(1 day, 20 hours ago)
Commons ChamberI am pleased to have secured an Adjournment debate on a topic that is so important to my constituency of Carlisle. In the last two decades, Carlisle has suffered two devastating floods, which have left local people fearful whenever there is a forecast of heavy rain.
In the flood of January 2005, which was the worst flood since 1822, three local people—Margaret Threlkeld, Margaret Porter and Michael Scott—tragically lost their life. Thousands were forced from their homes as 1,800 properties were overcome by water from the three rivers that converge in the centre of Carlisle. Power and telephone lines were disrupted. Road and rail networks were closed. All the city’s buses were damaged. The civic centre, designated as the emergency control centre, along with the police station, the fire station, the main electricity substation, the telephone exchange and the sewage treatment works, were all severely flooded.
It was record rainfall that caused the flood of 2005, but just 10 years later that record was shattered, and Carlisle was flooded again. This time, 2,200 properties were breached with floodwater. Given that the floods were in 2005 and 2015, I think the Minister will understand why many of my residents are concerned that 2025, another year ending in a “5”, might bring further devastation to our city. That fear is heightened, because the defences promised by the previous Government following the 2015 flood were never completed.
It is a fear I can personally relate to. In 1985, my family’s home in the Denton Holme area of Carlisle—one of the areas still at risk because of those incomplete flood defences—was flooded when the River Caldew burst its banks. I can personally testify to the terror and helplessness that people feel when their home is invaded by water. We waded through what was once our living room, surveying possessions and furniture destroyed beyond repair. It is a horrible, crushing feeling, and even after the water subsides, the smell of damp and sewage remains. Returning to any sort of normality can take months, even years. My parents had spent the best part of two decades creating a home in Denton Holme that they loved, and my mam—who, incidentally, will turn 91 on Saturday—still talks of it. After the flood, she said she could never shake the sense or smell of damp, and within 18 months we had moved house.
In response to the 2005 flood, the then Labour Government commissioned and completed new flood defences, and over the next five years, £38 million was spent on the design and construction of flood defences at the Eden, Petteril and Caldew rivers. These were designed to protect Carlisle from a storm with a one in 200 chance of happening, and they did make a major difference. In 2012 and 2013, the defences were estimated to have prevented in excess of £180 million-worth of flood damage to the city. But on 5 December 2015, Storm Desmond hit Carlisle. It was a storm with a one in 333 chance of occurring. The rainfall triggered the highest level of flow ever recorded on the River Eden. In some locations, flood levels were approximately 600 mm higher than those experienced in 2005. Such was the extent of the flood that the crossbar posts at Brunton Park, Carlisle United’s famous stadium, were submerged under water. Fortunately, no one lost their life in 2015, and while the recently constructed defences were effective at reducing damage and delaying flooding in some locations, it was clear that more needed to be done.
Progress has been made in subsequent years, and I commend the Environment Agency for that. Since the catastrophic floods of 2015, some 1,650 homes are better protected, thanks to over 6 km of new or raised flood defences. There have also been improvements to two culverts and their associated inlet or outlet structures. The Carlisle phase 1 and 1a schemes, completed in 2021, have increased protections for homes and businesses around the Warwick Road and Botcherby areas of Carlisle. The Carlisle phase 2 scheme, also completed in 2021, raised the flood defences along the River Eden, providing further protection to the Hardwicke Circus and Castle Way areas. The Rickerby and Low Crosby schemes have also reduced the flood risk to local communities. It is particularly excellent that the latter took an award-winning, innovative, low-carbon approach; it removed historical embankments to increase the effectiveness of natural floodplains.
My hon. Friend is making an excellent and powerful speech about this awful problem that affects so many people, particularly in her part of England. Can wider lessons be learned from the techniques she is describing—for example, lessons about the use of natural materials, and about changes in land use, particularly in a range of river catchments? In my area in the Thames valley, both the Thames and the Kennet have flooded; as a result of climate change, they pose much greater risk than they did. Many residents have concerns about a range of issues, and I wonder if my hon. Friend thinks there is a wider national lesson to be learned.
I do think there are lessons to be learned, not least because Carlisle has been so badly affected by flooding and it is so devastating. Lessons could be shared from the schemes that have been introduced in the city, particularly in relation to maximising the use of the floodplains. In a short while, I will discuss more generally some of the natural flood defence work that has happened on the outskirts of the city.
