(1 year, 6 months ago)
Commons ChamberI beg to move, That the clause be read a Second time.
With this it will be convenient to discuss the following:
New clause 1—Removal from the procurement supply chain of physical surveillance equipment produced by companies subject to the National Intelligence Law of the People’s Republic of China—
“(1) Within six months of the passage of this Act, the Secretary of State must publish a timeline for the removal from the Government’s procurement supply chain of physical surveillance equipment produced by companies subject to the National Intelligence Law of the People’s Republic of China.
(2) The Secretary of State must lay the timeline before Parliament.”
New clause 9—Application of this Act to procurement by NHS England—
“(1) Omit sections 79 and 80 of the Health and Care Act 2022.
(2) For the avoidance of doubt, the provisions of this Act apply to procurement by NHS England.”
This new clause includes the NHS under this Act and procurement by NHS England under the Health and Care Act 2022.
New clause 10—Tax transparency—
“(1) This section applies to any covered procurement for a public contract with an estimated value of £5 million or over.
(2) When assessing tenders under section 19 or awarding a contract under section 41 or 43, a contracting authority must require the submission of a tax report where a supplier is a multi-national supplier.
(3) Where a multi-national supplier fails to submit a tax report, a contracting authority must exclude the supplier from participating in, or progressing as part of, the competitive tendering procedure.
(4) Subject to subsection (5), a contracting authority that enters into a contract with a multi-national supplier must publish a copy of the tax report—
(a) if the contract is a light touch contract, before the end of the period of 120 days beginning with the day on which the contract is entered into;
(b) otherwise, before the end of the period of 30 days beginning with the day on which the contract is entered into.
(5) Where a copy of a contract is by virtue of regulations under section 95 published under section 53(3) on a specified online system, the tax report relating to that contract must be published on the same specified online system—
(a) if the contract is a light touch contract, before the end of the period of 120 days beginning with the day on which the contract is entered into;
(b) otherwise, before the end of the period of 30 days beginning with the day on which the contract is entered into.
(6) A ‘multi-national supplier’ is a supplier with two or more enterprises that are resident for tax purposes in two or more different jurisdictions.
(7) A ‘tax report’ means a report setting out—
(a) the income booked in the UK,
(b) the profit before tax attributable to the UK,
(c) the corporate income tax paid on a cash basis in the UK,
(d) the corporate income tax accrued on profit/loss attributable to the UK, and
(e) any other information specified in regulations under section 95
for the multinational supplier.
(8) A Minister of the Crown may by regulations amend this section for the purpose of changing the financial threshold.”
This new clause would require large multinational corporations bidding for a public contract to provide information about their Income booked in the UK, their profit before tax attributable to the UK, their corporate income tax paid on a cash basis in the UK and their corporate income tax accrued on profit/loss attributable to the UK, and that information to be published.
New clause 11—Public interest—
“(1) Where a contracting authority is considering outsourcing public services that are at the time of consideration delivered in-house or where contracts are due for renewal, the contracting authority must demonstrate that they have considered whether outsourcing or re-contracting provides greater public value than direct service provision.
(2) As part of the duty in subsection (1), the contracting authority should demonstrate that it has assessed the potential benefits and impact of outsourcing the service in question against a public sector comparator with assessments being based on criteria to be set by the Secretary of State, including taking a five year consideration of—
(a) service quality and accessibility;
(b) value for money of the expenditure;
(c) implications for other public services and public sector budgets;
(d) resilience of the service being provided;
(e) implications for the local economy and availability of good work in relevant sub-national labour markets;
(f) implications for public accountability and transparency;
(g) effect on employment conditions, terms and standards within the provision of the service to be outsourced and when outsourced;
(h) implications for public sector contributions to climate change and environmental targets;
(i) implications for the equalities policies of the contracting authority and compliance with the public sector equality duty.
(3) The contracting authority and the supplier of the outsourced service must monitor the performance of any contracted service against the public interest test and the stated objectives set by the contracting authority pre-procurement to demonstrate that outsourcing the service in question has not resulted in a negative impact on any of the matters mentioned in subsection (2)(a) to (i).
(4) The Secretary of State must from time to time set budget thresholds for when a public interest test would be required.”
The new clause would create a process to ensure that contracting authorities safeguard the public interest when considering whether or not to outsource or recontract services.
New clause 12—Protection of subcontractors’ payments under construction contracts—
“(1) A project bank account must be established for the purpose of subsections (2) to (4) in accordance with the following requirements—
(a) the account must be set up by the contracting authority and the contractor under a construction contract as joint account-holders;
(b) the monies in the account are held in trust by the contracting authority and contractor as joint trustees;
(c) the contracting authority must deposit in the account all sums becoming due to the beneficiaries and any disputed sums must remain in the account until the dispute is resolved and any retention monies remain in the account until they are released to the beneficiaries;
(d) due payments from the account must be made to all beneficiaries simultaneously; and
(e) the beneficiaries include—
(i) the contractor;
(ii) all subcontractors where the value of each subcontract is at least 1% of the value (excluding VAT) of the construction contract entered into between the contracting authority and the contractor; and
(iii) any other subcontractor which has specifically requested that its payments be discharged through the account.
