Commons ChamberI want to make clear straight away, on behalf of my constituents and in the light of my personal views on this Bill, my vehement objection to the proposals before us. I will vote against the Bill if there is a Division, which I rather think there will be. I have discussed my objections on various occasions both before the House and locally; they derive from the vast impact on my constituents in Baldwin’s Gate, Bar Hill, Whitmore and Madeley and the surrounding area, and Yarnfield and Stone and surrounding areas, as well as from my scepticism about the Government claims on the benefits of the HS2 scheme in general.
The Government in their 2012 national planning policy framework set out the three pillars of economic, social and environmental factors that all new plans must satisfy. I find it incomprehensible that the Government can so ignore their own framework on a national scale in relation to the HS2 scheme.
First, I shall comment on the lack of benefits in the proposed phase 2 scheme. Its cost is £3.48 billion, a figure that is bound to rise as the project proceeds. This has not been enough to stop it being characterised by the Country Land and Business Association as full of
“delays, secrecy, broken promises, and poor management.”
This has directly damaged already-strained relationships with those most affected by HS2 and is preventing the complaints of those involved from being heard effectively.
Moreover, the actual overall costs, which are escalating all the time, are incredibly badly accounted for. As the right hon. Member for Rother Valley (Sir Kevin Barron) indicated, we have seen report after report, including economic reports and independent assessments, from the Public Accounts Committee and all kinds of other committees, and it is inconceivable that the amount of money that is currently expected to provide for all this will be adequate.
There is also the problem of providing proper compensation for those affected, including advance payments, as was said by my right hon. Friend the Member for Chesham and Amersham (Dame Cheryl Gillan). I also understand the concerns being expressed by some of my constituents, who are deeply worried about the possibility of terrorist threats to the service. Associated with those threats is the inevitable delay that will be built in to the security needed to avoid them. That will increase the amount of time it takes people to get on to the trains. HS2 might go very fast, and it might increase capacity, but there is no doubt that there will also be an enormous amount of delay, because its security arrangements will have to be similar to those used for other methods of travel such as air.
Phase 2 of HS2 will also have an immensely destructive effect on the environment. The Woodland Trust has noted that, unbelievably, given the impact on the environment that phase 1 will have, phase 2a will be more destructive per kilometre. The whole scheme will damage or destroy 98 ancient woods, with 18 alone coming from phase 2a. Over 10.5 hectares of irreplaceable ancient woodland will be lost in phase 2a, as well as at least 27 ancient and veteran trees. That loss is completely unacceptable.
The environmental impact does not end there. The National Trust has stated that phase 2a of HS2 will
“impact adversely on the conservation of the special places”
that it is charged with conserving, operating and managing,
“affecting both the experience of our visitors and the lives and livelihoods of our agricultural and residential tenants.”
The preservation of our natural heritage will be jeopardised by this project.
I am listening to my hon. Friend with considerable interest. Does he not agree that the saddest thing of all is that Arup came up with an alternative proposal that would not have damaged all those ancient woodlands because it would have used existing transport corridors? We could have done this so much better.
I absolutely agree, but unfortunately that advice has not been taken.
Secondly, I have no confidence whatever in the Government’s stated outcomes for HS2 phase 2 in building costs or in social and environmental impacts. This comes from the dismal experience of their failures over their own reports on phase 1. The House of Lords Economic Affairs Committee cast doubt on phase 1 from the beginning of the process, arguing that the evidence used to calculate the magnitude of benefit was out of date and unconvincing. The Library briefing shows how the benefit to cost ratio of phase 1 has fallen consistently over time. Nothing has been done to address these flaws in the economic modelling.
Progress on the delivery of phase 1 is similarly criticised by the National Audit Office in its 2016 review, which stated that the Department for Transport had
“set HS2 Ltd a schedule for achieving delivery readiness that was too ambitious”,
and that:
“There is a risk that the combined impact of cost and schedule pressures result in reduced programme scope and lower the benefit cost ratio.”
It also stated that:
“Effective integration of High Speed 2 with the wider UK rail system is challenging and poses risks to value for money”.
The NAO attacks the cost estimates for phase 2, which it says are
“at a much earlier stage of development than phase 1”,
with some elements currently unfunded. For the past four years, the Infrastructure and Projects Authority has put HS2 just one step above appearing what it defines as
“unachievable unless significant, urgent and often substantial action is taken.”
I ask the Minister what evidence there is that this will be done.
Cost overruns and delays have long been associated with public construction, but HS2 dwarfs the problems of the past. Think about the amount that could be made available to the public services if these billions and billions of pounds went towards something other than this white elephant in the making. We are doomed to exist in a perpetual cycle of departmental over-promising and under-delivering. In the light of concerns about the phase 1 Bill, it is impossible to trust the Government’s assertions as to the benefits of phase 2.
Thirdly, I must cast doubt over the ability of HS2 Ltd. The Public Accounts Committee accuses HS2 Ltd of having a culture
“of failing to provide full and accurate information to those responsible for holding it to account”
and states that it
“does not have in place the basic controls needed to protect public money.”
There cannot be a bigger condemnation than that. Those basic failures underline the incompetence with which the project has been conducted. Most damningly, the PAC accuses both HS2 Ltd and the Department of not appearing
“to understand the risks to the successful delivery of the programme”.
This is a Second Reading debate, and I am saying that all the reports indicate that we can have no trust in how the principal objectives of the project are being conducted. That is evident in the employment of Carillion as a key contractor on the project. A clear lack of oversight and due diligence has jeopardised public money. Those arguments mean that the Bill fails to meet the standards required of this House.
Moving to the local issues that affect my constituents, I am thoroughly dismayed with the entire project. Not only does the proposal carve through my entire constituency from top to bottom, without any immediate benefit to my constituents in terms of communication or railway stops, but many will acknowledge that the current west coast main line provides a good service and short journey times. As my right hon. Friend the Member for Chesham and Amersham has indicated, this HS2 project will be overtaken by new technologies, such as the possibility of a maglev system or a hyperloop system, and the technology used in the HS2 project is increasingly out of date. Within the timespan for the completion of the project, the money would be better spent on other programmes and public services.
Does my hon. Friend agree that if the project involved running autonomous passenger and freight vehicles or other vehicles of the future up and down the line, it would probably be slightly more popular? The trouble is that the technology and the whole approach involved will produce something that is from the last century.
That is completely right. It is also perhaps true that travel times were quicker in those days than they are now. This project is about not simply capacity but efficiency, and I do not believe that its objectives will be achieved.
Turning to my local objections, a railhead will be established at Yarnfield during the construction period and will later be turned into a permanent maintenance facility. The relocation of the planned facility away from the original destination in Crewe has caused massive consternation to all my constituents in Stone and Eccleshall, and in all villages around the area, particularly Yarnfield. On 24 November 2016, I secured a half-hour Adjournment debate on the matter, and I have spoken in a variety of meetings both locally and in the House since then. Most recently, I had a meeting with the Stone Railhead Crisis Group on Friday 19 January. I will be offering help with petitions to anybody who wants it. I have invited the Clerk of Private Bills to meet the group, and I hope that that meeting will take place soon.
I reiterate that the way in which alternatives to the final proposition were considered was appalling. The original proposal for the railhead to be at Crewe was not selected. I believe that there has been serial misdirection and misinformation about employment and environmental issues. Crewe would have been far better, but now HS2 has decided to go for Yarnfield and the vicinity thereof, which will do appalling damage to my constituents, and their traffic and schools. Every single aspect of the development will have the most serious and deleterious effect on my constituents.
