High Speed Rail (West Midlands - Crewe) Bill (First sitting) Debate

Full Debate: Read Full Debate
Department: HM Treasury

High Speed Rail (West Midlands - Crewe) Bill (First sitting)

Matt Rodda Excerpts
Committee stage & Committee Debate: 1st sitting: House of Commons
Tuesday 25th June 2019

(4 years, 10 months ago)

Public Bill Committees
Read Full debate Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: Public Bill Committee Amendments as at 25 June 2019 - (25 Jun 2019)
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The clause authorises the nominated undertaker to construct and maintain the works specified in schedule 1 for the construction of phase 2a of High Speed 2 and other incidental works. It is a standard clause found in all works Bills. Phase 2a sits between two larger phases of the HS2 project, so the clause makes provision to accommodate emerging design works for phase 1 at Handsacre junction and phase 2b at Crewe.

Schedule 1 sets out the construction requirements for the scheduled works and provides permitted limits of deviation from the siting of works as shown on the relevant plans. It also provides a description of the scheduled works. The permitted deviation limits have precedence in other railway Acts, most recently the High Speed Rail (London - West Midlands) Act 2017. The limits of the deviation reflect the fact that the design of phase 2a is, by necessity, at an outline stage—detailed design will come later—so some flexibility is essential. Any variation within the limits of deviation is controlled by the environmental minimum requirements.

Matt Rodda Portrait Matt Rodda (Reading East) (Lab)
- Hansard - -

Labour supports High Speed 2, as it will address the severe capacity constraints on our rail network and improve connections between cities in the midlands and the north. Any responsible Government must contend with the fact that commuter and freight services are being squeezed off the network due to lack of capacity. HS2 is vital for unblocking the railway and creating additional capacity.

The UK is off track to meet its emission reduction targets under the Climate Change Act 2008. Transport is the most emitting sector of the economy and the worst performing sector with regard to emissions—indeed, emissions have risen since 2010. HS2 will provide an alternative to domestic flying and will tackle that important issue. It will also allow for more reliable rail services.

It is vital that we get HS2 right. It is a tremendous opportunity to improve connectivity and we support it as part of a package of delivering transformative investment in our rail system.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

I welcome the hon. Gentleman’s comments. We are debating a particular section of the line, and I welcome his support.

Question put and agreed to.

Clause 1 accordingly ordered to stand part of the Bill.

Schedule 1 agreed to.

Clause 2

Further provision about works

Question proposed, That the clause stand part of the Bill.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Clause 3 introduces schedules 4 and 5, which allow the nominated undertaker to carry out works to and otherwise affect highways. That includes creating new or improving existing highways and highway accesses, and stopping up roads. It also requires the nominated undertaker to obtain the consent of Highways England before carrying out works to roads for which that body is responsible, for example motorways and trunk roads.

Matt Rodda Portrait Matt Rodda
- Hansard - -

Developers can be overly dependent on road transport, which is ironic in a major rail project. I hope that the Minister will agree that as much freight as possible should be delivered by rail so as to minimise road use and the inevitable disruption to local communities. What steps have the Government taken to address that important issue?

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman makes a valid point. We want the project to be as clean and green as possible, and freight capacity is a major issue that we are investigating to ensure that as much freight can be moved by rail as possible. I hope that provides him with the confidence he needs.

Question put and agreed to.

Clause 3 accordingly ordered to stand part of the Bill.

Schedules 4 and 5 agreed to.

Clause 4

Power to acquire land compulsorily

Question proposed, That the clause stand part of the Bill.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Clause 4 provides the Secretary of State with the power to compulsorily acquire land within the limits shown in the Bill, where such land is required for phase 2a. Subsection (2) introduces schedule 6, which describes some of the land to be acquired and the particular purposes for which it may be acquired. It is not land required for the scheduled works; it is land required for ancillary works, including environmental mitigation, utility diversions and borrow pits. The clause further provides that the normal legislative regime relating to compulsory acquisition is to apply, subject to the modification set out in schedule 7. The purpose of the modifications is to streamline the land acquisition process, as Parliament will already have given approval to the Bill.

