(7 years, 8 months ago)
Commons ChamberYou normally call me Andrew Jones, Mr Speaker.
Thank you. May I first welcome today’s announcement of an HS2 depot in Leeds, which is welcome news for the northern powerhouse? The A59 at Kex Gill is an important trans-Pennine route, and its closure is impacting on residents and businesses in my constituency. Will my right hon. Friend meet me to discuss what support the Government can provide to North Yorkshire County Council to carry out works on that site, including its potential re-routing?
Mr Speaker
I say gently to the hon. Member for Harrogate and Knaresborough (Andrew Jones) that one of his most endearing qualities is his gentleness and modesty. However, he should not be quite so modest—he is, after all, a distinguished former Parliamentary Under-Secretary of State with responsibility for buses, and that was a motivational factor in my calling him to ask a supplementary at Transport questions.
(7 years, 8 months ago)
Commons ChamberI thank the hon. Gentleman for that intervention. As it is on the subject of borders, which is what we are debating, it is an entirely appropriate intervention. It gives me the opportunity to point out that the same Secretary of State often refers to the advantages of the border between Norway and Sweden. Again I am not sure whether he has visited that border. Maybe he has. If he has, he will have found on his visit that some of the border points are inconveniently shut at certain times of the day and night. He will also have discovered that one of the factors that Swedish business often cites as being a major constraint on doing trade with Norway is the fact that the border is not in fact frictionless. So there is a bit of a problem in terms of the Secretary of State, but I am sure he has now been on many fact-finding missions and has increased his knowledge of the subject on which he speaks.
The right hon. Gentleman talked about the causes of Operation Stack in 2015. There were two causes, neither of which was the one he identified, so I would not want him to be inadvertently misleading the House. The causes were the migrant crisis affecting the operation of Eurotunnel and the French ferries going on strike. It was very clear at the time that those were the causes. Ministers were all over it. It was not as he is suggesting. I am sure it is appropriate, and he will be grateful, that we have been able to put the record straight.
I am very happy to put the record straight as far as I am concerned and the record as far as I am concerned is that, when I visited the port authorities and talked to them about the 15-mile tailback, they were very clear in telling me that that occurred as a result of two French police officers not turning up for their shift.
The hon. Gentleman can shake his head, but he should perhaps talk to the port authorities and find out from them what the cause of that particular delay was. That is the information I have had. They are the ones in charge of the port and, frankly, I would have thought that they knew what they were talking about. I am happy to give way if he disagrees with me.
The causes were very clear. I was the Minister at the time who had responsibility for Operation Stack. I went down and met with people who were operating it and dealing with the problems. What the causes were was extremely clear. The right hon. Gentleman is just plain wrong.
I am afraid that we will have to disagree on this matter. If the hon. Gentleman wants to raise the issue with the port authorities, from whom I got this information, I recommend he does so. That is what they told me. However, we can have an argument about whether that particular incident—there has been more than one Operation Stack—was or was not caused by migrants through the tunnel, which is some distance from the port of Dover, or alternatively by two French police officers not turning up, but what is indisputable is the point that Airbus, BMW, Honda and Siemens have been making in the past few days: the Government are at risk of creating major problems for them in terms of their just-in-time operations because of whatever the Government are planning—if only we knew what they were planning on future customs arrangements. Added to that, the Government are causing those businesses huge uncertainty, which probably explains why investment in the car industry has dropped by half in the last 12 months.
I want to say a few quick words in support of the Bill and the sector. The road haulage industry is hugely important to the United Kingdom. It does the heavy lifting of goods around our country and because it works so well and so smoothly, it is frequently taken for granted.
There are 320,000 HGV drivers employed in the UK, and in terms of the workforce, that goes up to around 2.5 million when we include the broader haulage and logistics industry. Road haulage is the main means of moving goods around the UK and it plays a huge role in our exports. Over 3.5 million road goods vehicles left the UK for Europe last year. We have been talking about the implications for exporting. The goods that we rely on, our food and drink, and the stock for our nation’s high streets—much of what we export—are moved by trucks and the workforce that drives them. Those goods are stored in warehouses and managed by the logistics teams who ensure that they are where we need them when we need them.
The Bill deals with a critical part of the UK economy and is about making sure that whatever happens in our Brexit negotiations, the Government will be able to deliver a smooth Brexit. This Bill is about preparations that may never be needed—indeed, I hope they are not. We do not know what the deal will be, so while the negotiations are progressing, it is right for the Government to plan for different eventualities. It is about creating the capacity to develop background systems, and about doing so in collaboration and consultation with the industry. We saw that with the addition in the House of Lords of a consultation clause, which was very positive. We have liberalised access for haulage and the Government are working to maintain that, but it is right to have the contingency, which is what the Bill is about.
