Rail and Road Connectivity: Northern Lincolnshire Debate

Full Debate: Read Full Debate
Department: Department for Transport

Rail and Road Connectivity: Northern Lincolnshire

Martin Vickers Excerpts
Thursday 5th September 2024

(3 months, 2 weeks ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Martin Vickers Portrait Martin Vickers (Brigg and Immingham) (Con)
- View Speech - Hansard - -

I congratulate my constituency neighbour, the hon. Member for Great Grimsby and Cleethorpes (Melanie Onn), on securing this debate. It is an important one and, as she knows, an issue that I have been campaigning on. Indeed, when she was previously in this House we held numerous meetings with Ministers and the like about it.

The new Brigg and Immingham constituency has 11 railways stations, the largest port in the country and an international airport, yet we are still struggling to get the A180 resurfaced and a direct train service to London. This afternoon I was looking at when I first raised this matter in the House—it was in 2011, on a debate about High Speed 2, ironically. My understanding is that the previous Secretary of State had approved the start of the direct service from Grimsby and had instructed LNER to incorporate it in its negotiations with Network Rail about the forthcoming winter timetable. As the hon. Lady said, it would be nice if the Minister could confirm that that is the case.

The A180 is an issue that has been rumbling on—no pun intended—for at least the 14 years that I have been a Member of the House. In 2018, I held a public meeting in Stallingborough village hall, and Highways England—as it was called at that time—said that resurfacing would commence and be completed during the 2020-21 financial year, which was subsequently confirmed in a letter from the Minister. The situation at the moment as I understand it is that a programme exists to spend £9 million in the current financial year to deal with particularly dangerous stretches, but I am told now that complete resurfacing from Barnetby Top to Grimsby, which is essential, is now in the £300 million-plus category, and will need authorising as a major capital project.

Very briefly, there are a couple of other points worth mentioning. The train service that runs through Brigg, the Sheffield-Gainsborough-Brigg-Cleethorpes train service, was until fairly recently a one day a week service, with three services on a Saturday. That has now changed to a five day a week service, but it gives only 90 minutes in either Grimsby—if people want, as they should, to stop there to do their shopping in Freshney Place—or Cleethorpes. It gives them a mere 90 minutes to explore the beach and all that Cleethorpes can offer. Let us get something sorted. A regular service on that stretch of line would be greatly appreciated.

My final comment is on the Cleethorpes to Barton service, which is a bit of a Cinderella service. There are so many cancellations and the timings are not good for commuters who want to use it. It needs to be fully restructured, so I urge the Minister to look at that.

Nusrat Ghani Portrait Madam Deputy Speaker (Ms Nusrat Ghani)
- Hansard - - - Excerpts

I cannot allow another speech, but interventions on the Minister, if the Minister chooses to accept them, are permitted.

Lilian Greenwood Portrait The Parliamentary Under-Secretary of State for Transport (Lilian Greenwood)
- View Speech - Hansard - - - Excerpts

I congratulate my hon. Friend the Member for Great Grimsby and Cleethorpes (Melanie Onn) on securing today’s debate and on returning to these Benches. I know she will represent her constituents wonderfully well, as she always did, and speak passionately, as we have just heard, about issues in her constituency and across northern Lincolnshire—an area she is rightly proud of and ambitious for. I am grateful for the opportunity to discuss transport in this region today.

There were certainly some attempts to broaden out the debate beyond north Lincolnshire. I understand the desire to talk about Lincolnshire, but I will perhaps stay clear of Northern Ireland, where transport is a devolved matter. Nevertheless, I am impressed with the determination of the hon. Member for South Antrim (Robin Swann) to speak for his constituents. Let me assure hon. Members that the Government understand the importance of transport to the people, communities and businesses powering local economies across the country, including on the south bank of the Humber.

I will begin with the A180. I am very aware that my hon. Friend and her Labour predecessor have previously raised the issue of road noise on this vital road for those travelling to and from her constituency. Assessments of road noise on the A180 have been undertaken by National Highways. Those assessments were carried out near Stallingborough—I hope I have pronounced that correctly—in May 2024, ahead of proposed concrete repairs. The noise levels recorded were between 65.9 and 82 dB, which I understand is reasonably loud for a driver over a sustained journey. However, I am afraid that they are also consistent with the expected amount of noise to be generated, given the volume of traffic the A180 supports. The age of the road is also an important consideration here, as wear and tear increases the level of noise generated. That being said, I fully understand the frustration that can be caused by sustained road noise for both drivers and those living near the road.