Matt Rodda Portrait Matt Rodda
- Hansard - -

Compulsory purchases and compensation have been an issue of contention during this process. For phase 1 it was initially decided that residents of urban areas would receive less compensation that those in rural areas—a decision that was eventually overturned. It is important that such issues are dealt with fairly, but it appears that tenants who are adversely affected by the scheduled works are not being treated fairly as there is no scheme to compensate them. Those who rent are already disadvantaged compared with those who own their own properties, and I believe that much more can and should be done. I will return to that issue when we discuss the new clauses.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman raises an important point. The purchase of land is essential to the completion of the proposed scheme. People directly and especially affected by the Bill have had the opportunity to petition the House and will have another opportunity to do so in the other place.

The project endeavours to use land as effectively and efficiently as possible. There are a number of places where compensation claims can be heard and settled by agreement, whereas disputes can be dealt with by the upper tribunal or by other factors that HS2 has put in place to deal with local communities and local people. Even though the project provides some disruption along the line, we want to ensure that we are doing the right thing by the communities we are working with.

Question put and agreed to.

Clause 4 accordingly ordered to stand part of the Bill.

Schedules 6 and 7 agreed to.

Clause 5

Acquisition of rights and imposition of restrictive covenants

Question proposed, That the clause stand part of the Bill.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Clause 8 allows the nominated undertaker to use any subsoil beneath the highway within the Bill limits which is required for the purpose of construction and maintenance of works authorised by the Bill, without the need formally to acquire the subsoil or any interest in it. This does not apply to cellars, vaults, archways or other structures that form part of a building fronting on to a highway.

Subsections (3) and (4) introduce schedule 12, which lists the highway allowed within the Bill limits where the powers to take subsoil or compulsorily acquire interest in the land cannot be exercised except in the case of street works, as per subsection (6). Subsection (5) provides that, in the case of highways in the land specified in the table in paragraph 1 of schedule 11, only subsoil that is more than nine metres beneath the level of the surface may be taken.

Matt Rodda Portrait Matt Rodda
- Hansard - -

Obviously, layers of subsoil are important. There is a link to the depletion of high-quality soils. We need to preserve good soil for farming. Some farmers in this important agricultural area might have spent time improving the quality of soil on their land. We would like this issue to be addressed so that any movement of soil is managed with great care and caution.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman raises an important point. I already attend meetings with the National Farmers Union and the Country Land and Business Association. We will of course continue to work with them, and he will know that we try to reduce any environmental impact when building this railway line.

Question put and agreed to.

Clause 8 accordingly ordered to stand part of the Bill.

Schedule 12 agreed to.

Clause 9

Termination of power to acquire land

Question proposed, That the clause stand part of the Bill.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Clause 14 allows the nominated undertaker to use any road specified in the table in schedule 8, which is land for which only rights may be compulsorily acquired or over which restrictive covenants may be imposed, so as to obtain a right of passage for the purpose of phase 2a. This power ends five years after phase 2a is brought into general use.

Matt Rodda Portrait Matt Rodda
- Hansard - -

The clause will require ongoing construction work and will cause significant disruption to road networks in certain areas. It is important that disturbance is kept to a minimum. The use of roads is likely to result in unplanned road congestion, which can lead to delays for motorists, disrupt public transport and interfere with walking and cycling routes. It also has the potential to disrupt many people’s travel patterns, with the increase in roadside emissions as well. It is not possible to effectively predict the impact of the disruption to road networks, travel patterns and air quality in advance, which is why Labour thinks it is important that there should be ongoing public engagement to ensure that impacts are mitigated.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman raises another important point—the issue of ongoing engagement with Highways England, local authorities, those who drive, cycle and walk, and also Members of Parliament. That is the case at the moment. HS2 Ltd has provisions in place to ensure that it works with local communities and local council management on local travel plans. It will have to continue to do so through the construction phase.