There have been a number of schemes to the north of Carlisle. In the town of Brampton, natural solutions like tree planting and the creation of wetlands have been used to mitigate the risk of flooding from the Brampton beck, all while providing wider environmental benefits to the community. A new natural flood management scheme is currently being delivered at Brampton Fell farm, offering further protection to the town. There has also been the return of the “wiggling river” at Howgill beck, which was straightened more than 200 years ago. Thanks to the work of RSPB Geltsdale warden Jen Selvidge, a 1.8 km stretch of the beck has been returned to its natural wiggly state. During heavy periods of rainfall the river can now spill out on to the natural surrounding floodplain meadows, helping to reduce the chance of flooding downstream towards Carlisle, as well as having the added bonus of creating vital pools and damp patches for wading birds to feed on.
I am delighted that earlier this month the restoration project won the prestigious UK river prize project-scale award for 2025. Natural flood management schemes like these have an important role to play, and I urge the Minister to look closely at how a redesigned sustainable farming incentive can best encourage and compensate farmers who do the right thing by their local community for the loss of the income that they might otherwise have earned from the farmland that they have given over to natural flood management schemes.
One of the groups that particularly deserves praise in keeping Carlisle’s flood preparedness under the spotlight is the Carlisle Flood Action Group. Since its founding in January 2016 in the wake of the December flooding, it has done an excellent job of campaigning for the defences that our city needs. Indeed, it is one of many examples that show Carlisle at its very best. Our community is one that pulls together, and nothing encapsulates that better than it taking just 49 days from the 2015 floods to get the aforementioned Brunton Park back up and running and ready for matches once again. Some might say that, given our form this season, we could use a little bit of a delay to the end of it, but I will not dwell on that point.
Let me be clear: more needs to be done. In January last year river levels threatened to overwhelm the city again. Last May, rainfall equivalent to a one-in-300-year storm led to the flooding of 100 properties in the village of Scotby, just outside Carlisle. Our changing climate only makes these sorts of storms more common. Indeed, the Environment Agency believes that the impact of climate change in the River Eden catchment, which covers near the majority of my constituency, will be more severe than in the vast majority of river catchments in England.
At the very top of the list of what must be done is the Caldew flood risk management scheme, which many people in my constituency will know as the long-promised Carlisle phase 3 scheme—the one that was not delivered by the last Government. The scheme’s objective is to reduce flood risk to over 1,700 properties in the Denton Holme, Caldewgate and Willowholme areas of the city. I was grateful to Carol Holt, the Environment Agency area director for Cumbria and Lancashire, for accompanying me on a tour across the area in February this year, but despite assurances dating back years, residents have become frustrated by a lack of communication from the EA since the project was first paused in 2021 due to viability concerns.
We are not the only community waiting for defences or even trying to get maintenance done to existing defences. After 14 years of Conservative dither and delay, some 3,000 Environment Agency high-consequence assets were below the required condition. That is one of the reasons that I am glad we now have a Labour Government, and an especially responsive Minister for Water and Flooding. I welcome the planned investment of a record £2.65 billion in the next two years to build and repair over 1,000 flood defences, better protecting 52,000 properties across the country.
Last month, over £1 million was pledged towards a number of schemes in north-west Cumbria, including road surface work at Etterby Terrace and Wigton Road in Carlisle, and a property flood resilience scheme at Warwick Bridge, just outside the city, which I have been pushing the EA to deliver since I entered this place and which is planned to be finished by winter 2025. Some £300,000 was secured for the long-mooted Caldew scheme; I have been told that feasibility studies are due by the end of the summer, and although I look forward to their conclusions, I am concerned that even if a path is identified, it may be five to 10 years until the scheme can be delivered.
Tackling the risk from the Caldew cannot just be about creating ever higher and more expensive and imposing flood defences. Instead, we need a range of measures, both in Carlisle and outside it, to help slow and hold the water away from the city, buying precious time for the river levels to ease. I understand that the Caldew scheme will be one of the largest schemes that the Environment Agency has ever undertaken, but it is vital to the lives of over 100,000 residents in Carlisle and to the prosperity of a place that has been the centre of trading in north-west England since before Roman times. I recognise that delivering the scheme will not be quick and I urge the Minister to ensure that a suite of measures is employed in the interim to mitigate the immediate threat from the River Caldew. Those measures could include a plan to remove aggregate and vegetation build-up that slows the flow of the river through the city.
