It is a pleasure to serve under your chairmanship, Mr Bone. I congratulate my hon. Friend the Member for Enfield North (Nick de Bois) on securing the debate and presenting an impassioned case for improvement to rail services in the borough of Enfield. I recall him raising the issue in Transport Question Time shortly before the summer recess. I know that he is a staunch campaigner on these matters in his constituency, standing up for the interests of local commuters in a highly effective way, alongside my hon. Friend the Member for Enfield, Southgate (Mr Burrowes), whom it is great to see in the Chamber today. As the near neighbour of both my hon. Friends—I represent Chipping Barnet—I well understand the importance of transport links in the London suburbs.
My hon. Friend the Member for Enfield North set out his concerns about reliability and performance. As we have heard this morning, train services to Enfield are operated by both National Express East Anglia and First Capital Connect. In my ministerial capacity, I take a close interest in the performance of all train operators, but my role as MP for Chipping Barnet means that I have an additional reason to scrutinise the performance of FCC on the Great Northern line, as it serves my constituency as well as Enfield.
That franchise experienced significant disruption between October 2009 and January of this year. That was largely caused by industrial action, and Thameslink services were the worst affected. However, there were also problems on the Great Northern line, which serves Enfield. It was particularly regrettable that action by drivers meant that no trains ran on Remembrance Sunday last year on the suburban Great Northern line services. I am relieved that the problems that led to that disruption have gone away for the moment, and that First Capital Connect’s overall public performance measure has recovered to reach the levels prevailing prior to that episode. However, the underlying issue for the railway—namely that on a number of routes drivers are not under a contractual obligation to work on Sunday—obviously has yet to be resolved.
As far as National Express East Anglia—the main focus of my hon. Friend’s remarks this morning—is concerned, in the latest period for which complete performance data are available, 90.8% of NXEA’s trains arrived on time, according to the PPM moving annual average figure. That is an improvement, albeit a modest one, on the 88.6% reliability levels that it inherited from the previous franchise in 2005. It is also worth noting that PPM figures are aggregated across a diverse franchise, covering long-distance, rural and commuter services. That means that they do not necessarily give us all the answers, when it comes to the specific performance of Enfield services. As my hon. Friend pointed out, NXEA’s most recent national passenger survey results indicate that it is below the average for London and the south-east. I agree with my hon. Friend that there is room for improvement.
My hon. Friend referred in some detail to capacity and his constituents’ concerns about crowding. The latest passenger loading data confirm that overcrowding is indeed an important issue on some Enfield services. Anxiety about overcrowding in a number of parts of the UK’s rail network increased during the previous Government’s term in office. In my view, one of Labour’s most serious mistakes was that it took far too long to wake up to the seriousness of this problem. It took, for example, over a decade to get moving on projects such as Crossrail and Thameslink. Four successive Labour Secretaries of State for Transport promised extra carriages under the HLOS—high-level output specification— programme, but that political decision came late in the day and less than a quarter of what they promised had arrived by the time that Labour left office. That leaves the current Government to deal with the problem during very lean times, when the pressing need to deal with the deficit that we inherited from our predecessors places intense pressure on the public finances.
The issue for consideration today is how we address the problems experienced by commuters—problems of the kind outlined by my hon. Friend—in an affordable way, consistent with our pledge to address the deficit that we inherited from the previous Government.
First, I should mention that I meet senior representatives of the rail industry and the Office of Rail Regulation every month to assess performance levels on all lines, and to scrutinise carefully the record of Network Rail and the train operators. Of course, the ORR takes the lead on these matters, but I am grateful to those who participate in what is a very useful process for me. Following on from my hon. Friend’s intervention at Transport questions, I raised the issue of NXEA services in Enfield with the group.
As my hon. Friend was kind enough to acknowledge, the Government’s wider reform agenda has the potential to drive forward progress in addressing a number of the issues that he raised. Our approach has three parts: first, reform of Network Rail; secondly, reform of rail franchising; and thirdly, taking forward capacity enhancement programmes where they can be reconciled with our commitment to address the deficit.
As hon. Members will be aware, making progress on reliability and delivering extra capacity depends in no small part on ensuring that Network Rail, as the infrastructure provider, delivers high-quality services to its customers in an efficient and cost-effective way. In the case of the NXEA services that we are considering, the most recent industry figures indicate that Network Rail was responsible for just over 60% of delays on the franchise. In particular, I am advised that Network Rail infrastructure has suffered a number of overhead line problems.
I very much welcome the fact that the franchise operator and Network Rail are working together to try to address the problem. However, if we are to improve Network Rail’s performance and reduce its costs, the company needs to be made more accountable for its actions, and that includes demonstrating greater accountability for its decisions on executive bonuses. We are considering a number of options, and we are working with the ORR and other stakeholders to take that work forward. I should make it plain, however, that the status quo is not acceptable, and we will be making changes in due course.
As we heard this morning, the Government are consulting on reforms to the rail franchising system, and those are the second element of our strategy for addressing the problems outlined by my hon. Friend. The reforms are aimed at moving away from a system in which Whitehall specifies highly detailed and prescriptive inputs for franchises—what my hon. Friend referred to as the command-and-control approach to the railways. Instead, we want a stronger focus on the quality of outcomes for passengers, while giving the professionals who run our railways more flexibility to apply innovation, enterprise and specialist expertise in working out the best way to deliver outcomes.
We need a more qualitative approach to the assessment of franchise bids—an approach that judges the quality of a bid’s overall package of proposals to invest in the railways, improve services and grow passenger numbers—rather than focusing solely and exclusively on the binary question of the level of subsidy or the premiums to be paid. Again, I hope that that will address some of the problems involved in what my hon. Friend referred to as the money-go-round.
Franchises should also be longer. We expect 10 to 15 years to become the normal, expected length, with the possibility of franchises running for up to 22 and a half years, where significant investment is promised. The increased certainty that longer franchises will give train operators will encourage private sector investment in the railways and help to deliver the improvements that passengers want. My hon. Friend called for us to include better services, better stations, longer trains and better rolling stock. On the specific improvements that he asked for, I hope that he will understand that I cannot prejudge the process that will commence once the franchise re-let is under discussion, but I encourage him to take part in the consultation on the re-let as and when it starts.
Our reformed franchises will set demanding passenger satisfaction outcomes for train operators to achieve. Train operators that do not comply with franchise requirements will face sanctions. Ultimately, in the case of very serious failure, sanctions will include termination of the franchise. The approach that we have set out in our consultation document will enable and incentivise train operators to respond more effectively and efficiently to commuters’ concerns. I expect our proposed measures to help address a range of the customer service and capacity issues that my hon. Friend outlined.
At this point, I should respond to my hon. Friend’s questions about the timetable for re-letting the East Anglia franchise. I reiterate that I decided to cancel the franchise competition initiated by the previous Government to ensure that the new franchise was issued under the reformed system, and to ensure that passengers using NXEA services could have the benefits of the changes that the coalition has promised to deliver. The franchise was due to be re-let and to commence on 1 April 2011, but a contractual extension has been agreed until October 2011.
I turn now to the third element of Government policy that is relevant to the matters under consideration: delivering additional capacity, where that can be reconciled with our commitment to address the crisis in the public finances that we inherited from the previous Government. The Department for Transport is funding 120 new carriages for the East Anglia franchise. Most will be used on the Stansted Express route, with some deployed on Cambridge commuter services. The carriages are expected to enter service from March 2011, and that will free up carriages that will be used to strengthen services on other parts of the NXEA network. The decisions on exactly where those carriages will go have yet to be made, but I am advised that stations in Enfield will be among those that benefit from the extra capacity.
Additional capacity will be introduced on First Capital Connect lines to Enfield in December 2010. In the morning peak, five of the six stations in the borough—Gordon Hill, Enfield Chase, Grange Park, Winchmore Hill and Palmers Green—will have three additional six-car train services to Moorgate, and one of the existing services will be doubled in size from a three-car to a six-car train. The five stations will also be served by additional services to Hertford North and Gordon Hill from Moorgate. The remaining station, Crews Hill, will be served by two additional six-car train services.
