A5 Trunk Road (M42/M69) Debate

Full Debate: Read Full Debate
Department: Department for Transport
Tuesday 28th October 2014

(9 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Marcus Jones Portrait Mr Marcus Jones (Nuneaton) (Con)
- Hansard - -

I am delighted to have been able to secure a debate about one of the busiest and most congested parts of our strategic road network. I am pleased to see that my hon. Friend the Member for Bosworth (David Tredinnick) is present—he, too, has a constituency interest in this busy stretch of the A5—and I thank my right hon. Friend the Minister of State for his time, and for the consideration that I hope he will give to the debate.

Let me explain why I am concerned about this stretch of the A5, and why I believe that there needs to be a fundamental rethink about the future of that busy highway for the sake of my constituents who live on the route, and for the sake of economic growth in the west and east midlands corridor.

The A5, or Watling street, which marks the northern boundary of my constituency, was built by the Romans, who originally built the road from Londinium to Deva—or London to Chester, as we know them today. I have not established the exact date when Watling street was built, but the fact that the Romans withdrew from Britain in 410 AD gives us a slight clue as to the longevity of the route. I am certain that the sheer volume of traffic that would use Watling street in the 21st century was never envisaged, even once the ownership of cars became commonplace after the second world war. That is why so many other sections of the busy road, which now stretches from London to Holyhead, have been substantially changed to reflect the volume of vehicles that use it.

Today, the A5 between junction 10 of the M42 and junction 1 of the M69 is one of the most congested routes on the strategic road network, particularly between the Longshoot junction and the Dodwells roundabout. That section is considered to be the 15th most congested section of road on the network. Many of my constituents live along Watling Street and on feeder roads such as the Longshoot, Higham lane, Weddington road and Woodford lane. They live every day with the imposition of queuing traffic, high levels of noise and massive pollution.

The pressure on the route is often compounded when traffic shifts from the M6 to the A5. There are regular closures on the M6. As my right hon. Friend knows, I have expressed concern in the House before about the safety of junctions 1 to 4 on the M6, where there are regular accidents. My constituents are affected by the way in which the traffic shifts from the motorway through my constituency to the A5 in order to reach the M42 and the M69. You probably think that that is a subject for a debate on another day, Mr Deputy Speaker, but I am sure that my right hon. Friend will give my comments some consideration tonight.

Over the decades, this section of the A5 has undergone numerous redesigns to deal with safety issues and to mitigate the growing number of vehicles on our roads. For many years my constituents have suffered from the disruption of regular roadworks that are intended to improve the situation. At this very moment, work is taking place from the Dodwells roundabout to the Royal Red Gate junction, where the A5 meets the A444. Just tonight, I was interviewed on BBC Radio Coventry and Warwickshire about the issue, along with a very disgruntled lady who was less than happy about the current disruption. I think that that disruption is extremely unfortunate, but it is quite necessary. Much of the work that is being undertaken between the Royal Red Gate and Higham lane junctions is facilitating the new Motor Industry Research Association technology park, which is creating more than 2,000 new jobs. As well as the new jobs, that part of the route will have a very positive effect on the local area because it is being turned into dual carriageway. Inevitably, that progress will put greater stress on the Longshoot junction and the Dodwells roundabout east of MIRA, but that will largely be mitigated by the current pinch-point scheme now under construction. The changes now taking place on the A5 will have a positive effect and there will be gain for the pain that my constituents and the many users of this busy route are experiencing.

I am also convinced, however, that we need a longer-term solution and we must seek it now. We cannot wait five, 10, 15 or 20 years before we consider the future. That would not be right for my constituents or the wider west and east midlands economy.

A substantial amount of development is planned along the A5 corridor both in my constituency and in that of my hon. Friend the Member for Bosworth. As my constituents know, I do not agree with all the development plans being promoted by the local planning authority in my constituency. However, it appears from the approach it is taking that these developments will go ahead whether I or my constituents like them or not. We must therefore think about substantive solutions for this section of the A5 to deal with the future issues.

My right hon. Friend the Minister will also be aware of the significant partnership-working currently taking place on the issue between the Highways Agency, the Coventry and Warwickshire local enterprise partnership, the Leicester and Leicestershire LEP, Warwickshire county council, Leicestershire county council, and the Nuneaton and Bedworth, Hinckley and Bosworth and North Warwickshire borough councils. The Minister will know that those agencies have jointly started to conduct some very embryonic work on a strategic enhancement of this section of the A5. They are looking at the issues and constraints that affect that busy section of highway.

That work has been conducted by the partnership, which has been formed because there is a strong business case for a long-term solution to the problems we face on that section of highway. It is thought that a long-term solution for that section of the A5 could bring savings of £680 million through better travel times, lower vehicle operating costs and a reduction in the accident rate on what is a busy stretch of road. That proposal aligns with the strategic growth aspirations of both the public sector and the private sector in the area. This evening I am asking the Minister to look at the detail of the embryonic work that has already been conducted and that I am sure his Department has seen.

