Wednesday 17th October 2018

(5 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Rachael Maskell Portrait Rachael Maskell (York Central) (Lab/Co-op)
- Hansard - -

It is good to see you in the Chair, Mr Owen, and I thank my hon. Friend the Member for Newcastle upon Tyne North (Catherine McKinnell) for opening the debate with many pertinent points, as well as going over the heritage of our railways. I am pleased to say that the Rocket will end up residing at the National Railway Museum in York where it will have a good home. Our city can certainly boast its share of rail heritage.

I represent York, which is the mid-point on the east coast main line and a significant railway hub that brings many networks together. I therefore have a constituency interest to ensure that we get the right upgrade—as we have heard, it is well overdue. We heard from my hon. Friend the Member for Lincoln (Karen Lee) and from the hon. Member for Cleethorpes (Martin Vickers) about the significance of good connectivity through to London—my hon. Friend the Member for Stockton North (Alex Cunningham) and other hon. Members also mentioned connectivity. We must ensure that we get right that connectivity to the main line, and keep those flows moving through. Although we are talking about the east coast main line, this debate is also about routes that feed into that line and are being brought into the modern age, so that they are not, as my hon. Friend the Member for Newcastle upon Tyne North described, a kind of heritage rail service. We must ensure that control period 6 considers the continuum of a journey as opposed to the segregation of different routes.

Too often with transportation not only are road, rail and other forms of transport segregated, but separate segments of our fragmented rail system go to different places. Instead, we need to understand the power of connectivity and bring that forward. One of our biggest frustrations in the north is the fact that the Government have downgraded the trans-Pennine opportunity—Crossrail for the north—which would create connectivity between Liverpool, Manchester, through to Leeds, York and Hull, stretching north and south and, importantly, feeding into Sheffield and getting that connectivity right. We must connect up the powerhouse of the northern cities and drive the economy forward. Without that we have linear routes as opposed to the rail consolidation we need—that point was made powerfully by my hon. Friend the Member for Newcastle upon Tyne North.

This is not just about rail; it is about economic growth. The tremendous site of York Central sits adjacent to the main line. We want investment, and upgrading the east coast main line is one opportunity to drive that forward. Connectivity to the ports and across the trans-Pennine route will enhance that, as will heading north to Newcastle and Scotland.

We unquestionably need more capacity and speed, and we certainly need fewer delays—that is the real frustration faced by many passengers. It was shocking to learn this week that stations in York had the second highest number of delays in the country. The measure was just one minute, but that still leads to the stark realisation that we need great improvement across our rail networks.

The lack of investment in control period 5 has brought that into sharp focus. There are bottlenecks. There are overhead power line failures around, I think, the Retford area, which cause constant delays there. There are problems with old-fashioned fencing, through which animals come on to the tracks with great frequency. If animals can get on to the tracks, so can people, which creates a safety risk. The numerous level crossings along that route snarl up different conurbations. We need to ensure that the power needed to drive our railway into the future is available.

We also all know about the issues with our old infrastructure and rolling stock. That brings me on to the new Azuma trains, which have been put on pause by the Office of Rail and Road. Will the Minister tell us more about that? We understand that ORR has put the pause on because it requires Hitachi to resolve some safety issues, yet it has not withdrawn trains elsewhere on the network that have the same problems, including the Pendolino trains. There seems to be inconsistency in the safety features of those new trains and we need to understand why. I sat down with representatives from LNER last week who were also scratching their heads about that inconsistency, as were those from Network Rail. We therefore look to control period 6 to deliver a railway for the future.

Engineers say that one of their biggest frustrations is that they are brought in to find the best way to generate the most efficient and cost-effective rail enhancements at the wrong stage of the process. We need to ensure that, when engineering takes place, it is of the highest spec possible, because this is a once-in-a-generation opportunity for the east coast main line. We do not want to have to keep going back and tinkering with and tweaking the spec. We want that investment at the forefront. Why have we seen a downgrade in the money? LNER and Network Rail told me that more resource is needed to bring the enhancement and opportunity to the east coast main line that we need, so I want to know why that spec has been reduced.