In the evening peak, the same five stations will have an additional three services, two of which will go to Gordon Hill, with the third going to Hertford North. That is except for Grange Park, which will have two additional services running to Gordon Hill. All those additional services will be six-car trains. Additional services will also run from Gordon Hill to Moorgate. Crews Hill will benefit from an additional six-car train running to Hertford North. There will be three more services during the morning peak, and extra carriages will be added to one of the existing services. Evening peak service capacity will see similar improvements and increases in capacity. Those morning and evening peak improvements are part of the additional 3,800 peak-time seats being added to Moorgate services from December.
In conclusion, I understand my hon. Friend’s concerns. The Government are working to ensure that we have a reliable railway and that crowding problems are addressed. We face the difficult task of achieving that at the same time as tackling the state of the public finances that we inherited from the Labour Government. I have summarised some of the most important initiatives that we are taking to seek to achieve those important goals. When the consultation process begins for the re-let of the franchises serving my hon. Friend’s constituency, I very much hope that he will make his views known. I am sure that they will be a valuable and welcome contribution to that important process, just as his remarks this morning have been a valuable and welcome contribution to the debate.
(14 years, 2 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I congratulate the hon. Member for Sedgefield (Phil Wilson) on securing this debate on this important issue.
Before the interval for voting, I was congratulating the hon. Member for Sedgefield on his passionate support for the IEP. I thank him for the correspondence that he has sent to the Department, setting out a number of the points that he has raised, and for the report that I received today on the case that he has prepared for the IEP project. I am grateful for all of those. My colleagues at the Department and I will be giving serious consideration to all the points raised in the report and in today’s debate.
I welcome the fact that the hon. Gentleman, alongside a delegation from his constituency and around the north-east, is due to meet my right hon. Friend the Secretary of State for Transport to put these points to him directly. The coalition Government have made it clear that rail has a key part to play in our transport strategy. Although our priority has to be tackling the deficit that we inherited, the Government fully recognise the significant economic benefits generated by investment in transport infrastructure—a point that has been explicitly acknowledged by the Chancellor of the Exchequer. Nevertheless, we must apply a rigorous cost-benefit analysis to all our planned infrastructure projects, targeting investment where it makes the most difference and where it will generate the greatest economic benefit.
That is the background against which we need to assess the future of the IEP. There can be no doubt that the project has encountered a degree of controversy since the previous Government embarked on it over half a decade ago. The objective was, as we have heard, to replace Britain’s fleet of InterCity 125 trains, and to invest in capacity and passenger journey improvements on the east coast and Great Western lines. The procurement process began early in 2007, and two years later, Agility Trains was announced as the preferred bidder. An important component of Agility is Hitachi, the manufacturers of the Japanese bullet train.
As we heard from the hon. Member for Sedgefield, Hitachi simultaneously announced its plans to build the new train order in the UK. This summer, the company announced that its preferred site for a new manufacturing facility is Newton Aycliffe in the hon. Gentleman’s constituency. As he has explained, that town has historic ties with the railways. As we heard today, Hitachi has said that it proposes to use the site in County Durham to bid for orders abroad, and has aspirations to export British-built trains to Europe. The parallel with the successful model used by many Japanese car manufacturers is obvious; it is a very positive example of what can be achieved. As the hon. Gentleman explained, the facility has the potential to create hundreds of new jobs, and potentially many more in supplier industries. He has put the case articulately and strongly for the economic benefit that will accrue to his constituents and the wider north-east.
Of course, such inward investment would be very welcome and entirely consistent with the Government’s stated goal of rebalancing the economy and promoting manufacturing industry. I take on board the strong points that the hon. Gentleman made about the skills base in the north-east, and how appropriate it would be to support a facility of the kind that Hitachi has announced the intention to build.
However, the hon. Gentleman will, I am sure, appreciate that the decision on the IEP needs to focus on objective and established procurement principles—namely, on whether the project provides the right solution for passengers and the railways; whether it delivers value for money, compared to the alternatives; and whether it is affordable for the taxpayer.
In its original form, the order would have been the single largest procurement of rolling stock ever, and one of the biggest private finance initiative transactions in British history. During the later part of 2008 and 2009, the capacity of the debt market contracted and the previous Government decided that it would be better to split the transaction into smaller parts.
The deteriorating state of the debt market was just one of the challenges that faced the project. A further issue arose when the previous Administration changed their mind on electrification. Having published in 2007 a long-term plan for the railways that had a limited role for electrification, the Government put out the tender for a fleet, with a significant proportion of diesel trains as part of the IEP proposal. Two years later, at the height of the contractual negotiations, the Government announced they had changed their views and proposed to electrify. That meant that the order had to be changed to an electric and bi-mode mix, which led to an increase in costs. By the time Labour left office in May, £26 million had been spent on consultancy and preparation costs, without the contractual close stage even having been reached. That has caused a degree of concern.
The project was in some difficulty when the previous Secretary of State, the noble Lord Adonis, decided to commission an independent review by Sir Andrew Foster. When it was published in July, the Foster report presented a measured and thoughtful analysis of the relevant issues. As the hon. Gentleman has correctly pointed out, Sir Andrew had some very positive things to say about the IEP. He described the proposition as “positive and attractive” in a number of ways. He described the PFI-style funding arrangements as
“novel and well-aligned in terms of financial incentives”.
He concluded that faster acceleration and longer carriages would have a positive impact on network and passenger capacity. He acknowledged that the specification had also taken network sustainability and environmental imperatives seriously. Unfortunately, he also had some concerns about the project. He concluded that the previous Administration had made a number of mistakes on the programme. In particular, they did not engage the railway industry well enough and had sought to micro-manage the process. Importantly, the Foster report also highlighted that although the project has always exceeded the Department for Transport’s economic thresholds, its value for money has seen a decline over time, while its costs have increased.
Although I acknowledge and am extremely sympathetic to the case made by the hon. Member for Sedgefield (Phil Wilson) on behalf of his constituents and the north-east, is the Minister considering carefully Sir Andrew Foster’s conclusion that he is not convinced that all credible alternatives to IEP have been identified? He sets out the case in his report for a short-term IC125 refurbishment, which would be both cost-effective and technically feasible. The skills, buildings and infrastructure enabling that work to be done already exist in places such as my constituency of Crewe, where Bombardier can already carry out that work.
My hon. Friend’s intervention is timely, as I am just about to come to that point. As he rightly says, Sir Andrew did make some points about the possible alternatives to the current IEP proposition.
In response to Sir Andrew Foster’s report, my right hon. Friend the Secretary of State for Transport announced that the Government would use the period up to the spending review to give further consideration to the future of the IEP. In accordance with Sir Andrew’s recommendations, the Government are reviewing all the credible options in light of value for money, affordability and their compatibility with the plans for further rail electrification. That means careful consideration of how the IEP proposal could be reduced in cost, and evaluating alternative ways of addressing the problem that the IEP was designed initially to solve—that is, how to address the problems surrounding the ageing high-speed train fleet. As my hon. Friend points out, the alternatives include the possibility of refurbishing and extending the life of the existing InterCity 125 rolling stock. In that regard, compliance with disability deadlines will be an important factor to bear in mind in the assessment.
Is the right hon. Lady suggesting that the north-east should once again get second best, while the constituency of the hon. Member for Crewe and Nantwich (Mr Timpson) is, I think, served by a line with brand new trains?
I am saying that we have to carry out a very careful assessment of what the right outcome is for this programme, and what the right way is to address the problem of the ageing InterCity 125 fleet. That is what the Government are doing at the moment.