The disruption due to works at Norton Bridge has already started, and the HS2 works at Stone and Swynnerton belie the notion that disruption will be minimised—it is liable only to get worse. The HS2 phase 2 environmental statement draws attention to lighting being visible along Yarnfield Lane and on the north eastern edge of Yarnfield itself. That is on top of the significant and noticeable noise that the facility will generate, the destruction of woodland, the destruction of visual landscape and the substantial noise from construction traffic.
I am also deeply concerned about the impact on the elderly, and it is shameful that retired people who seek a peaceful rural life will find their area violated. I am also concerned about the communities that are being directly destroyed, such as two properties in Shelton under Harley. There will be noise from construction on Pirehill Lane. There are also problems for several grade II listed buildings, including Blakelow farm, the water tower on Stab Lane and the Swynnerton Heath farmhouse, in addition to non-listed heritage sites such as Darlaston pool, the milestone near Cash’s pit and areas of the Shelton under Harley farm. That is yet another example of the damage that will be done.
In an update statement on 17 July 2017, the Secretary of State for Transport assured me that Yarnfield Lane will remain open. I am afraid to say that that assurance is useless without any consideration of the impact of heavy goods vehicles travelling along that narrow road, rendering it impassable during peak hours as if it were fully closed. That is bound to have a very bad effect on my constituents’ health and welfare. The proposal to use Eccleshall Road as an access and supply route will block the whole area, which is already oversubscribed.
Cold Norton is a cluster of 40 dwellings within 500 metres of the M6, but it does not appear to be included in the documents. If the works lead to the closure of the B5026 and Yarnfield Lane, my constituents in Cold Norton, Norton Bridge, Chebsey, Yarnfield, Swynnerton and Eccleshall will not have access to their main travel route into Stone. There will also be an impact on Great Bridgeford and many other areas in the constituency of my hon. Friend the Member for Stafford (Jeremy Lefroy).
Trains will go straight down my entire constituency, from top to bottom. Baldwin’s Gate, Bar Hill, Whitmore and Madeley are in a rural area of outstanding natural beauty. The proposed scheme will cut straight through it, with two viaducts at the River Lea valley and Meece brook valley, and two tunnels along the way. There will be an enormous amount of construction work in a delicate area.
I will meet the Whitmore2Madeley action group on Friday 2 February to examine the proposed Whitmore construction site. I met the group in July 2017, and I have organised a meeting so that the group can meet the Clerk of Private Bills.
The environmental impact assessments show there will be significant quality-of-life problems at the Stone railhead. The views from Rectory Lane, Manor Road, Madeley cemetery, Madeley Park, Bar Hill Road and Wrinehill wood will all be negatively affected, and there will be traffic problems, too.
Then we have the A51 London Road and A53 Newcastle Road to consider. At least five footpaths will be closed in the process of construction. Communities and cultural heritage in the area will also suffer. Viaducts at Lea valley and Meece brook will prove to be eyesores. Nine properties will be permanently affected, including Rose Cottage and Wood Croft. Construction will cause impossible chaos for 29 residential properties in Whitmore and Whitmore Heath, 20 on Manor Road, 43 on Bar Hill Road and Mallard Close, and five at Moor Hall and Bower End farms. Furthermore, Hey House, a grade II listed house, will have its setting permanently degraded.
I now turn to the environmental cost in the area. Most prominent is the destruction of at least part of two woods—Whitmore wood and Barhill wood. The Woodland Trust points out the possible cost of this damage, noting that the
“Stone constituency will suffer loss or damage to 11 ancient woodlands, totalling 8.9 ha of loss. Whitmore Wood will suffer the greatest single loss of ancient woodland on the entire HS2 route. Tunnelling must be considered to avoid this loss.”
That is an attack on our woodland environment.
An additional 0.2 hectares will be lost at Barhill wood to allow for the Madeley tunnel portal. This forms just a small part of the argument for a longer, deeper tunnel to limit the environmental damage of the scheme, which I know that the Minister is examining. Such a tunnel would not completely remove the damaging local impact of this proposal, but it would nevertheless prevent the inefficient upheaval generated by involving multiple sites. There is an argument about this tunnel and I have been given certain assurances, but I am deeply concerned about whether the money will be made available in any case—we have no certainty about that at this stage. More specifically, the proposal for a tunnel from Whitmore to Madeley would, it is argued, avoid the destruction by HS2 works of 33% of Whitmore wood, the viaduct and embankments in the Lea valley, and the disruptive work on Manor Road. This has to be pursued vigorously so that we get to the bottom of exactly what will be involved. I understand the assurances that have been given, but there are also complications due to the relationship between the northern part and the southern part of my constituency, which will doubtless be the subject of petitions from the two groups in question.
In conclusion, I will be voting against the Bill, as I did on the previous Bill for phase 1. My constituents will be petitioning against the Bill and will appear in front of the Select Committee. I urge the Government and that Committee to do all they can to pay the most careful attention to these petitions if this Bill goes through today, and to provide my constituents with every opportunity to be heard. This is a very, very big thing for them—it is massive. Hon. Members should think what it would be like if this were to happen to any other constituency on the scale it is happening to mine, which is similar to the situation in the constituency of my right hon. Friend the Member for Chesham and Amersham. She has done a fantastic job and we will try to do the same in our area. At the moment, I am deeply disappointed with these proposals and I shall be voting against them.
I am most grateful to the hon. Gentleman. He is welcome to visit my constituency; we will make an arrangement. He will see the beautiful countryside of the upper Trent Valley, and I am sure that my hon. Friend the Member for Stone would also show him across Swynnerton Park and up towards Madeley, so that he can see the effect of the line on those areas.
The business case is another reason I believe this is the wrong project. We have heard from other hon. Members, including my hon. Friend the Member for Isle of Wight (Mr Seely), that the business case is not particularly compelling. In fact, our former colleague and former Chair of the Treasury Committee, Andrew Tyrie, said that HS2
“has the weakest economic case of all projects”
within the infrastructure programme. As has been mentioned, there is a hole in the business case. That is, there is no business case that I can see for the continuation of the existing west coast main line without the revenue from the high-speed services that currently use it and generate most of its revenue. How will that line be maintained? Will it be maintained purely with the revenue from local and regional services, on which prices can be extremely low? Will that generate enough revenue? Alternatively, will it be maintained using revenue from freight services? I do not know, but there is not a business case. I have asked for it and it has not been provided. I urge the Government—particularly if they are about to put out to tender for the package of HS2 and the west coast main line—to insist that we have a proper business case for the entire package, not simply for HS2.
Does my hon. Friend agree that this has all the hallmarks of a vanity project and that that is why there is not a proper business case? To a certain extent, that answers his question.
Well, I am not sure that it is a vanity project because, if constructed, it certainly will bring benefits to the country, although probably at much more expense than it should and at a huge cost to our constituents. When I challenged a very senior person who has been involved in this project in the past, they said, “Well, actually, it’s gone too far. We wouldn’t have started it here but we have gone too far.” The west coast main line was started, I think, in the 1850s—possibly even earlier—so this project will last for 200 years. What is a few years to get this right and to put it in the right place? I shall return to that point.
On the problems, let me start with the problems for people because people are the most important. I get pretty frustrated when HS2 staff come around to count bats. Yes, bats have importance, but my constituents are more important. HS2 is prepared to spend an awful lot of time and money counting bats and various other things, but not talking to my constituents. I have constituents who have waited for a visit for a year. These constituents have dairy farms, and HS2 wants to take 100 acres away from their farm, which would make a dairy farm unviable. Only last week, a constituent of mine suddenly received a letter from HS2 indicating that his entire property was needed, when it had previously only needed a very small part. I have a strong objection to the uncertainty and inefficiency with which my constituents have been handled. That is not to criticise every single employee of HS2. I have met some extremely good ones. There have been some who I would praise for their work, but there have been others who, I am afraid, have fallen short.
