George Howarth
Main Page: George Howarth (Labour - Knowsley)Department Debates - View all George Howarth's debates with the HM Treasury
(6 years, 1 month ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I congratulate my hon. Friend on securing the debate. I, too, voted against HS2, as I am sure he is aware, because we have probably the most affected constituencies in the country, given phases 1 and 2. If HS2 were to be scrapped, as he suggests, with potential savings of £50 billion, is he aware of the great British transport competition, which I recently launched in conjunction with the Taxpayers’ Alliance to identify how the money could be better spent across the country rather than in narrow swathes? Will he recommend to his constituents that they take part in the competition?
Order. Before Sir William continues his speech, I remind Members that a lot of people want to speak in the debate and I am sure that there will be interventions, which I hope can be kept brief, because otherwise it inhibits my ability to call everyone who wants to speak.
I endorse what my hon. Friend has said about what is an extremely good idea and fits in with the opinion poll I mentioned. I am extremely glad that he voted against HS2, and sorry that I did not mention that earlier.
The right hon. Lady makes a good point. I am a Manchester MP, I went to university in Sheffield and I always wanted the project to start in Manchester and Sheffield, but it would have been a unifying factor for the United Kingdom for the project to start in Scotland. There is no reason for it to start in only one or two places—it could have started in three; many projects of this scale do.
I could talk at length but many hon. Members want to speak. This is a project of national importance, like the third runway at Heathrow. I understand that the right hon. Member for Chesham and Amersham (Dame Cheryl Gillan) has constituency issues. Many of us understand national priorities but we are elected by our constituents and have to represent them. I understand that balance. I do not think that the HS2 consultation has always been perfect and it—and the compensation—could have been improved. I pay tribute to the right. hon Lady for the considerable amount of increased investment in HS2 tunnelling that she has managed to get for her area. We have to keep this in perspective. We do not want investment in the north of England to stop, yet again, because of the methodology and because lobbying in London is so intensely powerful.
Before I call the next speaker, I need to say that we will start on the wind-ups at 10.40 am. I will not set a time limit, but it would be helpful if those who speak from hereon in confine their remarks to about eight minutes.
Order. I have to impose a five-minute limit on speeches—I am afraid the time available does not allow for anything else.
It is a pleasure to serve under your chairmanship, Mr Howarth. I thank the hon. Member for Stone (Sir William Cash) for bringing forward the debate and all other hon. Members for their pertinent questions. Let us first remind ourselves why investment in growing our railways is imperative. We need investment in capacity growth and connectivity, which is being called for particularly in the north but also across the rest of the country. We also need to see environmental improvements, particularly in air quality. Rail provides a real opportunity for modal shift, whether from car to train or, indeed, from plane to train in the case of high-speed trains. We also need to invest in economic opportunity, so much so in the north, which for generations has missed out on the investment we have seen in London and the south-east.
However, we must be mindful of communities, the environment and construction costs. For such major infrastructure projects, we must also be mindful of skills, the opportunity for employment and how we develop engineering across the country. We must also be aware of the cost of getting it wrong. It is therefore right for hon. Members to call for reviews, investigations and transparency, because this is a publicly supported project about which the public demand answers, and they must receive them. As the project moves into a new phase of governance and leadership, it is important that a new approach is brought to high-speed rail to put in place the scrutiny that the public demand.
We must also get answers from the Minister. We have heard speculation and read reports, so today I ask her to clarify the actual costs of each part of phase 2—phase 2a, phase 2b east and phase 2b west—so that we can all understand the figures, how they have been derived and where costs fall. We must also understand the timeline, which we hear has been set back.
HS1 was hailed as a success, coming in on time and on budget, but clearly the rumours are that HS2 will not have such success. We need to understand why the learning of HS1 has not been translated into this project. HS1 is successful in bringing people from mainland Europe to the UK and in taking people to the south-east. We are proud of that project, but we must understand where the needs sit now.