One thing was omitted from the original planned routes for the implementation of IEP, and that is the inclusion of the London-Norwich line, to the great disappointment of the people who live along it. The problem is that the rolling stock is not only ageing, as is that of the high-speed train fleet, but actually the cast-offs from the main lines to the north-east and north-west. If the routes are to be renegotiated, I hope that the line will be included, but I have to say that this is a lunatic way to procure trains. We heard about the Austin Allegro, famously specified by civil servants. I would not like this to be a similar instance of specification by civil servants that is not suitable for industry.
Many parts of the network would like to have extra capacity, and I shall take my hon. Friend’s concerns on board as a representation. Regarding additional projects of that sort, it clearly all depends on what proves to be affordable, but we intend to learn lessons for the procurement process from the experience of the IEP.
As regards reappraisal of the original IEP concept, the Department has listened with great care to the ideas put forward by Agility on how to improve the value for money of its proposition, and I would like to put on record our sincere thanks to Agility for the diligent and constructive work that it has done, in contributing to both the Foster review and the re-evaluation process that followed. I am very aware that the issue is taken seriously in Japan.
Does the right hon. Lady agree with me that the answer is not to give the existing rolling stock a lick of paint, but to invest in the infrastructure? The rolling stock has been around since the 1970s, and the technology that we have brought on board through Hitachi is cutting-edge. The trains that it uses are comparable with the Javelin ones used in Kent, which are some of the best in the country. The kind of technology that Hitachi wants to bring on board is suitable for people in the north-east of England and elsewhere who would benefit from it.
I can assure the hon. Gentleman that the respective merits of the different options will be carefully and rigorously considered before a decision is made. This entire debate will be a helpful contribution to the decision-making process.
The hon. Gentleman mentioned that the Secretary of State for Transport has met the president of Hitachi, as has the Secretary of State for Business, Innovation and Skills. I have discussed the project with the former Japanese Minister for Transport, and the Minister of State, Foreign and Commonwealth Office, my hon. Friend the Member for Taunton Deane (Mr Browne), discussed the matter on a visit to Japan. We are taking the concerns of the Japanese Government on board in discussions on the process. Agility’s proposals are due shortly, and they are likely to include plans to standardise the design of the new trains, as was recently reported in the railway press. I am also advised that Agility expects to offer a significant cost-saving, while still meeting the specification that it was originally asked to meet. We will then be able to complete our assessment of both the IEP and the credible alternatives on an equal footing.
In conclusion, I would like to assure the hon. Gentleman that the Government will take into account the representations that we have received from him today, and the representations in the report that he has submitted to us, along with those that he and colleagues have made in the past. The decision on the future of the IEP will be made on the basis of the fullest possible evaluation of all the relevant matters. I am, of course, well aware that the recent period of uncertainty has been a cause for concern to those with an interest in the project, such as the hon. Gentleman and his constituents, and the Government really appreciate the patience shown by all concerned, not least Agility Trains. However, there is a complex interaction between the IEP and other key programmes under review as part of the comprehensive spending review. In light of that inescapable fact, it seemed impossible to make a sensible and objective decision on the IEP in isolation from the conclusions that we have to reach on those other interdependent projects, and from the overall decisions on the resources available for transport infrastructure.
Although the stage that we have reached means that I cannot give the hon. Gentleman all the answers on the programme, as he has kindly acknowledged, the Government are anxious to resolve the matter, and we will convey the decision to the House as soon as we can, as part of the spending review process in October. I thank the hon. Gentleman again for his contribution, and I look forward to continuing discussions with him on the subject. As I say, we will report to the House as soon as is practical regarding this decision, which is crucial not just for the north-east but for the future of the railway network in this country.
(14 years, 2 months ago)
Written StatementsIn January 2009, the previous Government announced their decisions relating to the future of Heathrow Airport. In addition to supporting the construction of a third runway, a number of additional decisions were taken relating to operations at the airport.
This Government have already made their position clear in rejecting the case for a third runway, and opposing new runways at London’s other main airports—Gatwick and Stansted. I now wish to outline the Government’s position in relation to those additional operational decisions.
I can confirm that we remain firmly committed to retaining runway alternation and will not approve the introduction of mixed mode operations at Heathrow. This Government believe that any potential benefits mixed mode might bring to the airport are outweighed by the negative impact such operations would have on local communities.
Operating procedures known as westerly preference, early morning runway alternation and night-time rotation of easterly/westerly preference have also all brought noise mitigation benefits to local communities. This Government do not intend to revisit previous decisions taken in relation to these procedures and they will continue to operate as they do now.
The previous Government’s decisions in 2009 also included a commitment to end the Cranford agreement. This decision was based on the desire to distribute noise more fairly around the airport and extend the benefits of runway alternation to communities under the flight paths during periods of easterly winds. We support that objective and do not intend to re-open the decision. A number of infrastructure and operational changes by BAA and NATS are needed to implement this decision. The airport operator, BAA, is currently developing proposals for ending the Cranford agreement with a view to confirming the necessary works by the end of this year. I will look to BAA to ensure that proper consideration is given to appropriate mitigation and compensation measures for those likely to be affected by the proposals.
(14 years, 4 months ago)
Commons Chamber10. What progress has been made on the Government’s review of rail franchising; and if he will make a statement.
The Government today launched their consultation on the future of rail franchising policy. Our proposed reforms will lead to longer, more flexible franchises to incentivise private sector investment in the railways, which will benefit passengers and improve value for money.
Given the current poor standard of commuter service that my constituents in Enfield North receive from National Express, as evidenced by the lowest average customer satisfaction rates across the south-east, how will our franchising proposals improve the experience for passengers in my constituency and elsewhere?
We will ensure that the new rail franchising system imposes on train operators demanding performance requirements, based on passenger outcomes and passenger satisfaction. Operators that do not meet those demanding requirements will face serious sanctions that will include, in the most serious cases, termination of the franchise. We believe that longer franchises will lead to more private sector investment and the improvements to stations and railways that passengers want, to improve their journeys. Longer franchises will also enable train operators to build longer-term working relationships with Network Rail, which are so vital to ensure that our railways are run efficiently and deliver value for money.
Many of my constituents in Milton Keynes are angry that despite paying about £5,000 for annual season tickets and having undergone years of misery as the west coast main line was upgraded, they are still denied access to Virgin trains at peak hours; the trains either do not stop at all or—perversely—they do stop, but only to let people off, not on. The long-term solution is the extra capacity that High Speed 2 will deliver, but will my right hon. Friend give an undertaking that when the west coast main line franchise comes up for renewal in 2012, she will ensure that my constituents have fair access to high-speed services?
All representations from the affected communities will be taken on board as the decisions are made. We hope that what will result from the rail franchising reforms on which we are consulting at the moment is a better and more intelligent and flexible approach to timetabling. That will enable the demands of passengers to be more readily met than they are by the current inflexible system. My hon. Friend is right that the long-term solution has to be a new high-speed rail line. There will come a time in the not-too-distant future when the west coast main line will be simply full to bursting and we will need to provide extra capacity. That will release more space for commuting and stopping services on the west coast main line.
The tourist industry in Great Yarmouth is worth almost £500 million, yet the train station is not exactly a welcoming gateway to our town. Residents would like a better station. Will the Minister give some assurance to the residents of Great Yarmouth that under the new franchise agreement we will be able to put some onus on the franchisee and Network Rail, to make sure that they can invest in things such as the stations themselves, so that we can get a better train station for Great Yarmouth?
I recall the discussions that we had on this issue when I visited my hon. Friend’s constituency. I believe that the issue is a prime example of how the reforms that we are proposing could yield significant benefits for passengers. They will give the opportunity for private sector investment in stations such as Great Yarmouth’s. At the moment the franchise is of about seven years, and that simply does not give the certainty needed for private sector investment to pay for itself during the franchise. With longer franchises, we can expect more station improvements of the sort that my hon. Friend wants.
Will the Minister agree to meet a small delegation led by me and my hon. Friend the Member for Coventry North West (Mr Robinson) to discuss the Nuckle project in Coventry? The situation has been going on for a number of years and it needs resolving one way or another.
