Read Bill Ministerial Extracts
High Speed Rail (West Midlands - Crewe) Bill (First sitting) Debate
Full Debate: Read Full DebatePaul Sweeney
Main Page: Paul Sweeney (Labour (Co-op) - Glasgow North East)Department Debates - View all Paul Sweeney's debates with the HM Treasury
(5 years, 5 months ago)
Public Bill CommitteesThe hon. Gentleman raises an important point. Of course local communities want to protect their local heritage sites, and of course we will work with local authorities and Historic England. HS2 Ltd has an extensive community engagement team that works on the ground, and there are also opportunities to petition at the appropriate points in the Bill’s passage.
The listed buildings affected are listed in tables 1 and 2 in schedule 18, and the disapplications or modifications apply only to those buildings. Schedule 19 allows a person authorised by the Historic Buildings and Monuments Commission for England to enter land where there is a scheduled monument to observe or advise on the carrying out of works to ensure the protection of monuments. Similar provisions were included in the Crossrail Act 2008 and the phase 1 Act of 2017.
It is always a cause of dismay when our built heritage is affected by new development. The provisions in the clause are very wide ranging. The Minister could consider better safeguards to further ensure that our country’s built heritage is protected during the construction of this vital national infrastructure project. In particular, perhaps a presumption against demolition could be considered where practical. Indeed, the dismantling and relocation of items of built heritage, where practical, might be presumed a better solution. If that were not possible for the entire building, certainly key features of interest could be dismantled, preserved, salvaged or relocated where appropriate.
On the inspection and observation of works, schedule 18 merely indicates that there will be an opportunity for English Heritage to inspect the works, but there is no obligation on it to do so. That could be tightened by the inclusion of an obligation to ensure that all heritage assets affected are inspected and recorded, including by laser scanning to provide a highly accurate 3D model of any assets that are destroyed as a result of the project. That would be a far better way to safeguard the built heritage of our country as a result of the project.
I concur with my hon. Friend the Member for Glasgow North East. I know he has a deep personal commitment to this issue, as he represents a constituency in which a wonderful historic building suffered serious damage.
We take this issue seriously, and I urge the Government to take great care and look at some specific pieces of heritage that might be affected by the developments, such as the historic mileposts, the 1867 rail building at the important historic rail town of Crewe, and the grade II listed farm houses in the line of the route. It would be ironic if wonderful railway architecture from previous generations was damaged or completely destroyed by the building of HS2. It would be so much better if whatever possible could be preserved for the benefit of future generations. We hope the Government will look further into that and consider possible mitigation.
I thank my hon. Friend for his intervention; it is nice to have a colleague from Berkshire Labour intervening on me. The Government need to be responsible with these very large sums of public money, and it is deeply disappointing that they have fallen well short at times.
The words of the Public Accounts Committee are worth considering:
“a shocking waste of taxpayers’ money”
is a severe condemnation of the Government. There have been many other allegations about HS2’s potentially not being well planned or managed. Ensuring that HS2 secures value for money is essential if we are to retain public support for the project. There should be no blank cheque.
My hon. Friend makes an important point about the general principles of HS2 and the need to ensure that the project delivers maximum economic benefit to the nation, including industrial skills and job opportunities. When we look at how the Treasury assesses such projects, we see that very little consideration is given to how much value is created in the wider economy, particularly through industrial development. In my own constituency, the Caledonian railway works in Springburn faces closure. Would it not have been possible to utilise the supply chain opportunities of HS2 to ensure that highly skilled jobs in the railway industry are supported and maximised through the project’s supply chain?
I thank my hon. Friend for his intervention and particularly for pointing out the importance of the supply chain. I will add that the value of apprenticeships, degree qualifications and other opportunities for young people linked to the programme should be first and foremost in the Government’s mind when they come to look at the supply chain.
Returning briefly to clause 61, essentially it says that there is potential for uncapped Government expenditure, leaving open the possibility of no upper limit on the costs of HS2. Will the Minister update the Committee on the latest cost estimate, and does she believe that the project will be delivered at cost?
