London Olympic Games and Paralympic Games (Amendment) Bill Debate

Full Debate: Read Full Debate

London Olympic Games and Paralympic Games (Amendment) Bill

Christopher Chope Excerpts
Thursday 8th September 2011

(13 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text
Baroness Primarolo Portrait Madam Deputy Speaker
- Hansard - - - Excerpts

Before I call the Minister, I wish to inform the House of an issue that will need to be dealt with. I understand that amendments to the Bill tabled by the hon. Member for Christchurch (Mr Chope) on Tuesday evening did not appear on the amendment paper. The reasons for this, which are currently unknown, are being urgently investigated. As this oversight has been discovered at such a late stage, I do not consider it appropriate to select the hon. Gentleman’s amendments. However, he can be confident that he will be able to raise his substantive concerns about the Bill during this afternoon’s proceedings.

Christopher Chope Portrait Mr Christopher Chope (Christchurch) (Con)
- Hansard - -

Further to that statement, human error has obviously intervened in the matter, and it is the first time in 28 years—since I was first elected—that amendments which I have tabled have not been translated on to the amendment paper. It is a pity that I was on parliamentary business abroad yesterday and did not realise that there was a problem until first thing this morning, but I am happy that we will be able to discuss at least the substance of my amendments under the debate on new clause 2. I am grateful to you, Madam Deputy Speaker, for making that indication.

Baroness Primarolo Portrait Madam Deputy Speaker
- Hansard - - - Excerpts

I am grateful to the hon. Gentleman for his co-operation, but as he has said, although this is a very rare occurrence, it is none the less of a nature that needs to be taken seriously and urgently investigated, and I am sure that the Table Office will inform him of exactly why it occurred.

New Clause 1

Goods vehicle operator licences

After section 16D of the London Olympic Games and Paralympic Games Act 2006, insert—

“16E Goods vehicle operator licences: waiver of procedural requirements

(1) This section applies in a case where, on an application to vary an operator’s licence under section 17 of the Goods Vehicles (Licensing of Operators) Act 1995 (“the 1995 Act”), a traffic commissioner is satisfied that—

(a) the variation applied for has a connection with the London Olympics,

(b) there would not, but for this section, be sufficient time to dispose of the application before the beginning of the London Olympics period, and

(c) the circumstances in which the application is being made are such that, but for this section, it could not have been made in sufficient time to be disposed of before the beginning of that period.

(2) The traffic commissioner may direct—

(a) that subsection (3) is to apply in relation to the application, and

(b) if the traffic commissioner proposes to hold an inquiry under section 35 of the 1995 Act in relation to the application, that subsection (4) is to apply in relation to the inquiry.

(3) If the traffic commissioner gives the direction under subsection (2)(a), the following provisions of the 1995 Act do not apply in relation to the application—

(a) section 17(3) (publication of notice by traffic commissioner);

(b) section 18 (publication of notice by operator).

(4) If the traffic commissioner gives the direction under subsection (2)(b), Schedule 4 to the Goods Vehicles (Licensing of Operators) Regulations 1995 (S.I. 1995/2869), in its application to the inquiry, has effect as if for sub-paragraph (3) of paragraph 1 there were substituted—

(3) The traffic commissioner may abridge the periods referred to in sub-paragraphs (1) and (2).”

(5) Section 23 of the 1995 Act (conditions as to use of operating centres) applies in relation to the licence as if the application were an application of which notice has been published under section 17(3) of that Act.

(6) Such variations as are made to the licence on the application, including by the attachment of conditions under section 21 or 23 of the 1995 Act (road safety and operating centres), have effect only during the London Olympics period.

(7) Subsection (3)(a) does not affect the liability incurred in respect of the application under regulation 3 of the Goods Vehicles (Licensing of Operators) (Fees) Regulations 1995 (S.I. 1995/3000) (which requires payment of a fee on an application for variation for which publication is required by section 17(3) of the 1995 Act).

