Flood Risk and Flood Defence Infrastructure: North-west England Debate

Full Debate: Read Full Debate
Department: Department for Environment, Food and Rural Affairs

Flood Risk and Flood Defence Infrastructure: North-west England

Sarah Hall Excerpts
Tuesday 18th November 2025

(1 day, 10 hours ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Sarah Hall Portrait Sarah Hall (Warrington South) (Lab/Co-op)
- Hansard - -

I beg to move,

That this House has considered flood risk and flood defence infrastructure in the North West.

It is a pleasure to serve under your chairmanship, Dr Murrison. I asked for this debate because people in Warrington South are worn down by the constant risk of flooding. It shapes their day-to-day lives far more than most people realise. We need a frank conversation about what is happening and what needs to change. For my constituents in places such as Dallam, Bewsey, Sankey Bridges and Penketh, this is not about distant risks or statistical forecasts. It is about the reality of waking up to flood alerts, checking river levels whenever the rain starts to fall, and wondering whether the water will stop before it breaches the banks of the brook.

I have lost count of the number of people who have told me that they cannot sleep when heavy rain is forecast. Parents have told me that their children get anxious when storms are mentioned on the news. Older residents tell me that they keep a torch by the bed, just in case. It is those small details that show just how deeply flooding affects people long after the water has gone. That is no way to live. No family should have to brace themselves over and over again for another clean-up every time the water rises.

In Dallam, we now see a situation where people are effectively marooned. When Longshaw Street floods and the Hawley’s Lane bridge goes under, Dallam becomes an island. People cannot get to work, get their children to school or leave their homes safely. Older residents who rely on adult social care are cut off. Patients at Lea Court are placed at additional risk because the access routes simply disappear under the water. Those are serious safety issues. No community should find itself trapped because the infrastructure around it can no longer cope.

From Merseyside to Greater Manchester, and Warrington in between, communities are facing the same issues: extreme rainfall, overwhelmed watercourses and schemes that take too long to materialise. The north-west is carrying a growing share of the national flood burden. Our region contributes significantly to the national economy. We should not be left fighting year after year for the basic infrastructure needed to keep homes and businesses safe. For too long, flood resilience in the north-west has relied on a patchwork of bids, lobbying rounds and one-off pots of money. That is not a strategy. It leaves communities vulnerable, stuck in a cycle of uncertainty.

On new year’s day, I was out across Warrington South in communities devastated by flooding, down Higham Avenue, Tavlin Avenue, Longshaw Street and Southworth Avenue. Some families were only just returning to normality following the Storm Christoph floods in 2021. Others were already exhausted by the constant cycle of rain, flood alerts, worry and clean-up, and it has not stopped there.

Andrew Cooper Portrait Andrew Cooper (Mid Cheshire) (Lab)
- Hansard - - - Excerpts

My hon. Friend mentioned Storm Christoph. Both Northwich and Winsford in my constituency flooded twice in an 18-month period, most recently during that storm. Our section 19 investigation found that although Northwich’s flood walls held, the ancient Victorian combined sewerage system was not up to scratch. Does she agree that when we talk about investment in flood defences, it is about not just flood walls, but investment in our sewerage infrastructure?

Sarah Hall Portrait Sarah Hall
- Hansard - -

I absolutely agree; my hon. Friend makes an important point.

In September, we came within inches of another major event. The emergency services set up a temporary command post, and we were preparing to evacuate homes again. Then, just last Friday, we had another flood alert, with modelling suggesting that we were heading for yet another breach. Residents can see what is happening: these events are coming closer together and they are becoming harder to predict, but none of that should come as a surprise.

I want to be clear that the areas most exposed to flooding in Warrington South are some of the most deprived, with some of the highest levels of disadvantage. They are the least able to shoulder the cost of repairs, the rising insurance premiums or months of disruption. Those communities are hit first and hit hardest, and they deserve the very best protection we can give them, not the uncertainty of waiting year after year for the infrastructure that they should already have had.

