High Speed Rail (Preparation) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (Preparation) Bill

Natascha Engel Excerpts
Wednesday 26th June 2013

(11 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

We will be looking at that. I will say a bit more about costs a little later, if my hon. Friend will wait. As always, we will look at how we finance, and not necessarily just in respect of the area to which he has referred. We could see private sector investment in some of the stations that we are going to develop. I will say something more about the stations in a few moments.

We will deliver the investment to develop new stations and growth at places such as Old Oak Common in west London, where we will invest more than £920 million in a new hub linking the west country, Crossrail and HS2. At Curzon Street in Birmingham, we will invest £335 million on station developments. Similar investments are due in Manchester, Leeds and other great railway centres such as Sheffield and the east midlands.

HS2 will also allow for significant improvements to the rail service on the existing main north-south lines, providing benefits for towns such as Milton Keynes, Tamworth and Lichfield. It will provide real scope to get more freight on to the railways, which I would have thought the hon. Member for Brighton, Pavilion (Caroline Lucas) would welcome. It will also free up capacity on the M1, the M6 and the M40.

My second point this afternoon is about the Bill before the House. It will authorise essential expenditure on the preparation work for high-speed rail. Planning and building the line will take time.

Natascha Engel Portrait Natascha Engel (North East Derbyshire) (Lab)
- Hansard - -

On the point about this legislation being the paving Bill and agreeing the expenditure before the line gets built, will the right hon. Gentleman assure the House that he will publish the receipts relating to everything spent as we advance to building the line, so that we can assure ourselves annually that the money spent represents value for money to the taxpayer?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I am about to make exactly that point; obviously, somebody else has an advance copy of my speech.

The line will be overseen and delivered by successive Parliaments, which is why it is right to provide Parliament with the opportunity to debate the project. The hybrid Bill will provide additional opportunities for closer scrutiny of HS2. This is the moment for Parliament to demonstrate that it is backing British business, jobs and growth by backing HS2.

Let me say how the Bill will help achieve those aims. Without this legislation, Treasury rules would limit the amount of work that could be done or undertaken until after Royal Assent on the hybrid Bill. That includes design work on the construction of the line, planning the movement of utilities and carrying out ecological surveys. The legislation will also ensure that future spending on the discretionary property compensation is compliant with the PAC requirements.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I assure my hon. Friend that, if he has a little patience, I will say something about that exact point a little later.

The PAC requirement states that when there is significant new expenditure that is likely to persist, authority should normally be sought from Parliament. I appreciate that many hon. Members have concerns about the authorisation of expenditure on early works in advance of the subsequent hybrid Bill. That is why this Bill ensures complete transparency in what we are doing, when we are doing it and—crucially—how much we are spending.

The Bill creates a duty on the Secretary of State to produce an annual financial report on the amount of expenditure incurred, allowing Parliament to keep a check on the costs and progress. I hope that that answers the point made by the hon. Member for North East Derbyshire (Natascha Engel).

Natascha Engel Portrait Natascha Engel
- Hansard - -

Will the Secretary of State publish the receipts?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I will look at the detail of that. I am certainly determined that Parliament should be kept well informed and, of course, the company will be open to the scrutiny of the Public Accounts Committee and the National Audit Office reporting to the PAC. There is a way in which the House can keep an eye on the matter.

My third point is about funding. We can today welcome the allocation made by the Chancellor in infrastructure investment. Tomorrow, the Chief Secretary to the Treasury will say more about our plans. I know that in the context of the Bill, the House will want to be updated on the cost of HS2. I can therefore tell the House that tomorrow I will be writing to the chairman of HS2 Ltd to set a target price for delivering phase 1 of the project. That amount is £17 billion at 2011 prices. That takes account of the design and environmental changes to improve the scheme. Those changes include a tunnel from Old Oak Common to Northolt, design changes at Euston station, and a tunnel under the M6 near Birmingham.

As a responsible Government, we must be prudent, which means allowing the right level of contingency. In addition, therefore, we have set an overall indicative amount for the budget for phase 1 of £21.4 billion. For phase 2, it is £21.2 billion, so the total is £42.6 billion at 2011 prices. That includes £12.7 billion of contingency.