(2) Subsections (3) and (4) have application to construction contracts having a value in excess of £2 million (excluding VAT).
(3) Not later than 30 days after entering into a construction contract a contracting authority must ensure that a project bank account is in place.
(4) In the event that a contracting authority fails to comply with this subsection the construction contract ceases to be valid and may not be enforced by either party.
(5) The Secretary of State must provide statutory guidance on the operation of project bank accounts to ensure that such operation is standardised amongst all contracting authorities.
(6) Subsections (7) to (10) apply where retention monies are not protected within a project bank account.
(7) The contracting authority must establish a retention deposit account with a bank or building society which fulfils the requirements of subsection (1)(a) and (b).
(8) On each occasion that retention monies are withheld the contracting authority must lodge them within the retention deposit account and maintain a record of the names of each subcontractor having contributed to the withheld monies and the amount of the monies contributed by each.
(9) Subject to subsection (10), not later than 30 days after the date of handover of each subcontracted works at least 50% of the withheld retention monies must be released, and not later than the date which is 12 months from the date of handover of each subcontracted works the balance of the retention monies must be released.
(10) A contracting authority has a right of recourse to subcontractors’ retention monies but such right is limited to any subcontractor which is in default of its subcontract in having delivered works which are defective and in breach of the subcontract.
(11) Paragraphs (9) and (10) also apply where retention monies are protected in a project bank account.
(12) Non-compliance with subsections (6) to (11) renders any entitlement to withhold retention monies in a construction contract or subcontracts of no effect.
(13) Subsections (6) to (12) do not affect the right of any subcontractor to pursue recovery of any outstanding or wrongfully withheld retention monies against its other contracting party.
(14) The Secretary of State must provide statutory guidance on the operation of retention deposit accounts to ensure such operation is standardized amongst all contracting authorities.
(15) Any dispute under this section is referrable to adjudication in accordance with section 108 of the Housing Grants, Construction and Regeneration Act 1996.
(16) The Secretary of State must carry out a review of the operation of this section within 5 years of it coming into force.
(17) In this section—
“bank” has the meaning given to it in section 2 of the Banking Act 2009;
“building society” has the meaning given to it in section 119 of the Building Societies Act 1986;
“contractor” is the party engaged under a construction contract with a contracting authority;
“construction contract” has the meaning given to it in section 104, Housing Grants, Construction and Regeneration Act 1996;
“handover of each subcontracted works” signifies the date when the works as defined in each subcontract are substantially complete;
“project bank account” is an account set up with a bank or building society which has the requirements listed in subsection (2);
“retention monies” mean a proportion of monies withheld from payments which would otherwise be due under a construction contract, subcontract or any ancillary contract the effect of which is to provide security for the current or future performance by the party carrying out the works;
“subcontract” and “subcontractor” includes sub-subcontracts and sub-subcontractors.”
This new clause ring-fences monies due to subcontractors in construction supply chains through mandating use of project bank accounts and ensuring retention monies are safeguarded in a separate and independent account.
New clause 13—Dependence on high-risk states—
“(1) The Secretary of State must within six months publish a plan to reduce the dependence of public bodies upon goods and services which originate in whole or in part in a country considered by the United Kingdom as a high risk sourcing country.
(2) For the purposes of this section, a country is considered a high risk sourcing country by the United Kingdom if it is defined as either a systemic competitor or a threat in the latest Integrated Review of Security, Defence, Development and Foreign Policy.”
New clause 14—Procurement and human rights—
“(1) A contracting authority may apply a policy under which it does not contract for the supply of goods, services or works from a foreign country or territory based on the conduct of that foreign country or territory relating to human rights, provided that—
(a) the contracting authority has a Statement of Policy Relating to Human Rights, and
(b) that statement of policy is applied consistently and not specifically to any one foreign country or territory.
(2) Within six months of the passage of this Act, the Secretary of State must publish, and lay before Parliament, guidance on the form, content and application of Statements of Policy Relating to Human Rights for the purposes of subsection (1).
(3) Contracting authorities must have regard to the guidance published under subsection (2) when applying a policy in accordance with subsection (1).”
This new clause would enable public authorities to choose not to buy goods or services from countries based on their human rights record. They would not be able to single out individual nations to apply such a policy to, but would have to apply it consistently, and in accordance with guidance published by the Secretary of State.
New clause 16—Eradicating slavery and human trafficking in supply chains—
“(1) The Secretary of State must by regulations make such provision as the Secretary of State thinks appropriate with a view to eradicating the use in covered procurement of goods or services that are tainted by slavery and human trafficking.
