Tuesday 4th March 2014

(10 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

John Glen Portrait John Glen (Salisbury) (Con)
- Hansard - -

It is a great pleasure to serve under your chairmanship, Dr McCrea, and I am delighted finally to have secured this afternoon’s debate. The A303 is a 92-mile road of historic importance that runs from Basingstoke to Devon and is one of only two major routes across the south-west. It is often affectionately referred to as the highway to the sun, because of its popularity with holidaymakers. I am sure that many hon. Members in the Chamber have fond memories of their long trips down it.

Unfortunately, such trips have become far from stress-free, and they now take far too long, because of the formidable traffic jams that are regarded as an everyday occurrence even outside the high season. A document published by the Department for Transport in July last year revealed that an estimated 20,000 vehicles drive within 200 metres of Stonehenge on an average day. The problems have become particularly acute since the closure of the A344 at Stonehenge. Sadly, to my constituents, the old Roman name for the road, which was the devil’s highway, seems appropriate. For many people, travelling on the A303 has become a deep source of frustration. Parents battling to the west country in half-term dread it, but it is a hassle that they face only once or twice a year. It is far worse for my constituents, who have to wrestle every day with what feels like one of the most notorious traffic blackspots in the country.

I have called the debate because I want to ensure that the 15 miles of the A303 that run through my constituency are not overlooked in the Government’s evaluation of the road as one of their national strategic priorities. More than 20 years have passed since the first dualling proposal was put on the table, and a staggering £43 million has been spent on numerous feasibility studies that have ultimately, and very sadly, come to nothing. That is all despite the fact that when the M4/M5 route to Devon and Cornwall was constructed in 1961, it was always envisaged that the A303 would be entirely dualled, given the road traffic and economic forecasts at the time. That was 53 years ago. My predecessor, the excellent Robert Key, campaigned on the matter throughout his 27-year career in the House. He tells me that he had meetings with 70 different Ministers from different Departments during that time, which even involved the late Baroness Thatcher examining maps on the floor of her office.

Sadly, debate over the dualling of the A303 has become increasingly polarised. For those who are primarily concerned with traffic flows and the prosperity of the south-west, dualling is a no-brainer that will ease congestion and boost the regional economy.

Sarah Newton Portrait Sarah Newton (Truro and Falmouth) (Con)
- Hansard - - - Excerpts

I am grateful to my hon. Friend for securing this vital debate. He is making an excellent case, which I would like to back up by saying that people in Cornwall would benefit enormously from the dualling of the A303 throughout his constituency, because it is a vital arterial road into Cornwall.

John Glen Portrait John Glen
- Hansard - -

My hon. Friend makes a wise and sensible point, and I will expand later on the economic benefits for the south-west as a whole.

On the other side of the argument, we cannot ignore the fact that the A303 runs very close to the UNESCO world heritage site at Stonehenge. We have a responsibility to protect that sacred site and reduce the blight that traffic continues to cause. If we do not, the National Trust, English Heritage, the Stonehenge Alliance and the Council for British Archaeology inform me that Stonehenge will be formally placed on the at-risk register. That would be extremely damaging to our reputation as a world leader in safeguarding our heritage.

John Howell Portrait John Howell (Henley) (Con)
- Hansard - - - Excerpts

Does my hon. Friend accept that the argument is about not only the megalithic monument at Stonehenge but the landscape in which it sits?

John Glen Portrait John Glen
- Hansard - -

Absolutely. My hon. Friend makes a sensible point, which I will expand on in a moment.

The risk of Stonehenge losing world heritage status is not an empty threat. That happened to Dresden in 2009 when a new four-lane bridge was constructed. As my hon. Friend just said, we must recognise the unique nature of the environment that surrounds the A303. Understanding how the greater Stonehenge and the vast interlacing of pathways, waterways, tombs, stones and enclosures fit together is not the idle pursuit of a few; it is a national heritage responsibility for us all.