I entirely agree. I apologise if I gave the impression that I do not care about bats at all, but I care about my constituents a little bit more. There are also the issues of the slow process, the lack of engagement, totally unnecessary arguments over valuations and a lack of knowledge. For example, one constituent of mine was not aware of what was going on. He sold the property after the line was announced and made a huge loss, but was then unable to claim for that loss because he was told that he should have gone through the process. This elderly gentleman was basically robbed of tens of thousands of pounds simply because he did not quite understand the system. Will the Minister see whether there is some way that we can get compensation for my constituent, who deserves it? I have constituents, an elderly couple, whose property is going to be boxed in by the works on HS2—literally boxed in. Yet, as things stand, they are not going to be allowed to sell their house to HS2, for reasons I fail to understand.
Then there is the impact on communities and the environment. The line runs adjacent to Great Haywood. It goes through Ingestre, Hopton, Marston and Yarlet. These are mainly old and ancient villages with strong communities. Hopton has lost a lot of its population already because people have moved out. There is not the community there that there was, because HS2, although it is renting out to people some of the properties that have been sold to it, is not doing so quickly. Naturally, the people who are coming in, perhaps for the short term, are not able to join in the community as much as others would.
Does my hon. Friend recall the impact that this will also have on Yarlet School, which is a very serious problem for those who have this fantastically good school and the facilities that go with it?
I do indeed. The line goes pretty much straight through Yarlet School, and not only that but through Yarlet wood, which is one of our ancient woodlands. I think it is even noted in the Domesday Book, so it is the best part of 1,000 years old.
Another very important part of Staffordshire life that the line goes straight through, or almost straight through, is Staffordshire showground, which hosts not just the county show but hundreds of other events every year, with probably the best part of 300,000 or 400,000 people attending. It is a very important employer and economic entity within my constituency.
The line goes very close to Shugborough. The irony of this is that when the west coast main line was put through Shugborough in the 19th century, the Earl of Lichfield persuaded the railway company to build a cut-and-cover tunnel through Shugborough, which one still sees when going on the main line up to Liverpool. We have been unable to persuade HS2 to provide such tunnelling for my constituents. Clearly, where the railways would listen to the Earl of Lichfield 150 years ago and more, they do not listen to the ordinary people today who would like to have some protection from this line. The line also goes pretty much straight through the beautiful Ingestre and Tixall parklands and landscapes.
The next issue is transport infrastructure. The line cuts straight across several major roads, including the A51, the A518, the A34 and the M6, and goes over the west coast main line. As far as I can see, HS2 and Highways England do not seem to have a plan on how to manage the inevitable disruption to local, regional, and indeed national transport that is going to be caused. I hope they do have one, because the M6 must be, if not the busiest motorway in Europe, then one of the busiest, and the A34 is a kind of relief road for the M6. If both of those are going to be disrupted, particularly if it happens at the same time, the consequences for the regional and national economy, right up to Scotland, will be quite substantial.
Another problem is connectivity after HS2. Clearly, connectivity from Stafford will be better. There will be a faster journey from Stafford to London than at present. It is already an extremely good and fast journey—nobody has complained to me about it in the past—and it will, I admit, be a few minutes faster. Northbound, we are really concerned about connectivity, because we understand that the trains through Stafford and Stoke will end at Macclesfield. I have nothing against Macclesfield; in fact, it is a wonderful town. However, most of the time my constituents tend to prefer to go further to Manchester and Liverpool rather than to stop at Macclesfield. As I say, I have nothing against Macclesfield.
The next problem is the impact on businesses. Last week, I heard from a business that received, out of the blue, a letter saying, “We want all your land.” This business employs a large number of people in a rural area; it is possibly the biggest employer in that area. Yet suddenly, with literally no notice, we are suddenly told that HS2 needs the entire plot that it is working from, without any alternative.
I have listened carefully to today’s debate and thank all hon. Members for their contributions. I have heard the concerns and opportunities that the second phase of HS2 will bring. The high-speed rail journey began under the last Labour Government, who recognised the need for greater capacity and better connectivity.
The Victorian rail network has served us well, but nearly 200 years on it is overstretched. If we are to see a significant modal shift in the future—as Labour encourages—and if we want to see rail as the vehicle of choice for distance travel, we cannot stand back and do nothing, nor should we. It was from the Victorian age that our nation witnessed the foresight of a new generation of engineers to radically advance our country and the world. Yet today our trains are slow, crowded, and depend on outdated technology and infrastructure. It is therefore vital that, as a nation, we put ourselves in the driving seat again, strive to be world leaders and propagate the next generation of engineers, with both women and men taking on new careers in the sector.
Does the hon. Lady agree that it was not only the engineers of the Victorian age—great as they were—but also the capital that was provided which ensured that these schemes were actually put into effect?
We could spend a long time talking about the shenanigans that also took place in this House over the creation of the Victorian railways.
Future capacity is vital. Although longer trains, digital signalling and infrastructure upgrades connecting with new rolling stock may get us through the current period, we will need more lines if we are to look further ahead. If we are to develop more lines, it is right that we seriously consider where they go.
HS2 gives us a real opportunity to think about the future of our country and how we connect it to address the unacceptable levels of inequality across Britain. HS2 is not just about the route itself but about freeing up capacity on the west coast main line and on our roads. This will bring benefit to current road and rail users, as well as creating new opportunities for further development of passenger and, importantly, freight paths on the west coast, as my hon. Friend the Member for Liverpool, Riverside (Mrs Ellman) highlighted and my hon. Friend the Member for Stoke-on-Trent Central (Gareth Snell) asked for.
Of course, Labour would, as always, be looking at the bigger picture, embedding HS2 at the heart of a wider rail and transport strategy. It would be absolutely nonsensical to make such significant investment in a new rail line if we were not properly upgrading the north-west to north-east routes—the HS3 routes. The Secretary of State is not in his place at the moment, but I hope that he will take heed of this. It is not too late to reverse his decision to de-electrify the plans and put power back into the northern powerhouse. The cities in the north demand it. We believe that HS2, integrated with a new, dynamic rail plan, must bring economic investment to the midlands and the north, creating good jobs for a secure future, not least with the new skills required in designing and constructing HS2 through the 30,000 jobs it will create.
My hon. Friend the Member for Crewe and Nantwich (Laura Smith) eloquently set out a strong economic case for proper connectivity through a regional rail hub at Crewe, this being at the centre of a network to feed Cheshire and the wider counties, and north Wales. That is vital for the future economy of Crewe. I can think of no better politician than my hon. Friend to speak up for her town and to make that case.
We must remember that HS2 is not an entirety in itself but a bridge to enable economic growth and industrial investment. My hon. Friend the Member for City of Chester (Christian Matheson) made a similar point, again focusing on how to build the economies of the north-west by ensuring connectivity. It is vital that HS2 talks to the region, and we must dissect this in Committee to ensure that it does. I note his calling for the line to north Wales through Chester. We should not dismiss this opportunity for some of the communities in the UK who most need this infrastructure stimulus. My hon. Friend the Member for Leigh (Jo Platt) also stressed the need to focus on connectivity. A clear call for integration has been made—one that Labour will support.
Phase 2a is set to deliver nearly £4 billion of benefits over the 60-year appraisal period, with a cost-benefit ratio of 1:9 and wider economic impacts. This indicates upper-end medium value for money, but accelerating this phase will represent very high value for money. Around Crewe, we will see 40,000 new jobs and 7,000 homes, opening up the life chances that have not been seen in the area before and starting to address the complete economic imbalance that we have in our country. Extending this to the Constellation Partnership will deliver 100,000 new homes and 120,000 jobs—20,000 in the Cheshire science corridor alone, putting the UK on the international stage in terms of science and technology.
