27 Andrea Leadsom debates involving the Department for Transport

High Speed 2

Andrea Leadsom Excerpts
Tuesday 14th January 2014

(10 years, 11 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Sheila Gilmore Portrait Sheila Gilmore
- Hansard - - - Excerpts

Personally, I would like to see it starting at both ends. I would be interested to learn the proposals of the Scottish Government to assist in achieving that within the powers that they have.

A number of objections are made to the arguments about capacity. Some people argue that the high rate of growth in long-distance travel—it has been about 4.8% a year—will not continue, but that is unlikely, given the patterns we have seen. The factors that are pushing people away from their cars and on to trains—high petrol prices and congested roads—are unlikely to change any time soon. Any type of sustained economic growth, which we all say we want, is likely to push demand for long-distance travel up further, not reduce it. On top of that, there are the predictions for growth in our population, which are now well established.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

Since the hon. Lady agrees that High Speed 2 is about capacity not speed, what assessment has she made of the difference in cost between going at high speed across floodplains, with tunnelling and the like through and across environmentally sensitive areas, versus the cost of going at a slightly lower speed around the problematic natural areas within England and Scotland that the HS2 link will have to go through?

Sheila Gilmore Portrait Sheila Gilmore
- Hansard - - - Excerpts

I understand the hon. Lady’s concerns, but if we are to make a serious step change in our rail investment, this scheme is the appropriate route to take.

The other point that some people have raised about capacity is that some inter-city trains operating at peak times—those operating in and out of Euston, for example—are not actually full and we should use that capacity before building a new line. However, on present patterns, it is likely that that capacity will be used up by the time the new line is built. London Midland trains, for example, which serve many commuter towns on the west coast main line, are already full to bursting and room must be created for trains to serve those destinations. Upgrading the west coast main line would be difficult and disruptive and would not provide the other benefits.

Some people have argued that HS2 would not release useful capacity around Birmingham, Manchester and Leeds. Existing services will still be needed in some places, but those trains will be able to stop at intermediate stations. The lines will remain and the trains will be able to stop at more intermediate stations without holding up longer-distance travellers, giving a substantial boost to regional connectivity. For example, stations between Coventry and Birmingham New Street would stand to gain more services.

We could tackle commuter demand at the southern end of the west coast main line by building more cross-rails. One is being built at the moment and another is planned. I am not saying that those schemes are not helpful, but if such an approach continues it will exacerbate many of the problems created by London’s dominance and would not help economic growth in other parts of the country. People often suggest that other schemes could achieve that, but no one has come up with firm proposals in which we can have confidence. The main transport corridor between Newcastle, Leeds, Manchester and Liverpool—the trans-Pennine route—is already being electrified and will provide that greater connectivity, which is good. This is not a matter of either/or.

The other argument that is often raised is that the business case is not sufficiently strong. Perhaps one of the biggest arguments is about the use of time and the value that is placed on that. People say that in the modern age people can work on trains so there is not the same value to be gained from speeding up journey times, but that does not make up for the fact that it is even more valuable if staff can arrive at their destination and return in a shorter time. Although the cost-benefit ratio is low compared with smaller projects—some people have suggested that road bypasses have a much higher cost-benefit ratio—we cannot build a whole network with small projects. As large projects go, HS2 is relatively good value for money.

There are wider economic benefits that are not always captured in the business case. One argument that I have already addressed but want to talk about a bit more is that HS2 will be a disbenefit to the midlands, the north and other parts of the UK. Examples sometimes cited from Europe are that high-speed rail there has not benefited the places to which it goes. What matters is whether the project connects significant population centres.

High Speed Rail (Preparation) Bill

Andrea Leadsom Excerpts
Wednesday 26th June 2013

(11 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I heard the hon. Gentleman’s question to the Prime Minister. Those debates on that whole process are ongoing and still at an early stage. I have some worries and I would want to get clarification before we changed the Government’s position.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I have not yet given way to my hon. Friend, so I will now.

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

Will my right hon. Friend explain what the £12.7 billion of contingency will do to the benefit-cost ratio? During the consultation period, it was always made clear that the £32 billion was the absolute maximum and contained a vast sum for contingency.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

At the moment, the value-cost ratio is reckoned to be 2.5. I also point out that the BCR tells us some things, but not everything. For instance, the BCR on the Jubilee line was a lot lower than that for High Speed 2. If the Jubilee line had not been developed, a lot of the development in Canary Wharf would never have taken place. The line brought a huge amount of investment into the area and the country. It is important that we are seen to be able to compete with other countries in the global race to attract businesses to this country. The point also relates to the Olympic games, where a contingency was allowed and in fact the price of the games came in below the budget that had been set by the Government. I expect the final costs to be lower than those I have outlined. However, I take on board my hon. Friend’s point about BCR.

--- Later in debate ---
Maria Eagle Portrait Maria Eagle
- Hansard - - - Excerpts

I do not think it fair to assume that if I had the Secretary of State’s role after the next general election, I would tear everything up. I have made it clear that when there are projects that run across Parliaments, it is important to co-operate and to understand that decisions have to be made. We will, however, have to see where we are by the time we get to the next election. I would certainly want to take every opportunity to make sure that the nation gets the best possible outcome from the money spent. As I say, we shall have to see where we are at that time. I am not interested in delaying going forward with what I believe to be a tremendously important scheme.