I remind the hon. Gentleman that we are here to scrutinise the Bill line by line, but I welcome the opportunity to remind everybody of the importance of HS2. Of course, it is a crucial project, linking eight of our 10 greatest cities. Supportive comments have been made recently by everybody involved, including the Mayors of Manchester and Liverpool and the leader of Leeds City Council, who have been watching very closely. They are northern, locally elected leaders who are waiting for HS2 to roll through their communities, because they fully understand not only that, at its peak, it will provide work for 30,000 people—most of those jobs being outside London—but its value for money and how it will smash the north-south divide, encourage our communities to come even closer together and force investment in rail infrastructure in the north of England for more than 100 years. This is a key infrastructure, social and economic project for our country.
The Minister notes that there is an opportunity to close the north-south divide, but the project’s scope does not include extending the infrastructure to Scotland, to include Glasgow, Britain’s third-largest city. That is critical to the success of this project, and I hope that in the next phase of the HS2 programme the Minister will consider extending the railway all the way to Glasgow, because although Glasgow will benefit from reduced journey times to and from London, the journey times to and from Manchester will actually increase, which is detrimental to the Glaswegian economy.
I look forward to joining the hon. Gentleman in the Committee and the Chamber, and I welcome his support for the next phase, but let us deal with this Bill in these few short sittings.
We know that this project creates jobs and supports apprenticeships. There are already 2,000 businesses in the chain, and two colleges are supporting it. I do not want to move too far away from the clause, but a valid argument was made about the rest of the Government’s investment in the north. We know that Northern Powerhouse Rail is based on HS2 infrastructure, which is why this Bill, these clauses and this line are so important. We are investing more than £2.5 billion in a rolling programme to upgrade the railway between Manchester, Leeds and York, and the great north rail project is investing more than £1 billion by 2022. I have never seen HS2 as an either/or project; we need to do both. This is a great investment in the north of our country. There is no upper limit. There is just one budget, which is the budget that HS2 must hold itself to. It must also hold itself to the schedules.
Question put and agreed to.
Clause 61 accordingly ordered to stand part of the Bill.
Clause 62
Commencement and short title
Question proposed, That the clause stand part of the Bill.
High Speed Rail (West Midlands - Crewe) Bill (Second sitting) Debate
Full Debate: Read Full DebatePaul Sweeney
Main Page: Paul Sweeney (Labour (Co-op) - Glasgow North East)Department Debates - View all Paul Sweeney's debates with the HM Treasury
(5 years, 5 months ago)
Public Bill CommitteesI return to highlighting how important this line is and the fact that it has to adhere to a single budget. Of course, without HS2 there would not be Northern Powerhouse Rail, because it requires the infrastructure for HS2.
Before I address some of the issues raised about climate change, I remind the hon. Member for Reading East that travelling by rail is the most efficient way to travel. It is a good form of transport because it means that passengers do not fill up lots of cars on the motorway or take flight. The hon. Gentleman threw down the gauntlet on a number of issues relating to carbon impacts; he gave me the right to reply in writing, but I may have the answers in front of me, so I will do my best to respond.
Compared with most other transport modes, high-speed rail offers some of the lowest carbon emissions per passenger kilometre, significantly less than cars and planes. As an annual average, the scheme’s carbon footprint over the course of the construction period will represent less than 1% of the UK’s annual construction carbon footprint. The scheme is expected to save 419,000 tonnes of carbon dioxide emissions through modal shift in transport—that was a very good term that the hon. Gentleman used—with approximately 364,000 tonnes saved as a result of road, rail and domestic air passengers switching to high-speed rail, and 55,000 tonnes saved as a result of road freight moving on to existing rail lines due to released capacity from the scheme. Over the 120-year design life of the scheme, the net carbon emission reduction from modal shift is estimated at minus 307,000 tonnes.
