Southern paid £215 million, First Capital Connect paid £187 million, c2c paid £176 million, and Greater Anglia paid £139 million, all in the last year for which figures were available.
By contrast, in other parts of the country the payments went in the other direction—I will come on to the extent to which such payments are justified or not. Northern Rail received a subsidy from the Treasury of £152 million, Arriva Trains Wales received £140 million, First Trans- Pennine Express received £41 million and CrossCountry received £21 million. The only London commuter services that attracted a significant subsidy were Southeastern, which received £82 million, and Chiltern, which received £21 million.
I am probably the only person who has done so, but I have dubbed these payments a “commuter train tax” that our constituents—including yours, Sir Roger—pay to get to work in London. Of course, people say, “That is not the full picture,” because train operating companies receive a payment from the Government through Network Rail that must also be taken into account. However, if we do that, we discover an interesting pattern. The lowest subsidy per mile through Network Rail is for First Capital Connect, at just 5.3p per mile. Southern gets 7.3p per mile, c2c gets 7.1p, and South West Trains gets 7.6p.
If we look at other parts of the country, the Network Rail grant is worth 29.1p per mile to Northern Rail, 13.9p for East Midlands Trains, and 12.3p for First TransPennine Express. In other words, the same broad pattern is shown: not only are our constituents paying more per mile to the Treasury in one direction, but they are receiving less back per mile through the Network Rail grant. That is a major problem.
I must acknowledge that the architecture of the current system was introduced by the previous Labour Government. We are looking, therefore, not at some fundamental change that has been introduced in the past three years, but at the implications of simply rolling forward an approach that was put in place a number of years ago. I would argue that for my constituents the system is getting completely out of hand and completely unfair.
In the last year for which figures are available, the south-east commuter train companies were collectively paying more than £1 billion to the Treasury—or rather, their passengers were. That has quadrupled under the current Government—it was just £230 million in 2009. One might argue that, as part of a general shift towards putting greater pressure on passengers to pay for the rail services—my party, Labour, did that in government, and it has continued—some move in that direction was fair. However, we must now ask whether putting such a big weight on the pockets of commuters in the south-east is really fair.
There are a number of reasons for saying that we are producing real injustice, as regards the extent of the burden that passengers are expected to bear. We can look at two measures. The first is season ticket price as a percentage of salary. A season ticket on a medium-length journey is about 20% of the income of an operative who commutes to London, according to the Hay Group. For a professional, it is about 12%. That is twice the proportion of income paid by people commuting to Bristol, Cardiff, Birmingham, Manchester, Leeds, Glasgow or Edinburgh. In other words, commuters from our constituencies are paying a much higher proportion of their incomes to get to work than commuters do in comparable cities around the country. There is a similar pattern—not quite as marked—for people making long journeys to London from our constituencies, compared with those in other parts of the country. That is one indication of unfairness.
Heidi Alexander (Lewisham East) (Lab)
Is my right hon. Friend aware of the figures from the Campaign for Better Transport, which show that for a couple with two children in London, rail fares and child care costs can amount to 40% of their income? Does he agree that it is the cumulative impact of such outgoings—fares, child care, rent—that have such a devastating impact on many families in the south-east?
Mr Denham
My hon. Friend is right to raise that point; there is a cumulative impact. Another recent study, published a couple of weeks ago—I forget what it was called—showed that the increase in rail fares in various towns and cities in the south-east has now offset the apparent benefits of living outside London, where there are lower house prices. Fares have risen so much that, despite the disparity between London prices and those in other places, the costs are extremely high.
The other indicator of unfairness in the system is the fact that customer satisfaction with value for money, as measured by Passenger Focus, is lowest on the London commuter services. The hon. Member for Dartford talked about Southeastern, where only 31% of customers believe that they get value for money. On First Capital Connect, it is 32%; on South West Trains, 33%; on Southern, 36%. Perhaps we are not surprised that the more highly subsidised services, like Northern Rail, get a customer satisfaction rating of 54% on value for money, and Arriva Trains Wales 54%.
Westminster Hall debates are meant to raise issues, rather than to say there are simple answers to problems. The architecture of the subsidy and cross-subsidy system has been in place for some time, but it is now getting out of hand. It is perhaps comparable in some ways to measures such as the fuel duty escalator, which was originally introduced with cross-party support. It is sometimes amusingly referred to as Labour’s fuel duty escalator, even though it was introduced by a Conservative Government. Although there was cross-party support when it was introduced, the point came, as has been recognised by all parties, where simply rolling ahead with it became politically and financially untenable for many of our constituents. Those of us who are speaking up for the south-east must say that we cannot simply roll forward the current way of doing things without questioning it.
The Campaign for Better Transport recently published a consultant’s report, which said that even with fares capped, as the Chancellor has just done, by 2018 the Government will be making a profit out of running a rail system. In other words, passenger revenues paid to the Treasury will exceed the money paid out. That means that our constituents—commuters in the south-east whom we represent—will be paying the entire cost of subsidising railways in other parts of the country, and making a profit for the Government to boot. That is not tenable; we have to do something.