I have experienced the sector both as a Minister and prior to that, in my working career, and I know just how important is to have smooth operation and a successful future for this critical part of the UK economy. The Government are to be commended for planning ahead and taking the necessary precautions for whatever Brexit may bring. That is why I will support the Bill; I urge everyone to do so.
(7 years, 9 months ago)
Commons ChamberAs the hon. Lady will find when she reads the updated NPS document, that latter point is one of several recommendations from the Committee that we have addressed, and we have added additional information to the NPS.
On the hon. Lady’s comments about access to the airport, I have just given a firm commitment that we should deliver a package as broad as that to support this. One Select Committee recommendation was to strengthen the wording about western and southern rail access, and that has happened; we are very committed to both of those. This is a broad-ranging package that will transform surface access to Heathrow.
I welcome my right hon. Friend’s statement. Does he agree that as Heathrow is the UK’s hub airport and this expansion will bring forward new routes, improved connectivity to Heathrow will bring important benefits to the people and economy of Yorkshire and other parts of the northern powerhouse?
I completely agree with my hon. Friend. One of the disappointments recently has been a reduction in the number of flights from Leeds Bradford airport to Heathrow. Creating more capacity at Heathrow will create greater competition and allow new entrants to regional markets, and will allow some of the routes that have not been there in recent years to reappear.
(7 years, 9 months ago)
Commons ChamberI thank my hon. Friend for that intervention. There is surely no north-south divide in this situation.
The fault of the services, as I will explain, can be traced back to significant delays to the Network Rail upgrade works on the electrification of the Manchester to Preston via Bolton route. That has had a knock-on effect on Northern’s ability to run its timetable properly. Network Rail is ultimately the Government’s responsibility. What are Northern rail, Network Rail and the Department for Transport going to do to urgently solve the problem so that people can get into Manchester in the morning for work, so that pupils can get to school, and so that people can get home again?
The greatest—but by no means only—problem with the new timetable relates to the glaring gap in the morning rush-hour commuter service to Manchester. The service originates in Buxton and picks up passengers from Hazel Grove station, as well as from Woodsmoor and Davenport stations, which are just outside my constituency boundary but still used by a great number of my constituents. The train service is vital for people to get to work.
The new timetable, which came into effect this week, removed the two most popular peak-time trains: the 7.50 am and 8.01 am from Hazel Grove station, which went on to call at Woodsmoor and Davenport. That leaves a glaring hole. The new timetable has three trains in the space of half an hour between 7.9 am to 7.35 am, but then nothing calls at those three stations until just after 8.20 am. As I said, Hazel Grove no longer has the 7.50 am or 8.01 am service, and the 37-minute gap between 7.35 am to 8.12 am is far too long at that time of the morning.
Hazel Grove does fare slightly better, because an East Midlands train does call there, but it does not stop at later stations. Woodsmoor now has a 45-minute gap in service between 7.38 and 8.23, and then there is nothing until after 9 am. Similarly, Davenport has a 45-minute gap in service between 7.40 and 8.25, and then nothing until after 9 am.
The changes are having a massive effect on people’s ability to get into Manchester before 8.30 am. Oddly, from 9 am, the services resume to three an hour—at 10, 20, and 35 minutes past respectively. That is obviously a better service, but it comes too late for people to get into Manchester for work, and the situation is causing massive disruption. Many commuters are faced with the choice of being late for work because of taking a later train, or being forced to take an earlier train only to arrive at their place of work unreasonably early.
The change in the time of the arrival of the train from Buxton from 8.04 to 7.38 causes problems for local schools. For example, many pupils at Stockport Grammar School used the 8.04 service. The new timetable will have a significant effect on parents having to co-ordinate dropping off their children in the morning and arranging suitable childcare.
It is not only the gap in services that is causing the problem. The loss of two train services means that the same numbers of passengers are forced into fewer trains, so when a train does arrive, passengers have to stand in cramped conditions—they do not even have the privilege of a seat. People are in effect paying a premium rate to travel at that time although there are actually more regular services off-peak.
The situation was already bad with the 7.50 and 8.01 services, as they were generally quite overcrowded. One commuter even told me that last week their train had to be met by an ambulance at Piccadilly station because a passenger had passed out due to a combination of the hot weather and cramped conditions.