(8) The power to give a direction under subsection (2) includes power to vary or revoke the direction.

(9) In exercising functions under this section, the traffic commissioner must act under the general directions of, and have regard to guidance given by, the senior traffic commissioner.

(10) In this section, “operator’s licence” has the same meaning as in the 1995 Act (see section 2(1) of that Act).”’.—(Hugh Robertson.)

Brought up, and read the First time.

--- Later in debate ---
Baroness Jowell Portrait Tessa Jowell
- Hansard - - - Excerpts

Perhaps uncharacteristically in this place, we do not intend to press the new clause to a vote, subject obviously to the Minister providing satisfactory assurances on the points raised. The most important thing is that he raises them with the relevant authorities and that we find a solution to the growing concerns of Londoners about the prospect of Olympic lanes. This is but one example of very many that we will face in the weeks—47 now, I think—before the games. We have to be vigilant and focused on helping the relationship between the huge festival that is the Olympics and the daily lives and convenience of Londoners and London businesses.

In conclusion, I hope that I have—fairly briefly—made clear our concerns, which are reflected by Members who represent London constituencies on both sides of the House. I have had some helpful discussions with the Minister, and I am sure that we will listen eagerly to this reply.

Christopher Chope Portrait Mr Chope
- Hansard - -

It gives me great pleasure to support the new clause tabled by the right hon. Member for Dulwich and West Norwood (Tessa Jowell). She said that she was not going to push the matter to a vote, but she might change her mind when she hears what has happened in my constituency over the so-called consultation—or lack of—on part of the Olympic network.

Mr Deputy Speaker, as was indicated by Madam Deputy Speaker earlier, I tabled a series of amendments and new clauses that, owing to a glitch, did not appear on the Order Paper, but which reflected the spirit of the right hon. Lady’s new clause. One of my amendments would have required that no road closure or restriction be operated outside the London Olympics period as defined in the London Olympic Games and Paralympic Games Act 2006. I tabled that amendment because we, in my constituency, are concerned about the disruption that will be caused to local residents and businesses well before the games start by the execution of improvement works at the Canford Bottom roundabout.

The right hon. Lady and others will recall that we discussed this matter on Second Reading on 28 April. I make no apology for returning to the subject today, however, because on that occasion I said that clause 4 would be helpful because it would enable the authorities to impose restrictions on side roads and local authority roads, thereby avoiding the need for the Canford Bottom improvements to be pushed through in defiance of local public opinion before the Olympics. That is how it was left on Second Reading.

My hon. Friend the Member for Mid Dorset and North Poole (Annette Brooke) and I then went to see the Minister with responsibility for roads, who was extremely helpful and accommodating, and said that there must be a proper public meeting and public exhibitions of the proposals, which was not what the Highways Agency originally proposed. Unfortunately, the exhibitions and the public meeting did not take place until the last week or two of July. What concerned my hon. Friend and me at the public meeting was that even at that late stage the Highways Agency had not produced the data about the impact of the closures and the works on local people and local businesses. That meeting took place after the House had gone into recess, but to give due credit to the Minister, he intervened and said that he would not allow the contract for the works to be let straight away, because it was important that the data, which had been promised for months if not years, should be made available to my hon. Friend and me and to the local highways authority.

Two weeks later we got a letter saying that the data were now available—they had been put up on some website. Unfortunately, that same day, before the data had been examined by my hon. Friend the Member for Mid Dorset and North Poole or me, or by the other people to whom it had been sent, we were told that the Minister was going to authorise the letting of the contract because he needed to be able to deliver the Olympic route. Under the terms of the Bill, it would not be necessary for him to have those works carried out at the Canford Bottom roundabout in advance of the Olympics, because he would have the power to restrict the local roads at the time and thereby compensate for any other traffic jams that might arise. We therefore faced a situation where the Minister, by his own admission, was contradicting what he had told my hon. Friend and me when we went to see him, namely that the issue of the improvements to the Canford Bottom roundabout was totally separate and apart from the London Olympics route network. It has now become apparent that the Olympic authorities are dictating the terms of the process and riding roughshod over local public opinion. They are also ignoring the representations made by the local highways authority, in so far as it has received sufficient information to enable it to make such representations.