The Minister makes an important point about the benefits of modal shift. It is important that we have a national aspiration to integrate all the United Kingdom’s core cities with high-speed rail networks, and this is a significant step in that direction. However, on a good day, flying from Glasgow to London takes me three hours from door to door. It is clear that even with these improvements, the journey from Glasgow to London by rail will still take three hours and 40 minutes. It needs to be below three hours. What will the Minister do to advance that national objective?
There will be a reduced journey time on high-speed rail, which will open up capacity on existing railway lines. It will also shift people from roads or flights to rail, which is incredibly important. We will continue to invest north of London. This is just one way of ensuring that the journey becomes far more integrated, but I know that the hon. Gentleman would like it to become even faster. Considering that it has taken us so long to get high-speed rail up and running, who knows what will come in the next iteration? However, I do take his point.
Let me return to the important point about skills that the hon. Member for Reading East raised. At present, there are 9,000 people working on high-speed rail, with more than 2,000 businesses already involved in the chain. The hon. Gentleman raised an important point about how we will reach the 30,000 people who will be required to build the railway; that is why we have two colleges set up to improve the technical and academic skills of people working on the railway line, from design to construction.
Having made all those arguments, I really do not understand the need for new clause 6. The issue of quarterly reporting has been raised, but HS2 Ltd already provides annual reports to Parliament, as required by the DFT-HS2 Ltd framework document. I believe that that level of reporting is proportionate and sufficient. The project is bound not to exceed the likely significant environmental effects assessed for the scheme, as reported to Parliament. As part of HS2 Ltd’s sustainability policy, an environmental management system will be developed that will set out the procedure to plan and monitor compliance with environmental legislation; the record-keeping arrangements, including reports to my Department; and the procedures that will be put in place to monitor compliance with the Bill’s environmental provisions.
There is so much scrutiny and accountability that separate quarterly reporting would be excessive and burdensome to the Department. There are already reports out there; if the 11,000-page report were read fully, I believe it would answer a number of the questions that have been raised so far. I do not believe that there is any need for the new clause. It should be withdrawn.
High Speed Rail (West Midlands - Crewe) Bill Debate
Full Debate: Read Full DebatePaul Sweeney
Main Page: Paul Sweeney (Labour (Co-op) - Glasgow North East)Department Debates - View all Paul Sweeney's debates with the Department for Transport
(5 years, 5 months ago)
Commons ChamberI thank my hon. Friend for giving way. I share her enthusiasm for this ambitious project. She talks about journey times. To achieve that modal shift, particularly between Scotland and London, we need to get rail journey times below three hours. Does she agree that that requires much more ambition in the future to ensure that we have a UK-wide network, which includes integrating Glasgow and Edinburgh into the high-speed network?
I certainly do agree with those excellent points, because HS2 cannot stop at Crewe. We must build further north and right into the heart of Scotland, particularly into the major cities of Edinburgh and Glasgow, to ensure that we get the connectivity right in the future. We know the power of infrastructure to transform people’s lives. We want to see inward investment into those conurbations, which is why we believe that, at this point—this is where the Government have been far too silent—we need to ensure that we build that vision for Glasgow and Edinburgh and beyond as we move forward. As my hon. Friend is such an excellent champion for his city of Glasgow, I am sure that he will be making those points to the Government time and again until we see more action.
My hon. Friend is making an excellent point about why we need to improve the governance and oversight of this project, to ensure that the maximum benefit is realised for the country. I am thinking of the supply chain benefits, particularly in my constituency, which was once a world leader in locomotive and railway manufacturing. We are just about to lose the last railway engineering works in my constituency because of a lack of coherent planning. There is a lack of capacity in the rolling stock overhaul business in this country, because of the failure to anticipate it. That is exactly the opportunity that this new clause presents, to ensure that we can respond better to changes in the market.
I thank my hon. Friend for his point. The jobs in his constituency are vital. Having met some of those workers, I know that many of them have tremendous skill and could participate in this project. I urge the Minister to look at that situation and ensure that the gates do not close and that those jobs can be saved and integrated into the HS2 project. I trust that she will want to meet my hon. Friend, to advance the case that he has been fighting so hard for.