As those two perspectives collide, doing nothing is not the only option. Although people tell me, “Just get on and dual the road,” a poorly designed and badly executed overground dual carriageway that undermines a 5,000-year-old world heritage site is not an improvement worth fighting for. In the past, however, all parties have repeatedly united around one solution: a deep-bore tunnel that is at least 2.8 km long, which would pass unseen beneath the hidden barrows and earthworks of the wider Stonehenge site. It seems to me that no other realistic solution has been offered—other proposed solutions have been a cut-and-cover tunnel or open dualling—that provides the same protection for the historic asset of Stonehenge and delivers the improvements to traffic that so many of my constituents desperately seek, and which I so enthusiastically support. Successive programmes have been cancelled on the grounds of costs that made them politically impossible to deliver or justify. As a result, we are left with a highly congested road, dissatisfied local people, wasted investment in feasibility studies, long delays for businesses and an imperfect solution for those who seek fully to address the heritage concerns.

Anne Marie Morris Portrait Anne Marie Morris (Newton Abbot) (Con)
- Hansard - - - Excerpts

Does my hon. Friend agree that sometimes it is difficult to look at the benefit of a project? I look back to the debates over the Channel tunnel and think of what that has delivered. Tourism is mission-critical for the south-west, and if we do not get the A303 sorted, we will have a real problem. Our small businesses depend on it, and if the situation is not improved, the potential of the south-west will never be realised.

John Glen Portrait John Glen
- Hansard - -

I agree entirely with my hon. Friend. Later in my speech, I will describe the analysis that has been done on the impact on the south-west economy, the support of the CBI and others, and the reasons why it is imperative to get on with improving the road.

The difference now, compared with previous attempts to deal with the problem, is that Britain’s engineering expertise has developed and we now have an international reputation for excellence in large-scale infrastructure projects that involve tunnelling. I understand that as a result of the expertise accumulated through Crossrail, the Hindhead tunnel and the Thames Tideway tunnel, the cost of such a project today should, in real terms, be around half the cost that was quoted in 1996.

I recognise that the dualling of the A303 by Stonehenge has aroused significant debate over many years, but the current impasse requires clear ministerial engagement and decisions. I therefore urge the Minister to be the one who unlocks decades of inertia—to be the Minister who finally delivers a solution for the road, rather than being added to the 70 I mentioned earlier who sadly failed.

Ten years ago, the then Secretary of State for Transport, the right hon. Member for Edinburgh South West (Mr Darling), said:

“Let’s have no further re-examinations and re-examinations and reviews—let’s get on with it”.

Jeremy Browne Portrait Mr Jeremy Browne (Taunton Deane) (LD)
- Hansard - - - Excerpts

I am grateful to the hon. Gentleman for giving way, and for securing this debate. I completely agree with him on the need to be sensitive to Stonehenge and its surrounding environment. Nevertheless, does he share my observation that the road must be dualled at some future point, at least as far as Ilminster, because the volume of traffic will inevitably make it necessary? Indeed, it already has. The question is not really whether we dual it, but whether the Government have enough sense of urgency about the economic benefits for the south-west and the time that is being lost daily. Are we going to keep pushing the problem on to future generations of politicians and future Governments when we should be looking to resolve it ourselves?

John Glen Portrait John Glen
- Hansard - -

I am grateful for the hon. Gentleman’s intervention. He makes a passionate case on behalf of the Somerset people he represents, and everyone in the region, on the legitimate economic arguments for the whole country, and the south-west in particular. I fully back him up on what he said.

Will the Minister tell us how the feasibility study will be framed to deliver an unambiguous solution for the A303 in Wiltshire? I do not mean a solution on paper, and subject to further decisions near or after a general election; I mean a solution that will secure physical changes on the ground. As other Members have said, the A303 is vital to the south-west, but it is also a route used day in, day out, by local people in my constituency, and they are very concerned.

Winterbourne Stoke is a typical Wiltshire village, except that more than 30,000 vehicles thunder through it every day. In just five years, there have been two fatalities and nine serious injuries in a number of collisions. The case for the Winterbourne Stoke bypass was accepted in previous studies and public inquiries. I recently visited the proposed sites with local councillor Ian West, who said that there is no controversy over the best route or its inclusion in any upgrade to the A303. Will the Minister reassure my constituents in the village that this notorious accident blackspot will finally be addressed?