There are no easy answers. There is clearly no pot of public money sitting there that can be sloshed into a greater subsidy. I am not familiar with all the railways serving London, but there are lines where the quality of the rolling stock and track in the south-east is significantly better than in other parts of the country. A backlog of investment needs to be addressed in some areas, so it is not a matter of simply saying, “Let us tilt the balance in another direction”. However, looking forward, we have to try to set out a long-term strategy—hopefully one that can be agreed by all parties—for getting some basic fairness and justice back into the system, and for putting a cap on what our constituents are expected to pay, not only for their journeys to work, but for the cost of funding the rail system as a whole.
Heidi Alexander (Lewisham East) (Lab)
It is a pleasure to follow my right hon. Friend the Member for Southampton, Itchen (Mr Denham), who has put some very thoughtful points forward, and I congratulate the hon. Member for Dartford (Gareth Johnson) on securing the debate. I should say at the outset that I have a meeting that I need to chair at 10.30 am, so I hope Members will forgive me if I cannot stay for all of the debate.
Most people think that people who live in London travel by tube or bus to work. That is not strictly the case. In south-east London, we have swathes of the capital where people rely wholly on the rail network to get to work. The tube map barely reaches the boroughs of Lewisham, Bromley, Bexley and Greenwich, so the overland rail services, provided predominantly by Southeastern, and also by Southern in some areas, are essential for people’s daily lives. In Lewisham, 38,000 people travel to work by train—nearly a third of all the people who work. The figures are comparable for the other London boroughs that I have just mentioned.
If anyone had stood at any station in my constituency this morning, they would have seen thousands and thousands of people trying to cram themselves into horrendously overcrowded trains operated by Southeastern. One of the problems for my constituents living in Lewisham is that when the trains arrive at our stations—Blackheath, Grove Park or Lee Green—they are already packed full of people travelling to central London. For that pleasure, my constituents are asked to pay astronomical amounts of money. For a journey that should be about 10 minutes, from Hither Green to London Bridge, a zone 1 to 3 annual season ticket now costs £976. It has gone up by £216 since 2010. That is a 28% increase in four years. As my right hon. Friend the Member for Southampton, Itchen said, wages have simply not kept up with that increase. Ministers might want to tell themselves that they are being tough on rail fare increases, but it certainly does not feel that way to many people in Lewisham.
To add injury to insult, the service is not getting any better. In fact, many would say it is getting worse. Ms Mulvey, who wrote to me last year, said that her problems with Southeastern are a “daily source of frustration”. She went on:
“This week my train to work has been cancelled twice, and this is not an unusual occurrence. My annual season ticket from Grove Park costs me £1,368 and rises significantly every year, even though the service does not get any better...It is quite embarrassing to be regularly late for work. Luckily my current employer is understanding and flexible, but I would not be confident of always having such an understanding employer.”
Alternatively we could take Mr Jolly, who is a frequent correspondent on matters to do with Southeastern. He says:
“Generally speaking, over the last quarter of 2013 the service offered by Southeastern rail has been mediocre at best, appalling at worst. It has markedly deteriorated recently, not that it was ever up to standards.”
These comments are not one-offs; I suspect that they are echoed by virtually every person who boards a Southeastern train during rush hour in my constituency.
The sentiments expressed in those letters and e-mails to me are borne out by industry surveys. I think that my right hon. Friend the Member for Southampton, Itchen, referred to the national rail passenger survey. When it asked people last autumn about satisfaction levels, 42% of those asked thought that Southeastern services offered poor value for money. If we expect people to pay huge sums to travel, surely they should be able to expect a basic standard of service.
What are the problems and what needs to be done? The first main problem on Southeastern relates to overcrowding. I know that significant work has been done at stations in south-east London to lengthen platforms, so that they can take 12-car trains. As I understand it, at the moment, none of the rush hour trains are 12-car trains; they may be 8-car or 10-car trains. Can the Minister tell me today when my constituents can expect to see 12-car services on all rush-hour trains stopping in my constituency? I am conscious that discussions are taking place between Southeastern and the Department for Transport, but I want to know by which date my constituents can expect to see longer trains on the services they use.
Can the Minister also say what action he is taking to ensure that Network Rail properly manages engineering works and has robust plans in place to deal with episodes of signal failure? In December last year, there was an almost farcical situation whereby no trains were running out of any of the mainline stations that serve south-east London when there was a fire at a signal box at London Bridge. It created absolute chaos on the travel network. Many of my constituents contacted me at that time to ask what the problems are in getting Network Rail to address such one-off incidents speedily. However, we experience such problems time and again when engineering works overrun, meaning that on a Monday morning there are delays on the network. That just adds to the sense of frustration that people feel when they are being asked to pay exorbitant amounts of money for the service.
