Rolling Stock (North of England) Debate
Full Debate: Read Full DebateYasmin Qureshi
Main Page: Yasmin Qureshi (Labour - Bolton South and Walkden)Department Debates - View all Yasmin Qureshi's debates with the Department for Transport
(10 years, 8 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I want to talk about the train service between Bolton and Manchester. The trains are incredibly overcrowded, especially during peak times. People often have to give up on one or two trains before they can get on one, and when they do they are completely squashed, as I know, because I travel on those trains myself.
The trains are small and need to be refurbished. We need more trains because those running between Bolton and Manchester are incredibly dangerous and overcrowded. A lot of people miss their trains as a result, and I have had letters from constituents who have lost their jobs because they have not been able to get to work on time and their employer has had no sympathy for the fact that they have been spending an hour or so travelling on a local train service.
It is regrettable that—
I am sorry, but I am not going to give way, as we have limited time.
We heard powerful examples of the difficulties commuters face from hon. Members from across the House, including the hon. Members for Cleethorpes (Martin Vickers) and for Southport (John Pugh), my hon. Friends the Members for Kingston upon Hull North (Diana Johnson), for Hartlepool (Mr Wright) and for Gateshead (Ian Mearns) and, briefly but eloquently, my hon. Friends the Members for Middlesbrough (Andy McDonald), for Stalybridge and Hyde (Jonathan Reynolds) and for Bolton South East (Yasmin Qureshi). As First TransPennine Express has said, even a relatively small reduction in the size of its fleet could have a profound impact on services. The company said:
“Our timetable from May 2014 through to the end of our current franchise term requires all of our existing fleets to be able to deliver the significant capacity increase that we have committed to provide. Similarly, the same total number of vehicles would be required to sustain the same level of service into the new ten-month franchise extension period from April 2015.”
If replacement rolling stock is transferred from Northern Rail, the same problem will be repeated. Passengers, transport authorities and operators now face years of uncertainty over rolling stock availability before electrification is completed. Drivers cannot be trained and new services cannot be planned. If still more trains are lost, those problems will only become more unmanageable.
I understand that Chiltern’s agreement to operate the Class 170s contains a sub-lease that would allow the trains to remain in use on the trans Pennine routes until replacement rolling stock can be found. I also understand that the Department for Transport, First TransPennine Express and Chiltern Railways are parties to that lease. Will the Minister tell us whether the sub-lease can go ahead only with the full agreement of the Department and Chiltern Railways? It is important that we have an answer to that question and to the other questions that hon. Members have raised today.
When the Minister responds I hope that he is not tempted to downplay the issue by saying that this situation is simply part of the normal process of cascading rolling stock. If that is so, why is the industry press reporting that the loss of the Class 170s is
“likely to produce a serious reduction in capacity”
on the TransPennine routes? As my hon. Friend the Member for Liverpool, Riverside (Mrs Ellman), who chairs the Transport Committee, has said,
“this issue is causing considerable uncertainty over the future viability of TPE’s timetable.”
The Minister might say that this is simply a matter for the market to decide, and, of course, the split between infrastructure, train operators and rolling stock companies was established in the botched privatisation by the previous Conservative Government. However, if it is simply something for the industry to decide, why has the Department been involved in discussions between Chiltern Railways and the rolling stock leasing company at every stage in the process? He might try to insist that the situation is simply business as usual, but after today’s debate, that simply would not be credible. The problem is the direct consequence of the panicked direct awards programme introduced following the collapse of the west coast competition. In turn, that was caused by Ministers imposing their new franchise model on one of the most complex routes in Europe. At every stage, Ministers are directly accountable, and they will be accountable for any reduction of services that results from that chain of events.
The truth is that, for all the talk of cutting red tape, the coalition will leave a record of five years of disastrous decisions in Whitehall, a top-heavy failure to manage key projects, and a huge expansion in the Department’s involvement in the rail network. I accept that the Minister may be an unlikely occupant of a Marxist universe, but perhaps we should not be surprised by the coalition’s switch to old-fashioned command and control. After all, last year, the Business Secretary said that a “rail revolution” was taking place. With services threatened and rolling stock taken away, we now know what the rallying cry of that strange revolution—it unites MPs across party boundaries—will be: “Passengers of the north, unite! You have nothing to lose but your trains.”
Season ticket prices have risen by an average of 20% since the election. Passengers deserve better than this. The Government must face up to the scale of the problem, set out a clear plan for meeting the north’s rolling stock requirements and get the improvements in the region’s rail services back on track.