Question put and agreed to.

Clause 14 accordingly ordered to stand part of the Bill.

Clause 15

Enforcement of restrictions on land use

Question proposed, That the clause stand part of the Bill.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The clause provides deemed planning permission under part III of the Town and Country Planning Act 1990 for carrying out the works authorised by the Bill. Deemed planning permission is granted only for ancillary works in the Bill where the impact of such work is assessed in the environment statement, or where the development is exempt within the meaning of the environmental impact assessment regulations. Any work outside those parameters would require separate planning permission. Subsection (3) introduces schedule 17, which sets out the conditions of deemed planning permission. That includes the requirement for approval from the relevant local authorities on specific aspects of design and construction to ensure that local impacts are appropriately mitigated in the area—for example, the movement of lorries to and from construction sites.

Matt Rodda Portrait Matt Rodda
- Hansard - -

This is an extremely important issue as it deals with important environmental matters. The schedule addresses salutary points and deals with the conditions of deemed planning permission, as the Minister mentioned. We are concerned about the environmental matters covered, including the impact of dust, soil and road traffic. We are also concerned about how material is taken away from the site, vehicle movements and the impact on historic sites, which we will deal with later. I will return to these matters later today.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman once again raises valid points about how we remove material and mitigate any impact on the neighbouring communities, which is what HS2 is doing with its local engagement, as well as by working with local authorities. Planning permission provided by clause 17 is necessary to the construction of the proposed scheme and it provides more clarity to those directly and specially affected by the Bill.

Question put and agreed to.

Clause 17 accordingly ordered to stand part of the Bill.

Schedule 17 agreed to.

Clause 18

Time limit on deemed planning permission

Question proposed, That the clause stand part of the Bill.

--- Later in debate ---
Paul Sweeney Portrait Mr Paul Sweeney (Glasgow North East) (Lab/Co-op)
- Hansard - - - Excerpts

It is always a cause of dismay when our built heritage is affected by new development. The provisions in the clause are very wide ranging. The Minister could consider better safeguards to further ensure that our country’s built heritage is protected during the construction of this vital national infrastructure project. In particular, perhaps a presumption against demolition could be considered where practical. Indeed, the dismantling and relocation of items of built heritage, where practical, might be presumed a better solution. If that were not possible for the entire building, certainly key features of interest could be dismantled, preserved, salvaged or relocated where appropriate.

On the inspection and observation of works, schedule 18 merely indicates that there will be an opportunity for English Heritage to inspect the works, but there is no obligation on it to do so. That could be tightened by the inclusion of an obligation to ensure that all heritage assets affected are inspected and recorded, including by laser scanning to provide a highly accurate 3D model of any assets that are destroyed as a result of the project. That would be a far better way to safeguard the built heritage of our country as a result of the project.

Matt Rodda Portrait Matt Rodda
- Hansard - -

I concur with my hon. Friend the Member for Glasgow North East. I know he has a deep personal commitment to this issue, as he represents a constituency in which a wonderful historic building suffered serious damage.

We take this issue seriously, and I urge the Government to take great care and look at some specific pieces of heritage that might be affected by the developments, such as the historic mileposts, the 1867 rail building at the important historic rail town of Crewe, and the grade II listed farm houses in the line of the route. It would be ironic if wonderful railway architecture from previous generations was damaged or completely destroyed by the building of HS2. It would be so much better if whatever possible could be preserved for the benefit of future generations. We hope the Government will look further into that and consider possible mitigation.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Once again, important points have been raised that were also made about HS2 and, no doubt, made to the Select Committee. One hon. Member has a particular issue within their constituency, which no doubt we will hear about again today.

Similar provisions were included in the Crossrail Act 2008 and the HS2 phase 1 Act of 2017. All works must be done in accordance with the environmental minimum requirements, and the normal requirements and appropriate consents are always obtained when dealing with listed buildings.