Other local areas have been similarly affected by the pollution, and particularly the noise, caused by the sheer volume of traffic. I am delighted that the Parliamentary Secretary to the Treasury, my right hon. Friend the Member for North West Hampshire (Sir George Young), is present. He has drawn my attention to the increased noise and pollution caused by the sheer volume of traffic around Andover. Will the Minister outline today how he intends to tackle that and replace the particularly noisy sections in that constituency? Will he agree, at the very least, to explore resurfacing the road so that those living next to it can have relative peace and quiet restored?

The village of Shrewton in my constituency has also paid a heavy price for the recent traffic changes associated with the construction of the new visitors’ centre at Stonehenge and the closure of the A344, which I mentioned earlier. The work of the Stonehenge Traffic Action Group—STAG—under the leadership of Janice Hassett and Dr Andrew Shuttleworth has motivated me to pursue those issues.

I turn to the wider economic benefits of improvements to the route. A study carried out in 2013 for Devon, Somerset and Wiltshire councils estimates that dualling the A303 would ultimately generate more than £41 billion for the economy, create 21,400 jobs and increase visitor expenditure by £8.6 billion every year. John Cridland, the director general of the Confederation of British Industry, has said that the A303 should be fast-tracked because it is

“pivotal in underpinning the government’s broader growth priorities: boosting our export capability and maximising the economic potential of all regions.”

Of 650 south-west businesses surveyed, 89% said that the reliability of the journey time was an issue for them, and 77% said that improving the route would increase investment in the area. More than two thirds of Wiltshire businesses alone said that dualling would increase their turnover, saving time, fuel and lives. The issue therefore is not simply one of a bit of traffic on the edge of Salisbury plain. The A303 is one of just two transport arteries to the south-west. The British Chambers of Commerce has shown that upgrading it offers the highest benefit-to-cost ratio of any UK transport project, including—dare I say it—a third runway at Heathrow.

Why would businesses invest in sites if accessing them involves travelling regularly on the A303? Staff would be plagued by delays and rarely be on time, while clients would never know whether staff would turn up. The benefits, therefore, are clear, as is the choice. We can continue with the clogged-up artery that is the existing A303, or we can provide the region with a much needed lifeline to catalyse economic growth in the south-west. It is somewhat sad that seven years ago my predecessor held a debate in this Chamber on this exact topic, but since that point nothing tangible has emerged from Governments of either side.

In recent days, I have spoken to English Heritage, the National Trust and Stonehenge Alliance, and I have received representations from the Council for British Archaeology, which will not accept anything that threatens the heritage interests of the area. Decades of consultations mean that we know the position of the Ministry of Defence and of the numerous stakeholders I have referred to, which have all contributed many times to the lengthy, expensive and repetitious public inquiries over the years. Let us be honest and say that tackling Stonehenge might well be the most difficult part of the A303 programme, but let us then get on with the job.

Let us have no more hand-wringing and procrastination, flying of kites that will not get off the ground or picking off of smaller, cheaper schemes elsewhere along the route—perhaps the Countess roundabout flyover, or an underpass at Longbarrow roundabout. They may be politically more palatable and fiscally less threatening to the Treasury, but they are not really what is required. We need an imaginative and holistic solution, and a realistic, fully costed explanation of how it will be paid for.

Have we explored every funding avenue available? Will the Minister agree to examine European funding avenues related to the economic interests of the far west of the region, which would undoubtedly benefit from the A303 being upgraded? Will he work with other Government Departments, including the Department for Communities and Local Government and the Department for Culture, Media and Sport, to ensure that all funding associated with this UNESCO world heritage site is pursued aggressively and exhaustively? More importantly, will the Minister pledge categorically that Stonehenge will not be simply siphoned off into the “too difficult” category in the study, in order to deliver improvements elsewhere on the route?

The harsh reality is that if the Stonehenge solution is ignored and the rest of the A303 is dualled, my constituency will remain host to the bottleneck that prohibits swift and easy access to the wider south-west region.