This is a very serious issue. Many Members might not be familiar with the Canford Bottom junction, but it is on the main A31 trunk road where the road changes from being a dual carriageway going west, and it is subject to significant congestion and delay, particularly at peak times. It seems that it is the purpose of the Highways Agency and the Olympic Delivery Authority to ensure that the A31 runs fine, but in so doing to ignore the needs of the other users of that roundabout. When I say that more than 60,000 vehicles a day use that roundabout, I hope that that puts the situation into context for hon. Members. We are not talking about some local roundabout; a roundabout taking more than 60,000 vehicles a day is an extremely busy roundabout. Indeed, it may surprise Members to know that at peak times, two thirds of the vehicles using the roundabout are not using the A31 in both directions, but are using the minor roads going off the roundabout. That means that at peak hours in the morning, when 4,500 vehicles an hour use the roundabout, some 3,000 of them are using the local roads—that is, they are either coming in from one of the four local roads or egressing along one.

What is going to happen to those vehicles? The Highways Agency and the Olympic Delivery Authority are now saying that in order to construct the hamburger junction, which will involve more than 70 traffic lights—[Interruption.] I knew that my reference to the hamburgers would get the right hon. Member for Bath (Mr Foster) excited again, as it did on a previous occasion.

Lord Foster of Bath Portrait Mr Foster
- Hansard - - - Excerpts

For the avoidance of doubt, the hon. Gentleman will well recall that I asked him to give a definition of a hamburger junction on the last time he raised it. I fully understand, as will all Members, what a hamburger junction is, so we do not need it repeated today.

Christopher Chope Portrait Mr Chope
- Hansard - -

Absolutely. I cannot remember whether you, Mr Deputy Speaker, were in the Chair last time, but in the course of the discussion the right hon. Gentleman was guilty of making some rather poor-quality jokes about whether or not hamburgers were going to be sponsored in the Olympics and so forth.

This hamburger junction construction is a really significant issue. I am delighted to see that the Under-Secretary of State for Transport, the hon. Member for Hemel Hempstead (Mike Penning) is now in the Chamber. He will, I hope, come down and visit this part of the network. If he does so, he will realise the implications of the prospect of total closure of all the side roads off that junction, day after day during five weeks when all four sections will be closed off. That will mean that in the peak hours, 3,000 vehicles an hour that use that junction now will not be able to use it. The consequences in terms of disruption to local businesses and local residents are absolutely beyond comprehension.

Last week, there was an incident on the road between West Parley and Longham—one of the side roads that leads ultimately into the Canford Bottom roundabout—as a result of which that road was closed. The traffic chaos, which extended well into the Bournemouth conurbation and had repercussions as far away as Poole, was enormous. There was a great deal of local anger, yet that was a closure that lasted only a few hours. What we are talking about now is a closure for 12 continuous weeks.

If this were happening in your constituency, Mr Deputy Speaker, you would have done exactly the same as me—raise the matter with the local highways authority. I put the point that if we can keep the main parts of the roundabout for the A31 running during working hours, why cannot we allow the side roads to operate—at least during peak periods or during the working day. The highways authority, Dorset county council, told me that it had been presented by the Highways Agency with some 10 different options for the construction of this hamburger junction. Those options ranged from closing off all the roads completely for 24 or 48 hours and doing the construction quickly, thereby minimising the expense and duration of the works but maximising the disruption to all traffic to, at the other extreme, closing none of the roads at peak times, with the works taking longer and perhaps costing a bit more.