When I looked at an old Ordnance Survey map from the 1880s, I saw that the land around Dallam and Bewsey was clearly marked as liable to flooding, with mud flats shown across an area that is now full of homes. Much of the housing built in the pre-war and post-war decades went up before anyone talked about climate resilience or long-term hydrology. Those decisions were not malicious; they were just made in a different era. With the kind of extreme rainfall that we are now seeing, those early planning decisions are showing their limits. That history matters—it helps to explain why that area is so vulnerable and why modern infrastructure simply must catch up.

Nobody back then could have foreseen the level of rainfall now, but we cannot pretend that those planning decisions are not part of why we are here today. We have a responsibility to respond to the risks that are now so clear. This is not bad luck or a one-off winter; it is a pattern. The storms are heavier, the water rises faster and the ground saturates more quickly. Our infrastructure simply was not built for that pace or intensity of change.

People often ask me about dredging, clearing the gullies, reopening canals and maintaining the brooks. Yes, those things matter, and I will always push for better maintenance, but we need to be straight with our residents. Dredging, clearing gullies, reopening canals and cutting back vegetation cannot prevent flooding when we get an entire day’s rain in just a couple of hours. That is the scale of the challenge; no amount of clearing alone can keep the water back.

Flood events that used to be rare are now frequent. What used to be a slow rise in water levels can happen in the blink of an eye. The weather has changed, but the infrastructure has not. That is why the Sankey brook flood risk management scheme is so important. It is why I fought to secure the funding that finally allowed the outline design stage to begin. The contract has now been awarded and engineers are progressing the plans. Without securing that funding, we would still be talking about possibilities, rather than the engineers beginning their work. But I have to be honest: in the past, promises were made without a plan and people were let down. I will not repeat those mistakes. Sadly, even now, there are some making big claims about this scheme without understanding how complex it is. It is easy to say what people want to hear, but much harder to follow through and deliver. This is not a fast process and I will not pretend it is, but it is real progress after years of false starts.

My constituents are desperate, and they ask me the same question time and again: when will this actually be built? The honest answer is not an easy one. At the moment, construction is not due to start until 2029, with an expected completion date in 2032. For communities that have faced repeated flooding, that is a long wait. They understand that the scheme is complex and that it needs to be done properly, so that flooding is not simply pushed on to other neighbourhoods. But they also need reassurance that the project will not stall again because, right now, we still do not have all the funding required. There is an affordability gap that we cannot ignore.

In the north-west, we have already seen schemes fall behind when the funding picture is unclear. We cannot afford for that to happen here. Sadly, we all know that the Sankey brook scheme will not entirely remove the risk of flooding. With more extreme weather and a change in climate, that risk will always be there in some form. What we can do is take every practical step to protect the communities most at risk. We can identify the gaps, strengthen the early-warning systems and put better support in place while the scheme is being designed and built.

Julie Minns Portrait Ms Julie Minns (Carlisle) (Lab)
- Hansard - - - Excerpts

My hon. Friend touches on an important point about early warning. My constituency experienced devastating flooding in 2005 and 2015. Last week, despite flood warnings, we mercifully escaped—though parts of the city were affected —when what had been forecast was not what transpired. The Environment Agency appears to lack access to accurate radar forecasting. Does she agree that we must equip the EA with exactly that type of early warning?

Sarah Hall Portrait Sarah Hall
- Hansard - -

I absolutely agree. We have also experienced that. At the time of the last flooding event, certain levels were predicted that did not come to pass. The accuracy is not there at the moment.

I want to take a moment to thank the EA, Warrington borough council and our emergency services, because they have done everything they can with the limited resources available. Partners I have worked with have been open and honest about the challenges, and they care deeply about getting this right, but they cannot carry the burden without stability and adequate support from central Government on the ground.

I hope that the Minister will consider the following asks. First, schemes such as Sankey brook need funding certainty. Families who have lived with repeated floods should not be waiting each year to see if the next phase can go ahead. Short-term funding creates long-term uncertainty. It slows down planning, delays construction and leaves communities exposed.