Sarah Newton Portrait Sarah Newton
- Hansard - - - Excerpts

The Government have commissioned a resilience review for the whole transport infrastructure to the far south-west in Devon and Cornwall, which is very welcome. Does my hon. Friend agree that we might also ask the Minister to consider giving the importance of the A303 greater emphasis in that infrastructure resilience report?

John Glen Portrait John Glen
- Hansard - -

That is a useful intervention. The difficult past few weeks, in which the infrastructure of the south-west has been under enormous pressure, have underscored the fact that we must open up new options for the A303. Sorting out the A303 in Wiltshire will provide a clear gateway to the south-west.

My constituents have been promised so much on this issue by many Ministers over many years; sadly, they have been let down every time. I am determined that they will not be let down again. I ask the Minister to commit today to ensuring that our hopes for the A303 can become a reality. I know that he is a plain-speaking Yorkshireman. I look for plain speaking in his response to us Wiltshire folk, who are fed up with constant words and little action.

--- Later in debate ---
David Heath Portrait Mr David Heath (Somerton and Frome) (LD)
- Hansard - - - Excerpts

In my 17 years in Parliament—other than the period when I was a Minister, when I had to secrete references to the A303 in answers on other things—there has not been a single year in which I have not raised the issue of the A303, so I am particularly grateful to the hon. Member for Salisbury (John Glen) for securing this debate, and for introducing it so well. The A303 is a special road. It is a road of myth and legend, about which books have been written and films made. It is Britain’s mother road. Sadly, it is a neglected mother, because successive Governments have failed to put in the investment needed, and it is frankly unfit for purpose. That is the simple point that many of us have made year after year to Government.

The hon. Member for Salisbury concentrated, quite reasonably, on Stonehenge, which is the major difficulty along the whole road. I hope that he will forgive me for concentrating, despite the fact that we do not have megaliths to hand, on the portion of the road that runs through my constituency, the Sparkford to Ilchester stretch. We have a couple of listed world war 2 hangars turned into houses that are of interest, but they do not quite merit the same attention as Stonehenge. Nevertheless, they are very interesting.

Sparkford to Ilchester is a stretch of road that should have been dualled a long time ago. There are reasons why it has not been, and in my view, those reasons are unsustainable. Casting my mind back a little, I remember appearing at a public planning inquiry in 1996 on the dualling of that stretch of the A303. Those of us who were in favour of dualling won the inquiry—the inspector found in our favour—and construction was about to start, when suddenly, in 1997, with the change of Government came a moratorium on all major road construction, and the Sparkford to Ilchester stretch was left out. That meant that work did not start when we hoped it would.

Then the regional bodies for local government in the south-west brought together the so-called south-west regional spatial strategy; very few people shed many tears when it went. Those bodies decided that the A303 should not be considered the second strategic route to the south-west. That was an utterly perverse decision, but of course the Government at that time, with many other demands for investment—

John Glen Portrait John Glen
- Hansard - -

In the north-east.

David Heath Portrait Mr Heath
- Hansard - - - Excerpts

In the north-east, as the hon. Gentleman says, or elsewhere. The Government were very happy to grasp that and say, “Well, the local people don’t think this is an important road, so why on earth should we invest in it?” So the road was still not dealt with at that time.

There were other knock-on effects. The hon. Gentleman mentioned Winterbourne Stoke, where I have spent many happy hours queuing in traffic over the years, and the effect of the surface noise from the road there. That problem also afflicts my constituency; around the Wincanton area, there are houses that are close to a busy road. We had a commitment 15 years ago to replace that road surface with a low-noise road surface, but guess what? The plans to do that were cancelled and the money was specifically moved to the A1(M), which was considered a higher priority.

The A303 has been constantly neglected. Also, the best has sometimes been the enemy of the good: sometimes the difficulties to do with Stonehenge and the Blackdowns—difficulties that undoubtedly exist—have been allowed to prevent anything being done along any part of the road. I entirely accept what the hon. Gentleman said about Stonehenge; it is essential that we find a solution.

--- Later in debate ---
John Howell Portrait John Howell (Henley) (Con)
- Hansard - - - Excerpts

Let me apologise, Dr McCrea, because I may not be able to stay to the end of this debate, depending on when it finishes, as I have another meeting to attend.