These changes will have a damaging and hurtful impact on the family and professional life of many of my constituents. Sadly, the view I hear from residents is that they have the impression that Northern, the Department for Transport and Network Rail do not care about passengers. There is extreme anger. The two words that have appeared most often in the dozens of letters and emails I have received on the subject have been “ridiculous” and “unacceptable”, and I must agree.
It is not just the weekday morning service that has been impacted, as the Sunday timetable also changed. It sees the last train to Romiley in my constituency from Manchester Piccadilly moved from 22.20 to 21.45, so the service runs 35 minutes earlier. That means people are no longer able to use the service after visiting Manchester on a Sunday evening, particularly if they are going to theatres and concerts as most events finish at 10 pm or later. The 22.20 train was already too early as passengers usually had to leave events so that they could make the last train home. Now there is absolutely no chance of people getting the last train at 21.45. Again, the situation is ridiculous and unacceptable.
I know that the Government are working hard to rebalance the economy and to support northern cities such as Manchester and the conurbation through the northern powerhouse strategy. Getting commuter train timetables right is essential for that. The impact of poorer services—cancelled trains, uneven timetables, less available rolling stock and overcrowding—will spill out from the rail network and on to our roads. The upshot will be that people are forced back into their cars. Money was recently invested at Hazel Grove station on a new multi-storey car park to encourage train travel, but now the morning service is so poor as to put passengers off. As the Minister knows—I have raised this many times in this House—the A6 corridor from my constituency into Manchester is one of the most heavily congested roads in the country, so a modal shift from rail back to road is not the direction in which we ought to be heading.
My hon. Friend is spot on in identifying the cause of the challenges faced by Northern rail with the implementation of the new timetable: the delay caused by electrification on the Manchester-Bolton-Preston line, which has had huge consequences. He has articulated the impact on his constituents incredibly clearly, but this is also happening in other parts of the franchise, including across the Pennines on the Leeds-Harrogate-York line. Does he agree that it is critical that Network Rail works with the Northern franchise holder and the Government, and keeps colleagues informed so that we know where we are? Does he agree that it should conclude the work as early as possible while planning appropriately? This is about planning to get more people off the roads and on to the railways.
My hon. Friend’s assessment is correct. We cannot get into a situation in which the buck is simply passed from one organisation to the other. It is clear that people need their commuter trains, and that is the end of the story as far as I am concerned.
This whole affair is clearly a great disappointment for Northern rail passengers, who need and deserve a proper service. However, I fear it could also detract from otherwise welcome and long-awaited improvements such as electrification, the 1,300 extra train services introduced across the Northern rail network, and the replacement of the uncomfortable, creaking and quite frankly detested Pacer trains, which I am assured is still on track.
Northern rail has been responding to customers by saying there is nothing it can do about the new timetable. It explains that the timetable is not the result of any decision made by Northern rail, but that it is, as my hon. Friend suggested, delays encountered by the Bolton electrification project, which is of course being delivered, albeit rather slowly, by Network Rail, that have had an effect on the timetable bidding process.
When Northern rail bid for the May 2018 timetable back in autumn 2017, it planned to include services in what has now become known as “the gap”, but those services were rejected by Network Rail, which has the ultimate say on the timetable. Such rejections are not uncommon in a timetable negotiation process, and in the normal course of things, the train operator would have negotiated with Network Rail to move services around a little to make sure all the services could fit in.
During the negotiation period, however, Network Rail announced that the electrification programme from Manchester to Preston via Bolton would not be ready in time for the May changes, which brings the delay to the completion of the project to two years. In the short term, the situation has severely affected plans to increase services and capacity across the Northern network.
Northern rail received the notification in January 2018. To be fair, that was incredibly late in the process, given that it normally takes at least six months to build a new timetable. Northern rail’s timetable planners have been working solidly on the new timetable since then, but have not been able to fit services into the gap.
To make matters worse, Northern rail had to build its timetable around those of other operators that had already had their timetables agreed by Network Rail. Just as airlines have to secure runway slots, rail operators have to bid for platform space at stations for their trains. The problem for Hazel Grove, Woodsmoor and Davenport services is congestion at Manchester Piccadilly.
The morning peak into Manchester, as could well be imagined, is incredibly congested, with many other operators bringing people in from right across the country and the wider region. It will be even busier from May, with TransPennine Express services coming into Piccadilly and heading to Yorkshire.
