High Speed Rail (West Midlands - Crewe) Bill Debate
Full Debate: Read Full DebateAndy McDonald
Main Page: Andy McDonald (Labour - Middlesbrough and Thornaby East)Department Debates - View all Andy McDonald's debates with the Department for Transport
(6 years, 9 months ago)
Commons ChamberI am pleased to stand here today to support a project which was instigated by the last Labour Government. National infrastructure investment is too important to be left to the vagaries of the election cycle. It is to the Government’s credit that they have continued to back both HS2 and Crossrail since 2010. Labour has always maintained that HS2 must be built as a network rather than a standalone piece of infrastructure. It is this approach which will deliver the maximum economic benefits. Both main parties can agree that HS2 is about more than transport. High-speed rail is about unlocking the economic potential of the north and the midlands. It will drive a rebalancing of the UK economy by improving connectivity between the north and south.
The hon. Gentleman talked about HS2 being an integrated network, but one of my criticisms of HS2 is that it is far from integrated. The original plan was for it to go direct down through the channel tunnel and into continental Europe and I can give other examples—I will probably will do so in my speech—but this is far from integrated: it is stand-alone, meets at Crewe and does not actually go into Birmingham New Street. Why is this?
I am grateful to the hon. Gentleman for that intervention, and it is key that HS2 integrates. We have just heard words from the Secretary of State about the need to ensure that it does connect with our northern cities, but we are yet to see those plans unfurl. We have heard about Transport for the North’s aspirations, but this cannot be a stand-alone project; it is essential that it links into our great towns and cities throughout the nation.
Linking the great cities of the north and midlands is equally important and will bring much-needed economic benefits to those regions. Labour supports the nearly 30,000 jobs the construction of HS2 will deliver and the huge uplift it will give to apprenticeships and training, particularly outside London. It is not too early to consider how we will retain and develop those skills in the future in other infrastructure projects both at home and abroad. I would be interested in any comments the Secretary of State has on this point, particularly with regard to Northern Powerhouse Rail and Crossrail.
I also make a plea that we must not repeat the catastrophe of the Carillion experience with apprentices. Apprentices in my constituency are being left flapping in the wind, not knowing whether they are going to be paid. We hear today that their employment will come to an end at the end of this month. It is a disgrace that £6.5 million of public money has gone into an apprenticeship programme that leaves our apprentices short of their qualifications and without employment. The Government should intervene now to guarantee that those apprentices will receive that assurance from this Government today.
I am grateful to the shadow Secretary of State for giving way, and he and I share that view. I can assure him that, on the HS2 project, the apprentices who were employed by Carillion are migrating to work for Kier and those employed by Carillion have been moved on to the project with the other two partners. So not only should there be no hiatus in the work taking place, but, more importantly, the people on those projects are moving to different companies involved in them. There are obviously some very difficult circumstances elsewhere as a consequence of the collapse of Carillion, but I have been very keen with this project to make sure we have the seamless transition we contracted for last summer, and I am delighted to see the apprentices move on in a way that enables them to carry on with their apprenticeships.
I am grateful for that reassurance in the context of these projects, but I am particularly concerned about these apprentices in the here-and-now; there are 100 out of the 1,400 who have been prejudiced in my community and we want to see this Government respond by coming to the table and making sure those young people have a future. It is difficult enough to encourage people into these industries in the first instance without leaving them high and dry, as has happened on this occasion.
I welcome the commitments contained in HS2’s environmental principles. It is imperative that environmental standards and air quality are at the forefront of the project. Many of the arguments about why we need HS2, and why we do not, have been well rehearsed in this House over many years: passenger rail numbers have doubled since 1995; rail freight has grown by two thirds over the same period; and the existing network has been operating at full capacity for years. No amount of timetable-tinkering can change this; I trust that all Members are in agreement about that.
Although it is important to maintain our vital road network, there is an urgent need to secure modal shift across transport: we cannot build our way out of congestion on our roads, and we must be watchful about the sustainability of domestic air travel. In addition, we face the prospect of the population of Britain reaching 70 million by the end of the decade. So the question is: how are we going to move our people around our nation? It is no exaggeration to say that the very economic and social livelihood of this country is at stake. Our capacity to move people by rail and bus is therefore crucial.
Given those circumstances and the pressure on the system, does the hon. Gentleman agree that the last thing this country needs is the nationalisation of our rail system?
I am grateful to the former Minister for his intervention. If he will be patient for just a few more minutes, I will happily address that point in full detail.
I was proud that Labour forced the Government to introduce much tougher reporting on HS2 spending through an amendment to the High Speed Rail (Preparation) Act 2013 before the previous Bill came to the House in 2014. I pay tribute to my predecessors, my hon. Friends the Members for Wakefield (Mary Creagh) and for Nottingham South (Lilian Greenwood), in that respect. We also amended that Bill to improve integration with existing transport networks and the specific reporting of the jobs and skills created by the project.