I will make a short contribution picking up on the historical implications of this issue, which my hon. Friend the Member for Salisbury (John Glen) mentioned. I declare two interests: first, I am a member of the all-party group on archaeology; and, secondly, I am a fellow of the Society of Antiquaries. The economic implications of this issue have already been highlighted by Members; I will not go over them again. I just point out that Stonehenge is an important element of the economic case that they have made, and we need to take it into account.

Inevitably, the issue of the A303 bottleneck in the area of Stonehenge has been raised. We need the Government to look for a long-term sustainable solution to this problem, which reflects their full cultural, environmental and international obligations. With respect to the Minister, this is not solely a traffic issue; at stake is the integrity of one of the world’s finest prehistoric landscapes.

I intervened earlier to say that this was not just about the monument. I am credited with being one of those who helped to invent landscape archaeology. I stress that the landscape in which Stonehenge sits is an important archaeological site in its own context. This Government should explore what impact on this world heritage landscape would be acceptable. Particularly for the reasons set out by my hon. Friend the Member for Salisbury, the Government should explore a long-bore tunnel option. That would add to the considerable achievement of the recent closure of the A344 next to the stones, which reduced noise and traffic pollution from the road, and that in turn moved us further in the desirable direction of allowing visitors to explore the entire world heritage landscape in its completeness.

John Glen Portrait John Glen
- Hansard - -

Although my hon. Friend makes a reasonable point about the wider heritage arguments, he must acknowledge that the closure of that road before a solution for the A303 was fully established caused enormous frustration to many local residents, some of whom are in the Public Gallery.

John Howell Portrait John Howell
- Hansard - - - Excerpts

I thank my hon. Friend for that comment. I fully accept his point, but we cannot undo what has been done historically, and we have to take the major benefits that came out of it, in terms of reducing noise and traffic pollution. We would like to get back to the amount of noise and traffic pollution being reduced, so that people can explore the world heritage landscape in its entirety.

The aim of all the key heritage bodies involved—my hon. Friend the Member for Salisbury listed them in their entirety—is to regain the tranquillity and dignity of this unique cultural landscape, as well as allowing the throughflow of traffic between here and the south-west, so that present and future generations can fully enjoy and appreciate the world heritage site as a whole. Anything that can be done to achieve those two objectives is to be welcomed as something that we should do now.

--- Later in debate ---
Neil Parish Portrait Neil Parish
- Hansard - - - Excerpts

I thank the hon. Lady for her intervention. Of course, when the Minister drives the route—he has probably already done so, but he will do it officially—he will see the length of the A30/A303 and will only probably get halfway along it. By some magic, he appears to be stopping at Honiton; I have no idea why. But seriously, we have to improve the road.

Hon. Members have said that we have few arterial routes into the west country. Bristol is not the west country; it may be part of the west country, but there is much after Bristol. To get to Devon and Cornwall, people need to cross Wiltshire and Somerset. We need to get that road done. A previous solution talked about in the spatial strategy—building on the A358 and dualling it out to the A303—is not a solution, because all that does is drive motorway and A303 traffic on to and off an already congested road. The west country—Somerset, Devon and Cornwall, and Wiltshire—relies a lot on tourism. We also rely on our businesses being able to be able to move their goods and services around. Come the summer, there are times when those roads are completely blocked. That has a huge economic effect on our businesses. Money for dualling the A303/A30 would be well spent.

I have made the point before in Parliament that, although I am 110% behind the Government taking action on our deficit—the huge sum that we have to borrow day in, day out, to pay the running costs of this country—there is an argument that says that, when interest rates are so historically low, we should borrow money to build infrastructure, because that builds up our economy and gives us a great future.

We expect our fair share of proceeds in the west country. Vast sums may or may not be spent on High Speed 2, yet we have railways that are falling into the sea. We are doing our best to make sure that that does not happen, and that railways are rebuilt. A second railway line needs to come down to the west country. All this is part of the infrastructure. Roads are also important.