I have no doubt that Northern rail wanted to run services in the gap but, due to how congested things are at Piccadilly, it seems that that is just not possible. Apparently no more services will fit in. If Northern rail had been advised three months earlier of the delays to the Bolton project, there is every chance that it would have been able to maintain the existing peak service and build a better new timetable, if not one as good as it was. Regrettably, Northern rail did not have that chance.
When I met Northern rail’s regional director in April to discuss these issues, I said it was unacceptable for passengers to be deprived of morning services, particularly given the substantial gap in the timetable. I made it clear that the proposals will cause considerable inconvenience to all commuters. Following that meeting, the regional director undertook to make representations to Network Rail to see whether a compromise could be found.
There has been one glimmer of success in this whole affair. Residents close to Rose Hill station in Marple contacted me about the hour gap in the outbound evening service between 5.09 pm and 6.10 pm from Manchester Piccadilly, which had arisen because Network Rail had, bizarrely, scheduled a maintenance train to be on the line at the time. However, following my meeting with Northern, it agreed to run a 5.34 pm departure in the new timetable to provide an extra evening service. That is a small bit of good news. I was pleased to be able to work with Friends of Rose Hill Station on this, and I wish to place on the record my thanks for all its hard work.
Northern rail is placing the blame for this sorry situation on Network Rail. As Network Rail comes under the control of the Department for Transport, I am looking to the Government at least to bang heads together and hold these organisations to account.
In conclusion, I would like to ask the Minister a number of questions. How can this terrible service represent value for money for commuters? Does he agree that the time has come for Transport for the North, the regional transport body, to conduct a formal assessment of whether Northern rail is in breach of its performance targets, as set out in its franchise agreements? If that is determined to be the case, what action can Transport for the North take? What are the reasons for the further delay to the biggest infrastructure project necessary for Northern’s modernisation—the electrification of the Manchester to Preston route via Bolton—which has caused this mess up of the timetabling process? What assurances can he give that this work will not be further delayed? Do passengers really have to wait six months for the next timetable review, or can the Minister promise today to get things moving much more speedily? I am determined to keep working constructively with all concerned to get the urgent improvements to rail services that my constituents deserve, and I very much look forward to hearing the Minister’s reply.
My hon. Friend neatly segues me on to my next topic. His point is well landed and well taken account of, and it will undoubtedly feed back to colleagues and officials, but as he will be aware, it does not require a PhD in cryptology or the detective skills of a Sherlock Holmes to realise that I am the Roads Minister and therefore will not be giving direct instructions to officials in this regard. Nevertheless, I shall ensure that due regard is taken of the point that he raises, and rightly so. For that reason, I may be a little less crisp on the detail than some of my colleagues on the rail side would be, but I assure all Members that their considerations will be heard and taken account of.
As my hon. Friend the Member for Hazel Grove will know, Northern is now running hundreds more services compared with last week. Clearly, there is an upside to this situation as well as a downside. By 2020, there will be more than 2,500 extra services a week with room for 40,000 extra passengers, and these will be, by and large, faster and more comfortable journeys, with new and direct services across the north and beyond. Indeed, this week’s timetable change, although we have properly and appropriately focused on the negative feedback that has occurred, has also been one that has delivered an extra 1,682 train services a week across the network.
As I have said, the Department for Transport is monitoring the situation very carefully. My colleagues have made it clear that if these teething problems are not resolved in the coming days, they will hold the industry to account—not merely the operators, but Network Rail itself, which is, I am afraid, at the heart of the problems that we have at the moment.
The beginning of the week, as my hon. Friends have noted, was a challenging time for customers of Northern and the TransPennine Express, and operators have appropriately apologised for the disruption. It is sometimes forgotten that they were upfront—perhaps not upfront enough—about the kind of disruption that they were expecting and the scale and the number of the changes. It is also right to note—the Secretary of State noted this himself earlier today—that many thousands of railway staff are working flat out to deliver the benefits of this enormous investment programme, and we should be celebrating their efforts. No one, least of all I or my colleagues, or indeed any Member of this House, wishes to see passengers face disruption, let alone on the scale that has been identified in the specific cases that have been picked out today. We understand the frustration that many have felt with this week’s service. The hope is that passengers will become a little more understanding as these initial issues are addressed and as the wider benefits start to feed through.
As colleagues across the House will know, in this case, the franchises are managed by the Rail North Partnership jointly on behalf of the Department and Transport for the North. I am assured that the team, which is based in Leeds, has been closely monitoring the situation and liaising with both operators. There is a timetable recovery plan against which Northern expect to be monitored by the Rail North Partnership team. In response to my hon. Friend’s question, I would not be surprised if a slightly more formal process of internal assessment were set up.