The Secretary of State will have to work with local authorities and Historic England. The Select Committee considered the scheme’s effect on specific historical sites, and the scheme is designed to seek to avoid impacts on culture or heritage. We recognise the importance of such assets to communities locally and nationally. Even though we are trying to build an up-to-date, modern railway line, since I became HS2 Minister, I have been concerned to ensure that we honour historical sites close by and try to mitigate any impacts on them. I am sure that HS2 Ltd will continue to do that.

Question put and agreed to.

Clause 21 accordingly ordered to stand part of the Bill.

Schedules 18 and 19 agreed to.

Clause 22

Burial grounds

Question proposed, That the clause stand part of the Bill.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The clause provides for the disapplication of laws concerning burial grounds and human remains. It also introduces schedule 20, which outlines the process that the nominated undertaker must follow in relation to the removal and reburial or cremation of human remains, and the removal and replacement of monuments to the deceased.

The clause disapplies ecclesiastical law for the purpose of constructing phase 2a. It also disapplies the law relating to burial grounds if the remains and any monument to the deceased have been dealt with in accordance with schedule 20. Similar provisions were included in the 2008 and 2017 Acts.

Matt Rodda Portrait Matt Rodda
- Hansard - -

This is obviously a very sensitive aspect of the Bill. We urge the Government to take great care in this matter and, in particular, to allow for more time and effort to be taken to contact the families of deceased people. In this modern age, with well-established genealogy and records of church burials and other burials, we hope more effort could be made to contact the families whose loved ones’ remains are being moved, because this is a sensitive issue for families.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman makes an important point. If he has had time to visit Euston, he will have seen the huge amount of work being undertaken to deal with remains, which are all being removed by hand. It is a long process, as it should be. We have not yet identified any known burial grounds that could be affected, but in the course of construction, we could discover previously unknown sites. If that occurs, the clause and its related schedule provide for the appropriate processes to manage the removal and reburial or cremation of human remains, and the removal and replacement of monuments to the deceased.

Where remains are less than 100 years old, schedule 20 requires a notice to be published in the local newspaper and displayed at the burial ground. Relatives have the right to remove and re-inter or cremate the remains at the expense of the nominated undertaker, who must pay reasonable costs. I hope that provides some assurance to the hon. Gentleman that we are taking the issue seriously.

Question put and agreed to.

Clause 22 accordingly ordered to stand part of the Bill.

Schedule 20 agreed to.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Clause 43 introduces schedule 32, which protects the interests of statutory undertakers and other bodies who may be affected by other provisions of the Bill. The provisions are similar to those in the Crossrail Act 2008, the Channel Tunnel Rail Link Act 1996 and the High Speed Rail (London - West Midlands) Act 2017. The protective provisions of the schedule cover highways and traffic; electricity, gas, water and sewerage undertakers; electronic communications code networks; land drainage, flood defence, water resources and fisheries; and the Canal & River Trust.

Matt Rodda Portrait Matt Rodda
- Hansard - -

We believe that far more work needs to be carried out by the Government over a range of infrastructure projects to minimise the impact of development of sites, and not least to re-explore the issue of rail enhancement programmes and how rail should be used, wherever possible, to shift goods. That is explored in one of our new clauses.

We know that congestion causes pollution, and we know about its effect on communities and the environment. The Government are willing to carry out some monitoring work, but we would like them to do much more. Are they planning to monitor pollution in detail, and to publish new journey times? Projects such as HS2 have an impact not only on those working on the site, but on the wider population in the area. There should, as has been said, be further work. The Government need to respond to the dilemma, not address it superficially.