Tracks are being upgraded, which we recognise the need for, as is the overhead line equipment between Peterborough and Doncaster—I mentioned Retford—and the power supply for digital signalling. Anyone who has the opportunity to visit the Rail Operating Centre in York will see the absolutely mind-blowing things that digital signalling can achieve. We will also have welcome upgrades of fencing and bridge-strike prevention planning. I talked to engineers in my constituency from Low & Bonar about their using laser technology to look at the strength of bridges and the opportunity that that provides. They can use digitalisation to engineer infrastructure, and to work with train designers as they do so. Level crossing closures are also needed. However, the opening up of Kings Cross will also be a real enhancement to the line.

We need to make sure that we have the full benefit of digital rail on the east coast main line, because that is where the future of our rail network sits. That upgrade is therefore important—it is a passion of the route operator of the east coast main line. It is certainly also one of mine and will be one of any future Labour Government. We will take those strides into the future, not into the past.

We know what needs to be done on the railways and do not need another year-long review. The power of bringing operations back under public control has been shown, with an increase in LNER patronage since it took over the east coast main line franchise. There is no appetite for a fourth franchising process. However, we need to bring track and train together in the public sector to bring the connectivity together. I say to my hon. Friend the Member for Keighley (John Grogan) that we absolutely believe that we should invest in new routes and new opportunities, and that we can do that under a national rail service. That is certainly what we want to do. It will not be a big, centralised body, as in the British Rail days. We are looking for a new model of public ownership that very much listens the voice of the passenger at the local level when devising what to do. He will have to hold his breath before seeing the details. We have been working with the industry, and it is very excited about the model we are putting forward.

We also need to ensure that we see a return for the passenger as well as the state, and we believe that our model will deliver that. We have rightly heard of VTEC’s £2 billion scandal. It robbed that money from passengers and got away with it, and passengers are now paying more and more for tickets.

There is without doubt great opportunity for the future of the network. Journey times will be down. We also have to think of the opportunity for growth. Some 80 million passengers travel on that route each year. We want a modal shift, with people having confidence in the reliability of rail and moving out of their cars. Since 22 May, people up and down the country have lost confidence in rail because of the timetabling chaos. Our model will make sure that that can never be repeated. Putting responsibility for operations and infrastructure in one place will mitigate against such disasters as those we have seen on the Government’s watch.

We want to make sure that rail is focused on the passenger, with good environments for passengers from stations through to trains, making sure that it is a public service in which people can once again have confidence. That requires good investment, which is what we want from the Government.

Lord Johnson of Marylebone Portrait The Minister of State, Department for Transport (Joseph Johnson)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Owen. I congratulate the hon. Member for Newcastle upon Tyne North (Catherine McKinnell) on securing the debate and on giving us the opportunity to discuss investment on the east coast main line. She is the chair of the APPG which, as she mentioned, I was pleased to attend a meeting of earlier in the year. She takes great pride in the railway and its contribution to her region of the north-east. The Government very much want to build on that heritage and ensure that we leave a railway that is stronger for future generations.

As the hon. Lady says, the east coast main line is a great national asset. Its sheer scope makes its huge importance to the national economy absolutely inevitable. It runs from London, through the east midlands, Yorkshire and Humberside, north-east England and reaches Scotland. The scope of the line speaks for itself. The extent of that scope creates wonderful opportunities for communities that depend on the line to access many other parts of the country, such as the region so well represented by my hon. Friend the Member for Cleethorpes (Martin Vickers).

That said, the route is not without areas that need investment. The Government are committed to ensuring that we provide the money, time and resources that those areas require. I will take a few moments to describe to right hon. and hon. Members some of the investments that we are making in the east coast main line. However, before doing that, I will quickly respond to some of the more general points made about the distribution of transport infrastructure spending across the country, which is obviously a subject of great importance to Members for understandable reasons.

The chair of the Transport Committee, the hon. Member for Nottingham South (Lilian Greenwood), criticised the Government’s appraisal methods when deciding where to spend transport infrastructure funds. We do not accept that our methods do not provide regions with a fair share. As her Committee acknowledged, it is difficult to assign benefits specifically to one region from spending in that region when we have a national system such as the rail system. Benefits often spread beyond the area in which a specific investment is geographically located.