It is absolutely right for passengers to be compensated if they are affected by disruption. I hope that it is understood across the House that the Department has, with some effectiveness, worked with train operators to promote passengers’ awareness of their compensation rights. Rail passengers are now more willing and more able than ever to demand and to receive, without undue disruption to their own timetables or cost, the compensation that they are due. Figures published for 2016-17 showed that more than £73 million was paid out to successful claimants—an increase of 63.8% on the previous year.
Both Northern and TransPennine Express operate this delay repay compensation scheme, which allows rail passengers to claim compensation for each delay of more than 30 minutes or more whatever its cause. There are no exclusions for weather or for other delays outside the control of the rail industry. One suspects that quite a lot of this compensation will spike as a result of the experience that we have had over the past few days.
In the case of multi-modal tickets, delay repay compensation is payable for delays that occur on the rail element of journeys covered by these tickets. Of course, the train operating companies and the relevant local transport authorities remain responsible for this policy. The Department has worked very closely with the train operators to make those compensation claims as swift and as simple as possible, including through online claim forms, smartcards and online apps.
Let me turn now to the timetable. Northern has planned for some time to introduce these changes in two phases—one in December 2017 and the other in May 2018, with the latter being larger and more relevant. These were supposed to be underpinned by planned line speed improvements and electrification of the route between Manchester and Preston. Again, my hon. Friend the Member for Hazel Grove, in a very incisive analysis, put his finger on the central problem, which was that this electrification did not take place on schedule and that had all of these knock-on effects, and of course, in a network, knock-on effects themselves have knock-on effects and the result creates further disruption.
The effect of the delays to the completion of the Manchester to Preston upgrade meant that Northern had to move some of its service enhancements to a later date. Further service enhancements for Northern and TransPennine Express are planned for introduction from the end of this year through until 2020. I am sure that colleagues will be working closely with the operators to ensure that they are put in place with minimum disruption. As a result, although the operators will be delivering an increase of 1,300 new services a week from May 2018, 900 services a week—disappointingly for customers—will not be delivered until the infrastructure is ready. Once that happens, it will be a further improvement.
It became apparent in the early part of this year that the electrification process would not be completed on schedule. My hon. Friend rightly targets the question whether enough notice was given at that time. This required a lot of rethinking and rejigging by Northern. Although we are in the midst of significant operational challenges, I am afraid to say that it is appropriate to recognise that they have not yet ended. Once wishes that it were not so, but there may still be some further localised service disruption. In a way, that is to be expected with any new timetable, but it is all the more regrettable given the current circumstances. Northern has assured us that it will continue to do everything it can to make certain that there is minimal service disruption and to keep customers informed. Officials in the Department have focused on ensuring that customers know that timetables are changing.
I will not go further than my hon. Friend in addressing the specific issues that he has experienced in his constituency and on the Buxton and Hazel Grove line into Manchester Piccadilly. He has done a good and accurate job of bringing these issues to the forefront of the House’s attention. It is worth pointing out, however, that we will continue to see further improvements over time.
In Greater Manchester, Northern will begin to operate two trains an hour between Buxton and Manchester Piccadilly, significantly increasing the capacity on one of the most popular lines into the city. There will also be six trains an hour on weekdays between Rochdale and Manchester Victoria, as well as an hourly Sheffield to Manchester Piccadilly service every day. In Merseyside and Cheshire, Northern has made it clear that it will operate two weekday trains every hour between Southport and Manchester Victoria, two morning peak services from Southport to Alderley Edge via Manchester Piccadilly and two evening peak services from Alderley Edge to Southport via Manchester Piccadilly. A host of other changes and improvements have been put in place.
My hon. Friend is quite right to highlight the frequency improvements and particularly the upgrade of the rolling stock, with the removal of the Pacers. In the context that the franchise is improving and has ambitious long-term plans—I ought to own up that I was a Minister at the time of the franchise renewal so am slightly marking my own homework—we are talking about identifying the blockage that is stopping the benefits being delivered. Can he take back to the Department and all relevant officials the message that we need a concentrated effort on removing that blockage, with the completion of the electrification works, to allow the significant benefits of the new franchise ambitions to be delivered for the people of the north?
My hon. Friend is absolutely right. That point is all the more forceful from someone with his experience and terrific track record in the Department, and officials and those in the industry will take it properly seriously.