I do not want to digress too much, but this is all relevant. We only need an incident on the west coast main line for everything to stop, and that certainly needs to be looked at. Also, I have constituents who will not qualify for compensation as a result of this project.
One of the main points about this project is that it will allow us to build resilience into the network. That is not an either/or; this is not simply about building HS2. My hon. Friend is right say that we need to build greater resilience into our network. On the point about compensation arrangements, it has been noted on both sides of the House that we need to ensure that proper compensation is paid. These are really sensitive issues, and people should not be left wondering whether compensation arrangements will come forward. My hon. Friend is right about that as well.
I am keen to hear the Minister’s views on striking the right balance between HS2 services and freight on the parts of the network where high-speed trains will run on conventional tracks. HS2, the Department for Transport and Network Rail need to resolve the important concerns that are being expressed by freight operators. Elsewhere, there are significant questions to be answered about how the new high-speed railway will integrate with the existing rail network. During the Second Reading debate in 2014, the previous Secretary of State for Transport boasted that
“upgrading Britain’s rail infrastructure is a key part of this Government’s long-term economic plan”.—[Official Report, 28 April 2014; Vol. 579, c. 567.]
He also said:
“we will be electrifying more than 800 miles of line throughout the country”.—[Official Report, 28 April 2014; Vol. 579, c. 561.]
It is quite clear that the Government have broken those promises over the past four years. They made commitments on rail ahead of the 2015 general election, only to break them days later. The reality is that the last two Transport Secretaries have cut upgrades to rail infrastructure and cancelled the electrification of rail lines. Of course, HS2 is but one piece of the jigsaw. I am therefore concerned that if the other pieces are not right, the whole thing will not fit together properly.
The current Secretary of State for Transport came to the House in November to announce his strategic vision for rail. The problem was that his plan was neither strategic nor visionary. It was a smokescreen to cover up a blatant multibillion pound bail-out of the east coast main line franchise. It is clear to passengers and taxpayers that this Government are defending a broken franchising system. Under this Government, protecting private companies comes before the public interest. Giving Carillion a contract for HS2 last July while that company was imploding was an appalling decision, and the Minister’s legal justifications for that decision were risible. His bail-out of Stagecoach-Virgin on the east coast was yet another serious misjudgement in which his dogma won out over pragmatism and common sense.
I think the hon. Gentleman has wandered into the wrong debate. We are talking about HS2, not about Carillion. Can we stick to the subject, please?
Order. That is a matter for me, actually.
Thank you, Madam Deputy Speaker. The hon. Gentleman will find out what HS2 has to do with the east coast and west coast main lines if he can be patient just a little longer.
The Secretary of State’s promised east coast partnership between track and train by 2020 is unworkable and undeliverable. No one in the rail industry believes that it is actually going to happen. Another of his pet projects is the west coast project—perhaps the hon. Member for Isle of Wight (Mr Seely) will want to pay attention to this—which is going to be awarded later this year. The winner of that contract will run services on the west coast main line and oversee the introduction of HS2 services. The Government have a track record of accepting bids from the private sector that are either too high or too low, and the Department for Transport has proved unable to manage such projects. Given that the Secretary of State has been found wanting so often, what makes him think that his west coast partnership will work any better than his east coast partnership?
High Speed 2 will be the jewel in the crown of Britain’s rail network when it begins operations in the next decade. It will be a shining example of Britain’s capability and talent, and it will encapsulate our technological and engineering prowess. However, I can tell the Secretary of State that there will be uproar across the land, should this piece of the family silver be handed over to Virgin Trains, Stagecoach or others of their ilk. I can tell the House today that there will be no gift of HS2 to Richard Branson or Brian Souter under the next Labour Government. HS2 will be built with public money and it will stay in public ownership.
I congratulate my right hon. Friend the Secretary of State on bringing forward this Bill. I also congratulate all those people in the Department for Transport and in HS2 who are working to finalise these proposals. It is a pleasure to follow the shadow Secretary of State, the hon. Member for Middlesbrough (Andy McDonald), although I think he slightly spoiled his speech by going off piste and talking about electrification. We will take no lessons from Labour on electrification, given its record between 1997 and 2010, during which time it electrified 10 miles of railway. I would like to say that that was a snail’s pace, but I think that a snail would have travelled further in 13 years than Labour did with its electrification.
The former Secretary of State seems to have totally forgotten the 67 miles of HS1 that were electrified then. Those 67 plus 10 miles add up to a lot more than this Government have ever electrified.
I think that HS1 was operating before Labour came into government.