As a result of the pressure of the ODA and the imperative to get this junction improved before the Olympic games—as I say, it is unnecessary, but it has now apparently been imposed on the roads Minister by his counterpart, the Minister for Sport and the Olympics—local businesses and local residents will suffer an enormous amount of disruption. In my submission, that is not consistent with the avowed intent of the Government, as expressed in paragraph 84 of the Bill’s explanatory notes, according to which:

“The Government’s aims in providing for, and enforcing, traffic restrictions required for the 2012 Games”

are

“to minimise the impact of the 2012 Games on local businesses and residents going about their everyday business.”

I have to tell my hon. Friend the Minister, and my hon. Friend the Minister responsible for roads, that those words ring extremely hollow in the Christchurch constituency, and in the neighbouring constituency of Mid Dorset and North Poole. I am sure that, in due course, when the residents of the Poole constituency, as well as the constituencies of Bournemouth East, Bournemouth West and North Dorset, realise the disruption that will be caused, the clamour for something to be done will become even greater.

In my view, prevention is better than cure, and it is not too late for the Government to intervene. They could say either that the construction works should not be carried out until after the London Olympics, or that they should be carried out using a different method that would enable the local traffic to flow, especially during peak periods. The consequences of the total closures to which I have referred will be completely disproportionate.

I have no doubt that if local people had known in advance about the data, which were supplied by the Highways Agency at the insistence of my hon. Friend the Minister only in the middle of August, there would have been uproar. They would have said that the plans were intolerable. Indeed, local businesses were not told about the proposed closures until the middle of August. They have now been told by EnterpriseMouchel, which works for the Highways Agency, that there will be road closures for 12 weeks from the middle of February 2012 until the beginning of May. That obviously includes the Easter period. My hon. Friend the Member for Harrow East (Bob Blackman) is looking at me with incredulity at the prospect of major roads being closed for that length of time.

It is impossible to over-emphasise the gravity of the situation. I do not think that the Highways Agency or the Olympic Delivery Authority have any notion of the anger that is going to be generated when people see what is happening on the ground and realise that there was, and still is, an alternative. This is not like when a motorway has to be closed following a fatal accident, which is an act of God—or perhaps not. We know that this is going to happen, and we ought to be able to plan for it and bring in the necessary traffic management measures to ensure minimum disruption to the local traffic. However, because of the imperative of getting the work done before the Olympics, local businesses and residents are going to be put through an enormous amount of inconvenience.

I cannot even get an answer on whether it will be possible for pedestrians to cross from one side of the junction to the other during the course of the works. A detour of perhaps four or five miles will be required for motorists, through congested urban conditions. That will add hours to people’s journeys and do immense economic damage to the locality. When we discussed this on Second Reading, my hon. Friend the Minister said that that was the first he had heard of the problem. I hope that he will now look into the matter again. His Bill enables him to say that the works should be half-completed or curtailed before the Olympics. They do not have to be finished until after the games, and if that is the price of enabling local people to go about their normal lives without disruption, so be it.

Another point relates to the substance of whether the junction improvements are valid. Only when we obtained the data did the position become clear. Although the Highways Agency and others had asserted that everyone would be better off when the improvements had been completed, it was clear from the small print that, even during peak hours, vehicles coming off the eastern part of Wimborne Road West would experience greater delays than they do at present, and that the same would apply to Wimborne Road West in the evening and Ham lane in the morning.

As for off-peak periods—and, of course, much of the day is off-peak, given that the peaks are defined as two hours in the morning and two hours in the evening—it is clear that, contrary to all the assertions, delays on the local roads will increase. That too was not made clear during the consultation, and the Highways Agency—perhaps in the knowledge that the consequences of declaring openly what was going to happen would be adverse to it—did not communicate the effects to local people. This is a serious example of the need for consultation with the local highways authority, but either there was no such consultation or, if it did take place, the highways authority has not been listened to.