I wish to address one other aspect of flood preparedness: emergency planning. I am glad that further expansions of the flood warning provision have taken place in Carlisle, including two new flood warning areas at Warwick Bridge and Parham beck, covering a combined 330 properties. I am also grateful for the flooding text alerts that I receive on a regular basis, but one issue that has been pointed out to me, particularly by the Carlisle Flood Action Group, is the need for more information to be made available to the public ahead of an incident, so that people can see where their nearest emergency shelter is planned to be in the event of a flood. I understand that such information is not currently available, so the first time the public hear of those locations would be when a flood occurs.
My hon. Friend makes a very good point. In my own experience and that of local residents, alerts sometimes happen in the middle of the night, so it is extremely worrying and difficult for residents to respond quickly. She is right that there needs to be a proactive element, but does she also believe that there needs to be better co-ordination between private landowners, local authorities and the EA to tackle this issue? Particular concerns about private landowners have been raised with me. Will she comment on that point?
I am aware, certainly in the Denton Holme area, that a number of different landowners have responsibility for the maintenance of the river banks. As my hon. Friend identifies, that patchwork of responsibilities gives rise to a number of issues. It would be desirable for more information about flood alerts to be available in advance, so that people could plan for such an eventuality, but I recognise that those plans need to be dynamic; as I highlighted, in 2005 people could not get to the emergency centre because it had been cut off by the flood water. I recognise that providing that information in advance will not be absolutely perfect, but it would be beneficial for it to be made available.
If emergency locations were known, residents would have a better understanding of where to move to in the event of an emergency and would begin to do so, as my hon. Friend the Member for Reading Central (Matt Rodda) indicates, when that all-important flood alert came through. I would be grateful if the Minister could consider that point in her response.
In summary, I urge haste. I have already said that we are in another year ending in a “5”, and that does present concerns for my constituency. We passed the 20-year anniversary of the tragic 2005 floods in January and we approach the 10-year anniversary of the 2015 floods in December, so it is vital that we get on with delivering the schemes needed to keep our great border city safe and secure for many years to come.
I thank my hon. Friend the Member for Carlisle (Ms Minns) for securing this debate. I wish a happy birthday to her mam, who I believe has her birthday at the weekend. I am really delighted to have the opportunity to hear about and discuss the steps being taken to prepare for flooding in Carlisle and across England. On a personal level, I have to say that my hon. Friend’s constituents made an excellent choice in making her their Member of Parliament, because she always lobbies me so nicely. That is always nice, but it also makes it very difficult for me ever to say no. I spoke with the Environment Agency earlier, and its representatives also told me how engaged my hon. Friend has been on flood risk reduction in Carlisle and were very complimentary about her persistent and kind lobbying.
Protecting communities, homes, businesses and farmland is our priority, and that is more important than ever as climate change brings more extreme weather to the nation. I have met my hon. Friend twice in the last year formally, and many times informally, to speak about some of the challenges that her constituency faces. I understand the awful experience of flooding, and I know full well that flooding of any kind is devastating for those affected. My hon. Friend has spoken in this House on the issue of flooding 20 years after the terrible 2005 floods, which are considered the worst in Carlisle since 1822 and, as she said, tragically claimed the lives of three people. In 2015, Carlisle saw further devastation from Storm Desmond. I know that she raised that issue last December, asking the Prime Minister what assurances could be given on delivering flood defences that might prevent a repeat. Only last year, Carlisle was badly affected again, so I understand my hon. Friend’s urgency.
Unlike the last Government, who left our defences in a state of disrepair, I am pleased to share that the investment for this year between April ’25 and March ’26 includes more than £1 million across nine schemes in my hon. Friend’s constituency alone. Her constituency is receiving £1,015,000 this financial year, of which £660,000 is allocated to the city of Carlisle itself. I know that she has expressed particular concern about the delays to the Caldew flood risk management scheme, which I am delighted to confirm has an investment of £300,000 this year for further development. I hope that reassures her that efforts to reduce flood risk to more than 1,700 properties in the Denton Holme, Caldewgate and Willowholme areas of the city are firmly in motion.
My hon. Friend mentioned the Caldew flood risk management scheme, which in ’25-26 will receive an investment of £300,000, in relation to feasibility studies. In 2021, Environment Agency consultants carried out a feasibility study on further flood risk management options for the city of Carlisle, the outcome of which was that that option was not viable. However, another feasibility study is live on other potential options for flood risk management schemes, including, as my hon. Friend mentioned, work upstream of the city. The EA expects that study to conclude this summer.