I assure the House that Labour will never stand in the way of providing such opportunities to communities that have been crying out for investment—a point powerfully made by my hon. Friend the Member for Birmingham, Edgbaston (Preet Kaur Gill).
Of course we are deeply concerned about the economy of south Wales. That is why we electrified the line to south Wales that helped to boost the economy in that region, and also ensured that HS2 fed into north Wales, helping the whole of the Welsh economy to grow.
We have some concerns, and it is absolutely right that there is tight scrutiny of every part of the project, as my right hon. Friend the Member for Rother Valley (Sir Kevin Barron) highlighted. At a time when the economy continues to fail, not least in the north, Labour understands why people are questioning the economic benefit of spending £55.7 billion on a rail route. This 36-mile section will cost £3.5 billion. At a time when our public services are crying out for investment, it is right that critical questions are asked about the project. However, the benefits are also clear, and it cannot be an either/or. This is about getting the Government’s economic strategy right. We will make sure that every decision brings maximum inward investment, as the economic opportunity is already estimated to be £92 billion across HS2.
We hear the concerns about the environment. It is vital that real consideration is given in Committee to the impact of construction and of the final network on the environment. That cannot just be about mitigation elsewhere, and I will push for us to maximise this opportunity. I will also want to ensure in Committee that modern, advanced engineering is able to find answers to the many questions raised about the environment and how the habitats directive, no matter which side of Brexit we are on, is seen in its fullest sense.
The hon. Member for Stafford (Jeremy Lefroy), who spoke particularly well on behalf of his constituents, highlighted how important it is to ensure that his constituents’ concerns are picked up. I assure him that in Committee, we will listen carefully to the points he has to make. The right hon. Member for Chesham and Amersham (Dame Cheryl Gillan) spoke of her vast experience in dealing with HS2. It is really important that lessons are learned and that there is good communication, and we must certainly end corridor deals.
The hon. Lady just said that in Committee, we will do such and such. I think she may have misunderstood the nature of the procedure. It will be a hybrid Bill Select Committee, not a Committee of the House.
I thank the hon. Gentleman, but I do understand the process. Petitions will be brought forward, and we will listen carefully to them.
Labour will want to ensure that all opportunities for cyclists and walkers are harnessed from the HS2 route. Not much has been said about that to date. Labour is committed to cleaning up our air and our environment by cleaning up on the actions of Government when it comes to transport. Labour believes that investment in public and, I must add, publicly owned transport—we are not going back to the past, but moving forward to the future—is the way forward to deliver a rail system fit for the 21st century.
My right hon. Friend has raised many issues about HS2 Ltd, its relationship with our constituents and its poor performance in communication previously, with the Secretary of State and with Ministers who have held my current position. I will indeed endeavour to hold HS2 Ltd to account. I am more than happy to take on board any cases that my right hon. Friend wishes to present to me, and I am grateful for her words in opening her speech. I will do my best to outlive previous Ministers in this position.
To turn to the hon. Member for City of Chester (Christian Matheson), the consultation on the Crewe hub that we published last year included service pattern options that will reap benefits for Chester, north and south Wales, Shrewsbury and the wider region. As I mentioned, we expect to respond to that consultation shortly.
I think I can say this on behalf of all those who are liable to petition in Staffordshire, thus representing several constituencies here: will the Minister do everything possible to help those petitioners to present their case, and show maximum understanding of what is affecting them, right the way through from one end of Staffordshire to the other?
My hon. Friend has been a great champion for his constituents and has made his concerns known to me, the Secretary of State and previous Ministers. The Committee is the best place for him to represent his constituents and encourage them to petition the Committee.
My right hon. Friend the Member for Chesham and Amersham (Dame Cheryl Gillan) raised an incident in Colne Valley. I expect HS2 Ltd and any contractors to treat everyone with respect. The reported behaviour that she mentioned is completely unacceptable and falls well below the standard that I would expect. I am happy to take up the case on her behalf.
The My hon. Friend the Member for Lichfield (Michael Fabricant) gave a very passionate speech, which I believe is now trending on YouTube, with his walk back and forth in the Chamber. I am not quite convinced about his journey times within Birmingham, and as a proud Brummie I would not mind spending eight or 22 minutes walking around Birmingham as I think it is a great place to be, but HS2 is connected to existing rail stations up and down the network, including Euston, Manchester, Crewe, Leeds and Sheffield.
My hon. Friend the Member for Erewash (Maggie Throup) raised a number of concerns. I know that she has spoken repeatedly to me, my predecessor and the Secretary of State, and that too she is a strong champion for her constituents. On Long Eaton, HS2 Ltd has had meetings with my hon. Friend, valuation agents and residents to try to progress this issue. HS2 Ltd is mindful that there are elderly and vulnerable residents involved, and these cases are getting very senior attention within HS2 Ltd to try to find a resolution. I do not doubt that my hon. Friend will continue to work with me to ensure that her constituents are satisfied with the responses that they get from HS2 Ltd.
Let me turn to the points raised by my hon. Friend the Member for Lichfield and others about ancient woodland. Of course, ancient woodland is irreplaceable, and although we cannot fully compensate for all impacts, we have committed to use best practice measures, such as enhancing links between woodland, reusing ancient woodland soils and creating new mixed deciduous woodland. More than 75 hectares of new woodland will be planted along the phase 2a scheme to partially compensate for the loss of 10.5 hectares of ancient woodland. It is unfortunate, but we are doing our very best to compensate for the woodland that is being taken.
I am unable to respond to many other Members’ comments, and I will endeavour to write to them all, but I want quickly to move on to the question of engagement. Many Members mentioned that HS2 Ltd has fallen short of expectations as to how it should communicate with Members as well as their constituents. I expect HS2 Ltd to reach extremely high standards in all its engagement activities, and I say to the House that I am sorry if in any of these cases the level of engagement has fallen short. I encourage any Members with particular concerns to meet me to discuss them. I will listen, and I will endeavour to hold HS2 Ltd to account. As a project, we will continue to learn and improve.
There have been a number of conversations about the cost of the project. To clarify, the 2015 spending review reconfirmed the Government’s commitment to HS2 and set a long-term funding envelope of £55.7 billion. The Government are determined, and are on course, to deliver HS2 within this. HS2 is a major investment but a necessary one. For every £1 of investment, it will deliver more than £2 of benefits. That is more than £92 billion of benefits to this country before we even talk about the 100,000 jobs, 70% of which are outside London.
I fear that I have run out of time, so I must come to a close. We have made the case for HS2 and we now need to get on and build it. This country invented the railways, and we should be proud of our Victorian pioneers, but we cannot continue to rely on the network that they built. Around the world, our global competitors are already investing heavily in high-speed rail. We are now catching up, and I do not want us to be part of a generation that sits back while others move forward. I was touched by what my right hon. Friend the Member for Derbyshire Dales (Sir Patrick McLoughlin) said: when trains were first offered from Birmingham to London, people said that canals were adequate. Let us not be that generation.
Let us make no mistake: this country can deliver major infrastructure projects, and we should have confidence that we can deliver HS2. We have already delivered the 2012 Olympics and Crossrail—two examples of what we can achieve when we are ambitious, believe in our ability as a nation to get big infrastructure projects done, and commit to investing in our country and in our future. This Government have a vision for a stronger, fairer country within an economy that works for everyone. Infrastructure is at the heart of our industrial strategy and that for the north—for a modern country with a modern transport infrastructure to match. HS2 will play a vital role in this. I therefore commend this Bill, my first Bill, to the House.
