10. What estimate the Commission has made of the cost of introducing electronic voting in the Chamber.

Tom Brake Portrait Tom Brake (Carshalton and Wallington) (LD)
- Hansard - -

The Commission has given no formal consideration to the cost of introducing electronic voting. Its responsibility is limited to any financial or staffing implications of any change in the present system, were a change to be agreed by the House. Such a change would normally follow a report by the Procedure Committee, which would, I am sure, welcome representations from the hon. Member for Glenrothes (Peter Grant) and his hon. Friends.

Peter Grant Portrait Peter Grant
- Hansard - - - Excerpts

While I accept that this is not primarily a matter for the Commission to decide, does the right hon. Gentleman not agree that before we spend astronomical sums on refurbishing this place, the Commission should at the very least build in the capacity for electronic voting in the future, should the House at some point decide to move itself into the 20th century before the rest of the world enters the 22nd?

Tom Brake Portrait Tom Brake
- Hansard - -

I have set out for the hon. Gentleman perhaps the most effective way in which he could voice his concerns, but an opportunity may well be provided shortly by a contingency Chamber, in which case it would of course be open to the House to decide to implement an electronic voting system if it considered that to be appropriate.

Patrick Grady Portrait Patrick Grady
- Hansard - - - Excerpts

We do read reports about a contingency Chamber. Have any assessments been made of the differing costs of installing voting Lobbies—which I assume would have to include little toilets at the end, in which Members could hide if they accidentally made their way into the wrong Lobby—and simply installing an electronic voting system? Would the latter not be a more sensible use of public funds?

Tom Brake Portrait Tom Brake
- Hansard - -

I suspect that we have not yet reached the stage of deciding whether the provision of toilets will be needed for a contingency Chamber, or, indeed, establishing whether any financial assessment has been made of the installation of electronic voting. According to figures produced in past debates, however, it appears that the cost might be up to £500,000.

Hannah Bardell Portrait Hannah Bardell
- Hansard - - - Excerpts

In the Scottish Parliament, where there is a seat for every Member and voting takes two seconds rather than 20 minutes, electronic voting is very effective. Is the right hon. Gentleman aware that in this Chamber there were more than 500 votes between 2012 and 2014, which took up more than seven days? Given what is coming down the line with Brexit, does he not think that this is a perfect time to install electronic voting in the House of Commons?

Tom Brake Portrait Tom Brake
- Hansard - -

I am aware that electronic voting takes place in the Scottish Parliament, and my personal view is that it is a more effective way of dealing with votes. Members who have not been here as long as I have may not remember that back in 1997 there was an attempt to reform a number of ways in which the House operated. I supported it, but it was blocked by the House.

Michael Fabricant Portrait Michael Fabricant (Lichfield) (Con)
- Hansard - - - Excerpts

But is it not the case that there are advantages in going into the Lobby—one can meet colleagues and do things? If we listen to the Scottish National party all together, why do we not go the whole hog? Why do we not just sit at home, watch proceedings on the Parliament channel, and vote on our iPhones?

Tom Brake Portrait Tom Brake
- Hansard - -

I did not hear in any of the earlier contributions any suggestion that we should stay at home to do our voting, and I am sure that the SNP representatives here today would not favour that approach either.

Philip Hollobone Portrait Mr Philip Hollobone (Kettering) (Con)
- Hansard - - - Excerpts

As a Minister in the previous coalition Government and now as a Back Bencher, the right hon. Gentleman will appreciate that one of the advantages for Back Benchers of voting in person is that Ministers have no escape from Back Benchers who want to collar them to raise local and national issues.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I am sure Ministers love meeting the hon. Gentleman in the Division Lobby, and that they have good conversations—although they are probably usually one-way.

Tom Brake Portrait Tom Brake
- Hansard - -

I have nothing to add to what Mr Speaker has said.

The right hon. Member for Meriden, representing the Church Commissioners was asked—
--- Later in debate ---
Tom Brake Portrait Tom Brake (Carshalton and Wallington) (LD)
- Hansard - -

Substantial progress has until now been hampered by the lack of a decision in principle by the two Houses on the preferred way forward. The report of the Joint Committee on the Palace of Westminster was published in September last year, and I am pleased that the Leaders of both Houses have indicated that they will make time for a debate before the end of this year.

Gavin Newlands Portrait Gavin Newlands
- Hansard - - - Excerpts

I thank the right hon. Gentleman for that answer, but the replacement of major systems in the Palace has been due for more than a decade. The Leader of the House is now appointing yet another Committee, delaying the repairs yet again, despite warnings that delays increase the risk of serious events such as fires. Has the Commission made any estimate of how much longer the deployment of a new body to consider costings will delay the timeline of the work?

Tom Brake Portrait Tom Brake
- Hansard - -

The expectation is that once the shadow sponsor board and the delivery authority have been established, it might take them something of the order of 12 to 18 months to consider the options for decanting. That would therefore add to the timescales. I welcome the fact that we are going to have the debate by the end of this year. We really need that, because meanwhile the fabric of the building continues to deteriorate and the very high maintenance costs that we incur as a result also continue apace.