Given that franchises have failed already, many more franchises are going to fail under what is likely to be a much harsher financial regime. Is it not time to bring things in-house and begin to recreate the state railway systems that operate so well and so much more cheaply on the continent of Europe?
The hon. Gentleman’s views on the railways are well known, although I am afraid that I do not share them. It would have been impossible for there to have been the significant growth in passenger numbers that we have seen since privatisation without the benefits that private sector innovation and enterprise have brought. Reversing things and renationalising the railways would be a retrograde step.
I note from the Order Paper that there are five identical questions on rail franchises from new MPs no doubt keen to impress their Whips. Half an hour before oral questions we had a press release from the Department for Transport announcing a consultation on the new rail franchises. Will the Minister confirm that in the new consultation that she has announced this morning, there will not be any barriers to stop new models, such as mutuals and co-operatives, from taking over franchises?
There would be no barriers to mutuals and co-operatives bidding for franchises if they fulfilled the criteria. All franchise bids will be judged objectively on the quality of the services they will provide for passengers and value for the taxpayer.
4. What plans he has for the future of the port of Dover; and if he will make a statement.
8. What estimate he has made of the number of passenger flights cancelled as a result of travel agents going into administration in the latest period for which figures are available.
In the year to 31 March 2010, 29 companies licensed by the air travel organiser’s licence scheme failed. Under the ATOL scheme, managed by the Civil Aviation Authority, 2,445 passengers were able to complete their holiday and return home without charge. A further 45,114 were entitled to full refunds.
The Minister will know that 180 passengers were stranded at Glasgow airport on Friday, thanks to the collapse of Goldtrail. There were also 16,000 people stranded abroad. How does she propose to try to help those people get compensation? In some cases, they have been told that they will have to wait for at least two years before they get their money back. How can she stop those companies causing such disruption and ensure that people get home as quickly as possible?
The CAA is working hard to repatriate the people affected by the Goldtrail failure, which has caused significant anxiety and disruption to people’s holiday plans. Our officials are working hard with the CAA to ensure that that repatriation effort goes well. We are also urging the CAA to ensure that lessons are learned from XL and the long time it took to process claims. The CAA urges all those who are ATOL protected to submit the relevant documentation so that refunds can be processed as quickly as possible. In the longer term, we need a bigger reform of the way in which the system works.
To refer my right hon. Friend to earlier answers on rail franchising—
13. What progress has been made on the Government’s review of rail franchising; and if he will make a statement.
I refer my hon. Friend to the answer that I gave earlier.
Will the Minister confirm that the review of the Greater Anglia franchise will recognise the vital importance of the east Suffolk line from Ipswich to Lowestoft, and the need for both an hourly service along the whole line and the reintroduction of through trains to London, which are being withdrawn in December?
My hon. Friend will appreciate that it would not be wise for me to start making timetabling decisions at the Dispatch Box. However, we are determined that the franchising reform, on which we will consult in the next few weeks, will deliver improvements for passengers, improve train operators’ ability to respond flexibly to increases in passenger demand on particular routes and help deliver the private sector investment to provide vital enhancements to our railways.
Given that current legislation prevents organisations and companies that do not yet run rail franchises from bidding for them, will the Government consider changing it in their review to allow mutuals and co-operatives to bid for future franchises?
I think that that question has been dealt with already. If mutuals and co-operatives can satisfy the requirements of the franchising process, they will be permitted to bid.
I think this is the appropriate moment to ask my question, Mr Speaker. In her discussions with rail franchises and franchisees, will my right hon. Friend ask them whether they will consider bringing longer trains through stations whose platforms have not been lengthened when they have available rolling stock? That is common on the continent, but we do not do it here, and it would greatly help at overcrowded stations such as Wandsworth Town station in my constituency.
I am well aware of my hon. Friend’s strong campaigns for rail services in her constituency, and our visit to Clapham Junction railway station was particularly informative. She makes a good point about the more flexible use of capacity, and the train operators and Network Rail would certainly do well to take it on board. I suggest she raises it further with them.
14. What recent representations he has received on a compulsory requirement on cyclists under 16 years old to wear cycle helmets.
Will the Minister let my constituents, and those of the hon. Member for Burnley (Gordon Birtwistle), know what progress he has made on the Todmorden Curve rail project?
I know that the local authorities are working hard on this project and have engaged Network Rail to do some important work on it. I very much appreciate the benefits that it could deliver, particularly when tied in with development proposals, if they go ahead. I am keeping a close eye on that. The hon. Gentleman will not be surprised to hear that I cannot give him guarantees on funding at the moment because of the state of the public finances. However, I know that the local authorities are taking this very seriously.
T4. Does my right hon. Friend agree that although high- speed rail services are important to our economy, many communities along the route, whichever may be chosen, will be adversely affected, including some communities in my own constituency? Will he therefore agree to mitigate, as far as he can, the impact on those communities, and will he also agree to—
Last week, I spoke to residents in Heswall in my constituency who are most concerned to get the train to Liverpool rather than their cars. The Wrexham to Bidston electrification project is vital for that. Will the Minister explain briefly what work her officials in the Department are doing to work with Network Rail, Merseytravel and others to take this vital project forward?
We are in touch with Network Rail and Merseytravel on this issue. Indeed, I discussed it with the director general of Merseytravel only recently. The hon. Lady will appreciate that this has been worked on by the Welsh Assembly Government, and I very much hope that progress can be made on it. However, she will appreciate that, as I said previously, the crisis in the public finances that we have inherited means that I cannot give guarantees on additional funding from central Government at the moment.
T5. I see that the shipping Minister has been to Harwich and Felixstowe in the past week. I invite him to come and see the port of Dover, so that he can see at first hand how our plans can be the jewel in the crown of the big society and make Dover the jewel in the crown of the nation once again.
Will the Minister rule out reclassifying Network Rail as a public company, which would be a Railtrack mark 2, and commit to a not-for-dividend organisation?
We are looking at the options for reform of Network Rail. We believe that the status quo is not acceptable, because Network Rail is not accountable enough to its customers or the passengers whom they serve. As for its balance sheet status, we believe that this is a matter for national statisticians. We will make decisions on the future of Network Rail based on what is best for passengers and the taxpayer, and not—as the previous Government did—on the basis of tortuous calculations about whether things are on or off the balance sheet.
T8. One of the projects currently under review in my area is the east-west link road in Camborne and Redruth, which is a crucial element of a broader regeneration project, led by the private sector, that would create 6,000 new jobs. Does the Secretary of State agree that when it comes to prioritising transport projects after the comprehensive spending review, one of the key criteria to apply will be the impact on enterprise and jobs?
(14 years, 4 months ago)
Written StatementsIn a written statement of 17 June, I informed the House that the Department for Transport would shortly begin a consultation exercise on the future of rail franchising policy. That consultation has been published today.
The reforms presented for consultation include longer more flexible franchises aimed at incentivising private sector investment in the railways to benefit passengers. The consultation will provide industry partners, local authorities, passengers and other groups with the opportunity to comment on the Government’s approach to rail franchising. In particular, we would welcome responses on the best way to ensure that the proposed reforms improve the efficiency and value for money of rail franchises, for both taxpayers and fare payers.
The consultation will remain open until Monday 18 October 2010. Copies have been placed in the Libraries of both Houses.
(14 years, 4 months ago)
Written StatementsI regret to inform the House that there was an inaccuracy in the answer I gave to parliamentary question 4042 on 7 July 2010, Official Report, column 265W, about what new rolling stock orders have been placed for each rail franchise since 2007. The table was incomplete and omitted the order, placed in April 2009 by National Express East Anglia, for 120 new EMU vehicles. The full table is reproduced below.