Paragraph 13 of schedule 32 deals with issues that I want to highlight concerning pedestrians, cyclists and other modes of transport, and how they cross the line. The schedule is not comprehensive enough, and we have drafted a new clause on the subject. We believe that pedestrians and cyclists should be at the top of the Government’s considerations in infrastructure projects, as the Government have targets for increasing walking and cycling. It would be somewhat ironic if an infrastructure project designed to improve transport withheld other aspects of it. The disruption to this group of highway users should be minimal. Bridges and tunnels can provide crucial access to those who need it, and can bring only greater connectivity to those who will be cut off by the HS2 line. The Government need to take a much closer look at this issue, and to address concerns that we will cover in a new clause.

Paragraph 14 of the schedule deals with the salient issue of highways repairs. We are becoming a pothole nation, as we have mentioned on other occasions in the House. Whether on major highways or smaller lanes, it is vital that proper repairs are made as damage occurs. Obviously, there will be damage in a major infrastructure project during which heavy goods vehicles will thunder down local roads. We want the Government to address that issue, which is of great importance to communities.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman raises important points, but most of them are detailed extensively in the environmental statement. My Department and HS2 Ltd have engaged, and will continue to engage, with all those who are worried about their local communities, the environment, congestion and traffic movement. They will all have the opportunity to petition this House and the other place. The clause is necessary to minimise disruption and allow the delivery of the proposed scheme, protects the bodies involved, and enables them to continue to carry out their duties.

Freight has been raised a number of times; I look forward to responding to the new clause on that issue. In anticipation, let me I point out that we are doing what we can to ensure that freight will support the movement of construction materials, whether aggregates or rail cement, during the construction of the railway.

Question put and agreed to.

Clause 43 accordingly ordered to stand part of the Bill.

Schedule 32 agreed to.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Clause 48 enables the Secretary of State to ensure that, following the construction of the scheme, he may impose conditions on land released where such land contains environmental mitigation for HS2. This is to ensure the maintenance of mitigation measures; upgrades to the mitigation, if required; and prohibition on uses of the land where such uses would detrimentally affect the measures in place. The clause binds successors in title into any covenant agreed with previous landowners. The Secretary of State or an authorised person may enforce the agreement.

Matt Rodda Portrait Matt Rodda
- Hansard - -

This is an important clause, particularly the mitigating provision in subsection (2), which proposes planting trees and shrubs to replace habitat where work has been carried out. I cannot stress enough how important it is to get this right. We need to ensure that biodiversity needs are addressed with the right solutions. The proposal to replace trees with native species is positive, but we need to ensure that those species fit with the local environment, that there is proper biodiversity and that habitats are protected in line with local ecology.

As well as planting trees and shrubs, we need to ensure that they are in the right places so that, for example, they mitigate flooding and enhance the natural environment. New plantations should be open to the public where possible and we should seek to create environments that encourage biodiversity, so features such as natural watercourses should be used to their advantage.

The end of the route passes through the salt marshes south of Crewe. That is an unusual habitat and a special site in the country, so that should be taken into account in the preservation of the natural environment.

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

The hon. Gentleman raises an important point to consider when undertaking such a large construction project. We are working with all stakeholders he would hope we would work with, including the Woodland Trust, to ensure that we not only replace trees but plant them in the most appropriate places, and to mitigate as much as possible the impact on the environment. The substantial environmental statement covered most of those issues.

Question put and agreed to.

Clause 48 accordingly ordered to stand part of the Bill.

Clause 49

Power to apply Act to further high speed rail works

Question proposed, That the clause stand part of the Bill.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

This is the standard clause that appears in Bills and provides for the expenditure of public money. It simply provides that any expenditure incurred by the Secretary of State under the Bill shall be paid out of money provided by Parliament.

Matt Rodda Portrait Matt Rodda
- Hansard - -

The Minister has addressed some of these issues, but it is vital to get this right. HS2 will allow for more reliable rail services. The current Secretary of State has plunged punctuality on the railways to a new depth—a 13-year low—and we must get on top of that issue. This is a tremendous opportunity to improve connectivity, and it is vital to get urban-to-urban connectivity within the country. We are committed to delivering a transformative package of investment across the rail network in the north of England, backed by a commitment of at least £10 billion to transform connections between major northern cities. The Government have touted similar plans, sometimes described as Northern Powerhouse Rail or HS3, but there is no commitment to the funding—it is interesting that the Minister used that point to address the financial side of the programme.