The Government must also be clear, following the successful judicial review, about how they intend to change the compensation scheme for households affected by the building of the line. The judge found that the consultation process was unfair, that not enough information had been provided and that the criteria for compensation options were not adequately explained. This failure has caused unnecessary added stress to those affected by the scheme, during what is obviously a very difficult time for them and their families.

It is simply not possible to take forward a project of national importance on this scale without causing a significant impact on some communities and on some people’s lives, but the obligation on all of us is to do what we can to mitigate that impact and to act fairly in terms of compensating people for the loss of property and value that they suffer. Ministers must now act quickly to bring forward a new, fair scheme and ensure that it is communicated clearly and transparently.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

Do the Opposition therefore support the concept of a property bond that would try to improve on the blight that is experienced by so many people?

Maria Eagle Portrait Maria Eagle
- Hansard - - - Excerpts

I am willing to support anything that can properly, fairly and reasonably compensate people in a way that still meets the obligation to be reasonable with taxpayers’ money. I would thus be happy to look at the details of the scheme, as I think the Secretary of State has said he is, too. I think we have a particular obligation to treat those affected as fairly as we possibly can and within as speedy a time scale as possible.

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

Does my hon. Friend think, like my hon. Friend the Member for Northampton South (Mr Binley), that this is a matter of needing more capacity? If so, why are we going for a very expensive system like high-speed rail, with its exponentially enormous engineering costs?

Iain Stewart Portrait Iain Stewart
- Hansard - - - Excerpts

My research has shown that if we are committing to build a new railway line, the cost of building a fast one is not significantly more than building a conventional one. The majority of the costs come in building the cuttings, the bridges and all the other necessary infrastructure. Making a faster one costs a little more, but not a huge amount more.

If we merely expanded capacity on the west coast or east coast lines, we would have to do that at the same time as running existing services. Anyone who used the west coast main line during the previous upgrade will say what an absolute nightmare that is. Such an approach would not solve the problem of competing demands for use on the existing line between commuter services, freight services, non-stop inter-city services and stopping services. We cannot continually squeeze more and more capacity out of one line, as we will reach capacity and will be overly reliant on that line. That is why I accept the case for a new high-speed line.

I accept that the project is controversial and completely understand the fears of residents along the proposed line of route. There are justifiable concerns about disturbing the peace and quiet of the countryside, but I urge right hon. and hon. Members to look at what happened during the construction and planning of High Speed 1. The same concerns were raised, but since the line has opened there have been very few, if any, complaints.

--- Later in debate ---
Natascha Engel Portrait Natascha Engel (North East Derbyshire) (Lab)
- Hansard - - - Excerpts

I shall vote for the amendment and against the Bill’s Second Reading, because I believe that this is the wrong scheme at the wrong time.

In the few minutes available to me, I want to present a passionate defence of nimbyism. I think that this is a case less of “not in my back yard” than of “not through my front door and the rest of my house”. When we consider the people whose lives this project is affecting, we realise that the position is far too serious for them merely to be asked “How much compensation do you want?” People living in the villages and towns that the trains will pass through if the scheme goes ahead are being expected to wait for 20 years with it hanging over their heads, seeing no shovel in the ground anywhere in North East Derbyshire, unable to sell their homes, and money is being lost hand over fist in very small rural businesses.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I pay tribute to the hon. Lady. There is rarely an occasion on which I do not agree with her. Constituents of mine have been literally suicidal because of the complete lack of sympathy for them, and because they are unable to obtain compensation although their businesses are failing. Does she agree with me that we must get the compensation right?

Natascha Engel Portrait Natascha Engel
- Hansard - - - Excerpts

Absolutely. It has already been suggested that the compensation schemes should mirror those in other countries such as France, where big infrastructure projects go ahead with no problems because the schemes are so generous. However, it is not compensation that people are after. They are saying “I have lived in this town, or this village, for four or five generations and I do not want to move. I am being asked to accept all the disbenefits of HS2 without gaining any of the benefits.” If I represented a major town, I might be able to see the benefits of this project, but it does not bring us in North East Derbyshire any economic benefits. In fact, it does exactly the reverse. I cannot see the sense of what is happening, and I shall explain why. I would welcome the Minister’s response to this.

Derbyshire county council has spent many years cleaning up, developing and redeveloping sites that were ruined by the results of the end of the mining industry and the steel industry in Sheffield. For decades those places have slowly been brought back into the economy. Up to £77 million has already been spent in Markham Vale, an area that I share with my hon. Friend the Member for Bolsover (Mr Skinner). That £77 million will, in effect, be wiped out because HS2 will be going straight through it. Chesterfield canal is one of the best and biggest pieces of redevelopment and regeneration in North East Derbyshire, bringing investment to the Chesterfield waterside project. It will now not have a waterside project, and will now not get the £310 million of investment in the local economy.

What about the small businesses in towns and villages such as Renishaw, too? Such businesses become the focal points of villages. Already, only months after the route has been published, a local wedding business has lost £70,000, some 20 years before anything is due to happen.

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

My views on HS2 since being elected to Parliament in 2010 are well known. I started by supporting the principle of high-speed rail but opposing the route, but the more I have found out about the project, the more I have become convinced it will not be to the benefit of British taxpayers.

We have rightly heard a lot of talk about the value to the economy as a whole of any new railway line, and that is, of course, true: any new railway line will generate jobs and growth. There is no doubt about that, but the essential point that differentiates one project from another is value for money, and that is what we are not hearing about with the necessary level of clarity. What it costs to generate the growth is what matters. Today, we have heard that there is now a £14.4 billion contingency plan, which potentially makes this project 25% more expensive than before.