If we look more widely, the position remains in many ways extremely positive. The Government will have spent more than £13 billion between 2015 and 2020 on improving and modernising transport in various forms across the north. We are building HS2—the first new north-south railway in this country for over a century—and will be providing better journeys through the new Northern and TransPennine Express franchises, albeit once the current disruption has settled. We are also investing well over £1 billion in improvements through the Great North rail project. As has been mentioned, Northern and TransPennine Express trains will be brand new or completely refurbished, and all Pacer trains will be gone. All that is to be welcomed.
Again, I thank my hon. Friend the Member for Hazel Grove and all colleagues for the contributions they have made. Once this present phase has been completed, passengers on Northern rail will benefit significantly through some 1,300 extra services a week and rail users will have many things to be hopeful about for the future—not just brand-new trains but improvements to stations as well to service quality. The Minister of State, my hon. Friend the Member for Orpington (Joseph Johnson), has spoken to the chief executive of Transport for the North and the Mayor of Greater Manchester to underline his and the Department’s commitment to improving performance for passengers. We continue to work closely with rail companies to drive down cancellations, and to support Network Rail and the wider industry in delivering these significant improvements. I suggest that those are all things for which we will ultimately be very grateful.
Question put and agreed to.
(7 years, 10 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Yes, I would be delighted to. I have recently written to Volkswagen to draw attention to the continuing dissatisfaction that I and my colleagues have with its performance. I have raised the matter not merely with the operating personnel but with the supervisory board of that company, and I understand that my colleagues in other parts of the Government are in touch with their German counterparts, to make it clear that we remain exceedingly dissatisfied on behalf of consumers, Volkswagen customers and the general public in this country by the performance of the company and we expect it to continue the process of making amends through the scheme it has in place, extending it as and when that may be required.
Let me proceed. I have said that we want almost every car and van to have zero emissions by 2050. We have said that we will end the sale of new conventional petrol and diesel cars and vans by 2040. My hon. Friend the Member for South West Bedfordshire asked whether that target was too far out. I say to him that it is not. If he reflects on the experience of the past 12 months, he will see that one of the results of the Volkswagen scandal has been that diesels—in many ways, diesel is a thoroughly excellent technology, which is rapidly improving and is useful especially for journeys of distance and between cities in particular—have taken the brunt of that. The result has been a worsening in performance on air quality or rather on emissions, and that is precisely the kind of counterintuitive response that would come from a failure to manage the process effectively. I draw his attention to that.
Will my hon. Friend the Minister give way?
I will give way once more, but tragically I will not have a chance to address any of the other points that were made.
The Minister has just mentioned air quality. Does he agree that electric buses, which are, so to speak, rolling out in Harrogate this year, are critical to providing a solid public transport system that will tackle the air quality in our towns and cities?
(7 years, 11 months ago)
Commons ChamberOn that last point, there was a revenue issue last year around Govia Thameslink Railway and the completely unnecessary strike action taken by the unions. I am happy that that railway is now mostly back to normal and I hope that we will not have that issue again. The hon. Gentleman asked about the east coast main line. I will come back to the House when it is the right moment to do so, when we are ready to set out the approach that we are going to take. It is important to ensure that that is dealt with on a value-for-money basis but also on an operational basis, to ensure that passengers are not affected by the trouble on that route at the moment.
The hon. Gentleman asked about timetables on the west coast main line. That will come from the bids that are tabled for that particular route, depending on how the bidders plan to enhance services. The invitation to tender starts today, and we will start to get the proposals back during the course of this year. Of course, no one can bid for a franchise without a passport, and that will continue to be the case. He also asked about the funding level for Scotland. I simply remind him that the Government have provided more than would have been provided under the Barnett formula. Scottish Members normally argue for the Barnett formula, except when it is inconvenient for them to do so. The reality is that they should be glad to get anything more than the Barnett formula, because that is what they always argue that Scotland should receive.
The hon. Gentleman asked about learning lessons from failure. As I said in my previous statement on the east coast main line, we have tightened the risk-sharing mechanisms and we will be watching this particular franchise like a hawk to ensure that it is financially solid and robust. He also asked about the speed of journeys to Scotland. Of course, HS2 will reduce journey times to Scotland. There is an issue north of Crewe because the new classic-compatible trains are not tilting trains, and that is something we will have to address as we go through the 2020s, but the reality is that journey times to Scotland will be reduced as a result of HS2 arriving. That is part of delivering better services right across the country and, crucially, delivering jobs right across the country. That will happen all across Scotland, Wales, Northern Ireland and England.
I congratulate my right hon. Friend on his statement. What he has outlined will mean a smooth transition to the national network upgrade that HS2 will deliver. Will he give the House a little more information about what the announcement will mean for passenger rail fares on the west coast main line?