Franchise | Order date | Type | Vehicles |
---|---|---|---|
Southern | May-07 | EMU | 48 |
London Midland | Aug-07 | EMU | 148 |
London Midland | Dec-07 | DMU | 69 |
Chiltern Railway | Jan-08 | DMU | 8 |
Southern | Mar-08 | EMU | 44 |
Virgin West Coast | Sep-08 | EMU | 106 |
National Express East Anglia | Apr-09 | EMU | 120 |
(14 years, 4 months ago)
Written StatementsDuring the passage of the Crossrail Act through Parliament, a commitment was given to Parliament that a statement would be published at least every 12 months until the completion of the construction of Crossrail, setting out information about the project’s funding and finances.
In line with this commitment, I am therefore publishing this statement within 12 months of the previous statement, which was published on 16 July 2009, and set out below the information required to fulfil the commitment to Parliament:
Total funding amounts provided to Crossrail Limited by the Department for Transport and TfL in relation to the construction of Crossrail to the end of the period (22 July 2008 to 29 May 2010) | £773,769,000 |
Expenditure incurred (including committed spend not yet paid out) by Crossrail Limited in relation to the construction of Crossrail in the period (31 May 2009 to 29 May 2010) (excluding recoverable VAT on land and property purchases) | £963,976,000 |
Total expenditure incurred (including committed spend not yet paid out) by Crossrail Limited in relation to the construction of Crossrail to the end of the period (22July 2008 to 29 May 2010) (excluding recoverable VAT on land and property purchases) | £1,160,779,000 |
The amounts realised by the disposal of any land or property for the purposes of the construction of Crossrail by the Secretary of State, TfL or Crossrail Limited in the period covered by the statement | Nil |
(14 years, 5 months ago)
Commons Chamber3. What information his Department holds on the effect of industrial action involving airlines on the number of passengers on flights operated by those airlines.
The Department does not routinely monitor or hold information on airline passenger loads. However, most publicly listed UK airlines, including British Airways, regularly publish traffic and capacity statistics.
Is the right hon. Lady aware of testimony from British Airways staff that British Airways has run commercially unviable flights in periods of industrial action, with low to zero numbers of passengers, to give the impression that it is unaffected by industrial action? Will you condemn any carrier for such environmentally unsustainable behaviour and investigate any report from BA staff?
It is clear that this Government are determined to provide encouragement to airlines to fly greener planes and to switch to flying fuller planes. That is what is behind the proposals we will make on reforming air passenger duty, and it will help to address the concerns around so-called ghost flights.
Turning to the hon. Lady’s specific example, that is primarily a matter for British Airways. I understand from the airline that some planes flew with low passenger loads, some were freight-only, and some had only crew on board, to ensure that the aeroplanes were in the right place to resume passenger operations once the dispute ended. That is a concern to us because of the environmental impact of empty flights. Unfortunately, that is another negative consequence of the industrial dispute and another reason why I urge the parties to get back round the table to ensure that it is resolved as soon as possible to prevent a recurrence.
4. What plans he has for the future of the national concessionary bus fare scheme.
7. What plans he has for the electrification of the mainline railway between Wales and London.
We support rail electrification because it helps to reduce carbon emissions and cut running costs. However, we are in the early stages of the new Government and Ministers are considering the full range of transport policy to ascertain what is affordable.
I welcome the Minister to her post and thank her for her answer. In considering those matters, does she understand the importance of electrification on the line between Wales and London? I am glad that she did not simply repeat the mantra of her right hon. Friend, which is becoming as boring as a vuvuzela at the World cup—the one-note symphony we are getting from the Government. However, does she understand the importance of this kind of infrastructure? It is not just about the budget deficit, but about the future growth of the economy.
I understand the importance of this issue, including in Wales, but the previous Government, of which the hon. Gentleman was a member, had 13 years to do this and failed. Just a few short years ago, the 30-year strategy they published for the railways had virtually no place for electrification. Then we had a last-minute change of mind, made at a point in the cycle when, as Labour’s outgoing Chief Secretary made clear, there was very little money left. We support electrification—it was in our manifesto and the coalition agreement—and we will take forward those projects that are affordable in the light of the deficit left to us by the Government of which the hon. Gentleman was a member.
8. What priorities he has set for departmental expenditure on the road network.
9. Whether his Department’s value for money evaluation of the proposed Surrey Canal Road station on the East London line extension has been completed.
We recognise the importance of Heathrow as the country’s international hub airport—
Order. I think that the Minister has the wrong brief. I may be mistaken—if I am wrong, I apologise to her—but she is answering a question about the Surrey Canal Road station on the East London line. That is what is of interest to the right hon. Member for Lewisham, Deptford (Joan Ruddock).
I apologise, Mr Speaker.
A value for money assessment of the proposed Surrey Canal Road station was carried out by Transport for London and Lewisham council last year. The Department for Transport has some concerns regarding the business case. I have asked officials to provide full advice on the matter and expect to make a decision in the near future.
I welcome the right hon. Lady to her position, and I am grateful for that reply. However, she needs to remember that Transport for London has found that the proposal more than meets the business case that was applicable to all other stations in London, and that it is pivotal to the development of 2,500 new homes and to the job prospects of the 2.9 million people expected to use the station. Will she meet with me to see how to get the station built now, alongside the construction of the railway?
I am happy to meet the right hon. Lady as soon as possible to discuss this important issue. She has fought hard on the campaign, and I am looking into the proposal with great care. I am discussing it with officials and, as I have said, I have asked them for extra briefing. It is important to take into account local views, TfL’s views and the views of other stakeholders. However, I must also make it clear that we need to assess such programmes carefully for affordability, given the state of the public finances and the deficit that we have inherited from Labour.
Does the Minister accept that this issue has a cross-borough and cross-constituency resonance, and that there is widespread support for the proposal across the parties? Will she meet all of us who have an interest in it? I hope that we shall be able to persuade her of its merits, because we have a very good case.
My constituents do not want the pollution that additional runways at Heathrow, Stansted and Gatwick would entail, but they do want shorter queues, fewer delays and better service. Does my right hon. Friend agree that there are plenty of ways of achieving that through improving operations at those airports?
I very much agree with my hon. Friend. That is why the Secretary of State has established a taskforce to look into the ways we can make good on our promise to make Heathrow better. We have rejected a third runway because of the huge environmental damage it would cause, but there is more we can do to improve the regulatory structure and we are bringing forward legislation on that to incentivise the airports to focus on the quality of service for passengers. We need to keep security measures under review so that passengers are kept safe and we can mitigate the hassle that those measures cause. We need to work with the stakeholders and the airlines to get the right solution to integrate high-speed rail with Heathrow, to provide a viable alternative to having many short-haul flights and to relieve overcrowding problems at the airport.
T5. What is happening about the sell-off of BAA, its monopoly—particularly north of the border—and the imposition on passengers, especially in Glasgow, of charges for being picked up after their holiday flights, and the requirement to walk for an exorbitant distance? It is an absolute disgrace, and it is time that such companies were brought to book and made to compete.
The hon. Gentleman is right to draw attention to a consumer issue which, I know, greatly concerns his constituents and many other users of that airport. It is just the type of issue that we hope our new airport regulation Bill will address. We intend to give airports stronger incentives to look after and respond to their customers.
The proceedings of the Competition Commission in relation to the ownership of various airports around the country are a matter for the commission, but we have often highlighted the benefits that diversity of ownership in the United Kingdom airport sector can yield to customers.
Is the Minister aware that Arriva buses recently introduced a completely new network and timetable in Milton Keynes? At a public meeting last Friday many of my constituents, especially pensioners, told me that they had been greatly inconvenienced by the changes, and that they had not been properly consulted. Will the Minister do all that he can to ensure that operators consult their passengers properly before introducing such radical changes?
Will the Secretary of State confirm that he will protect runway alternation at Heathrow?
I can give that confirmation. We support the current protections of runway alternation. We defeated Labour’s proposals for mixed mode when we were in opposition, and we will not revive them now that we are in government.