High Speed Rail (West Midlands - Crewe) Bill Debate
Full Debate: Read Full DebateWilliam Cash
Main Page: William Cash (Conservative - Stone)Department Debates - View all William Cash's debates with the Department for Transport
(5 years, 5 months ago)
Commons ChamberMay I thank you, Mr Speaker, for selecting the new clauses that stand in my name and those of my hon. Friends? When Labour envisaged HS2, it was a very different infrastructure project from what we see today. We recognised that the generations, particularly across the north and the midlands, needed far better connectivity. We wanted to regenerate the northern towns and cities of our country, and we saw the potential in the midlands to spark a new industrial age and how that was not being met.
After decades of disproportionate investment in London and the south-east, it was a Labour Government who saw how improved connectivity was needed to attract vital inward investment and to revitalise economies in the north. That is what Labour is about: creating high-quality jobs and opportunities to inspire a generation. It is in our name, Labour. Of course, we all knew that rebuilding connectivity had to start in the north, particularly with the east-west connections, to truly join up what is now aspiring to be the northern powerhouse. However, without the power of investment in the transport system, that will be nothing more than a soundbite. That is why Labour supports phase 2a, which will be the shortest leg of the route, at just 37 miles in total, and provide that vital north-south link, north of Birmingham to Crewe. Our support is not unreserved, though, and we believe colleagues should join us in the Lobby today to vote for Labour’s new clauses.
As the hon. Lady knows extremely well, I have opposed this Bill and its predecessor Act of Parliament, which inaugurated the first phase, absolutely 100% all the way down the line. Although I have a great deal of sympathy for the new clauses that the hon. Lady has tabled, I cannot quite understand how she can reconcile what she has just said with the origins of the proposals. New clause 4 says that an independent peer review ought to consider questions relating to the project’s environmental and economic impact and its engineering and governance and that that review must be carried out by persons who are independent of the Government, HS2 Ltd and all the rest. It sounds to me like the hon. Lady is not terribly keen on the proposals.
The hon. Gentleman’s intervention seems slightly premature, so I ask him to hold his breath as I come to talk about the other new clauses. This is clearly a massive opportunity, not least for the hon. Gentleman’s constituents, to benefit from more high-quality jobs, which our country desperately needs. I am sure that his constituents would want him to go through the Lobby to achieve that aim.
I thank the right hon. Gentleman for his intervention. As I have already said, we would focus on the north and on making sure that we get those trans-Pennine links in place. We see that as a priority over all rail infrastructure projects, because we understand the power of joining up Leeds, Manchester and Sheffield and the cities and towns beyond. We want to see that investment coming forward. Electrification will also ensure that we benefit from better journey times, reliability and connectivity, which are vital for building our railways into the future. However far into the future it will be until we see the realisation of new rail, it does not mean that we will neglect that ambition to build more capacity north to south, which is vital if we are to take lorries off our roads and give freight an opportunity to move on the west coast main line.
I will, if I may, finish my point.
Although we all get frustrated because we want projects delivered sooner rather than later, what is crucial to us is that, if we do not start now, we will push the completion date even further away. That is why we are keen to get on with it today.
I certainly do agree with those excellent points, because HS2 cannot stop at Crewe. We must build further north and right into the heart of Scotland, particularly into the major cities of Edinburgh and Glasgow, to ensure that we get the connectivity right in the future. We know the power of infrastructure to transform people’s lives. We want to see inward investment into those conurbations, which is why we believe that, at this point—this is where the Government have been far too silent—we need to ensure that we build that vision for Glasgow and Edinburgh and beyond as we move forward. As my hon. Friend is such an excellent champion for his city of Glasgow, I am sure that he will be making those points to the Government time and again until we see more action.
France is a very different country from the UK, and we must bear in mind the potential opportunities from improved connectivity across the north given, for instance, the power of the ports in Hull and of course in Liverpool. There is an opportunity for the economy to be built up through those ports, particularly when the Government are looking at our whole trade policy. So there is real opportunity in this project if we get the infrastructure built right, and that is why it is so important that HS2 does not stand alone but is fully integrated across the whole of our transport and rail network to ensure we get the power of the whole project.
I am not sure whether this will come as music to the hon. Lady’s ears, but I am proposing to vote for her new clauses. However, I am really puzzled by new clause 4(4) and (5) and what they say about the independent review, which I am completely behind, as it is to be completely independent of HS2 and the Government and the persons contracted and so forth. Is this not really just window-dressing, however, because the new clause goes on to say the report
“must be laid before the House of Commons within 12 months of this Act receiving Royal Assent”?
In other words, it will be enacted, although I want to see it repealed—[Interruption.] Yes, I do indeed. What is the use of a report being produced by all these incredible independent experts if it will simply not be carried through?
There are two separate points. We want to ensure that we get value out of the project, and it is astonishing that the Government have not put in place the peer review mechanisms over it—both economic and engineering peer reviews—as has been the case for other major infrastructure projects. This is a way to build public confidence and to ensure that we have a real comprehension of the power of these projects. Unfortunately, HS2 is working very much in isolation, and that responsibility sits with the Secretary of State, who is not calling it to account enough; it is a shame not to see him in his place today because he is answerable to the House for this project, and he has not done his duty in ensuring that HS2 fulfils its responsibilities. But perhaps we will get a showing from the Secretary of State later—let us hope so.
I want to talk about the environmental concerns that have been raised and the costs. Many have also questioned the engineering itself. In my experience, senior engineers from across the rail industry—not necessarily involved in the HS2 project—have been making these points and have called for greater scrutiny. It is therefore really important that we identify any fault lines in the project to ensure that amendments are made. Of course, it takes time to ensure that there is a proper review and that the project is built for the long term.
Not at this time—I am going to move on.
As raised in Committee, there is a major issue with compensation for those who rent. For example, a tenant farmer who works on the land may be moved and have to work away from their farm. People who rent privately consistently miss out when infrastructure projects force them out of their homes or away from their businesses. We believe that they must receive compensation. The issue was raised at the petition stage of the Bill and it would be right to respond today. The new clause would enable that to happen when the statutory instrument is laid.
Let me briefly move on to new clause 5. I am looking forward to the contribution from the hon. Member for Eddisbury (Antoinette Sandbach), and I confirm that Labour supports her new clause. There has been a lot of learning around non-disclosure agreements, as my hon. Friend the Member for Bury South (Mr Lewis) alluded to. I know from my time as a trade union official, and from my time on the working party on bullying and sexual misconduct procedures here, that these agreements are used to see that commercially sensitive information is not shared with external parties, but they are also used around failures of management, and bullying would be one such example.
If the culture is wrong, it is not right to put money into it, and the management should be held to account. My hon. Friend said that 270-plus non-disclosure agreements have been signed, so we need to ensure that there is proper scrutiny and transparency. New clause 5 addresses that issue very comprehensively, ensuring that commercial sensitivities are not undermined, and also that all of us can have a real grasp of what is happening in the culture of HS2. It is a sensible way of addressing the serious amount of money that is being spent on these agreements. We certainly believe that the culture in HS2 must move forward.
We will listen to the debate to decide how we handle the new clauses I have laid before the House. I hope the Minister will give us assurances on them, and I will be listening carefully to determine whether to proceed to a vote. With these enhancements to the Bill, the whole HS2 project could proceed with far greater confidence and far greater support.
I made it clear in my remarks to the shadow Minister that I am minded to vote for these new clauses. However, towards the end of what she said, serious doubt began to descend on the House as to whether she would actually push them to a vote. She is therefore welcome to come back to the Dispatch Box to tell me whether she in fact intends to do so.