We have also heard comparisons with the motorway network, the Jubilee line and HS1. They were all very much resisted at the time, but every single one of them was unique in its own way. For motorways, there is a junction every few miles, so everybody benefits from them; they undoubtedly promote growth in our economy. Likewise, the Jubilee line has many stops, and therefore benefits a huge swathe of the population. HS1 is unique in the sense that it was the link to mainland Europe. HS2 is none of those things; it is a decision that we have taken in isolation.

Stuart Andrew Portrait Stuart Andrew (Pudsey) (Con)
- Hansard - - - Excerpts

HS1 has brought some multinational companies to the end of the route at King’s Cross. Surely that is a benefit that HS2 can bring to other cities, such as mine, Leeds.

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I absolutely agree with my hon. Friend, and I am not denying that any railway line or other infrastructure will bring growth. I am saying that the critical differentiator is whether the line brings more growth and jobs than something else, and that is where the case for HS2 is not proven.

Brian Binley Portrait Mr Binley
- Hansard - - - Excerpts

I welcome the point about making more use of the high-speed track. Why, then, is my hon. Friend not campaigning vigorously for a station in Brackley, which would be of enormous benefit to her constituents?

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I am delighted that my hon. Friend intervened, and that would be a possibility. The bottom line is that we are all here to represent our constituents. There is a case for making that argument, and if I made it, it would undermine the view of many of my constituents that this project is just wrong. Winning that argument would almost certainly cast the line in stone. My hon. Friend will understand that I could not do that, against the very clear wishes of my constituents.

If this is about the value for money of this project versus that of any other project—not the absolute but the relative level of growth and jobs generated by this project, compared with a different one—we need to ask ourselves, first, is this the best value for money for taxpayers? HS2 does mean little curvature of the line. My hon. Friend the Member for Milton Keynes South (Iain Stewart) said that a high-speed track is not much more expensive than a regular train track. That is not what HS2 engineers have told me. They said that it is very engineering-intensive. Because it has to go in a straight line, because there are lots of flood plains, hills and other inconveniences, and because of the speed of the trains, the line has to go through, under and over those obstacles. Therefore, it is much more expensive.

Secondly, high-speed rail has an exponentially higher carbon footprint, so in that sense it is not environmentally friendly compared with a classic line. HS2 has a massive impact on valuable open countryside and sites of special scientific interest, battlefield sites, grade I listed homes and so on.

Thirdly, if, as my hon. Friend the Member for Northampton South (Mr Binley) said, this is about capacity, why not go slightly slower but along an existing travel corridor, so that costs and the impact can be reduced? Fourthly, is the project going to deliver soon enough? We will have no use of it until 2026, yet people say all the time that rail capacity is needed now. Fifthly, does it create the maximum number of jobs? Would another, less engineering-intensive project along an easier route, which we could easily find if speed were not the only goal, generate more jobs? Finally, what about both ends? Does it really make sense to decide where the traveller ends up before we have decided on our strategy for airports?

Having said all that, I note the commitment of the Government and the Opposition, who are determined to see this project built. Although I remain optimistic that during the Bill’s progress substantial changes may be achieved, it is important for me to be realistic. If HS2 is to go ahead, I want to achieve fair compensation and mitigation for the hundreds of my constituents who will be so devastatingly affected.

On mitigation, I urge the Government to ensure that HS2 is much more transparent and that they engage with communities much better than they currently are. Communities’ ideas on mitigation must be given full and proper consideration. The Department for Transport must prioritise the consultation on a full compensation scheme as a matter of urgency. It is shocking that a judicial review had to determine that the original consultation was unfair and in fact unlawful. The exceptional hardship scheme, to my constituents’ bitter experience, has been nothing short of a disaster. Residents up and down the proposed line of route and in the surrounding communities find themselves trapped in their own homes, unable to move either home or business. I strongly urge the Minister urgently to help with this situation.

I hope that, as well as a full compensation scheme that is more generous than the statutory requirement, the Government will agree to a property bond, and that the Secretary of State will meet with the Council of Mortgage Lenders and the National Association of Estate Agents, among others, in order properly to explore the options for a property bond. If banks will not give mortgages on properties because they are blighted by HS2, people cannot get on with their lives, at least until 2026. That is absolutely unacceptable.

Finally, I really regret the position that many Members have been placed in by the Bill. We have been told that this is a vote on the principle of HS2, yet we are also told it is an opportunity for a meaningful compensation scheme to be put in place for those affected. That makes me very schizophrenic, and it places all Members who have strong feelings about this project in a difficult position. I do not want to vote in favour of HS2 but I also do not want to do anything that delays my constituents’ receiving the compensation they deserve. As this is the first opportunity in the Chamber to vote on the principle of HS2, I shall, with a heavy heart, have to vote for the reasoned amendment and against the Second Reading of the Bill, and I urge colleagues to do likewise.

High Speed Rail

Andrea Leadsom Excerpts
Monday 28th January 2013

(11 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

It was a pleasure also to see the hon. Gentleman this morning. I hope that as a result of having announced in this way where the route will go, improvements can be achieved in the interim period in some of these areas. I have talked to Leeds city council about the site that we have earmarked, and it is, as I understand it, content with it.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

The consultation on compensation for phase 1 ends this week. First, I urge my right hon. Friend not to take the word of his departmental officials but to look himself at the impact of the exceptional hardship scheme on many constituents whose lives have been utterly destroyed by incompetent and completely inconsistent panels. Secondly, I urge him to reconsider a property bond. Although officials have said there is no evidence that that works, it would be the one way to ensure that the blight that extends for miles in my constituency is removed. Finally, I urge him to look at the fairness of compensation between phase 1 and phase 2.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

As my hon. Friend correctly said, the consultation period on the compensation scheme ends at the end of this week. I know that she has put her own representations into that consultation, and of course I will consider them among many of the other representations we have received.