Does the new, post-bureaucratic age of transparency extend to a commitment to publish bus and rail timetables in digital format for open public reuse?
We are looking at that issue at the moment. I think there are considerable benefits to be gained from a more open approach to timetabling, and I would be delighted to have a discussion with the hon. Gentleman if he wants to give me further indications of his ideas on this, so that we can ensure we get the maximum benefits for passengers.
Vehicle excise duty remains unpaid on 2 million vehicles, 80% of which are uninsured and 70% of which are owned by people with criminal convictions. Given that these vehicles kill 160 people a year and injure 23,000, may we have a crackdown?
(14 years, 5 months ago)
Written StatementsThe Department for Transport will shortly begin a consultation exercise on the future of rail franchising policy. This consultation will provide industry partners with the opportunity to comment on the Government’s approach to rail franchising and whether bidders for longer franchises would be able to offer investment in improvements to trains and services. It will also allow the industry to set out its proposals for improving the efficiency and value for money of rail franchises, for both taxpayers and fare payers. I will set out further details to the House in due course.
To enable the next Greater Anglia and Essex Thameside franchises—which are currently in the process of being re-let—fully to reflect the changes resulting from this review of policy the competitions for these franchises, which were started in January 2010, are to be cancelled.
It is currently expected that a new competition for the Greater Anglia franchise will be advertised by the end of the year, after the consultation responses have been considered, with the Essex Thameside franchise following in autumn 2011.
It is also expected that there will be some consequent changes to the procurement time scales previously published for the InterCity East Coast franchise. Rail services will continue to run as normal on all affected franchises. A prior information notice (PIN) setting out the Department’s proposed future rail franchising programme will be issued in due course.
(14 years, 5 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I am grateful, Mr Benton, that you should be presiding over this debate; it is a pleasure to serve under your chairmanship.
The debate is being held in Government time to allow us to consider the severe problems caused by volcanic ash in April. We are all too aware of the significant inconvenience and unhappiness caused to those who were stranded by the crisis or whose travel plans were disrupted. That alone merits the House’s giving careful consideration to how the crisis was handled and how we should deal with the continuing threats caused by volcanic ash.
Hon. Members will be aware that the source of the problems is the Eyjafjallajokull volcano. I hope that the House will forgive my rudimentary attempts at Icelandic pronunciation; I plan to say the volcano’s name a few more times today, so it might improve. For brevity’s sake, however, hon. Members may prefer to call it E15, not least because mispronouncing it has caused a number of problems for media outlets across the world.
A key point is that the distinctive individual characteristics of different volcanoes can have a significant impact on the level of disruption generated by their ash clouds. Eyjafjallajokull has a number of features that are relevant to the matters that we are considering this afternoon.
First, previously recorded active periods show eruptions of varying intensity taking place over many months. That is in significant contrast to volcanic eruptions such as those at Mount St Helen’s or Pinatubo; those were very intense, but they lasted only a matter of hours. Secondly, E15’s caldera is capped with ice. Initially, the magma erupted through the ice cap, which caused rapid cooling of the magma, leading to its explosive disintegration into fine particles of ash. I am advised that fine particles of ash are more easily conveyed over long distances by the prevailing wind, and they remain in the atmosphere for longer than the larger particles produced by eruptions like Mount St Helen’s.
Thankfully, E15 stopped emitting ash on 22 May. However, that does not mean that the crisis has gone away or that we should ease off with important activities meant to deal with the threat to flying posed by volcanic ash. The volcano could erupt again at any time over the next few months. Moreover, it is located 15.5 miles west of a larger volcano called Katla. Historical evidence indicates a worrying correlation between activity at E15 and subsequent eruptions at Katla. The risk of activity at Katla remains present. For a number of reasons, there remains an urgent need to address the issue and to ensure that we get the right safety and regulatory framework in the event of a recurrence of volcanic ash problems.
I am sure that everyone here will agree that safety must be our paramount concern. Volcanic ash presents a problem for modern jet-powered engines for two principal reasons. First, the ash is silica-rich and therefore abrasive, especially when it hits aircraft at high speed. That affects forward-facing surfaces such as the windshield and the leading edges of the wings, and it can also lead to accumulation of ash in surface openings—including, most importantly, the engines. Secondly, the composition of most volcanic ash is such that its melting temperature lies within the operating temperature range of modern large jet engines.
The risks have been illustrated in a number of previous incidents, and I draw the House’s attention to two of them. On 24 June 1982, a BA 747 jet, on its way from London to Auckland, flew into a cloud of volcanic ash 100 miles south-east of Jakarta. In rapid succession, all four engines flamed out and shut down. The aircraft entered a glide, dropping from 37,000 to 13,500 feet before the pilot was able to restart the engines; one of the engines failed again soon afterwards. Similarly, on 15 December 1989, a KLM 747 flying from Amsterdam to Tokyo flew into volcanic ash on the approach to Anchorage airport. Again, all four engines shut down. The plane dropped 14,000 feet before the pilot was able to restart the engines. Damage to the plane was reported to have cost more than $80 million.
I return to the crisis that we face in this country. The initial reaction of air traffic controllers and regulators in Europe was to follow the internationally established procedures set down in the International Civil Aviation Organisation’s volcanic ash contingency plan for the European region. That plan is based on experience, and it provides that aircraft should avoid flying in volcanic ash. The scope of the zone affected by volcanic ash was determined by a computer model run by the Met Office, in its role as the volcanic ash advisory centre for the north Atlantic. Using data about the ash emitted from the volcano, the model is used to predict where the north Atlantic winds will carry the ash, and the potential peak concentrations of that ash. As a result, the Civil Aviation Authority and NATS imposed movement restrictions in UK airspace that had the effect of grounding commercial aircraft between 15 and 20 April.
That decision undoubtedly triggered controversy. However, it mirrored similar measures taken throughout Europe. It also reflected the advice of aircraft manufacturers at the time that aircraft should not fly in areas if there was a risk of ash being present. Whatever the merits of the choices made during the tenure of the previous Administration, it soon became clear that a rule that required complete avoidance of volcanic ash in affected areas would not be a long-term solution in Europe’s congested airspace. That is why the CAA brought together airlines, regulators, and aircraft and engine manufacturers, to develop a new approach to reducing the disruption caused by Eyjafjallajokull.
After a review of test flight data, and in consultation with the airline operators, manufacturers and international partners, the CAA issued new guidance on the use of airspace on 20 April. That guidance reflected revised ash tolerance levels, as determined by the engine manufacturers. Put simply, it was established that there was after all a level of ash concentration that was consistent with safe flying. The area in which it was safe to fly was thus expanded, and aircraft were permitted to start flying again in UK airspace. That, of course, was immensely welcome.
The new regulatory framework designates three airspace categories. The first consists of airspace predicted to be free of ash, when no special restrictions apply. The second is a red enhanced procedures zone, when low ash density is predicted and aircraft are permitted to fly so long as increased safety and maintenance checks are carried out. The third category is a black no-fly zone, when predicted ash levels exceed safety limits and no commercial flights are permitted.
That was the situation in place when the new ministerial team took over the Department for Transport in mid-May. Given the hassle caused to passengers and the economic impact on airlines, the volcanic ash problem was clearly one of the most important issues for the new team to address. In the days immediately following the new Government’s taking over, officials had to work around the clock to deal with the matter. We need to pay tribute to their hard work, under both this Administration and the previous one. The new Secretary of State’s first official decision was to declassify the five-day ash concentration forecasts of the Met Office and authorise their publication, to assist the aviation community to tackle the crisis. He has focused time and effort on this matter every day since his appointment.
We have been working hard with officials, the Civil Aviation Authority and industry to ensure that such disruption to UK aviation is not repeated, even if there is renewed volcanic activity. Finding a safe way to achieve that goal is a high priority for us, which is why we put this debate on the agenda this afternoon. I look forward to hearing hon. Members’ contributions and comments on this important matter.