Jo Swinson Portrait Jo Swinson
- Hansard - - - Excerpts

Does my right hon. Friend agree that the public might be somewhat puzzled at the thought of a further 12 to 18 months’ delay while options that have already been assessed are discussed yet again? When works are considered urgent for structural and safety reasons, surely we should choose the option that maximises the ability to carry out those works efficiently while minimising the cost to the public purse without any further delay.

Tom Brake Portrait Tom Brake
- Hansard - -

I thank my hon. Friend for that question. Since the original Joint Committee report, the idea of creating a contingency Chamber and perhaps doing more works around the northern estate have changed the picture slightly. The sponsor board and the delivery authority will be established according to the timescale set out, and I hope that she and others will take advantage of the engagement programme that the Government have launched, with three separate dates on 14, 21 and 28 November, and that Members will avail themselves of the opportunity to go on the tour of the basements to see why these works are needed.

Martin Vickers Portrait Martin Vickers (Cleethorpes) (Con)
- Hansard - - - Excerpts

I might be wrong, but I get the impression that the Treasury would much rather spend money over a long period than over a shorter period. Does the right hon. Gentleman know whether the Treasury would prefer to spend £5 billion or £6 billion over five or six years or much more over 20 to 30 years?

Tom Brake Portrait Tom Brake
- Hansard - -

As the spokesman of the House of Commons Commission, I am somewhat loth to express a Treasury view—the Treasury is better equipped to do that than I am. However, as for the risk profile associated with doing these works over, say, a 30-year period as opposed to a much shorter period of time, the risk of some catastrophic failure is clearly much higher if the works take place over 30 years while we are in situ debating in either Chamber and, indeed, our staff are here working.

Chris Bryant Portrait Chris Bryant (Rhondda) (Lab)
- Hansard - - - Excerpts

The right hon. Gentleman says that we are hampered in making a decision because the two Houses have not come to a view, but that is because the Government refuse to table the motion that was agreed last year by the then Leader of the House, which says that there is

“an impending crisis which we cannot responsibly ignore.”

It is downright irresponsible of the Government consistently to delay. The next edition of the “Oxford English Dictionary” will say for the word “procrastination”: “See the inaction of the Tory Government on the misunderstanding of the phrase ‘impending crisis’.” Get on with it, man!

Tom Brake Portrait Tom Brake
- Hansard - -

For the reasons I set out about the risk profile associated with the services in the building, I certainly support what the hon. Gentleman says about the need for urgent action to be taken, although I may not echo the tone that he uses.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

I am very grateful to the hon. Member for Rhondda (Chris Bryant) for his attempted imitation. I usually have the copyright on the phrase “Get on with it, man,” but they say that imitation is the sincerest form of flattery, so I am deeply obliged to the hon. Gentleman.

--- Later in debate ---
Alan Brown Portrait Alan Brown (Kilmarnock and Loudoun) (SNP)
- Hansard - - - Excerpts

Given the attitude to change in this place, including the resistance to electronic voting, does the right hon. Gentleman agree that consideration should be given to turning this place into a museum?

Tom Brake Portrait Tom Brake
- Hansard - -

When that matter was looked at by the Commission and the Lords equivalent, there was no desire to turn this place into a museum. Indeed, there was a desire to ensure that this building is able to continue to operate for staff, for Members and for visitors and to remain a significant world heritage building. [Interruption.]

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

Just in case those attending to our proceedings did not hear, the hon. Member for Lichfield (Michael Fabricant) says that he wants to be an exhibit. He should be careful of what he wishes for.

--- Later in debate ---
Tom Brake Portrait Tom Brake (Carshalton and Wallington)
- Hansard - -

The House awards contracts to the most economically advantageous tender, in accordance with the statutory regime set out in the Public Contracts Regulations 2015. That involves the evaluation of bids using weighted objective criteria, such as whole-life costs, service levels, equality and other environmental or social aspects to ensure compliance with the principles of transparency, non-discrimination and equal treatment, meaning that tenders are assessed in conditions of effective competition.

Christian Matheson Portrait Christian Matheson
- Hansard - - - Excerpts

The Big Ben refurbishment contract has been awarded to McAlpine, which is up to its neck in blacklisting. Is it not now time that we gave McAlpine a taste of its own medicine? Is it not possible for us to strip that blacklister of the contract? If not, can the House of Commons Commission take industrial relations and social responsibility into account in the awarding of future contracts?

Tom Brake Portrait Tom Brake
- Hansard - -

I understand the hon. Gentleman’s question. He may be aware that pre-qualification criteria contain grounds for mandatory exclusion where a potential supplier has been convicted for breaching any relevant legislation, including the Employment Relations Act 1999 (Blacklists) Regulations 2010. However, I think the critical issue is there having been a conviction for breaching that legislation. The other difficulty is that, unfortunately, a large number of major contractors in the UK were involved in blacklisting, and an approach that involved offering no work to any of those, including those who perhaps settled out of court, would make it very difficult for any work to be undertaken.