Any incoming Labour Government would rescope the project to seriously reduce costs and provide far better integration. Furthermore, there is concern over the accountability and the ability of our colleagues in this House to scrutinise HS2, ensure that costs are kept under control, and address the issue of public trust. We believe there is the potential to reduce the cost of HS2 by using a number of other technical measures—I will not address those in detail now—and the operation of HS2 is also contentious. Billions of pounds of taxpayers’ money is being invested in HS2, and it is right that revenues go back to the Exchequer and not into the hands of private train operating companies. HS2 should be run in the public sector as a public service. I will return to some of those points later in relation to the new clauses.

The Government have been somewhat inept in handling another specific aspect. HS2 has been rightly criticised for sometimes failing to provide value for public money. For example, the Public Accounts Committee described an unauthorised redundancy bill of £1.76 million as

“a shocking waste of taxpayers’ money”,

blaming it on

“weak internal processes at HS2”,

and there have been other concerns about the project.

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - - - Excerpts

Does my hon. Friend agree that the issue of spiralling costs concerns many of us up and down the country? If we do not get this right, it will have a huge impact on how services are delivered in our local communities in terms of housing, education, hospitals and so forth. Does he agree that the Government need to get a grip on the costs of HS2?

Matt Rodda Portrait Matt Rodda
- Hansard - -

I thank my hon. Friend for his intervention; it is nice to have a colleague from Berkshire Labour intervening on me. The Government need to be responsible with these very large sums of public money, and it is deeply disappointing that they have fallen well short at times.

The words of the Public Accounts Committee are worth considering:

“a shocking waste of taxpayers’ money”

is a severe condemnation of the Government. There have been many other allegations about HS2’s potentially not being well planned or managed. Ensuring that HS2 secures value for money is essential if we are to retain public support for the project. There should be no blank cheque.

Paul Sweeney Portrait Mr Sweeney
- Hansard - - - Excerpts

My hon. Friend makes an important point about the general principles of HS2 and the need to ensure that the project delivers maximum economic benefit to the nation, including industrial skills and job opportunities. When we look at how the Treasury assesses such projects, we see that very little consideration is given to how much value is created in the wider economy, particularly through industrial development. In my own constituency, the Caledonian railway works in Springburn faces closure. Would it not have been possible to utilise the supply chain opportunities of HS2 to ensure that highly skilled jobs in the railway industry are supported and maximised through the project’s supply chain?

Matt Rodda Portrait Matt Rodda
- Hansard - -

I thank my hon. Friend for his intervention and particularly for pointing out the importance of the supply chain. I will add that the value of apprenticeships, degree qualifications and other opportunities for young people linked to the programme should be first and foremost in the Government’s mind when they come to look at the supply chain.

Returning briefly to clause 61, essentially it says that there is potential for uncapped Government expenditure, leaving open the possibility of no upper limit on the costs of HS2. Will the Minister update the Committee on the latest cost estimate, and does she believe that the project will be delivered at cost?

Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

I remind the hon. Gentleman that we are here to scrutinise the Bill line by line, but I welcome the opportunity to remind everybody of the importance of HS2. Of course, it is a crucial project, linking eight of our 10 greatest cities. Supportive comments have been made recently by everybody involved, including the Mayors of Manchester and Liverpool and the leader of Leeds City Council, who have been watching very closely. They are northern, locally elected leaders who are waiting for HS2 to roll through their communities, because they fully understand not only that, at its peak, it will provide work for 30,000 people—most of those jobs being outside London—but its value for money and how it will smash the north-south divide, encourage our communities to come even closer together and force investment in rail infrastructure in the north of England for more than 100 years. This is a key infrastructure, social and economic project for our country.