Central to our efforts is an attempt to engage with manufacturers, to distinguish between concerns about safety and concerns about the commercial impact of ash damage to engines. Given that the issues cross both the aircraft’s body and its engine, a key task for the CAA and the airlines has been to press the aircraft and engine manufacturers to establish, with clarity, what level of ash their engines can safely tolerate. That is a key question, and the Department continues to be actively engaged in that important process.
The general approach that I have outlined was endorsed at an international conference hosted by the CAA on 13 May. The conference brought together more than 100 representatives from organisations such as the European Commission, the European Aviation Safety Agency and Eurocontrol, as well as from the airlines, airports and manufacturers. I am pleased to say that on 17 May further progress was made. The CAA established an additional area for safe flying—a new time-limited zone—which is between the black no-fly area and the red enhanced procedures zone. Aircraft and engine manufacturers agreed that it was safe to allow operations in the new grey zone for a limited time at higher ash densities than were previously permitted.
To operate in the new zone, airlines need to present their national supervisory authority with a safety case that includes the agreement of their aircraft and engine manufacturers. Essentially, there was a doubling of the ash threshold for safe flying from 2,000 to 4,000 micrograms per cubic metre, which was a significant and a welcome step forward. However, I want to emphasise that the new Government are not letting up the pressure. We are also pushing for progress on the matter at an international level, both within the European Union and more widely in the International Civil Aviation Organisation. We want to see ICAO take forward the development of a new global standard on volcanic ash.
Turning now to the impact of this incident on passengers, I have immense sympathy with those who had their travel plans disrupted or who had difficulty getting home for work, school and other commitments. The situation must have been a nightmare for thousands of families stranded around the world during the Easter holidays. Certainly, the efforts made by the previous Government in aiding the repatriation of those passengers were subject to some controversy and criticism, and I imagine that during the course of the debate, hon. Members will want to recount the problems experienced by their constituents.
We need to acknowledge that many passengers felt angry and frustrated about how the situation was handled. Particular controversy surrounded the Madrid hub that was established by the previous Government to help bring home long-haul passengers. Nevertheless, to be fair, we should acknowledge that the Foreign Office did provide consular assistance to thousands of British nationals around the world. Additional capacity was also provided on Eurostar, the channel tunnel, cross-channel ferries and domestic rail to help passengers return home. Moreover, we should recognise the efforts made by the airlines and travel companies—initially to get people home by road, rail and sea and then by laying on extra flights once air space reopened.
Most passengers have statutory entitlements under one or both of the denied boarding, cancellation and delay regulations or the package travel directive, depending on the type of holiday that they bought. I do not propose to go into the detail of the rights accorded by such regulations, but further advice on them can be found on various internet sites, including that of the Air Transport Users Council. In practice, a proportion of passengers were provided with food and accommodation by their airline or tour operator until they could travel. Others covered by the regulation who opted for re-routing but who were not provided with up-front assistance are entitled to claim reasonable costs from their airline.
Most people acknowledge that the regulations did not work perfectly, but they were being applied in an unprecedented situation. There can be little doubt that the eruption of an Icelandic volcano was not a scenario uppermost in the minds of the legislators who drafted the rules. Their operation, therefore, clearly needs to be reviewed.
The response to the ash crisis is an important matter on the agenda for the next meeting of EU Transport Ministers, which will take place on 24 June and which the Secretary of State is planning to attend. Whatever the debate about the future of these rules, it is important to make one thing very clear and put it on the record. Despite the controversy surrounding the denied boarding rules and the undeniable burdens that they have placed on the airline industry in what was an unprecedented situation, we expect pending claims under those rules to be processed fairly, expeditiously and in accordance with the current law.
I should like briefly to address some issues around the impact of this episode on the aviation and travel industry. A number of organisations and trade associations from air transport and related industries have asked for financial assistance from the Government to help meet the costs of looking after passengers, and to cover lost business during April. In the last couple of weeks, the Secretary of State has met the chief executives of the major UK airlines to discuss a number of topics, including this one. We appreciate and understand the concerns expressed by the companies that were hit with an unexpected bill so soon after the end of the recession and so soon after what everyone has acknowledged has been a very difficult period for the aviation industry generally.
The Government have not ruled out providing support for airlines, but I do not want to raise expectations. The starting presumption must be that it is for businesses to meet their own operating risks and legal liabilities. Moreover, EU state aid clearance would be needed if assistance were to be given. Even more importantly, the state of the public finances means that such assistance may not be affordable. My understanding is that although Governments across Europe may sympathise with the plight of the airlines, they are also constrained by similar concerns about affordability. Such a view can come as no surprise to anyone given the current financial situation, which has been all too apparent in news bulletins recently.
In conclusion, this was and remains an unprecedented situation. It required the rapid development of a new approach to air safety regulation and lessons need to be learned to deal with similar emergencies in the future. Indeed, they are already being learned, as is shown by the urgent work that the new Government have undertaken to seek improvements to the robustness of the regulatory framework and its ability to adapt and to respond to the challenge posed by volcanic ash.
In that regard, it is worth noting that with the adoption of the 17 May set of changes, which I outlined earlier, the maximum concentration of ash designated as being consistent with safe flying has risen by a factor of 20 since the decisions that were made at the start of the crisis in April. But let me emphasise that both the CAA and the Department for Transport are continuing to work hard with engine and aircraft manufacturers with the goal of establishing a further increase in safe ash tolerance levels.
Eyjafjallajokull may have stopped erupting for the moment, but no one can rule our further volcanic activity and further disruption during the coming months. So I want to close my opening remarks by assuring the House that the new Government will work hard to see that every effort is made to minimise any disruption, with the goal of avoiding a rerun of the events in April that caused so much mayhem and unhappiness for so many passengers.
With the leave of the House, we have had a very constructive discussion. As the shadow Minister, the hon. Member for Glasgow North East (Mr Bain), correctly pointed out, the debate has been remarkably consensual and good natured across all parties. I fear he is correct that that will not necessarily be repeated on every occasion when we discuss transport matters in the main Chamber or this place.
Before dealing with hon. Members’ individual points, I want to mention a subject that cuts across a number of the speeches made this afternoon: the impact of data. The lack of data about the impact of ash on engines was clearly a big part of the initial problems, and there was also a need for more data on identifying where the ash concentrations actually were. As I outlined in my speech, significant progress was made on that problem relatively rapidly, and progress has accelerated. However, all hon. Members who mentioned that matter were correct to say that efforts to ascertain the facts about those two issues are pivotal to ensuring that we have a robust regulatory framework under which safety is paramount and the disruption caused by volcanic ash episodes is minimised and reduced.
Work on that matter is continuing with airlines and, crucially, with aircraft and engine manufacturers. The CAA is also actively engaged with that work, as is the Department for Transport through the active and energetic involvement of the Secretary of State and Ministers, who are engaging with the process and encouraging progress to be made. Such work is obviously hugely important if we are to be successful in preventing a recurrence of disruption on the scale that we saw earlier this year. In that regard, work is also being done on test flights. That kind of data will be important in improving the regulatory framework and making progress on the matter.
A number of hon. Members asked whether there should have been more advance preparations and why the scale of disruption was so much more significant in this case than it has been in relation to other volcanic incidents around the world. That point leads me back to some of the remarks that I made at the start of my speech. It was the type of volcano and its location that played a significant part in the degree of disruption caused. The fact that the ash was particularly fine meant that it was dispersed over a wide area and, geographically, the volcano was close to a very congested area of airspace. That unfortunate combination played a significant part in the extent of the disruption caused and is one of the reasons why we must make progress in improving the robustness of the regulatory framework to deal with such an unprecedented situation.