Oral Answers to Questions

Andrea Leadsom Excerpts
Thursday 18th October 2012

(12 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

We are some way off getting to that stage. I am dealing with a number of other figures at the moment, so I will take away the hon. Gentleman’s question and think about it a little more deeply, rather than give a rushed answer at the Dispatch Box.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

Is my right hon. Friend aware of the concerns of constituents up and down the route of the line who have been unable to access the exceptional hardship scheme? When will he start his consultation on fair compensation? We said that we would not allow anybody to have to pay with their own assets or in terms of their own life, and yet that has proven to not be the case.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I well understand that point and the opposition that HS2 has generated. Any major infrastructure brings about a lot of opposition. I hope to be able to publish the Government’s consultation on compensation in the not-too-distant future.

--- Later in debate ---
Jo Swinson Portrait Jo Swinson
- Hansard - - - Excerpts

I thank the hon. Lady for her question, and I certainly think that many across the House would do well to look at what the Australian Prime Minister says and at her rather excellent recent speech on the issue of equality. I disagree that quotas are the right way to proceed, and I do not recognise the figure of 1% that she mentioned. The percentage of women on boards has increased to 17% from 12% since the election, and as I have said, a third of new appointments in the last year have been women.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

8. May I say what a brilliant Women and Equalities Front-Bench team we have now? I really think that the women of this country can take heart from that. Will my hon. Friend continue to hold the line against the EU’s determination to introduce a quota of 40% of women on boards? We simply cannot have quotas for women; they have got to get there under their own steam.

Jo Swinson Portrait Jo Swinson
- Hansard - - - Excerpts

I can certainly give that reassurance. The approach that we are taking through the Lord Davies review—a target of 25% on boards by 2015—is showing itself to be successful. In fact, we are ahead of schedule in hitting that target. Our approach is showing itself to be successful and the right one to take, and we will resist the EU calls for quotas.

West Coast Main Line

Andrea Leadsom Excerpts
Monday 15th October 2012

(12 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I am very pleased to hear the right hon. Gentleman give such a strong endorsement of the service that he already receives. However, what we are trying to do with franchising is improve that service, not just for his constituents in Manchester but throughout the line, and I do not think that it would be appropriate—in fact, it would not be possible—for me to do as he wishes. I think that what I have set out today is the best course for the next three years on that particular line.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

I do not want to give my right hon. Friend cause to roll his eyes, so I shall not mention HS2. He can clap if he wants to.

I congratulate my right hon. Friend thoroughly on his decision to call a halt to the west coast main line franchise problem, but does he agree that now is the right time to start looking creatively at how to get fares right down and capacity right up? Perhaps he could consider introducing “standing room only” tickets for short journeys. That would both increase capacity and make journeys far cheaper for passengers who need to travel on a low budget.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I am not sure how popular that would be, but, as I have said in the House on other occasions, I am looking at the whole issue of fares and the way in which they are calculated.

Oral Answers to Questions

Andrea Leadsom Excerpts
Thursday 28th June 2012

(12 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Theresa Villiers Portrait The Minister of State, Department for Transport (Mrs Theresa Villiers)
- Hansard - - - Excerpts

This Government are determined to get the cost of running the railways down. That is the way we deal with the concerns that passengers have about fares. If the Opposition think concerns about fares started in May 2010, they are living on another planet. We need reform to get the costs down so that we can respond to passengers, and it is time Labour started producing its own reform plans if it insists on rejecting ours.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

T4. My right hon. Friend is aware that I have had constituents in tears in my advice surgeries who are blighted by the HS2 project and trapped in their homes, unable to sell them. Can she reassure my constituents that she is determined to make sure that no private home owner has to pay with the value of their home for the project? What update can she give us on the consultation to get a decent, fair compensation scheme in place?

Justine Greening Portrait The Secretary of State for Transport (Justine Greening)
- Hansard - - - Excerpts

I know that the High Speed 2 line is already causing uncertainty for many individuals, communities and businesses that will be affected along the route. We have introduced the exceptional hardship scheme. As my hon. Friend knows, I am about to have a meeting later today to talk to some of the key stakeholders, including herself, about their concerns. Having listened to many concerns and looked at the effectiveness of the exceptional hardship scheme, we are drawing up long-term proposals for compensation, and we will be consulting on those very shortly.

Oral Answers to Questions

Andrea Leadsom Excerpts
Thursday 19th April 2012

(12 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Norman Baker Portrait Norman Baker
- Hansard - - - Excerpts

We have the biggest rail investment programme since Victorian times, but we are always looking for schemes that are sensible and help local economies. I or the Minister of State will be happy to meet the hon. Gentleman and his colleagues.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

T1. If she will make a statement on her departmental responsibilities.