I understand the public’s frustration. The complete chaos across our rail network over the last three months has set it in the minds of so many that rail can no longer be relied on. We have seen people stranded at stations, people losing jobs because a train has not turned up, and people not getting home to see their family in the evening. When the Government cannot even get the basics right, people are asking, “Why aren’t we getting things shored up before we move on to HS2?” We will read the Glaister report—I understand the interim report will be out later this month—which will address those issues, with interest.
We must have a fully integrated rail system, not one with segregated high-speed rail. I want assurances from the Minister that we will see that integration rather than have high-speed rail just for people who can afford premium rates, because that will not bring economic opportunity to the north. That is why Labour is clear that we would have one fully integrated rail network owned by the public and run by the public as we move forward.
We know that we must build more capacity on the rail network, that we must invest in the economies of the north and that people must be able to travel. The point about freight is important: we need more paths for freight. We must enable that serious modal shift and move freight off roads and on to rail. Investment is therefore imperative, as we know that the road haulage industry cannot recruit the drivers required to run the freight network on the roads. We must make those changes, and we therefore need available paths to do that. Building that capacity is essential, and the west coast main line will lend itself to that.
We also need leading-off capacity to the south-west, Wales and elsewhere across the north, including north of Manchester and York. Labour has closely considered how to develop a long-term plan for rail investment because, as many hon. Members have indicated, it is important to invest in the right places. We have been clear that creating a Crossrail for the north, bringing that connectivity to the north of the country, is our priority.
The Secretary of State’s decision not to electrify the trans-Pennine line has brought real damage to the north, but Labour will introduce reparation for that decision as soon as we come into government. We will ensure that someone can travel from Manchester, Liverpool, Leeds, Bradford, York or Hull, and down into Sheffield and up to Teesside and Newcastle. These are important decisions, and Crossrail for the north will be our priority, ensuring that we catch up on the timeline on which we have been so let down by this Government. Building connectivity to Sheffield will start to address the issues about what route HS2 should take in a faster way, because we wish to ensure that people can get to where they need to go. We must also invest in digital rail so that we get maximum capacity and opportunity from our railways. We must address the dreadful overcrowding that commuters experience day by day, because often people are not even able to get on the trains.
On speed, we believe that it is important to improve the east coast main line. Since we do not know when—or indeed whether—HS2 will be achieved, it is important that control period 6 provides extra capacity for speed and upgrades to the east coast main line. Travelling from York to London will take only 1 hour 31 minutes, and the additional time saving that HS2 will bring to cities such as mine will not be the reason why we need the additional spend required by high-speed rail. This is about capacity, not speed; it is about whether someone has a seat and can work or carry out their activities. That is why we need to invest in rail.
We must also ensure that we are responsible for the environment. I have met the Woodland Trust, and I am concerned about some of the environmental impacts of the project, particularly on sites of special scientific interest. We must be mindful that once things have gone, we cannot bring them back, and I believe that we must maximise our support for the environment as this project moves forward.
Today we have all identified wasted opportunities. Where, for example, is the cycle route alongside this network? That would make sense, but it has not yet been planned, despite its minimal cost. The hon. Member for Stafford (Jeremy Lefroy) mentioned a depot that suddenly appeared on land, and we must scrutinise every decision and decide whether it is imperative for each little piece of infrastructure to go ahead, or whether there are alternatives. It is certainly distressing to hear that so much construction will be delivered by road rather than rail, and it is important to consider that.
Finally, on economic opportunity, I agree with my hon. Friend the Member for Blackley and Broughton (Graham Stringer) that we need better connectivity to the north. Manchester is such an exciting city, but we cannot stymie its growth by denying it that much-needed connectivity. Liverpool is also moving forward and follows closely behind. We must ensure the right connectivity and invest in the right places. We need transparency on spend as we move forward. People are concerned; they are paying so much more for their rail fares, which have gone up by 35% under this Government, and they need to understand what the future will hold.