On a slightly more controversial note, people say, “If you dual those roads, the traffic will go faster and it could cause more pollution.” However, in my view, it causes much less pollution. There is nothing worse than car engines ticking over for hours on end; cars do not run well when the engines are not running smoothly, and the amount of fuel and carbon monoxide that comes out of cars that are queuing for hours adds to pollution.

In my constituency, especially coming out of Honiton, several villages along the A30, which leads into the A303, have poor access to and egress from that road. There have been many accidents along it, so there are many good reasons, from a traffic safety point of view, for improving it.

People might think that I, as the Member for Tiverton and Honiton, would be telling the Government, “You must start by dualling the A30/A303 from Honiton eastwards,” but I am not saying that. I say that eventually we must dual the whole road. We must not be stopped by either Stonehenge or the Blackdowns in my constituency, because those are the expensive parts of dualling the road. In a former life, I drove around the whole south-west region. I often drove down the A30 into Cornwall. Short stretches of single-track road do not hold up traffic anywhere near as much as longer lengths of single-track road. My point is that we have to start the job. There is a saying that a job started is a job half done. There is no doubt that, once we break the logjam by starting to dual the road, it will be dualled the whole way.

John Glen Portrait John Glen
- Hansard - -

I accept my hon. Friend’s positive approach, but does he acknowledge that, for the large volume of people going all the way through to the furthest extremity of the south-west region, the economic advantages of spending money on the route will not be realised unless they can get through the significant bottlenecks near Stonehenge? We have to do something; otherwise people will not get down to the south-west quickly enough.

Neil Parish Portrait Neil Parish
- Hansard - - - Excerpts

I thank my hon. Friend for his comments. He is fighting the corner for Stonehenge, but if we improve the roads either side of Stonehenge, we will solve the Stonehenge issue. We do not want to say, as the previous Government did in many respects, that we will not spend any money on the A30/A303 unless the Stonehenge situation is sorted. I will support him all the way in whatever he wants to do to get his piece of the road done, but we should not let that be the piece that holds up the whole road. I will not necessarily throw all my rattles out of the pram—I will throw only a few of them—when the A30/A303 at the Honiton end, going east, is not the first part to be dualled. I believe that the dualling will happen, and it is right that it does. We are considering the long-term strategy for the south-west. The A30/A303 has to be part of that strategy. Businesses, the local enterprise partnerships and councils are all pulling together, which is amazing in itself, so let us not say that it has to be Somerset, Devon or Wiltshire. It has to be all of us pulling together.

--- Later in debate ---
Richard Burden Portrait Richard Burden (Birmingham, Northfield) (Lab)
- Hansard - - - Excerpts

I congratulate the hon. Member for Salisbury (John Glen) on securing this debate, which has attracted interventions and speeches from no fewer than eight speakers from both sides of the House. All of today’s speakers have made important points on this piece of road. It is difficult to talk about it as a “piece of road”, because it is so long. He described it as “the highway to the sun.” Coming from Birmingham, I know such highways well. The hon. Member for Somerton and Frome (Mr Heath) describes it as “Britain’s mother road”. Both of those descriptions are accurate.

Many hon. Members have talked about the economic importance of the A303. Most notably, it was a major part of the speech of my hon. Friend the Member for Plymouth, Moor View (Alison Seabeck). There has been unanimity today on the need to invest in creaking parts of the road network to cope with demand, improve safety, relieve congestion and secure jobs and growth. There is also an understanding that, however we do that, it has to be done in a way that improves our communities and quality of life. Protecting the environment is an add-on to that and has to be part of the process.

The A303 is a road that has tested the ability of successive Governments to deliver those objectives. We have to be honest about that. There is a clear need to improve the route, which is vital for the entire south-west’s connectivity to the rest of the UK. Incomplete dualling over the years has resulted in a number of bottlenecks, about which we have heard today. Those bottlenecks cause road safety problems and cost trade and tourism. There has been a range of continuing reviews, public inquiries and policy changes from the 1990s to the current day. They have demonstrated just how contentious delivering some crucial road upgrades can be in practice. Any solution to this matter will be difficult, but I am concerned—some of the issues put to the Minister are real ones—whether the Government’s approach fully learns the lessons of the past. I have a number of questions for him to tease that out. The recent floods have underlined just how important it is to improve strategic transport connections to the south-west more generally. It is no good just looking at roads, although they are important; we need to take into account all the transport networks of the south-west—that point has been made by a number of Members today—and improve transport resilience across the piece in the region.