Justine Greening Portrait The Secretary of State for Transport (Justine Greening)
- Hansard - - - Excerpts

Last month we published the rail Command Paper setting out how we will reduce the cost of running our railways so that we can end the era of above-inflation fare rises for passengers. We have also kicked off the consultations on how best to bring fares and ticketing on the railways into the 21st century and to give local communities more power over local services. We also, as we have already discussed, set out our bus strategy, including new funding for low carbon buses and smart ticketing. Users of the Humber bridge have finally begun to benefit from the lower tolls that this Government have introduced.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

When my right hon. Friend announced HS2, she assured the House that a fair property and blight deal would address any blight caused by HS2 and reassure property owners. Many people in my constituency have been trying to sell their home for up to two years but are without access to a compensation scheme. What can I say to them to reassure them? Will she reconsider the prospects for a property bond, which would be the only way of ensuring that the property market works normally?

Justine Greening Portrait Justine Greening
- Hansard - - - Excerpts

I assure my hon. Friend that I recognise the impact that plans for High Speed 2 are already having on individuals, communities and businesses along the line of route. That is why we will shortly consult on a package of measures that will help property owners. It is an important step for the Government and enables those affected or interested to respond to the consultation and help shape Government policy. She talked about a bond-based property purchase scheme. I assure her that I am committed to making sure that the package is fair.

Transport and the Economy

Andrea Leadsom Excerpts
Tuesday 28th February 2012

(12 years, 9 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Karen Bradley Portrait Karen Bradley
- Hansard - - - Excerpts

That is exactly what Moorlands and City Railways wishes to do. It would like passenger trains to return to Staffordshire Moorlands for the first time since the line was officially closed in, I think, the 1950s. There is a problem, though: part of the line extension would involve relaying track to the village of Alton to provide access to Alton Towers by train. In theory, that is a good idea, but that part of the country is an area of outstanding natural beauty and the residents along the railway track are very concerned about the proposal. Although I can see the benefits of getting traffic off the roads, it has to be done sympathetically.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

Does my hon. Friend agree that such consideration for areas of outstanding natural beauty should be taken into account for all train systems, or does she limit her remarks to Staffordshire Moorlands?

Karen Bradley Portrait Karen Bradley
- Hansard - - - Excerpts

I fear that my hon. Friend’s question might be related to a certain high-speed line, which is something that I was going to touch on briefly.

--- Later in debate ---
Jonathan Ashworth Portrait Jonathan Ashworth (Leicester South) (Lab)
- Hansard - - - Excerpts

I start by paying tribute to my hon. Friend the Member for Liverpool, Riverside (Mrs Ellman), who spoke with great eloquence and distinction. She spoke a lot of good sense on behalf of the Transport Committee and I agreed with every word that she said. She is quite right to draw the link between the wider impact on economic growth and investing in and building a modern transport infrastructure.

The Transport Committee’s recent paper highlighted the need for the Government to

“ensure that where it approves transport schemes designed to stimulate economic growth and rebalance the economy, they are supported by convincing economic development strategies.”

In my brief speech I will argue that electrification of the midland main line meets exactly those criteria, but although that is what I want to concentrate on, I will start by saying a word or two about high-speed rail.

On balance I support high-speed rail, although I understand the arguments against it, not least the argument put by hon. Member for South Northamptonshire (Andrea Leadsom). However, I want to put a point to the Minister on which I hope he can reassure me in his summing up. There is concern among campaigners for the electrification of the midland main line that they may not see any direct advantage from HS2—that resources for the scheme will be taken away and we will never get electrification. [Interruption.] The Minister is shaking his head, but that is a genuine concern, so perhaps he can touch on it in his response to the debate.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

As I will not get the opportunity to speak later, I want to ask the hon. Gentleman whether he agrees that there is a concern about the total cost of high-speed rail, bearing in mind that the Y shape is not even known yet, and the rising cost of mitigation and compensation that is the inevitable result of that uncertainty? Does he share my concern about the impact that that will have on scarce resources?

High-speed Rail

Andrea Leadsom Excerpts
Tuesday 10th January 2012

(12 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Justine Greening Portrait Justine Greening
- Hansard - - - Excerpts

The right hon. Gentleman raises the wider point that we will need a broad-based strategy if HS2 is to come into Euston—the broader regeneration of Euston that I believe can take place alongside HS2 and the redevelopment of Euston station. I am absolutely committed to doing whatever I can: to work with Camden council, and to meet the right hon. Gentleman separately to talk about what we can do to minimise the disruption to local residents while HS2 is being built and in the years beforehand. There are statutory processes that I am very happy to talk through with him in detail, and I look forward to doing that.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

My right hon. Friend has been very patient in hearing from me many times about the concerns of my constituents, many of whose communities will be blighted by this high-speed rail line. She is also well aware of my concerns about the economics of the project. How sure is she that the actual costs in their entirety will be kept to the amounts we have been talking about, and how realistic is it for Britain to afford this project at this very difficult time economically?

Justine Greening Portrait Justine Greening
- Hansard - - - Excerpts

I would argue that we cannot afford not to do this. The cost to the taxpayer will start once Crossrail has finished. On the overall costs, High Speed 1 was brought in on time and to budget, and our costing includes a substantial allowance for so-called optimism bias, because we know that such projects tend to grow in cost. If anything, I would aim to bring it in under the amount we have budgeted for, but we have allowed for some optimism bias, as we do for these projects.

High Speed 2

Andrea Leadsom Excerpts
Thursday 13th October 2011

(13 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

I beg to move,

That this House has considered the matter of High Speed 2.