On new clause 1, it would be eminently sensible to have quarterly reports on environmental impact, costs and progress. One thing that has been completely lacking is any proper analysis by the Government or HS2 of all three of those issues.
On the question of environmental impact, does my hon. Friend think that we were too obsessed by speed in the early years of this project? The Government now justify it on the basis of capacity, but there would still be much less environmentally damaging ways of increasing capacity—for instance, by laying more of the line along existing motorways such as the M40. Will my hon. Friend and other hon. Members also bear in mind counties not directly affected by the line, such as Lincolnshire, which are being starved of resources for our rural and commuter lines?
I entirely concur with my right hon. Friend. The very fact that he is in the House, as are other Members who are not directly affected by the line, is a reminder of the fact that, on the last occasion the Bill was voted on—on Second Reading—the number of people who actually voted was very small compared with the number of people who could have voted, from which one might infer that the enthusiasm for this proposal is minimal. I think as many as 200 MPs did not vote, which was quite extraordinary.
On the question of environmental impact, I would simply say that my constituents will be deeply and profoundly affected not only by the havoc that will be created by forcing this juggernaut through my constituency from top to bottom, but by the dislocation, the highways and the impact on businesses. A quarterly report is, quite frankly, a very good idea, but I am more interested in getting an answer from the shadow Minister—it is not forthcoming at the moment—because there is no point in putting forward the proposals if they will not see the light of day in a vote.
We started off with a figure of about £35 billion or £36 billion. The latest figure is somewhere around £55 billion. My hon. Friend and I have seen credible estimates upwards of £80 billion. Should the House not know what it is actually voting for tonight? How much will it be?
I absolutely agree with my hon. Friend—a real friend, quite apart from being an hon. Friend—and I would add that we only have to look at clause 61 to realise the financial implications and how costs will be dealt with. There is talk about the overall cost being about £51 billion—there has been an upgrade in the amount of money intended to be applied to this part of the proposal. We cannot separate out the cost of distance between London and Birmingham, and then leave out Birmingham to the ultimate destination. The reality is that we are faced with a proposal under the Bill that is excessive in its totality and unjustified in the unbelievable havoc it will cause my constituents.
The other point I would make on new clause 2 relates to the compensation scheme for tenants, an idea I put forward on a number of occasions. There is no doubt that a huge number of people will be adversely affected by the scheduled works. It is not just tenants who will be affected but property owners. They will be severely damaged. Many of my constituents have been put under the most incredible stress and anxiety. There have been suggestions that some people, elderly people in particular, have been under such intense stress that they have died prematurely.
There are some unusual cases in my constituency. There are a number of people with canal boats who pay for moorings. They are very hard to locate, and they will get no compensation. There are those with farm tenancies that give them security in their home, which is very difficult to replicate under the Agricultural Holdings Act 1986. Those are the kinds of tenants who need to be compensated, are they not?
They certainly are, and there are also freehold properties. People who own property, as I have just described, are being put under the most intense anxiety, so I understand the reasons that lie behind the principle of new clause 2.
On new clause 4, I made my point in my intervention on the shadow Minister. I simply cannot understand it. Notwithstanding the intention that appears to be behind the first part the new clause—I am grateful to my hon. Friend the Member for Lichfield (Michael Fabricant) for backing me up on this—it is inconceivable that the report should only come into effect within 12 months of the Act receiving Royal Assent. It is nonsense. I ask the hon. Member for York Central (Rachael Maskell) to note that although I shall vote for the principle of an independent peer review, it will be on the strict understanding that that is without prejudice to my concern that the Act will need to be repealed.
I make this point now and may do so again on Third Reading: we are about to experience a new Government, effectively, with a new Prime Minister, depending on the outcome of the leadership election. The two contenders for the leadership have differing views on HS2: one is in favour and the other says that he wants to put it under review. Although rumours are like bats that fly in the night, the fact is that there are very strong feelings in favour of abandoning this entire project. We understand that it has already cost about £5 billion or £6 billion. That is enough money in itself, but to subject this country to unbelievable havoc as the project goes through constituencies such as mine, with all the attendant problems and anxieties that I have described, and to say, at the same time, that the proposal will go through and that the Labour party, by all accounts, will vote for it seems to be completely at variance with all the evidence and reports—I referred to them in the Westminster Hall debate and on many other occasions—which indicate that this is not a viable project. It was dreamt up by a Labour peer. I am never quite sure what the noble Lord Adonis’s allegiance is these days, but he was certainly a Labour member of the Government when this was proposed, and he deserves to be thoroughly condemned for it.
Did my hon. Friend notice that while Labour says that it wants a 12-month review of fairly fundamental things, it made it very clear that it does not want any material changes to the project that might delay it? I do not really see what the point of the review is.
The hon. Member for York Central is smiling as she looks across the Chamber—[Interruption.] She says that it is unbelievable, but it is anything but unbelievable—it is entirely true and entirely credible. My hon. Friend the Member for Lichfield backed me up on this. What is the point in having a first-class, independent review of the kind that is being advocated and saying that it will come into effect only after this has been made into the law of the land? [Interruption.] I see the Opposition Front Bencher, the hon. Member for Middlesbrough (Andy McDonald), chuntering, but perhaps he would like to come to the Dispatch Box and explain the nonsense that lies behind that reasoning.
Does the hon. Gentleman not accept that this is just good governance? If we are spending this amount of taxpayers’ money, we have to have decent oversight to make sure that the money is being used to the best effect. That should perhaps have been built into the process earlier, but the fact is that it is being brought forward at this stage. Presumably that is why he supports it, but let us be honest: whatever is introduced, he will never support this project, which I do strongly, because this is about not just rebalancing the UK economy but connecting the north to great opportunities across the whole of mainland Europe.
The hon. Gentleman is completely right to say that I will never accept this project. I have made that abundantly clear not only by my votes, but by the arguments that I have presented. I come back to this point: we cannot say that there is transparency if this is turned into the law of the land. It is one of the most nonsensical new clauses that I have seen, notwithstanding the fact that I strongly believe that an independent peer review would be a good idea. However, it should come before Royal Assent, not after.
My hon. Friend is making complete sense. He mentioned Lord Adonis earlier. Is my hon. Friend aware that the original plan for HS2, designed by Arup, would have gone up the M40 and connected with Heathrow, as my right hon. Friend the Member for North Shropshire (Mr Paterson) said, and it would have connected with HS1 not by linking in the south at great expense, as the hon. Member for York Central (Rachael Maskell) suggested, but by going directly through St Pancras?
That all sounds frightfully interesting, but I am afraid that it is not what we are dealing with. We have this Bill and a project that is the biggest white elephant that has ever been seen in modern history, as far as the United Kingdom rail system is concerned. It is a complete outrage that my constituents should have this perpetrated on them.
I am serious when I say that I shall be campaigning not only for a review of these proposals but in pretty short order to have the Act repealed, because that is the only way this can be sorted out. It is a complete disgrace that the Government have introduced the Bill in the dying days of this Government. [Interruption.] The hon. Member for Crewe and Nantwich (Laura Smith) is laughing because she knows I am right. These proposals almost certainly would not survive the review that will be taking place under a new Prime Minister. I am making a fair assumption about who that person will be.
I will give way again to this extremely energetic Member of Parliament.
I can assure the hon. Gentleman that I do not feel energetic. Is it not the case, though, that the zero-based review, which the Chief Secretary to the Treasury proposed, is not a genuine review of the project but is about creating a war chest to buy the support of Conservative shire candidates? It has nothing to do with HS2; it is about clawing back the money for a fighting fund.