It is really important that HS2 does not become a premium service that today’s passengers cannot afford to travel on. Our expectation is that fare structures will stay broadly similar, and it is certainly not my intention to create a situation where HS2 suddenly becomes much more expensive than the west coast main line is today.
(8 years, 1 month ago)
Commons ChamberI absolutely agree with my right hon. Friend. Toton is going to be a fantastic centre in the east midlands for commercial development—transport and residential—whose benefits will ripple out across the area and have a hugely positive effect on the whole of the east midlands. I understand her point. We are working as fast as we can to bring before the House the powers we need for the east midlands and Yorkshire leg. I want to get it right—there are sensitivities on the route, as she will know—and I have travelled much of the route myself and looked at the issues as and when they arrive. We will do everything we can to minimise the impact on residents—I understand that such major projects have a negative effect on some people—but I assure her that we will bring the measure for the rest of the route before the House as soon as we can.
I have talked a bit about the north. Let me now talk about Scotland, because I want it to benefit from HS2 on the day it opens. When the full Y network opens in 2033, HS2 trains will run seamlessly on to the west and east coast main lines from the network that is then built. My Department and Transport Scotland are working closely with Network Rail in looking at options that will go beyond HS2. We want to identify options for strong business cases that can improve journey times, capacity, resilience and reliability. Our ultimate ambition is for three-hour rail journeys between London and Scotland’s central belt—a further strengthening of the Union that we all hold so dear. That, I think, is the point: HS2 will be a transformative project for the entire United Kingdom, including the parts that it does not serve directly. The benefits in terms of job creation, business opportunity and technological development will be enormous for the whole country.
I strongly support the Bill, and agree with my right hon. Friend’s comments about capacity in our rail network and the positive impact that HS2 will have on our northern economy. Can he tell us a little more about the impact on job creation in the north and elsewhere outside London?
I rise to speak in support of the Bill. It is positive that we are debating it and I very much enjoyed playing a role in its development.
As my right hon. Friend the Member for Derbyshire Dales (Sir Patrick McLoughlin) said, passenger numbers on our railways have grown from just over 700 million to nearly 1.6 billion. That is a fantastic turnaround for an industry that had seen decades of decline. The industry now faces the challenge of how to cater for the growth it is experiencing. It is a completely different mindset, so it is positive that we are seeking finally to bite the bullet and construct some new capacity in the UK rail network. We have deferred this decision for far too long. Things such as small upgrades to reduce pinch points and thereby increase capacity have only deferred the big decisions. If we consider the fact that we have not built a new railway line in England north of London since the reign of Queen Victoria, we realise just how overdue HS2 is.
Does my hon. Friend agree that part of the reason why we now face a capacity issue and need to deliver HS2 is that the frailties of the nationalised rail service caused the shutdown of so much of the capacity throughout the country?
My hon. Friend makes an insightful point. We had decades of decline when the rail industry was in public hands. The turnaround post-privatisation has been dramatic. Opposition Members take that for granted and suggest that nationalisation is a way forward, but they have forgotten the complete change we saw, with the focus on customers and growth, and how that has delivered and been a key part of the UK’s economic growth.
Will the hon. Gentleman not concede that that turnaround has taken place on the back of several hundred million pounds of public money being given to the train operators every year?
Well, the hon. Gentleman suggests that even more public money should go in, so I am not sure where his argument takes him, apart from round in a circle. We are seeing long-overdue public investment in the rail industry.
We do not want to spend too much time on this issue, but the simple fact is that in the past, when the nationalised railway had to rely solely on the Government, the Government cut off its funding. With privatisation, it has attracted funding. The truth of the matter is that that has seen growth in the rail industry that has made something like HS2 absolutely necessary.
My right hon. Friend is as wise as ever. Not only do we have public money going into our railways, but we are seeing private investment attracted into our railways and therefore more investment in aggregate. We have this urgent need for capacity within our network to cater for the growth both in passengers and in freight.
After years of decline, this decision has been taken to go for growth. The next question that successive Governments have faced is what form that should take. Should it be investment in the classic rail network, or should we be embracing new technology? Well, we should of course be embracing new technology. Perhaps it is again worth remembering that that has not always been the case under nationalised industries. The UK built its last steam engine in 1960, and it was only in 1964 that the Japanese introduced the bullet train. The Government are buying investment not in phone boxes, but in fibre broadband. Technology should of course be at the heart of our investment decisions.