I am delighted to have the opportunity to open the debate, and I am particularly grateful to all the Members —in all parts of the House and on all sides of the debate —who have turned up to participate. It is an incredibly important debate, because it involves £32 billion of taxpayers’ money. I am delighted to see that my right hon. Friend the Secretary of State for Transport is not present, because, being an eternal optimist, I believe that he is delaying his decision until December—as he certainly should—and is keen to listen to the debate as it progresses. I know that not just you, Mr Speaker, but many right hon. and hon. Members have taken a great interest in this subject. Let me mention in particular my hon. Friends the Members for Lichfield (Michael Fabricant) and for Kenilworth and Southam (Jeremy Wright).

It is fashionable for those who oppose HS2 to be dismissed as nimbys. Let me make it clear that I am here today not just as a concerned constituency MP but as someone with 25 years of experience in finance, including project finance, and that I am determined to defend the taxpayer against what I consider to be an unjustifiable and eye-wateringly expensive project. If the route went from Truro to Paddington, or from Leeds to Edinburgh, I would still be here today defending the taxpayer.

When I first heard about HS2 I thought it was a superb idea, but 18 months later all the proposed benefits have fallen away one by one, and there is no hard evidence that spending £32 billion can truly be justified. For instance, there is no evidence that this project will solve the north-south divide. In fact, there is plenty of evidence from the experience in France and Germany, and from our own HS1, that high-speed trains can suck development out of the regions and into the major cities.

I also have an intuitive concern about the point-to-point nature of the project. The north is not a place; it is a region. Those close to the terminals will benefit of course, but it is unclear how people outside those areas can directly benefit. I recently spoke to my former constituency chairman in the Knowsley South seat, which I contested in 2005, and his view is that Knowsley South will end up paying its share of the cost of this project but will get little, if any, benefit.

Paul Maynard Portrait Paul Maynard (Blackpool North and Cleveleys) (Con)
- Hansard - - - Excerpts

The north is not a region. It is made up of three regions—the north-west, Yorkshire and Humber and the north-east—all of which have their own identities, which I hope my hon. Friend will respect.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I thank my hon. Friend for making that point, and I certainly do respect the right of people in the north to economic regeneration. I am speaking as much for them as I am for people in Cornwall and the Isle of Wight when I say that £32 billion spent on this project is the wrong use of taxpayers’ money.

None Portrait Several hon. Members
- Hansard -

rose

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I would like to make some progress, if I may.

There is no hard evidence that this project will reduce unemployment in the north. HS2’s own estimate of 30,000 new jobs—

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

The figure is 40,000, my hon. Friend says from a sedentary position, but some 73% of those jobs will be generated in and around London, not in the north. Moreover, every one of those jobs will be associated with £300,000 in costs, which is about five times more than the cost of job creation in other infrastructure projects.

None Portrait Several hon. Members
- Hansard -

rose

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I want to make one further point before giving way again.

On HS2’s green credentials, HS2 itself admits that at best the project is carbon neutral. That leaves me pondering whether £32 billion of taxpayers’ money spent on a project that essentially only cures the capacity problems on the west coast main line is good value for money. It blatantly is not. I am not alone in thinking that. Organisations including the RAC Foundation, the Institute of Economic Affairs and the TaxPayers Alliance seriously challenge the business case for HS2.

Angela Smith Portrait Angela Smith (Penistone and Stocksbridge) (Lab)
- Hansard - - - Excerpts

London’s Crossrail was given the go-ahead by this House on a consensual basis. Surely what is good enough for London is good enough for the rest of the country?

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I am glad the hon. Lady raises that point, because it is ludicrous nonsense. Anybody who has any knowledge whatever of assessing such projects and making sure they offer value for money would say it is nonsense. This is not our money; it is the taxpayers’ money and it belongs to the country. We should not spend money on HS2 on the grounds that we did so for Crossrail. That is just nonsense.

None Portrait Several hon. Members
- Hansard -

rose

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I want to make a little more progress, if I may.

I hear arguments that lots of other countries have high-speed rail so we need it to be able to keep up and compete with them, but the truth is that France, Germany and China are very different from our country. They each have a far greater land mass and much longer distances between cities. Furthermore, their high-speed railways follow existing transport corridors, and their non-high speed trains are extremely slow, unlike our existing inter-city trains, which are technically high-speed, with a top speed of 125 mph.

I also hear arguments that we should replicate the fabulous experiment with HS1. Yet a wealth of evidence suggests that commuter services running parallel to the HS1 link have become more expensive, have far more stops and far fewer trains running along the line, in order to subsidise HS1. Even the chief engineer of HS2 Ltd told me that, as a Kent commuter, he has had to get used to more expensive train fares in order to subsidise those using the HS1 service.

If all else fails, we hear that killer argument, “This is about a vision for Britain. This is like the great Victorian railways. It is like the fabulous post second world war motorways.” I am sorry, but I just do not buy that argument. The Victorian railways were largely privately funded The motorways are fabulous, but they have benefited every town and village in this country, because they have junctions every few miles. By contrast, every family in Britain will pay £1,000 for HS2 but 99% of people in this country will use the service less than once a year, and the wealthiest will use it four times more often than the poorest. That is a massive skewing of scarce resources.

Mark Garnier Portrait Mark Garnier (Wyre Forest) (Con)
- Hansard - - - Excerpts

Does my hon. Friend agree that although £32 billion is a great deal to spend on an infrastructure project, it is probably a welcome sum to spend on the supply side of our economy? Does she further agree, however, that it could be better spent on more local projects, such as the Stourport relief road in Kidderminster?