However, the Government have long acknowledged that the economy is imbalanced and needs rebalancing, and that changing the distribution of transport infrastructure spending to redress past patterns of underinvestment is an important part of what we need to do as an economy. We will therefore invest significantly in the north of England over the next few years. For example, between now and 2021, we will invest £13 billion in transport infrastructure in the north of England. Some of our biggest transport infrastructure items will be in the north of England, such as the trans-Pennine upgrade, which has been allocated £2.9 billion for the next five-year spending period from 2019 to 2024.

It is often asserted, seemingly without challenge, that the south gets more planned transport infrastructure spending from central Government than the north, but analysis by the Infrastructure and Projects Authority suggests otherwise: for the next four years, it reckons that the three northern regions will receive more per head than southern regions.

Let me focus on what the Government have been doing to ensure that the east coast main line continues to play an important role in our national economy. Hon. Members will be aware of the £5.7 billion Government-led intercity express programme—the new trains to which hon. Members have referred. The programme will provide the east coast and Great Western routes with a completely new fleet of trains equipped with the latest technology. The trains are being built at Hitachi’s County Durham factory, which is home to more than 700 permanent staff and supports thousands more in the national supply chain. Up to 70% of the train parts will be incorporated from sources in the UK. The full roll-out should be complete by 2020, as planned. As part of the programme, Hitachi has invested in a new state-of-the-art maintenance facility at Doncaster and has enhanced other ageing depots along the length of the line.

As I informed the hon. Member for Newcastle upon Tyne North in my letter last month, and as she mentioned in her speech, the Prime Minister has announced funding of up to £780 million in control period 6—the next five-year planning period—for the east coast enhancements programme. The programme will provide funding for important works, some of which the hon. Lady mentioned; they include power supply upgrades between Doncaster and Edinburgh, a new rail junction at Peterborough, modifications at Stevenage station to allow turn-back, and track remodelling at King’s Cross station. Together, those works will reduce congestion and enable more services to operate.

Rachael Maskell Portrait Rachael Maskell
- Hansard - -

Will the Minister explain why there has been a reduction in the amount made available to provide the upgrade when £900 million was requested?

Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

First of all, I would point out that this money represents a very significant increase in spending on the east coast main line. In control period 5, from 2014 to 2019, we spent about £400 million on upgrades to the line. In control period 6, that amount will increase to £780 million—it will almost double. To cast that increase as a reduction does an injustice to the Government’s ambition for this section of our network. That spending will be coupled with a £5.7 billion programme of investment in the new rolling stock, a significant proportion of which will result in increased capacity and more comfortable journeys for passengers along the east coast main line—that cannot be described as a reduction.

Of course, there will always be bids for further Government spending on all bits of the transport network. They cannot all be accommodated at the same time, but as and when business cases develop for specific pieces of work, they can be considered as part of our enhancement programme.

--- Later in debate ---
Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

May I deal with a specific point raised by the hon. Member for Jarrow (Mr Hepburn) about the trains and the line? He questioned whether they would operate at their potential. The top line speed on the east coast main line is 125 mph, and the new Hitachi Azuma trains will run at that speed. Passengers will benefit from journey time improvements delivered as a result of the trains’ improved acceleration and reduced dwell times in comparison with the existing fleet. Some of the passenger benefits from saved journey times are striking: journeys will be 10 minutes quicker between London and Newcastle, 15 minutes quicker between London and Edinburgh, and so on up and down the line. Those time savings should be celebrated.

The hon. Member for York Central (Rachael Maskell) mentioned issues with electromagnetic interference on IEP trains. Hitachi and Network Rail are working together to resolve those electromagnetic compatibility issues and ensure that new trains can operate in electric mode when they enter service as soon as possible.

Rachael Maskell Portrait Rachael Maskell
- Hansard - -

I was referring to the cabling of the trains and to the fact that passengers or members of the public could climb up on the roof. There was an electrocution on a Pendolino train because of that design, yet those trains are still running on the Great Western route, even though the Office of Rail and Road has stopped them running on the east coast.

Albert Owen Portrait Albert Owen (in the Chair)
- Hansard - - - Excerpts

Order. I remind the Minister of the time constraints, especially if he wishes to allow the mover of the debate to wind up.