I thank the hon. Gentleman for giving way; he is being generous. I do not disagree with his arguments about the need for infrastructure investment or the need for additional capacity, but this Bill in particular is about the route between the west midlands and Crewe. The route that has been chosen is the most expensive that it could be, delivering the least economic benefits for Staffordshire and causing the most ecological damage. That is what we should be discussing this evening.
That has been part of the discussion throughout the day. I have to say that I missed some of the speeches. I am sorry to hear what the hon. Gentleman had to say, but I simply do not agree with his basic premise. I have travelled the route, met local communities along the route and met local government leaders and local businesses along the route. I simply do not agree with his premise.
The issues raised by colleagues along the line of the route are of course entirely fair and legitimate, and they are right to speak up for their constituents. It is difficult delivering infrastructure—whether it is transport, digital or housing infrastructure—without causing some environmental impact. It is clearly right for the Minister to listen to the concerns raised by Members and to respond appropriately. I know that when I was part of the Transport team, we did nothing but listen and try to address those issues. I know that the Under-Secretary of State for Transport, my hon. Friend the Member for Wealden (Ms Ghani), will be in the same grain.
Despite all the sensitivities that have been raised, it is very encouraging that we have a Government who are seeking to deliver HS2 as fast as possible and have brought forward HS2 phase 2a. Views have been well articulated today. The reasons why I am so supportive of the development are that it will deliver key strategic benefits for the UK in terms of economic growth and the skills legacy. I have visited the two HS2 colleges in Doncaster and in Birmingham—only during their construction phase; not since they have progressed further —and I was incredibly impressed by what I saw. They offer great facilities for skills development for people taking apprenticeships. They will learn all the skills that we will need not just for this project, but for future high-speed rail projects.
I hope the House will forgive me for raising this issue again, but because he has visited the college and I have not done so, will he tell me what progress he saw on the initiative for getting more women into the train and engineering industry while he was there?
My hon. Friend makes a very interesting point. It was reasonably hard to see that from the project in development, but the teams I met working in the colleges were absolutely clear that they will be drawing on as much talent as possible, which will obviously mean bringing more women into engineering. We have a huge shortfall in the number of engineers in the UK. Historically, we have failed to draw on as wide a talent base as possible. The more we talk about the matter in this place, the more we follow it through within communities, and the more we offer a series of careers that can deliver high-quality jobs that solve community problems, the more women we will attract into the industry.
Cutting-edge strategic decisions always bring with them a certain degree of contention, which is why Governments in democratic polities too rarely make such decisions. They also bring with them opportunity. One thinks of Crossrail. At the beginning, there were doubters, but Crossrail has, without doubt, led to the development of skills of the kind my hon. Friend described, the creation of opportunities, and the seeding of jobs, which have led to us being world beating. The same thing can happen in respect of HS2.
My right hon. Friend makes an interesting point. I entirely agree with him. For those who have not yet had the opportunity to go to see Crossrail, the opportunity may well occur again as Crossrail has been taking people down to have a look at its sites. What Crossrail has achieved is fantastic. I hope that my hon. Friend the Member for Redditch will shortly be able to visit one of the HS2 colleges, where she will see just the difference that the project has made.
I would just say in response to the previous intervention that there would have been far fewer problems had the tunnel gone the entire way under the Chilterns. It would have been advisable to do that. Does my hon. Friend agree that there is a real danger that we will not have the engineering capacity to complete these projects on budget and on time, and that, as we currently lack so many skills in engineering, it will be hard to make up that deficit?
My right hon. Friend makes two points. We have previously discussed the issue of tunnelling in the Chilterns. I feel more optimistic about the project as a whole. I do not feel that the current skills gap will hinder the delivery of the project, and I am clear that that will not happen because of the actions taken to bring more people into the sector. The fact that we have to deliver skills via building colleges suggests that the Government have been taking seriously the issue of skills in the railways.
The key reason that phase 2a is such a positive project is that more people will benefit from HS2. Crewe is a rail hub. More passengers will be able to access the benefits that the HS2 network will deliver. I want us to go forward to further develop high-speed rail in other parts of the UK. I am particularly thinking about Northern Powerhouse Rail across the Pennines. I look forward very much to seeing the progress of the Bill and the rail line that will come from it, and how the Government will work with local communities and local government to maximise the opportunities that this line presents.
The HS2 argument has changed from whether we should have it, to how we can maximise the opportunities when it arrives. Those opportunities will be commercial, environmental and in skills. I see huge opportunity throughout the project, which is why I will support the Bill should we divide on it this evening.