Turning to some of the comments made about the efforts to repatriate passengers, I emphasise that work on that is under way. We all hope that there will not be significant disruption in the future, but we must prepare for the eventuality that it might occur. The Government as a whole, under the auspices of the civil contingencies secretariat in the Cabinet Office, are looking at contingency planning should there be another significant eruption. That work is considering all modes of transport, not just aviation. The Department for Transport is also working closely with the Foreign and Commonwealth Office, which would lead on the issue of repatriating stranded British nationals. We will be placing a priority on preparations for that kind of effort to deal with disruption, if such a situation occurs again.
The hon. Member for Newcastle upon Tyne North (Catherine McKinnell) made some interesting remarks about Newcastle International airport, which has an important place in the economy—not just for her constituency, but for the north-east as a whole. The right hon. Member for Gordon (Malcolm Bruce) and my hon. Friend the Member for South Derbyshire (Heather Wheeler) also made it plain that regional airports play a significant part in regional economies. Many regional airports have experienced significant difficulties as a result of the ash crisis, which is certainly something that we will take on board.
On compensation, I am afraid that I cannot add to my previous remarks. We understand the concerns of the airlines, the airports and travel-related industries, but, in an era of constrained public finances, the issue of compensation is very difficult. The kind of compensation that the hon. Member for Newcastle upon Tyne North would like to be paid simply might not be affordable, but we will be devoting care and attention to the matter before a final decision is made. She also emphasised the issues surrounding data, some of which I have already responded to.
I turn to the remarks of the right hon. Member for Gordon. He outlined some of his own travel problems, with which I have great sympathy. He was right to point out that it was, literally, an ill wind that blew nobody any good—although some of the train operators did quite well as a result of the crisis. He was also right to say that one of the things that we must work on, just in case these events recur in some form or other, is trying to get as much information to people as early as possible, so that they can plan their travel.
One of the Secretary of State’s first acts was to release some of the hitherto classified Met Office data for five-day forecasts, to help the airlines plan in the eventuality of further disruption and, in turn, help their customers.
The right hon. Gentleman also rightly referred to the importance of improving work on forecasting the location of ash concentrations, and I have outlined that. He mentioned that the crisis had caused some people to reconsider their travel plans and to look at alternatives to flying. Some people did go through that process but, as the hon. Member for Glasgow North East also pointed out, the incident has shown us the important part that flying plays in our daily lives and our economy. Although it is useful to look at the environmental benefits associated with finding alternatives to flying, that is obviously not a solution when there is disruption on the scale that we experienced a few weeks ago.
The right hon. Member for Gordon went on to talk about losses at Aberdeen airport, and I think that I have covered that point. He also emphasised the importance of UK authorities working closely with European ones, and I can assure him that that is under way at the moment. He asked whether the UK needed special considerations and perhaps special rules, and whether we would always be in line with what the rest of Europe was doing. That is a point to note, because our being closer to the volcano than other countries has an impact on the decisions that we can make on airspace, and it perhaps played a part in the slight differences between the timings of the relaxation of restrictions. In response to what has been said by other hon. Members about the timing of that relaxation, it is worth bearing in mind that the work done by the CAA led the debate and formed one of the reasons why airspace across the rest of Europe was reopened. Some of the work done by the CAA was, I understand, adopted and used by other European countries in making their decisions to reopen their airspace.
My hon. Friend the Member for South Derbyshire spoke very eloquently about East Midlands airport and its importance to her constituents, and also about Rolls-Royce’s superb manufacturing facilities in her constituency. She told us about some of the difficulties that local residents had in getting home. She asked for leadership on the issue, and we are determined to provide that; I appreciate how important it is for all her constituents who work at East Midlands airport and at Rolls-Royce. We put this debate on the agenda this afternoon precisely to enable Members such as my hon. Friend to make those kinds of points, to listen to Parliament’s concerns and to ensure that we provide the leadership needed to take forward the improvement to the regulatory system.
My hon. Friend the Member for Stourbridge (Margot James) talked with eloquence about the inconvenience suffered by her constituents. I am sorry to hear that her election campaign was disrupted somewhat by the volcanic ash; that happened to a number of people. I had conversations with Conservative party HQ about the fact that Icelandic volcanoes were not included in its list of contingency plans for election tours. Nevertheless, the election efforts carried on undiminished. It was interesting to hear my hon. Friend’s comments about the impact on Birmingham airport. She, too, emphasised the importance of further research on the impact of volcanic ash on engines—a point I think I have covered. She paid tribute to Willie Walsh for his work in a test flight, and she welcomed the work done by easyJet, with its AVOID system.
Turning to some of the questions asked by the hon. Member for Glasgow North East, I, colleagues and the CAA very much welcome easyJet’s efforts to contribute to the debate. EasyJet’s efforts and the technology that it is trialling are being carefully considered. The hon. Member for Glasgow North East urged us proceed swiftly to deliver safety certification, but I am sure that he would not suggest that we cut corners. Interesting work is being done, and no doubt the CAA will monitor it carefully and go through the appropriate steps to ascertain whether and when it might receive the safety certification that the hon. Gentleman has suggested. That is, however, a matter for the CAA to determine, taking into account all the relevant facts.
My hon. Friend the Member for Dartford (Gareth Johnson) spoke with great authority about the impact of the crisis on both passengers and the aviation industry. One of his questions was about the famous Madrid coaches. I have a long, full list of coaches, which I do not propose to read out, but I can send it to him. The total number of passengers transferred from Spain to Calais was more than 1,000, with a significant number of coaches leaving from Madrid, Barcelona, Malaga and Alicante.
My hon. Friend also referred to the difficult issue of waiving night flight restrictions. For his information, night flight restrictions were waived briefly when airspace first reopened after the prolonged restrictions on flying. Making an exception to the night flight rules is always a very difficult decision. I am a strong supporter of the protection that people are given as a result of the restrictions on night flights but, given the scale of the emergency, it was felt that a brief relaxation was justified.
In the event of a similar emergency in the future, I am sure that airspace authorities would give careful and due consideration to the difficult competing concerns. One wants to make every possible effort to normalise travel as soon as possible, but night flights have a corrosive impact on people’s quality of life and one therefore needs to act with extreme care, even when referring to only a very brief lifting of such important protections. My hon. Friend also urged me and my colleagues to work with the airlines, the agency and the industry on technology. We are definitely doing that—it is the only way forward. He also called for common sense to prevail, and I shall certainly try to ensure that that is the case.
The hon. Member for Glasgow North East asked a number of questions, some of which I have addressed already. He asked, in particular, whether the UK is working with ICAO on its work to revise the volcanic ash rules and the programme for Europe. Yes, work is going on with ICAO on precisely that. He also asked whether the Government would impress on the airlines the importance of paying out in line with their obligations under the denied boarding and cancellation rules. As I sought to set out in my opening remarks, we believe that, whatever debate there may be in the future about those rules, it is important that the airlines pay out under their legal obligations in the rules as currently drafted, and that claims are settled as expeditiously as possible. He was right to raise the concerns of those who are awaiting settlement of reasonable claims under the provisions.
The hon. Gentleman urged me to prevent any dilution of EC regulation 261/2004. We need to look at it in the round to see whether there are ways to make the whole system work in a better and fairer way. As I mentioned in my opening remarks, the matter will be discussed by EU Transport Ministers in the near future, at their next meeting.
Lastly, the hon. Gentleman spoke about adapting the allocation of emissions permits under the emissions trading scheme so that the interruption in flying does not have a distortive effect on the allocation of permits when that is decided. That is a fairly technical matter, but I hear the point he is making and shall pass his comments on to those in the Department who are dealing with the mechanics of getting the ETS into operation. We need to see whether we can ensure that the interruption of flying as a result of volcanic ash does not have a perverse or distortive effect on the decisions that will be made in the future on the allocation of emissions permits.
With that, I shall close. I am grateful to all right hon. and hon. Members for participating in this constructive debate on an issue that is extremely important to our economy, as well as to holidaymakers, as we make progress on improving the robustness of the regulatory framework and its response to volcanic ash.
Question put and agreed to.