Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairmanship, Mr Owen. I congratulate the hon. Member for Newcastle upon Tyne North (Catherine McKinnell) on securing the debate and on giving us the opportunity to discuss investment on the east coast main line. She is the chair of the APPG which, as she mentioned, I was pleased to attend a meeting of earlier in the year. She takes great pride in the railway and its contribution to her region of the north-east. The Government very much want to build on that heritage and ensure that we leave a railway that is stronger for future generations.
As the hon. Lady says, the east coast main line is a great national asset. Its sheer scope makes its huge importance to the national economy absolutely inevitable. It runs from London, through the east midlands, Yorkshire and Humberside, north-east England and reaches Scotland. The scope of the line speaks for itself. The extent of that scope creates wonderful opportunities for communities that depend on the line to access many other parts of the country, such as the region so well represented by my hon. Friend the Member for Cleethorpes (Martin Vickers).
That said, the route is not without areas that need investment. The Government are committed to ensuring that we provide the money, time and resources that those areas require. I will take a few moments to describe to right hon. and hon. Members some of the investments that we are making in the east coast main line. However, before doing that, I will quickly respond to some of the more general points made about the distribution of transport infrastructure spending across the country, which is obviously a subject of great importance to Members for understandable reasons.
The chair of the Transport Committee, the hon. Member for Nottingham South (Lilian Greenwood), criticised the Government’s appraisal methods when deciding where to spend transport infrastructure funds. We do not accept that our methods do not provide regions with a fair share. As her Committee acknowledged, it is difficult to assign benefits specifically to one region from spending in that region when we have a national system such as the rail system. Benefits often spread beyond the area in which a specific investment is geographically located.
However, the Government have long acknowledged that the economy is imbalanced and needs rebalancing, and that changing the distribution of transport infrastructure spending to redress past patterns of underinvestment is an important part of what we need to do as an economy. We will therefore invest significantly in the north of England over the next few years. For example, between now and 2021, we will invest £13 billion in transport infrastructure in the north of England. Some of our biggest transport infrastructure items will be in the north of England, such as the trans-Pennine upgrade, which has been allocated £2.9 billion for the next five-year spending period from 2019 to 2024.
It is often asserted, seemingly without challenge, that the south gets more planned transport infrastructure spending from central Government than the north, but analysis by the Infrastructure and Projects Authority suggests otherwise: for the next four years, it reckons that the three northern regions will receive more per head than southern regions.
Let me focus on what the Government have been doing to ensure that the east coast main line continues to play an important role in our national economy. Hon. Members will be aware of the £5.7 billion Government-led intercity express programme—the new trains to which hon. Members have referred. The programme will provide the east coast and Great Western routes with a completely new fleet of trains equipped with the latest technology. The trains are being built at Hitachi’s County Durham factory, which is home to more than 700 permanent staff and supports thousands more in the national supply chain. Up to 70% of the train parts will be incorporated from sources in the UK. The full roll-out should be complete by 2020, as planned. As part of the programme, Hitachi has invested in a new state-of-the-art maintenance facility at Doncaster and has enhanced other ageing depots along the length of the line.
As I informed the hon. Member for Newcastle upon Tyne North in my letter last month, and as she mentioned in her speech, the Prime Minister has announced funding of up to £780 million in control period 6—the next five-year planning period—for the east coast enhancements programme. The programme will provide funding for important works, some of which the hon. Lady mentioned; they include power supply upgrades between Doncaster and Edinburgh, a new rail junction at Peterborough, modifications at Stevenage station to allow turn-back, and track remodelling at King’s Cross station. Together, those works will reduce congestion and enable more services to operate.
Will the Minister explain why there has been a reduction in the amount made available to provide the upgrade when £900 million was requested?
First of all, I would point out that this money represents a very significant increase in spending on the east coast main line. In control period 5, from 2014 to 2019, we spent about £400 million on upgrades to the line. In control period 6, that amount will increase to £780 million—it will almost double. To cast that increase as a reduction does an injustice to the Government’s ambition for this section of our network. That spending will be coupled with a £5.7 billion programme of investment in the new rolling stock, a significant proportion of which will result in increased capacity and more comfortable journeys for passengers along the east coast main line—that cannot be described as a reduction.
Of course, there will always be bids for further Government spending on all bits of the transport network. They cannot all be accommodated at the same time, but as and when business cases develop for specific pieces of work, they can be considered as part of our enhancement programme.
May I deal with a specific point raised by the hon. Member for Jarrow (Mr Hepburn) about the trains and the line? He questioned whether they would operate at their potential. The top line speed on the east coast main line is 125 mph, and the new Hitachi Azuma trains will run at that speed. Passengers will benefit from journey time improvements delivered as a result of the trains’ improved acceleration and reduced dwell times in comparison with the existing fleet. Some of the passenger benefits from saved journey times are striking: journeys will be 10 minutes quicker between London and Newcastle, 15 minutes quicker between London and Edinburgh, and so on up and down the line. Those time savings should be celebrated.
The hon. Member for York Central (Rachael Maskell) mentioned issues with electromagnetic interference on IEP trains. Hitachi and Network Rail are working together to resolve those electromagnetic compatibility issues and ensure that new trains can operate in electric mode when they enter service as soon as possible.
I was referring to the cabling of the trains and to the fact that passengers or members of the public could climb up on the roof. There was an electrocution on a Pendolino train because of that design, yet those trains are still running on the Great Western route, even though the Office of Rail and Road has stopped them running on the east coast.
Order. I remind the Minister of the time constraints, especially if he wishes to allow the mover of the debate to wind up.
Thank you, Mr Owen. I will move rapidly on. The hon. Lady’s question is a matter for the ORR, which undertakes safety reviews of all equipment operating on the network.
My hon. Friend the Member for York Outer (Julian Sturdy) asked about the digital railway and the east coast main line. Network Rail is developing proposals for deploying digital railway technology on the southern part of the line, which would have benefits for the entire route. Decisions about progressing the project depend on that important development work.
My hon. Friend the Member for Cleethorpes raised several important points relating to his coastal constituency. I congratulate him on all his campaigning to get the town deal for Greater Grimsby and Cleethorpes—a hugely important £67 million deal that will generate almost 9,000 new jobs and help to create 10,000 new homes. Plans for a direct service to Cleethorpes are not being developed at present, but TransPennine Express, which serves the area directly, will be getting new trains from December 2019, with more seats and faster journeys.
The scope of investment in the east coast main line extends beyond just the infrastructure and the rolling stock running on it. Hon. Members will note that further time and money has been spent to improve stations, such as Lincoln’s listed building.
I am just coming to the hon. Lady’s points about Lincoln. I want to address directly her important questions about the introduction of new services.
We have accepted the industry’s recommendation to significantly reduce the extent of the timetable change planned for this coming December. The industry is also reviewing proposed changes to the May 2019 timetable as part of a new and strengthened process to ensure that everything is ready before improvements are introduced and avoid the unacceptable disruption that passengers experienced in parts of the country this summer. That process is ongoing for the whole industry, but at this stage LNER has taken the decision to introduce improvements more gradually than was previously planned. The hon. Lady will get her services at Lincoln, and the rail industry intends to provide an update on plans for the May 2019 timetable across the country in the coming months.
I will end my remarks there to give time for the hon. Member for Newcastle upon Tyne North to wind up the debate.
I call Catherine McKinnell, for the few seconds remaining.