The hon. Gentleman has very sensibly tempted me into saying something else that I believe. I am completely against these proposals in relation to my constituents and the national interest—it is the biggest white elephant of all time, as all the reports I referred to in my Westminster Hall debate demonstrated. There have been even more since, including one from the Infrastructure and Projects Authority, which rated the whole thing as amber—although in fact it probably thinks it is in the red. If only, it said, we could get rid of this ridiculous proposal and put the money where it deserves to go, which is across the country, east to west, which I happen to agree with very strongly. On that point, I had some sympathy with what the shadow Minister said.
There is another factor. This incredible waste of money could make an enormous difference to this country’s coffers in the not very distant future. It seems absurd to be wasting money like this. We hear all these ridiculous arguments about Brexit, but this is the kind of thing that is bringing the country to its knees by virtue of wasted expenditure on projects that are no more than a white elephant.
It is a pleasure to follow the hon. Member for Stone (Sir William Cash). We disagree on almost everything, but I do sympathise massively with people’s concerns about their property and will always support them as their constituency MP.
This is a significant Bill of vital importance to our future prosperity and a key feature of any strategy to build a more balanced economy. My contribution to this debate will outline the reasons why I believe we must support the Bill and also the vision that underpins HS2. Without that strategic outlook, we risk losing the bigger picture to narrow debates about direct benefits such as commute times or becoming distracted by false choices, such as whether to spend on HS2 or northern powerhouse rail.
Of course, it is important that any publicly funded project be wholly transparent and subject to proper scrutiny. Let me begin with my own constituency of Crewe and Nantwich. It goes without saying that Crewe is famous for being a railway town. In fact, it has been suggested that Crewe was actually named after the railway station, rather than the other way round. Before the Grand Junction Railway company chose Crewe as the site for its railway station and works, Crewe was reportedly a tiny village with as few as 70 residents. That was until our current station was completed in 1837. About a decade later Crewe Works was producing one locomotive a week. Our communities flourished around the works and ours is now widely recognised as one of the most historically significant railway stations in the world.
The hon. Lady might anticipate what I am about to say. The proposals put the railhead down at Yarnfield, which itself is an absolute and total disgrace. It was originally going to be in her constituency. She has just been rightly praising the people of her constituency for their wonderful work over the last century and a half. Would it not have been so much better had the proposal been to put the railhead in Crewe, as was originally intended, and not down in Yarnfield, where it will destroy so much of my constituency?
I personally believe that the hon. Gentleman needs to look at the benefits of HS2 for people in his constituency, such as the jobs that it will bring. I do not think that it is all doom and gloom for his constituents, and I will continue to speak positively about my own constituency.
Yes, I do. I think the Pendolino fleet, introduced by a previous Labour Government, has done a great job, and I am therefore very disappointed that Virgin Trains and Stagecoach are not going to be involved in the next phase of this service. In the nine years in which I have had the honour to represent my constituents in this House, I have used that service between two and four times a week, and it has been late a handful of times. It is an excellent and reliable service; others may have had different experiences, but that is my experience over the past nine years.
I am glad to confirm everything my hon. Friend has said, but I am a little puzzled that he left new clause 4 out of the list of amendments on which he was intending to cast a vote. I wonder if he could throw any light on that: is it because of the point that I and others have made about the report coming into effect only after the Act has received Royal Assent, or is it because of something else? Most of the measures in new clause 4(2) would give rise to the business case my hon. Friend is calling for, and with which I agree.
Only a few days ago the Stone Railhead Crisis Group, which represents the interests of my constituents around Stone, met the regional director of Highways England and discovered that there are some very serious problems for Highways England at both Hanchurch and the proposed HS2 junction at Yarnfield Lane that really require re-evaluation, which I intend to go into a bit on Third Reading. Is my hon. Friend aware of those conversations and the fact that Highways England is in fact very concerned indeed about the situation?
I am most grateful to my hon. Friend for making that point. I did in fact refer to junction 15, which is also known as the Hanchurch junction. It is actually a series of junctions that are critical to the national road network, not just the local road network. Junction 15 is one of the most difficult and congested junctions on the motorway network because of the topography of the area, and it finds it difficult to handle the current amount of traffic, let alone the vastly increased amount that there will be under phase 2a of HS2.
Having listened to the Front-Bench speeches from both the Government and the Opposition, I could not disagree with both of them more. This Bill is a travesty. It is an abomination. I heard the Opposition spokesman say just now that it will transform the midlands, providing huge opportunities. I do wish that she would understand from what I said earlier that my constituents most emphatically do not agree with one word that she said—or, for that matter, with what the Minister said, either—because, as far as we are concerned, HS2 is a disaster. It is causing havoc in my constituency, in respect of property ownership, the environment and the economics. The trouble is, as I said earlier, that not a single report is in favour of this monstrosity. This white elephant should be condemned to the rubbish dump.
On the question of highways, let me refer briefly to a meeting that took place only two or three days ago. It was attended by the regional director for Highways England and by my constituents, including the redoubtable Trevor Parkin. The meeting lasted for two hours, and new information emerged. HS2’s detailed borrow-pit report, which was prepared for the National Farmers Union and finalised in April, undermines its claims about the 2,500 missing heavy goods vehicles at Hanchurch, as well as the false information regarding its ability to U-turn HGVs at Yarnfield that HS2 presented to Stone Town Council on 23 April. The meeting also covered the question of HS2 Ltd’s unsafe and unacceptable proposals for changes to the Hanchurch interchange and the A519.
On 3 July, there was also a meeting in Hanchurch village hall on Whitmore Road with the residents of Newcastle Road, which is on the A519. HS2 Ltd had nothing new to say or to offer, and I am told that its four representatives
“got a very hard time from the local residents. We asked for the designers (Arup) responsible for the shambolic design work, together with the HS2 person overseeing their work, to be made available for a further meeting, but HS2 stonewalled on this saying that these people did not attend meetings.”
We need the Minister to intervene to ensure that something actually happens. HS2 is not only an administrative disaster, costing a vast amount of money, with far too many people being hopelessly overpaid, but they just simply do not do their jobs properly.
For practical purposes, the question of lorry movements is a matter of the gravest concern to all my constituents, as, indeed, it is to my neighbour, my right hon. Friend the Member for North Shropshire (Mr Paterson).
As far as compensation is concerned, the amount of money made available to recompense people is inadequate. In addition, the way in which the compensation claims have been dealt with is completely unacceptable.
As was said in earlier interventions—my hon. Friend the Member for Stafford (Jeremy Lefroy) and I are completely on the same page on this—the bottom line is that the amount of money that is being spent requires a business case and one has not been provided. I voted for new clause 4 because I had hoped that might give an opportunity for a review, although the Labour party’s proposals would take effect only after Royal Assent.
The legislation needs to be repealed. I say, with respect to Ministers, that it is disgraceful that, in the dying days of this Administration, this Bill should complete its procedure when it has been so severely criticised by so many reports. I will not go into them now; I set them out in the Westminster Hall debate, and Ministers know the ones to which I refer. The bottom line is that this is not the time to put this Bill through and to give it the final seal of approval from the House of Commons. This should have been deferred until the review, promised by one of the candidates for the Conservative leadership who I hope will become Prime Minister, has had the opportunity to grapple with the terrible anxieties and difficulties that have been inflicted on my constituents. I condemn this Bill. It is a disaster; it is a white elephant; and it deserves to be sent to the graveyard.
High Speed Rail (West Midlands - Crewe) Bill: Revival Debate
Full Debate: Read Full DebateWilliam Cash
Main Page: William Cash (Conservative - Stone)Department Debates - View all William Cash's debates with the Department for Transport
(4 years, 9 months ago)
Commons ChamberThank you, Madam Deputy Speaker. Once again, I am tempted to talk about a very laudable proposal from my right hon. Friend. I know that the Minister of State, my hon. Friend the Member for Daventry (Chris Heaton-Harris), who is sitting next to me, sees significant merit in that proposal and will hopefully be looking at it in due course.