When I raised the matter with the traffic manager at Dorset county council’s environmental directorate, he told me that the proposals considered with the Highways Agency included 10 different options for dealing with the traffic. The issues that they took into account were disruption to the network, buildability, and value for money. I asked what the county council thought, and at that stage it became rather difficult to engage with it. I asked a specific question: did the council believe that the proposals to block access and egress from all four local roads for such a long period was reasonable, or did it place a disproportionate burden on local residents and businesses? I also asked it to look at the 10 possible scenarios, but I am sorry to say that I did not receive a very clear answer from the highways authority. I am not sure whether its members had really got their heads around the gravity of what is proposed. The area contains many major businesses, including aerospace manufacturing, and those businesses—not to mention people going about their own ordinary daily business—will be greatly inconvenienced.

If my amendments had been printed and selected, it would have been possible for the Bill to include the commitment made by the Minister earlier and repeated by the Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead—who is responsible for road traffic—that the disruption to local businesses and residents would be minimised. It is clear from what has happened so far in relation to the A31 and the Canford Bottom improvements that that commitment is not being fulfilled.

I hope that the Minister will relent between now and the beginning of the disruption that is due to start in February. As was established on the last occasion when we discussed the matter, any competitors or officials wanting to go to the Weymouth site will need to be there in good time. They will not want to risk a delay to their journey at the Canford Bottom roundabout, which, in any case, is probably a good hour and a half’s drive from the Olympics venue. Officials and media people may want to bear that in mind.

--- Later in debate ---
Annette Brooke Portrait Annette Brooke (Mid Dorset and North Poole) (LD)
- Hansard - - - Excerpts

I endorse the points that are being made. The Olympic games are a wonderful opportunity for this country, but the impact on our area is beginning to be very considerable, and some of it is causing a great deal of resentment and fear among local businesses. In respect of these road works, due consideration must be given to our local economy and the way of life of local people.

Christopher Chope Portrait Mr Chope
- Hansard - -

I am grateful to my hon. Friend for her intervention and her support for our line; we have been operating on this issue together. We have been in the dark for quite a lot of the time, but we have worked hard to try to cast some light on the issue.

There is much talk about the Olympic legacy, and perhaps the Minister will refer to that in his summing up. I fear, however, that the Olympic legacy in my constituency will be people saying, “The Canford Bottom roundabout should have had a proper improvement, but instead a half-baked hamburger junction has been incorporated that will not on any view solve the long-term traffic problems. That was the price that had to be paid for the Olympics.”

I think it is too high a price, and it is also an unnecessary price, because there could have been a little more consultation and rational thought about this matter. We could have delayed the improvements until after the Olympics and thus ensured that they would deliver real benefits to local road users, as well as to national road users using the important A31 network.

Mike Freer Portrait Mike Freer (Finchley and Golders Green) (Con)
- Hansard - - - Excerpts

I rise to make a few brief remarks on new clause 2. I urge the Minister to ignore the siren voices calling for yet more consultation as we near the Olympic period. While the Opposition will not press their amendments to a vote, I fear that the Minister might choose to acknowledge their sentiments and take on board what they propose.

I am not generally a great fan of Transport for London, but I have to say that its consultation on the Olympic network has been exemplary. Phase 1 addresses the A12 Leytonstone to Redbridge roundabout. Although it is not in my constituency, it is an important London junction, and TfL has written to every resident and business within a certain distance, informing them of all the changes and proposals. It has also held three drop-in sessions, and that procedure has been repeated for every phase.

--- Later in debate ---
Mike Freer Portrait Mike Freer
- Hansard - - - Excerpts

No, I am just making a general point about the quality of consultation on the priority route networks.

Under Mayor Johnson, TfL has been exemplary on this occasion. My hon. Friend the Member for Christchurch (Mr Chope) made a powerful case about consultation, and perhaps we should extend the purview of Mayor Johnson to Christchurch, as that might improve the level of consultation on my hon. Friend’s local council.