In the last year, National Highways has carried out three road surface improvements on the A180, with a fourth planned to commence this October—in just a few weeks’ time. Those works have and will reduce noise and improve road safety. Subject to confirmation of funding, additional surface treatment work is planned for the third roads investment strategy period and, when finished, it should substantially reduce noise levels along the route. The works will be of significant benefit to the lives of my hon. Friend’s constituents, and those of other hon. Members, both those living close to the A180 and those who regularly drive along the road. I completely understand my hon. Friend’s desire to make the journey to her coastal community as smooth and pleasant as possible, both for her constituents and for those making the important business journeys that she described.

Let me turn to the introduction of a direct train to London from Cleethorpes and Grimsby. The benefits of having direct links to the capital are clear: that is why we are working with industry to address the timetabling, financial, operational and infrastructure issues that need to be resolved before a service to Cleethorpes can be introduced—all of that once the east coast main line timetable change has been implemented. Assessments made by LNER and Network Rail have confirmed that LNER services can call at Cleethorpes and Grimsby, but in order for LNER trains to serve Market Rasen station, significant changes to platform length and height are required, as well as a new foot crossing to allow safe access to platforms.

My noble Friend Lord Hendy, the Minister for Rail, will consider the proposals that have been made, with final approval subject to funding and a thorough business case process. That was the case before the general election, and it is still the case now. The previous Rail Minister talked of an ambition to introduce the service, but I am sure that my hon. Friend and other Members understand that an ambition is not the same as a promise. In the meantime, addressing the performance of rail services in the region in advance of any decision on direct services between London and Cleethorpes and Grimsby will significantly improve journeys and reduce delays. My hon. Friend painted a picture, very effectively, of the impact on rail travellers when the integration between services is not working properly.

I am pleased that TransPennine has improved its service significantly over the last year, but it is clear that there is still room for improvement, and, as my hon. Friend knows, my right hon. Friend the Secretary of State has wasted no time in holding train operators to account for poor performance. In her first month in the job, she met the managing director of TransPennine Express and Network Rail representatives to demand action. Between 21 July and 17 August, only about 50% of all trains on the route ran to time, with fewer than 80% arriving within three minutes of timetable. During that period cancellations stood at 3.4%, with an increase attributed to problems with the Keadby swing bridge on 1 and 5 August, along with several Network Rail incidents. I will say more in a moment about how bringing track and train together under Great British Railways can help to drive improvements, because they are very much needed.

Northern’s performance over the last few months has been unacceptable. Between 17 July and 21 August, trains on the Doncaster-Scunthorpe route arrived on time only 78% of the time. The proportion of total cancellations was about 4%, although, depending on the day and conditions of travel, passengers may have experienced a better or worse service than that. In July, the Rail North Partnership, through which my Department and Transport for the North jointly manage Northern’s contract, served it with a breach notice which compels it to produce a formal recovery plan. It will be required to explain how it will tackle the underlying issues that are holding back performance, resulting in the current unreliable service. The plan will be scrutinised by my Department and by Northern leaders through Transport for the North’s Rail North Committee. We will ensure that the needs and expectations of passengers, including those in north and north-east Lincolnshire, are put at the heart of Northern’s recovery and development.

Let me now address the daily—well, five days a week—Sheffield-Cleethorpes service. I remember when the Brigg line service ran only on Saturdays, and I am probably among a select group who have actually travelled on the service; but the hon. Member for Brigg and Immingham (Martin Vickers) already knows that, because we took the trip together and stopped for a cuppa in Cleethorpes. The service is primarily intended to maintain route knowledge on the Brigg line in case of diversions. Although I appreciate the appetite for services to spend more time in Grimsby and Cleethorpes, Northern’s turnaround at Cleethorpes is necessitated by other demands on the network, including from freight services, and by crew rostering. Adding an additional service on the route could create clashes and would cost between £400,000 and £900,000 a year, depending on staff and rolling stock demands.

Naturally, the Department requires operators to match their services to demand. Demand remains low on the existing services from Sheffield to Cleethorpes, which reach only about 30% of their capacity even during the busiest times. Most of the demand on the service is driven by passengers joining at Worksop and Retford for Sheffield, or by Northern’s competitive leisure pricing between Sheffield and Cleethorpes, although TransPennine trains also offer services over a similar route. Demand on the route is also very seasonal; I know from my Nottingham constituency how much city residents enjoy a trip to the east coast in the heights of summer, but they find it less appealing on wet and windy days in the winter.

Martin Vickers Portrait Martin Vickers
- Hansard - -

I take the Minister’s point about the small number of passengers on the route, but that is partly because there is only one service a day. If there were a regular service that people knew was there—even every three hours, shall we say—they could spend the day in Cleethorpes. It would encourage more passengers on to the route.