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

My hon. Friend makes a good point, and we could have a fabulous relief road for £32 billion. He makes the serious point that there is a huge opportunity cost to spending this amount of money on HS2.

None Portrait Several hon. Members
- Hansard -

rose

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I will give way in a moment, but first I wish to discuss the business case for HS2. HS2 Ltd claims that there is a net benefit ratio of two, which means a £2 return for every £1 spent. That is pretty much the minimum we could expect from a rail project, but even that modest claim makes some enormous assumptions. For example, a core, but ludicrous, assumption is that the time spent on a train is completely wasted, so we can attribute a value in pounds to any minute saved on travel. That would not matter so much if it were not for the fact that more than 50% of the £20 billion return claimed for this project comes from the time savings. That is simply ludicrous.

A second enormous assumption is made in the passenger forecasts. HS2’s forecasts are heroic when compared with Network Rail’s own assumptions over a similar period. Surely we should learn the lesson of history. By 2009 Eurostar had achieved only 37% of the passenger numbers forecast when the HS1 link was built. We simply cannot continue to make these massively optimistic forecasts. The Public Accounts Committee took the Department for Transport to task on this point, and the DFT agreed that it would put in far greater downside assumptions for its next infrastructure project.

Hugh Bayley Portrait Hugh Bayley (York Central) (Lab)
- Hansard - - - Excerpts

If the hon. Lady represented a constituency further away from London than Northamptonshire, she would value the time savings that would allow businessmen to meet their business contacts more quickly. Has she not seen the PricewaterhouseCoopers assessment that within three years of the line being completed the Government could cover their costs and get £6 billion or £7 billion in addition by floating the railway to the private sector?

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I thank the hon. Gentleman for that intervention. Has he seen the Mott MacDonald report showing that since the advent of wi-fi and the internet the value of time spent on a train has been increasing exponentially every year? It is ludicrous to assert that there is no value in time spent working on a train.

None Portrait Several hon. Members
- Hansard -

rose

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I wish to make some more progress. Families up and down the country are feeling the pinch desperately. We are in an economic crisis, yet this project is costing the taxpayer £1 billion even before a single piece of track is laid in 2015—that sum is just to pave the way for HS2.

I wish now to discuss the ludicrous time frame. Nothing is going to get built before 2026. When I commute between Euston and Milton Keynes in peak hours, as I often do, it is not a case of, “Can I get a seat?”; it is a case of, “Can I physically get standing room on the train?” There is a massive capacity problem right now, and it cannot wait until 2026. It certainly cannot wait for 21 years, until the full “Y” is completed. Man might not land on Mars by 2032, but it is entirely possible that there will be technological changes by then that mean that HS2 is out of date before it is even finished.

Baroness Bray of Coln Portrait Angie Bray (Ealing Central and Acton) (Con)
- Hansard - - - Excerpts

Does my hon. Friend not accept, however, that HS2 was a manifesto promise that was extremely valuable to people like me who were campaigning against a third runway at Heathrow? We were going to put people on trains, not planes, and phase 2 of this project will deliver precisely that.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I thank my hon. Friend for that intervention. All I can say to her is that when the facts change, we should change our minds. HS2 has not fulfilled its early promise. We simply cannot say that we will spend £32 billion because we broadly scoped something out in our manifesto that looked as if it would deliver the earth.

Julian Huppert Portrait Dr Julian Huppert (Cambridge) (LD)
- Hansard - - - Excerpts

Will the hon. Lady give way?

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I will not give way again. I am sorry, but lots of people want to speak.

I am no rail expert, but there are lots of people who are, and they have put forward a broad range of different options that the Government and the Department for Transport should consider as alternatives that would offer more jobs, and faster and greater capacity while improving our existing rail infrastructure. I want to mention a few. We could lengthen existing trains from nine carriages to 12, and we could convert more from first class to standard.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I will not give way again.

We could consider solving the bottlenecks and pinch points that are so frequent along routes that slow down the system and give us less capacity. We could consider reopening old branch lines, particularly those that would enable passengers to switch between the east coast and west coast main lines and the Chiltern line. That would solve part of the problem in the firewall argument. We could consider solving the artificial peaks in demand generated by our appalling fare structure. We could even consider a new line just between London Euston and Milton Keynes so that the west coast main line could be dedicated to taking passengers to the north of England far faster and on a far more frequent service.

Julie Hilling Portrait Julie Hilling (Bolton West) (Lab)
- Hansard - - - Excerpts

I thank the hon. Lady for giving way, because it strikes me that her argument is that HS2 is a bad, bad idea, but that it is all right if we build an extra line between London and Milton Keynes. Is she then saying that those of us who live in the north, the north-west and Yorkshire and Humberside should not be allowed to travel on trains? I am bemused.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

If the hon. Lady had listened, she would have heard that I said we should consider building a dedicated local line so that the west coast main line could be exclusively available to those wishing to travel fast to the north of England on the inter-city train. It is nonsense to say that we should build a dedicated £32 billion line instead of considering a proper solution to the capacity problem. The final potential solution we should be considering is giving the right spending priority to rolling out superfast broadband.

Archie Norman, the chairman of ITV, has said:

“Scrap HS2 now and announce instead £17 billion of spending…to bring about the biggest improvement in history of Britain’s existing railway.”