Great progress has been made in Carlisle in recent years. Parts of the area have some of the highest standards of river and flood protection anywhere in the country, with new flooding schemes designed with a 0.5% annual probability of flooding. My hon. Friend highlighted the work of Jen Selvidge, the RSPB Geltsdale reserve warden, in helping to return 1.8 km of Howgill beck to its natural state of wiggliness, and the work of the Carlisle Flood Action Group to keep Carlisle’s flood preparedness in the spotlight. Local flood action groups play such an important role across this country. Led by the communities themselves, those groups give a voice to local areas and allow communities to work in partnership with local authorities and the Environment Agency. I pay tribute to all of them up and down the country.
Turning to the use of emergency shelters in a flooding event, it is of course local authorities that are responsible for setting up and managing rest centres during evacuations, providing temporary shelter and support for those who have been evacuated. Typically, those locations are not published in advance, as the locations in use will depend on availability, the location of the emergency, and the number of people who may need to use them. The concern is that publishing in advance could risk people attending an inactive location, or one affected by the emergency itself—my hon. Friend mentioned one of the emergency centres itself being flooded, and therefore unable to be used. We will, however, work with the local authority to ensure that a list of potential shelters is published, which can provide residents with notice of where their nearest shelters may be set up.
During a flood emergency, local authorities and the Environment Agency work closely with other emergency partners to co-ordinate messaging—including the possible use of emergency alerts—to affected communities and local flood groups, to ensure that residents have timely and consistent guidance during an emergency. I spoke to the Environment Agency this morning, which informed me that it would contact my hon. Friend the Member for Carlisle to discuss the location of emergency shelters in Carlisle and how to make people aware of where they could be, while taking into account that in an emergency, some of them might not be able to be used. We do not want people going to the wrong place, so there is a balance to be struck, but the Environment Agency is happy to talk to my hon. Friend in more detail.
Carlisle is one of the many areas in England that will be receiving investment this year. I am therefore proud to share that in delivering on the Government’s plan for change, we are investing a record £2.65 billion over two years in the construction of new flood schemes and the repair and maintenance of existing ones. With that funding, 1,000 flood schemes have been supported or will continue to be supported, helping to protect 52,000 more homes and businesses. Maintenance of existing flood defences is also being prioritised, ensuring that a further 14,500 properties will have their expected level of protection maintained or restored. In total, 66,500 properties will benefit from that funding, helping to secure jobs, deliver growth and protect against economic damage.
We recognise that many flood defence projects have stalled over time, due partly to an outdated formula for allocating money. We have therefore made available £140 million from the £2.65 billion investment programme, which has been prioritised for 29 projects that are ready for delivery, ensuring that nearby communities are protected as soon as possible. The full list of schemes to receive funding in 2025-26 was announced on 31 March and can be found online, and we will of course continue to invest in new defences.
Because we have inherited flood assets that are in the poorest condition on record following years of under-investment, 3,000 of the Environment Agency’s 38,000 high-consequence assets have been left below the required condition. In a November 2023 report, the National Audit Office recognised that increasing investment in operating and maintaining existing flood defences was critical to reducing the frequency and impact of flooding. As such, we are taking decisive action to fix the foundations, giving communities confidence that flood defences will protect them. To support that action, we are re-prioritising £108 million of investment in repairing and restoring critical assets: £36 million in 2024-25 to target repairs towards assets damaged in storms last winter and ongoing flood events; and a further £72 million this year to continue repairs and ensure that assets are as resilient and reliable as possible, and that they operate as expected in flood events.
In addition, the environmental land management schemes present a valuable opportunity to support flooding and coastal erosion risk management aims through direct funding of actions, providing a revenue stream to support landowners working with EA capital schemes, and indirect actions, which will lead to reduced watercourse maintenance requirements and increase the lifespan of our assets. I would like to reassure my hon. Friend the Member for Carlisle that the EA actively monitors aggregate and vegetation throughout the year for critical locations that are trigger points, and when those trigger levels are met, gravel and vegetation is removed when timing allows. If she has any concerns about those levels —if she believes they have already been met—that can be another conversation to continue with the Environment Agency.