I will not attempt to hide the fact that, like this Government, we faced challenges in delivering a second arterial road to this part of the country when we were in government. As Secretary of State for Transport, my right hon. Friend the Member for Edinburgh South West (Mr Darling) committed to improving the A303 in 2003. Our process was subject to lengthy public inquiries and the cost of the proposed schemes rose significantly during that period. When we left office, however, the Highways Agency had a costed and timetabled plan to improve the A303. That included—it has been contentious for some in the Chamber—dualling the A358 from Ilminster to Taunton, which avoided some of the problems with the area of outstanding natural beauty at Blackdown hills. What is the status of that plan now?

The hon. Member for Tiverton and Honiton (Neil Parish) spoke about money, and we need to press the Minister on that. When the Government entered office, nearly £4 billion of planned investment for our roads network was cut. Those are not my figures, but those of the National Audit Office. The Highways Agency budget for capital investment in roads has been cut from £1.6 billion in 2010-11 to just £877 million in 2013-14. That has had a big impact on specific road slippages.

A lot has been said about delivering major progress. Things were said about that in the autumn statement, but the truth is that most of the road schemes that are being talked about were started under the previous Government. I do not say that just to make a political point, although I am making something of a political point. My right hon. Friend the Member for Exeter (Mr Bradshaw) wanted to be here today, but was unable to come. He has said that the Government’s failure to invest in infrastructure has made the reality of improving the A303 further away than it could be.

On this side of the House, we are pleased that Ministers are finally talking about the need to invest in our country’s long-term transport infrastructure, but the important thing is to start delivering it. In the spending review of June 2013, the Government committed to producing a feasibility study on solutions for an alternative road route to the south-west, and I have a number of questions for the Minister on that. Will he clarify the study’s intended publication date? There has been some talk about that being spring 2015. I am sure that all of us are looking to spring 2015 for all sorts of things, but I suspect that the constituents of Members who have spoken today, seized though they will be by events in spring 2015, want to know what the significance of that study will be for the road scheme.

John Glen Portrait John Glen
- Hansard - -

The real lesson of the past is that publishing reports near general elections ensures that nothing happens for another five years. It is absolutely imperative that we have a clear proposal from the feasibility study much sooner than spring 2015. Does the shadow Minister not agree?

Richard Burden Portrait Richard Burden
- Hansard - - - Excerpts

The hon. Gentleman is ahead of me in many ways. It is important that the Minister is clear about the issue. If we are talking about publication in spring 2015, is the bottom line that it might not even be published before the next general election? If it is published before the general election, when does he, whichever Government are elected, see the study being put into operation in practical terms?

--- Later in debate ---
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I wish for no less for the hon. Gentleman, I am sure.

It might be useful to say a little more about the approach we are taking, as the feasibility study is the mechanism by which we will identify early solutions to the problems on the A303-A30-A358 corridor. The aim of the study will be to identify the opportunities and understand the case for future investment solutions on the corridor that are deliverable, affordable and offer value for money, including noise mitigation where appropriate, as my hon. Friend the Member for Salisbury suggested. Much work has been carried out, but agreement has not been reached on a set of solutions. It is therefore important for us to carry out this study to ensure that we understand the priorities for the corridor and that proposals for investment demonstrate a strong and robust economic case for investment, as well as value for money, and are deliverable.

John Glen Portrait John Glen
- Hansard - -

Does the Minister accept that the Stonehenge case will require not only a value-for-money approach, but a perspective on the wider heritage interests? What work is he doing to engage with other colleagues in government to take account of the particular concerns at Stonehenge?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

My hon. Friend makes a valid point. A number of issues associated with the route-based studies up and down the country include environmental or heritage considerations. It is important not to take the view that, because they are sometimes too difficult, they should not be considered properly.