I echo the point made by the hon. Member for Dartford about the need for better communication in, and better contingency planning for, times of bad weather. I understand that the challenges of providing a rail service, especially when the weather is as it is at the moment, must be huge; it is very difficult to run a rail service at such times. However, when a company’s website is not updated in real time, we can understand why people just feel so frustrated that they are not receiving timely and adequate information about the services that will be available to them. Also, can the Minister say whether he believes there is an adequate compensation regime in place for the occasions on which people cannot access the services that they have paid for?
I will conclude by saying that London is a fantastic city to live and work in, but we have to get to grips with rail services that are failing, and failing badly. With the franchising chaos that the Government have managed to create, it seems that Southeastern will continue to limp on and deliver services for a number of years to come, before a new franchise is let. There is merit in exploring whether Transport for London should become the franchising authority for rail services in London. I know that there is some pushback against that idea from some local authorities in Kent. However, TfL has been the franchising authority for the East London line on the London overground, and there we have seen services of a high quality, with high standards and good reliability. My constituents, who live in London, would like the same standards applied to their services.
I ask the Minister to assure me that in his discussions with the senior management of Southeastern and Network Rail, he will raise the matters that I have brought to his attention; that he will do all he can to ensure that our rush-hour trains in south-east London are lengthened to 12 cars; and that he will do all that he can to ensure that my constituents, who make a huge contribution to the London economy, get the sort of rail services that they deserve.
I will give the last word to my constituent, Mr Jolly, whom I quoted earlier, because he encapsulates the challenge for us politicians in Parliament. He says:
“Ultimately, if Southeastern rail is incapable of running an acceptable service over an extended period—and I am talking about 25% of the year here, but the service is mostly poor or very poor all year round anyway—isn’t it time to set up a commission of enquiry as to why, and try to find lasting solutions beyond the DIY approach that appears to prevail?...At present, and against a background of rising fares across the board, I have the feeling there is a complete lack of accountability and an inability to take action at a political level, which I find disturbing and depressing, to say the least.”
Heidi Alexander
The Minister just said that he believes that all passengers should have services that are reliable, quick and comfortable. He will know, from my contribution, that none of those adjectives applies to services experienced by my constituents. What will he do to improve the quality of services for the people travelling in on Southeastern trains from south-east London?
The hon. Lady is right. The situation has not just developed in the past four years; there has been a backlog in investment in our rail, particularly in rolling stock. Northern Rail has some very old rolling stock. Indeed, a couple of weeks ago, we had a debate in which my hon. Friend the Member for Stevenage (Stephen McPartland) suggested that the rolling stock on his line is older than he is. There is a lot to be done, but that is no reason for not continuing with the investment that we have announced and with the projects that we are continuing to deliver. I often hear the criticism that we are spending far too much in London, when other parts of the country are being neglected.
As the hon. Lady knows, not all delays are due to the actions of the franchisee. Network Rail sometimes has some explaining to do, particularly on overrunning engineering works, which can be a problem. I will address that later in my speech.
Heidi Alexander
I am grateful to the Minister for giving way again; he is being very generous. He talks about Southeastern’s contractual obligations, with specific reference to delays and cancellations. Can he tell me what proportion of trains on the Southeastern network have been shorter than they are contractually obliged to be? One of my constituents’ main complaints is that a six-car train turns up when an eight-car train should arrive. How often is that happening?
I confess that I do not have that figure in my head, but I will drop the hon. Lady a line to give it to her. She is right that if a train is shorter than expected, it will result in either more people standing or, in some cases, many people not being able to get on the train and having to wait for the next service. In fact, the person who texted me recently has always made the point that living in Dartford is good because the trains are usually fairly empty when they get there. As people get closer to London and go through places such as Lewisham, the trains get fuller and fuller and it becomes more difficult either to get a seat or, in some cases, to get on the train.
Of the total delay minutes for the Southeastern network, around one third are attributable to Southeastern. That is within Southeastern’s contractual benchmarks and 1.6 percentage points outside its improvement target set with Network Rail. The most significant amount, almost two thirds of all delay minutes, are attributable to Network Rail. Network Rail remains cumulatively 37.9% adrift of its targets, which is clearly influencing the downward PPM trend.
Delays attributable to Network Rail, however, include significant and, to a large extent, unavoidable delays. The St Jude’s day storm, for example, caused widespread disruption, as has the sustained severe weather we have been experiencing since just before Christmas. It is inevitable that some disruption will occur in such extreme weather. On a number of occasions Network Rail has been forced to order the suspension of rail services until a full route inspection has taken place, which has caused major disruption on many routes. I gave evidence to that effect to the Select Committee on Transport before Christmas.
Safety must remain the highest priority, and it is in no small part due to Network Rail’s performance on safety that the UK now has one of the safest, if not the safest, railways in Europe. However, adverse weather should not be allowed to overshadow risk factors that can be controlled. Indeed, it is noteworthy that the High Speed 1 line did not experience any problems due to the recent bad weather. Lines built to that standard, such as the new High Speed 2, should also not encounter such problems.