I am genuinely sorry to be so at odds with my Government and with many Members over this project, but we must seriously consider whether spending £32 billion of taxpayers’ money on a project that will deliver nothing until 2026 is worth while. In my view, it is not. It is monumentally expensive and the time scales are so long that they become satirical. As a result, HS2 risks being a vast white elephant that is out of date before it is even completed.

HS2 is not visionary, it is not green and it is definitely not economically sound. We can and must do better. I urge the Government, in the strongest possible terms, to reconsider this project so that it does not become a triumph of political will over economic sense.

None Portrait Several hon. Members
- Hansard -

rose

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

Does my hon. Friend accept that if we are going to make the case for “not only but also”, as he described it, the case for HS2 needs be made after the “not only”? In other words, if we are trying to make an economic argument, we have to add on the incremental improvements to be made and then justify HS2 expense on top of that.

Stephen Hammond Portrait Stephen Hammond
- Hansard - - - Excerpts

There is one fallacy with my hon. Friend’s argument. Simply speeding up the current network and alleviating some minor problems is no substitution for high-speed rail. It is clear that high-speed rail would at least double capacity, and on certain parts of the route, the capacity increase would be significantly more than that.

The Y-shaped high-speed network across the UK would bring a benefit-cost ratio of about 2:6. For the London to Birmingham section, the ratio would be 2:0. That shows that the case for going further north becomes more compelling and adds to the economic benefit. The proposals in “A Better Railway for Britain” would have a benefit-cost ratio of 1:4. Those ratios prove that high-speed rail is significantly better than some of these hotch-potch alternatives in “A Better Railway for Britain”.

--- Later in debate ---
Hugh Bayley Portrait Hugh Bayley
- Hansard - - - Excerpts

My hon. Friend has been a great champion of improving the rail infrastructure in Yorkshire and the north of England, and for connecting the north to jobs and markets in the south of England. We as British citizens have every bit as much right to be connected to our country’s capital—and, through the capital, to Europe—as people living in the south of the country.

Hugh Bayley Portrait Hugh Bayley
- Hansard - - - Excerpts

I give way to the hon. Lady, as she proposed the debate.

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I thank the hon. Gentleman. If HS2 is such a fantastic project, does he think that the private sector will finance it?

Hugh Bayley Portrait Hugh Bayley
- Hansard - - - Excerpts

That is a really good question, which I ask the hon. Lady to think about. The hon. Member for Wycombe (Steve Baker) made the same point, suggesting that the only test for whether there is an economic case is whether private investors would undertake a project on their own without substantial Government investment. Had that argument been applied to the building of the M40, the connection between his constituents in Wycombe and London, Birmingham and Oxford, it would never have been built. Exactly the same could be said with regard to the link between the hon. Lady’s constituency and London via the M1.

Big public transport infrastructure projects need political backing and leadership from Governments, and this project had it from the previous Government and has it from the current Government, which will give investors confidence. However, it will not get that investor confidence without Government cash. Had we not had the public investment in motorways in the ’60s and ’70s, just think out of the box about the economic state that our country would be in now. There are some local interests to be protected, which I understand, but the real test for the Conservatives now is whether or not they are going to speak for the whole country. I remind hon. Members that the Conservative manifesto stated:

“A Conservative government will begin work immediately to create a high speed rail line connecting London and Heathrow with Birmingham, Manchester and Leeds. This is the first step towards achieving our vision of creating a national high speed rail network to join up major cities across England, Scotland and Wales. Stage two will deliver two new lines bringing the North East, Scotland and Wales into the high speed rail network.”

I wish to make several points in the short time remaining. First, it is important that the high-speed wing of the “Y” that goes to Yorkshire and the north east leaves the line south of Birmingham, so that it can connect the three great east midlands cities of Leicester, Derby and Nottingham, through the Sheffield city region, to Leeds.

Secondly, it is essential that that line joins the existing east coast main line, which for some time will remain the link from Yorkshire to Scotland, south of York. The reason for that is partly self-interest—I am speaking as a York Member—and partly because York is a rail hub and the most interconnected station in the north of England, at least east of the Pennines. If we are to get feeder services, good connectivity with York is important.

Thirdly, the link to Scotland is extremely important, and the most viable first link should be from Leeds to Edinburgh and on to Glasgow, because that would provide connectivity with Tyneside and Teesside on the way, whereas pushing the line north from Manchester faces the environmental barrier of two national parks, and there are very few people, but many sheep, between Lancaster and Motherwell. I ask the Government to plan for the connection first to go through the east coast corridor.

Finally, it is not a case of investing in either the current infrastructure or High Speed 2. The country needs both and the Government must commit to both.

--- Later in debate ---
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

I congratulate the many colleagues who have spoken in this debate, and I am sorry for those who wanted to speak and did not. In particular, I pay tribute to my hon. Friend the Member for North Warwickshire (Dan Byles), who was instrumental in securing the debate. I am sorry that we did not get to hear from him.

I reiterate that I think we can all agree that there is a massive capacity problem not just on the west coast main line but across our entire rail network, and it is absolutely right that the Government should consider ways to improve capacity, rail infrastructure and economic development across the UK. However, I go back to the fact that HS2 is not a “build it and they will come” project. We should not look at a £32 billion expenditure as something that we can just do on the hoof and expect the return to come. There has been plenty of anecdotal evidence today—so-and-so says this, and so-and-so says that—but I have heard no hard evidence that HS2 will be good value for money. This is not our money; it is the taxpayers’ money. As my right hon. Friend the Minister so eloquently said, let us hope that we, like the Victorian railway owners, do not go bust and lose our shirts over it.