As my hon. Friend may know, the amendment that I proposed, which has not been selected—I do not complain about that, or rather I complain about the principle but not about the action—says that these Standing Orders would contradict fundamental constitutional principles. Bills come to an end in the Session in which they were introduced unless a carry-over motion is passed before Prorogation or Dissolution. It is extremely rare, and almost unique, for the process that we are now witnessing to take place. I just put that on the record; I have further points that I am sure the Minister is expecting me to make later.
I note my hon. Friend’s concern. My direct reference to “Erskine May” would, I hope, have put his mind to rest as to why we are using this procedure in this rather unique circumstance.
Since the Government have decided that HS2 should go ahead and that phase 2a should be built, we now need to take the next step, which is to revive the Bill. This motion has the same effect as a carry-over motion, and if Members agree it today, the Bill will resume in the same place that it stopped. That means it will pass to the House of Lords, where it would resume its Select Committee stage. Passing this motion therefore allows the progress already made to be kept. It allows those directly affected to continue with the legal processes they still have to complete, safe in the knowledge that the changes they requested to the Bill and previously received will be kept.
In a nutshell, I am seeking an assurance from the Minister, which I hope I will be able to get before the end of these proceedings, that phase 2a should be reviewed by Sir John Armitt at the same time as phase 2b, for which he has already been given terms of reference. Basically, it boils down to this: it is being suggested that the construction of phase 2a should follow quickly after phase 1—this view has been reinforced by the Oakervee review, which concluded that the Government should consider merging the construction of phase 2a with phase 1—but this is not only an unnecessary but an undesirable idea, and furthermore it is unrealistic.
I refer now to the actual motion before the House, which says that the Bill
“if…presented to this House in this session in the same terms as those in which the High Speed Rail (West Midlands - Crewe) Bill stood at the last stage of its proceedings…the Bill…shall be deemed to have passed through all its stages in this House, and…the Standing Orders”
adjusted accordingly. Given this motion and the arguments I am presenting, that means that we are bound to have regard to what the Bill says, and the extent to which it will be dealt with under the procedures that follow these novel and unique changes to the Standing Orders.
As we heard from the Minister, phase 1 of HS2 received Royal Assent in February 2017. It has not progressed because the main works civil contractors have been unable to come up with a design that can be delivered for the budget available. Phase 2a has not yet received Royal Assent, so we are at least a couple of years away from all this happening. Given the proposed changes to the Standing Orders, and the manner in which it is deemed that the Bill is being carried forward, is important to note that phase 2a is required only if phase 2b west is constructed according to current proposals. Crucially, those proposals could be changed by the Armitt review, and all that phase 2a would effectively achieve would be to connect HS2 to the west coast main line approximately 58 km further north—at Blakenhall, south of Crewe—rather than at the Handsacre link. With the estimated cost of phase 2a now rising to £6.6 billion, it is not wise—this is the crucial point—to commit to phase 2a without knowing what Sir John Armitt might conclude regarding phase 2b.
This project will cause immense damage to my constituents, although I will not expand on that at this juncture as that point is related to ground conditions and matters that I could go into in more detail only if I had more time. In a nutshell it comes to this: HS2 Ltd produced a report in 2019, and it is clear that it faces a shortfall of fill along the entire length of phase 2a. Such fundamental questions can be taken into account under the proposed changes to the Standing Orders now being discussed only if realism prevails.
Will the Minister use this opportunity to give an assurance on the Floor of the House that phase 2a will be treated, in some shape or form, in the context of what Sir John Armitt will consider with regard to phase 2b? The two things are interlinked, and as this is a railway that goes from north to south, it is essential that it all fits together. If phase 2b is to be reviewed by Sir John Armitt, for the reasons I have already given it is essential that phase 2a is also considered in the review by Sir John Armitt. Otherwise—I say this with a great generosity of heart—the Minister may find that if he does not do what I am suggesting, they will get to phase 2b and find that phase 2a does not work. If that does not work, we will end up with a railway that is not be capable of being constructed.
In light of the changes to the Standing Orders, I am offering a realistic appraisal that will make possible a proper review not only of phase 2b, but of phase 2a, which is what the Bill is about. I do not need to expand on that any more. I am concerned about compensation for my constituents, and about a range of other matters that lie outside the motion before us. In a nutshell, it is essential that phase 2a and phase 2b are somehow brought within the framework of the terms of reference issued by the Government for Sir John Armitt to consider. If we get that, we will at least be able to have a proper consultation, and on that I rest my case.
I am grateful for the opportunity to speak, because this matter is hugely important to my constituency. I welcome the revival of the Bill, and hopefully its imminent passage, as evidence of the Government backing Crewe and backing the north. If you will allow me, Madam Deputy Speaker, I want to explain why I support the revival of the Bill.
I was glad to have had the opportunity to host the Minister at Crewe station just last week, where he got to hear first-hand about what is already happening locally: businesses opening up in Crewe and the plans Cheshire East Council has to create a new economic hub around the station. The revival of the Bill will accelerate the positive changes we see locally.
Does my hon. Friend accept that originally the railhead was going to be in Crewe? It was only frustrated by decisions on housing grounds taken by the district council. In fact, it was dumped on Stone in my constituency without any notice.
I cannot pretend, as a new Member, to have my hon. Friend’s knowledge of the intricate detail and the history of the development of the railway line. However, whether we support or oppose it, we all have a duty, when decisions on individual stations are looked at in detail, always to be open-minded to change if things are undergoing scrutiny. Ultimately, as I will come on to say, if we are building a major new railway it is inevitable that some people will face a negative environmental impact and some will have some part of the railway deposited on their patch, which they are not happy with. If we allowed that to, in effect, put a moratorium on the development of major infrastructure, that would not be the right decision for this country, even if individual Members were unhappy with it.
On what does work for my constituents, they are not very interested in getting to London 30 minutes quicker; they really are not very interested in that. What they are interested in, and what we must remind them of in terms of what we get from HS2, is that it opens up capacity as we shift inter-city traffic on to HS2 so there are more routes and journeys available to them. Faster routes tend to push the local services off the track. They welcome HS2 because it means we can transport more freight by rail. Local businesses in my area cannot get freight on to rail. When they can do that, they will be more competitive and we will move congestion off the roads. If you drive around the A roads in Crewe at night, you will see lorry after lorry after lorry parked up. That is how things are moved around and we need to switch back to the railway.
I will not, because we are getting very short of time.
So on that local issue, I have got absolutely not an inch out of HS2. It has been completely inflexible. It is insisting on taking traffic round three sides of a rectangle, with a journey of about 14 miles, although it could have used a direct route of 6 miles. I am completely disillusioned with this project at national level, and I cannot see how we can justify this titanic sum of money. As my hon. Friend the Member for Lichfield (Michael Fabricant) said, the original plan was for the track to go up the M40. We were going to have very fast trains that would deliver a substitute for flight times, which is not going to happen.
Is my right hon. Friend aware of the fact that Lord Berkeley has sent a letter to the Chancellor of Exchequer giving full details of the £231 billion to which he has referred?
I am aware of that, and what is so worrying about the review is that it was totally split. Someone who is hopefully very respected by the Labour party, Lord Berkeley, is obviously strongly opposed to this.
Looking at the clock, I will finish quickly. At local level, I am totally opposed to this, and I have not had a single bit of flexibility out of HS2. This is a real threat to my constituents in Woore and, on their behalf alone, I will vote against it. At national level, I cannot possibly vote for this titanic expenditure on what is now a very flawed project, so I will vote against it tonight.