Mark Pawsey Portrait Mark Pawsey (Rugby) (Con)
- Hansard - - - Excerpts

My hon. Friend is making a very strong case for the A5, which is an important route from the M1 at junction 18 to the north-west, avoiding the M6. I wonder whether we might persuade the Minister to look at the southern part of the A5 as well, from the M69 down to the M1. There will be very substantial housing and commercial development at the junction 18 end, and we could use that as an opportunity to improve that thoroughfare.

Marcus Jones Portrait Mr Jones
- Hansard - -

I thank my hon. Friend, who represents Rugby. I completely agree with his request in relation to the section further down the A5, which can only help the situation further up the A5, to the benefit of my constituents and the constituents of my hon. Friend the Member for Bosworth. I would also say in that regard that the work currently going on at the Catthorpe interchange, where the M6 meets the M1-A14, will have an extremely positive effect for our constituents in addressing, hopefully, some of the issues—not all, but some—that I referred to earlier: the A5 and Nuneaton get so clogged with traffic due to accidents on the M6.

This evening, I am asking the Minister to speak to my right hon. Friends the Secretary of State for Transport and the Chancellor about this issue, which is a matter of major concern for my constituents and many other people living in the region. He will know that the embryonic work has been carried out. I am now looking for a sympathetic ear in the hope that he will put forward my argument that funding for a further in-depth investigation and feasibility study of this busy stretch of the strategic road network should be made available. The investigation needs to include all stakeholders, particularly the people who live on and are affected by the current route.

I know how diligent the Minister is. He has helped me personally with other issues in my constituency, including the fallout following the closure of Daw Mill colliery. I remember the assistance that he gave me at that time, and I am confident that he will try to help in whatever way he can now. We have an autumn statement coming up, and I am sure that he will make a strong case to the Secretary of State and the Chancellor so that we can look at the long-term future of this busy section of the A5, which needs urgent consideration. I hope that the points that I have put on record tonight will go some way to enabling the case to go forward, so that we can do the right thing for my constituents. That has not been achieved under numerous Governments over the decades, and my constituents have had to put up with absolute mayhem on that section of this busy route.

--- Later in debate ---
John Hayes Portrait Mr Hayes
- Hansard - - - Excerpts

My hon. Friend follows in the tradition of his predecessor, Sir Robert Peel, who also represented Tamworth, in his determination to do what is right for those whom he serves. I prefer to be inspired by Disraeli, as perhaps my hon. Friend does too. None the less, that is an important tradition, and he makes, as always, a powerful argument in this Chamber.

The Government already recognise the importance of improving the A5. The Highways Agency pinch-point scheme for the M42 junction 10, which was completed earlier this year, along with the Highways Agency pinch- point scheme for the A5-A47 Longshoot and Dodwells junctions, which has recently started on site, are due to be completed by March 2015.

In addition, the MIRA enterprise zone, which is located adjacent to the A5 in Hinckley, was successful in securing regional growth funding with which it is providing A5 improvements. Those improvements include increasing the capacity at the A444 Red Gate junction as well as improving the access arrangements to the site itself. Those works are currently on site and are expected to be completed by March 2015.

Overall, these schemes show Government investment of around £15 million into improving this section of the A5. However, I recognise that my hon. Friend the Member for Nuneaton is concerned that the scale and potential economic and housing growth along the corridor will place increasing pressure on the A5 and that—he has made the case tonight—further investment in the route is necessary. To that end I commend the efforts made by—

Marcus Jones Portrait Mr Marcus Jones
- Hansard - -

Will my right hon. Friend give way?

John Hayes Portrait Mr Hayes
- Hansard - - - Excerpts

Let me finish what I was saying, as I am about to commend my hon. Friend and I know that he would not want to miss that.

I was about to say that I commend the efforts made to date by my hon. Friend, along with the relevant local stakeholders, to engage with the Highways Agency through its route strategy process. I recognise that concerns over the capacity of the A5 were raised by a number of local stakeholders during the Highways Agency’s route strategy stakeholder event, with a particular reference to the notable economic and housing development planned along the corridor.

Marcus Jones Portrait Mr Jones
- Hansard - -

I thank my right hon. Friend for his kind words, which will, I am sure, be matched with action by him to support my constituents in relation to this important route. May I also impress on him the importance of consultation with the public in relation to any changes to the A5? Over many years, there have been lots of different reconfigurations, particularly at the Red Gate and Longshoot junctions, on which, unfortunately, my constituents have not been consulted. Many think that, as a result, they have not seen the best outcomes.

John Hayes Portrait Mr Hayes
- Hansard - - - Excerpts

At this point, to the distress of my officials no doubt, I will detach myself from the prepared brief and say two things. First, if that is the case, then I will give this guarantee to the House tonight from this Dispatch Box that we will improve the way in which we engage with local stakeholders to ensure that any omission or error is not completed. Secondly, as my hon. Friend mentioned that the A5 was a Roman road, I will draw on G.K. Chesterton’s poem, “The Rolling English Road”. I am inspired by the following words. Chesterton talked about walking with

“clearer eyes and ears this path that wandereth.”

I assure my hon. Friend that with that clear sight, this listening Minister in this listening Government will ensure once again that local people’s views are taken fully into account.