Local choice cannot become a replacement for proper, national investment. It was never designed to plug repeated funding shortfalls. We need a mechanism that can close affordability gaps quickly for schemes that are already progressing. It is not good enough for a project to be technically sound, publicly supported and urgently needed, only to sit half-funded for years.

Secondly, we need faster approval and progress for schemes where the risk is clearly rising. Sankey brook is routinely flagged during heavy rainfall. The recent September near miss, new-year floods, Storm Christoph and this past Friday show how urgent that is.

Thirdly, we need better support for interim measures while the long-term scheme is built. That includes making flood alerts more reliable, especially at night and for nearby communities. It means property flood resilience grants, measures to protect people’s homes, and enhanced practical help that is routinely available for councils and landlords dealing with the aftermath of flooding. Our experience in Warrington shows that the current flood recovery framework and Bellwin scheme are not fit for purpose and do not go far enough to support communities or local authorities.

Fourthly, I ask the Minister to look seriously at the growing issue of insurance affordability. Local residents are finding that they either cannot get flood insurance or that the premiums are so high that they cannot afford insurance. I urge her to look for solutions to ensure that families are not left uninsured or financially exposed while they wait for long-term schemes like Sankey brook to be completed.

Fifthly, I ask the Minister to recognise the importance of the Sankey brook flood risk management scheme, give it the priority the project deserves and do everything in her power to ensure that the scheme progresses at pace. My constituents and I are desperate for this scheme. We have lived through years of flooding, near misses, evacuations and constant anxiety. This is not a “nice to have” for my constituents. It is essential infrastructure. We need additional funding, more resources, spades in the ground and defences built. We need certainty and a commitment that only the Minister can provide.

Across the north-west, we are seeing a pattern: more extreme rainfall, more frequent events, and infrastructure that simply was not built for that. Communities cannot tackle this alone. Warrington South is an incredibly strong and resilient place. People look out for one another—they always have—but they should not have to rely on luck every time the rain comes. Good will alone will not keep homes dry. People need proper infrastructure behind them.

Jeff Smith Portrait Jeff Smith (Manchester Withington) (Lab)
- Hansard - - - Excerpts

My hon. Friend is making an excellent speech and I agree with all the things that she has asked for. Perhaps I can add one more ask of both the EA and the Government, which is for more of a focus on the upstream prevention activity, so we can stop the waters coming down on the Mersey—a number of colleagues here are based on the Mersey, and she described the floods coming down so well. Perhaps we could work upstream in the Goyt valley and bring some of the longer-term measures forward to cut the problem off at source. Maybe we can all work together. The MPs who represent constituencies along the Mersey could talk to the EA about how we do that.

--- Later in debate ---
Sarah Hall Portrait Sarah Hall
- Hansard - -

I absolutely agree and would be more than happy to do that.

Residents across Bewsey, Dallam, Sankey Bridges and Penketh are doing everything asked of them. They sign up for alerts, check river levels, move furniture upstairs and support one another through the worry. But what they cannot do is hold back water that rises faster and more aggressively every year. We finally got the Sankey brook scheme moving. Now we need the reassurance that it will continue at pace with the funding and support required to get it over the line. If schemes like this stall, the ripple effects are felt from family homes to local businesses and transport routes.

The storms will not wait for 2032. The water will not wait for the next funding round. We have been lucky more than once this year, but luck is not a flood defence strategy. It is not good enough for communities who have already suffered through repeated floods. Behind every issue I have raised this afternoon is a principle: people deserve to feel safe where they live, supported when things go wrong and listened to when they speak up. My constituents in Bewsey, Dallam, Sankey Bridges and beyond have waited long enough. They deserve the right infrastructure to protect them, and I will keep fighting until they get it.

--- Later in debate ---
Sarah Hall Portrait Sarah Hall
- Hansard - -

Thanks, everyone. It has been a fantastic debate.

Andrew Murrison Portrait Dr Andrew Murrison (in the Chair)
- Hansard - - - Excerpts

That was commendably brief.

Question put and agreed to.

Resolved,

That this House has considered flood risk and flood defence infrastructure in the North West.