Protecting communities around the country from flooding is one of the Secretary of State’s five core priorities, which is why we set up the flood resilience taskforce to provide oversight of national and local flood resilience and preparedness. That taskforce brings together Ministers from DEFRA, the Ministry of Housing, Communities and Local Government, the Cabinet Office and the Department for Transport—the fact that we have so many Ministers in the same room to discuss flood resilience demonstrates the priority given to that issue across Government. It marks a new approach to preparing for flooding by bringing together representatives from national, regional and local government, the devolved Administrations, the emergency services, charities and environmental interest groups. I was pleased to chair the taskforce when it met on 5 February to look at learning from flooding since last September and longer-term funding and investment reform. The discussions from that meeting are now being taken forward through collaborative action groups of taskforce members, and we are looking at flood warnings, flood recovery and flood insurance. The next taskforce meeting will take place in May 2025, where the action groups will report back on their work to improve flood resilience and better protect and support vulnerable communities, because flood warnings are frequently mentioned as a concern after flooding events.
We are also providing vital funding to support greater resilience for farmers and rural communities. The Government announced last month an additional £16 million boost to the internal drainage board fund, which has been bolstered to a total of £91 million from the previously allocated £75 million. It will enable investment in modernising and upgrading IDB assets and waterways to ensure they are fit for the future. More than 400,000 hectares of agricultural land and around 91,000 homes and businesses across England are expected to benefit from the IDB fund.
Turning to the sustainable farming initiative, more than half of all farmed land is now being managed in environmental land management schemes. That includes more than 37,000 live SFI agreements undertaking a range of actions, including to strengthen natural flood defences. We announced on 11 March that the current SFI budget had been fully allocated, and we will continue to support farmers to transition to more sustainable farming models, including through the thousands of existing SFI agreements over the coming years, and a reformed SFI offer.
Now is the right time for a reset of SFI, supporting farmers, delivering for nature and targeting public funds fairly and effectively towards priorities for food, farming and nature. The Government will work with the farming sector to prioritise funding for future years, so that we can target those who will benefit most before reopening to new applicants. There will be a new and improved SFI offer, with details to follow in summer after the spending review. The improved SFI scheme will be another step in this Government’s new deal for farmers to support growth and farm profitability. If my hon. Friend would like, I can share details highlighting her interest in providing views to the officials responsible.
Looking ahead, I have set out plans to consult on a new strategic vision for floods investment. I am pleased to say that a consultation on reforms to the funding formula will be launching shortly this spring. We will ensure that the challenges facing businesses and rural and coastal communities are adequately taken into account when delivering flood protection. Flood schemes proceeding in 2026, 2027 and beyond will continue to be subject to the annual regional flood and coastal committees consenting process, with local elected representation, and to decisions from the upcoming spending review.
I appreciate the work that the Minister is doing in this area. She is proving herself to be an excellent Minister who is willing to listen to those of us with concerns about flooding. As part of the review, is it possible to investigate the role of locks and weirs in river catchments and how they are maintained and operated when rivers are at a high level? Concerns have been raised with me by local residents that some weirs or locks—this is an issue within the community, which I have not yet been able to fully check out—may have been opened at times of high flow, when perhaps it might have been better for the water to have been managed in a different way. Is it possible to have further consultation on that?
I understand that in some catchments there are different ways of locks and weirs being managed, and it may be that there is no national standard. On the Thames, there are often lock-keepers who are paid employees, but with some tributaries, it is not as organised as that, and it may be individual landowners who are responsible. In our area, the way that the Kennet—it is a large tributary, but still only a tributary—is managed is different from and less professionalised than the Thames, and concerns have been expressed about that.
I thank my hon. Friend for his thoughtful contribution as always and for his interest in this area. The management of locks and weirs probably does not come into the scope of the flooding formula review, but I have heard the point he is making, and I will talk to officials about whether the management of locks is taken into account with flood plans and how that is managed consistently around the country. I will write back to him on that, if that would be useful.
The Government’s record two-year investment in our flood defences will better protect communities across the country from flooding. It will also boost economic growth in local communities by protecting businesses, delivering new jobs and supporting a stable economy in the face of the increasing risk of flooding as a result of climate change.
Through our plan for change, this Government will deliver a decade of national renewal and economic growth, and we are committed to ensuring that communities are better protected from flooding in the first place. We will continue to deliver and repair flood defences, improve drainage systems and develop natural flood management schemes. As ever, the emergency services, the Environment Agency, local authorities, voluntary organisations and Government Departments stand ready to support affected people in any future flooding event, and I pay tribute to them all. It is a personal priority and a privilege to be the Minister responsible for flooding, and I will continue working to ensure that this country is more resilient to floods.
As the Member for Carlisle mentioned her mother’s 91st birthday, it is only appropriate that I wish Freda Minns—what a beautiful name—a very happy birthday.
Question put and agreed to.