--- Later in debate ---
Natascha Engel Portrait Natascha Engel (North East Derbyshire) (Lab)
- Hansard - -

I shall vote for the amendment and against the Bill’s Second Reading, because I believe that this is the wrong scheme at the wrong time.

In the few minutes available to me, I want to present a passionate defence of nimbyism. I think that this is a case less of “not in my back yard” than of “not through my front door and the rest of my house”. When we consider the people whose lives this project is affecting, we realise that the position is far too serious for them merely to be asked “How much compensation do you want?” People living in the villages and towns that the trains will pass through if the scheme goes ahead are being expected to wait for 20 years with it hanging over their heads, seeing no shovel in the ground anywhere in North East Derbyshire, unable to sell their homes, and money is being lost hand over fist in very small rural businesses.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - - - Excerpts

I pay tribute to the hon. Lady. There is rarely an occasion on which I do not agree with her. Constituents of mine have been literally suicidal because of the complete lack of sympathy for them, and because they are unable to obtain compensation although their businesses are failing. Does she agree with me that we must get the compensation right?

Natascha Engel Portrait Natascha Engel
- Hansard - -

Absolutely. It has already been suggested that the compensation schemes should mirror those in other countries such as France, where big infrastructure projects go ahead with no problems because the schemes are so generous. However, it is not compensation that people are after. They are saying “I have lived in this town, or this village, for four or five generations and I do not want to move. I am being asked to accept all the disbenefits of HS2 without gaining any of the benefits.” If I represented a major town, I might be able to see the benefits of this project, but it does not bring us in North East Derbyshire any economic benefits. In fact, it does exactly the reverse. I cannot see the sense of what is happening, and I shall explain why. I would welcome the Minister’s response to this.

Derbyshire county council has spent many years cleaning up, developing and redeveloping sites that were ruined by the results of the end of the mining industry and the steel industry in Sheffield. For decades those places have slowly been brought back into the economy. Up to £77 million has already been spent in Markham Vale, an area that I share with my hon. Friend the Member for Bolsover (Mr Skinner). That £77 million will, in effect, be wiped out because HS2 will be going straight through it. Chesterfield canal is one of the best and biggest pieces of redevelopment and regeneration in North East Derbyshire, bringing investment to the Chesterfield waterside project. It will now not have a waterside project, and will now not get the £310 million of investment in the local economy.

What about the small businesses in towns and villages such as Renishaw, too? Such businesses become the focal points of villages. Already, only months after the route has been published, a local wedding business has lost £70,000, some 20 years before anything is due to happen.

Andrew Bridgen Portrait Andrew Bridgen
- Hansard - - - Excerpts

Does the hon. Lady share my concern that about 30% of the businesses on the route that could be affected have suggested they would close down, rather than relocate, so all those jobs would be lost all the way along the route?

Natascha Engel Portrait Natascha Engel
- Hansard - -

That is absolutely right. This affects rural areas differently from how it affects cities. We are talking here about HS2 and a national economic policy, but we are not distinguishing between the cities and the rural areas.

I was going to go into the detail of the issue of connecting cities. This absolutely will connect cities, but that is not the issue for people who live in North East Derbyshire. In Apperknowle, what people want is to get a bus to the hospital, not to go to London. In each of the recent public meetings I have held, attended by hundreds of people, we asked when was the last time anybody had been to London. In one group of 300 people, five people had been to London in the past five years. This is not being done for the benefit of the people of North East Derbyshire.

I have serious doubts about the business and economic case, too, but those concerns have been raised by other Members, so I will not rehearse them. I do want to say, however, that I have found the consultation to be the most disappointing part of this whole project. HS2 Ltd has been very good at consulting stakeholders, but the stakeholders do not include those people whose houses and businesses the route is going through. The project has failed at the level of going and talking to people—not just persuading them of why the train has to come through their front room, but explaining why a high-speed rail link is needed. People are just not convinced.

At the same time as there is the hardship scheme, we are being told the route has not yet been fixed and the consultation has not even been opened, and therefore no decisions can be made on where the route is going to go. At the same time, however, not very far from my constituency, a kink has been put in to get the train to go around Firth Rixson steelworks in Sheffield. Why are we allowing and announcing changes to the route when the consultation has not even been opened? If the Department for Transport and HS2 Ltd are open to persuasion, will they please put in a kink and go all the way around North East Derbyshire?