The study work will be conducted in stages, with the Department initially looking to identify the current and future challenges along the corridor. We are keen to ensure that we have the most up-to-date and relevant information available to inform the study. The Department has asked stakeholders to furnish us with any additional study work or analysis that they might have commissioned. The next stage will be to identify the range of solutions or measures that could address the problems identified along the corridor. Again, we will look to build on previous work, rather than starting from scratch, as the hon. Member for Birmingham, Northfield suggested, but we will not rule out other potential investment proposals that may emerge from the first phase of the route-based strategy process, as well as potential investment proposals on the A358.

We will look to engage with a range of stakeholders throughout the life of the study, including local highway authorities, local enterprise partnerships and local environmental groups. A stakeholder reference group will be established to ensure a mechanism through which the views of stakeholders may be incorporated in the study work. The views of hon. Members will also be important in the deliberations. The outputs of the route-based strategy and of the six feasibility studies will inform the Department’s roads investment strategy, which is being developed and which we have committed to publish by the end of the year.

I fully understand the Stonehenge concerns of my hon. Friend the Member for Salisbury. As is well known, the single carriageway section of the A303 can cause congestion during traffic peaks on bank holidays and through the summer. I am aware that local lobby groups have been established, such as the Stonehenge traffic action group, of which I understand that my hon. Friend is aware.

The new Stonehenge visitor centre opened in mid-December 2013 and is situated at Airman’s Corner on the A360. In terms of traffic to the centre, the car park fails to meet demand at busy times, and this leads to traffic that is queuing to enter the visitor centre backing up along the A360 and blocking it to other users. In extreme cases, the traffic has reached as far as the A303 at Longbarrow roundabout, causing congestion on the A303. In support of the new visitor centre and closure of the local road, the Highways Agency has carried out extensive improvements to the Longbarrow roundabout at the junction of the A303, with significant investment of more than £3 million to support the Stonehenge attraction.

In addition, drivers have been using the nearby byway and lay-bys to get a good view of the stones, which has further exacerbated congestion on the A303. The Highways Agency has worked with Wiltshire county council and the police to prohibit certain movements and to prevent drivers parking illegally, guiding them by the designated route to the visitor centre. I assure hon. Members that while we await the outcome of the feasibility study, the Highways Agency will continue to monitor and respond to congestion at this location. Wiltshire police have invited some local representatives to a meeting with key agencies, including the Highways Agency, the county council, English Heritage and the National Trust, to look at the short-term issues likely to arise this summer.

Given the flooding that we have seen over recent weeks and months, I emphasise to my hon. Friend that the strategic road network in the south-west has performed well, although there was a closure one weekend. By and large, the network has been kept running, keeping the south-west open for business during this difficult period and allowing the replacement buses to run. The importance of the A303 has been emphasised in light of the issues experienced on the rail network.

Flooding occurred at two locations on the A303, at Ilchester and at Deptford, which was due to adjacent water courses and groundwater run-off from fields. Flooding at Ilchester meant that the A303 was closed in both directions for 20 hours. The diversion route was utilised to keep the route into the south-west open. The flooding at Deptford saw the eastbound carriageway affected for 12 days, although within two days a contraflow was put in place, enabling traffic to get through.

In conclusion, I again congratulate my hon. Friend the Member for Salisbury on securing the debate. I have been clear that the Government are committed to and have set out plans for large-scale investment to improve our strategic road network in the relatively short term. We are also committed to developing a longer-term programme of investment through the route-based strategy process. Through the A303-A30-A358 corridor feasibility study, we will work closely with local stakeholders to ensure we consider current and future transport problems and the range of possible solutions that could deal with them. As I said, it is important that proposals for future investment are clearly supported by the local stakeholders and that there is a clear consensus on what is required. Ultimately, any proposals for future investment need to be able to demonstrate a strong business case and the delivery of both transport and wider economic benefits.

Every cloud is said to have a silver lining, and the weather in the south-west this year has emphasised the importance of a resilient road network when we have problems on our rail network. The fact that big investment is going into north-south rail connections makes an even stronger case for investment in roads in the south-west. I look forward to my road trip to Tiverton and Honiton—a road that I have travelled before. Having heard the points made today, I think that I need to set off in good time.