Christopher Chope Portrait Mr Chope
- Hansard - -

My point is not about the lack of consultation by the local council; it is about the lack of involvement of the Highways Agency.

Mike Freer Portrait Mike Freer
- Hansard - - - Excerpts

I stand corrected. My general point is that the new clause, whether or not it is pressed to a vote, asks the Minister to take on board a raft of additional consultations. It asks us to consult and inform ad nauseam, yet it is ill-defined.

--- Later in debate ---
Christopher Chope Portrait Mr Chope
- Hansard - -

The roads Minister told me that it was not necessary to go ahead with these works prior to the Olympics, but he has effectively told me in a letter that he has now been ordered to go ahead with them because they form part of the Olympic route network. If my hon. Friend the Minister for Sport and the Olympics can do nothing else today, will he confirm that as far as the Olympic Delivery Authority and the Olympic route network are concerned, it is not necessary to proceed with the Canford Bottom construction and improvements before the Olympic games? The route could be secured using the powers in clause 4.

Hugh Robertson Portrait Hugh Robertson
- Hansard - - - Excerpts

I shall certainly check that for my hon. Friend and, if he wishes, write to him, but the information that I have in front of me is clear—inasmuch as I can read it—that these improvements are required to deliver the Olympics. It is as simple as that.

Christopher Chope Portrait Mr Chope
- Hansard - -

Why are the improvements required? How will they make a difference? At the moment, my hon. Friend’s powers under clause 4 would enable all the other sides of the roundabout to be closed off, for example. Indeed, local people have said that they would prefer that. They would prefer to have all the roundabout closed off to local traffic during the Olympic games than to have to put up with this disruption and the construction of what seems to be a white elephant project.

Hugh Robertson Portrait Hugh Robertson
- Hansard - - - Excerpts

My hon. Friend will know, as he was a Transport Minister in the previous Conservative Government, that what local people want is not always the best traffic solution to achieve what people are trying to do on a national scale. We are committed to an Olympic route network—we will come on to that in a minute—and that was a commitment given at the time of the bid. As the right hon. Member for Dulwich and West Norwood has said, many of us are nervous about this, but it was a commitment we made when we signed the host nation contract back in 2005, and it is one that we are contractually obliged to deliver. We have taken advice from the experts—in this case, the Highways Agency—and I have a briefing from it among my notes. I have just received a copy of the letter that was written to the right hon. Lady by the Transport Minister. Both the briefing and that letter confirm that these works are necessary and that they will go ahead. I am sorry that my hon. Friend is so unhappy about it, but I do not see that there is a great deal that I can do.

Christopher Chope Portrait Mr Chope
- Hansard - -

Of course, my hon. Friend has to answer for the roads Minister, too, because that is the way this debate is going. My hon. Friend the Minister says that these works are necessary, but does he not agree that if we apply common sense we can see that it is possible to construct such a major new junction without closing the local roads for 11 weeks continuously?

Hugh Robertson Portrait Hugh Robertson
- Hansard - - - Excerpts

The short answer is that I simply do not know, because I have not seen this roundabout. I am an amateur, not a traffic professional, and I think that even if I went there and had a look, I would not necessarily be sure that I would get it right. That is why we have agencies such as the Highways Agency to give us advice. That advice has been examined and tested by my hon. Friend the roads Minister, and he has written accordingly. I am afraid that I have no option—and would not take any other up—than to accept his judgment and advice. I am afraid that that is where we are. I accept that my hon. Friend the Member for Christchurch does not like it, but I am afraid that that is the way it is going to happen.

Christopher Chope Portrait Mr Chope
- Hansard - -

Will my hon. Friend confirm that he has overruled the roads Minister in insisting that this project go ahead?

Hugh Robertson Portrait Hugh Robertson
- Hansard - - - Excerpts

No; absolutely not. I have not overruled the roads Minister in any way. I do not have that power, which does not exist.