(2) The regulations may, in particular, include—
(a) provision as to circumstances in which a supplier is excluded from consideration for the award of a contract;
(b) provision as to steps that must be taken by contracting authorities for assessing and addressing the risk of slavery and human trafficking taking place in relation to people involved in procurement supply chains;
(c) provision as to matters for which provision must be made in contracts for goods or services entered into by contracting authorities, including mandating or enabling the use of forensic supply chain tracing.
(3) In this section— “forensic supply chain tracing” is the process of using forensic techniques to track the movement of goods and services through a supply chain; “slavery and human trafficking” has the meaning given by section 54(12) of the Modern Slavery Act 2015; “tainted”: goods or services are “tainted” by slavery and human trafficking if slavery and human trafficking takes place in relation to anyone involved in the supply chain for providing those goods or services.”
New clause 17—Food procurement—
“(1) A public contract which includes the supply of food must include provisions ensuring that the supply of food under that contract—
(a) is aligned with the Eatwell Guide, and
(b) includes options suitable for a plant-based diet.
(2) The ‘Eatwell Guide’ is the policy tool used to define government recommendations on eating healthily and achieving a balanced diet published by Public Health England on 17 March 2016, as updated from time to time.”
This new clause would require public contracts for the supply of food to be aligned with current nutritional guidelines and to include plant-based options.
Amendment 14, in clause 2, page 2, line 15, after “funds,” insert “including the NHS,”.
This amendment includes the NHS in the definition of a public authority for the purposes of this Act.
Government amendments 19 and 20.
Amendment 60, in clause 13, page 10, line 11, at end insert—
“(3A) When the Minister lays the statement before Parliament, the Minister must also lay before Parliament a report which sets out—
(a) the Secretary of State’s assessment of the impact of the statement on meeting environmental and climate targets,
(b) the steps the Secretary of State has taken or intends to take in relation to procurement to support the meeting of those targets.”
This amendment would require the Secretary of State to explain in a report laid before Parliament the Government’s assessment of the impact of the national procurement policy statement on meeting environmental and climate targets and to set out any intended steps in relation to the meeting of those targets.
Amendment 4, in clause 19, page 13, line 31, at end insert—
“(aa) must disregard any tender from a supplier that does not guarantee the payment of at least the Real Living Wage to all its own employees and contracted staff and those of any sub-contractors;”
This amendment, together with Amendments 5 to 8, is designed to ensure that no public contract can be let unless the supplier guarantees the payment of the Real Living Wage to all those involved in the delivery of the contract.
Amendment 5, in clause 41, page 28, line 26, at end insert—
“(3A) A contracting authority may not award a contract under this section to a supplier that does not guarantee the payment of at least the Real Living Wage to all its own employees and contracted staff and those of any sub-contractors.”
See explanatory statement to Amendment 4.
Amendment 1, in clause 42, page 29, line 14, at end insert—
“(3A) Provision under subsection (1) must not confer any preferential treatment on suppliers connected to or recommended by members of the House of Commons or members of the House of Lords.”
This amendment is intended to prevent the future use of “VIP lanes” for public contracts.
Government amendments 21 to 23.
Amendment 6, in clause 43, page 30, line 3, at end insert—
“(5A) A contracting authority may not award a contract under subsection (1) to a supplier that does not guarantee the payment of at least the Real Living Wage to all its own employees and contracted staff and those of any sub-contractors.”
See explanatory statement to Amendment 4.
Amendment 2, in clause 44, page 30, line 16, at end insert—
“(4) Any Minister of the Crown, Member of Parliament, Member of the House of Lords or senior civil servant involved in recommending a supplier for a contract under section 41 or 43 must make a public declaration to the Cabinet Office of any private financial interest in that supplier within 10 working days.”
This amendment would implement a recommendation by the National Audit Office that any contracts awarded under emergency provisions or direct awards should include transparency declarations.
Amendment 7, in clause 45, page 31, line 6, at end insert—
“(aa) permit the award of a public contract to a supplier that does not guarantee the payment of at least the Real Living Wage to all its own employees and contracted staff and those of any sub-contractors.”
See explanatory statement to Amendment 4.
Government amendments 24 to 30.
Amendment 61, in clause 58, page 40, line 38, leave out paragraph (c).
This amendment would remove provision allowing a contracting authority to have regard to commitments to prevent circumstances giving rise to the application of an exclusion ground from occurring again when considering whether a supplier should be excluded.
Amendment 62, page 40, line 41, leave out paragraph (e).
This amendment would remove provision allowing a contracting authority to have regard to evidence, explanations or factors not specified elsewhere in the clause when considering whether a supplier should be excluded.
Amendment 63, page 41, line 8, leave out subsection (3).
This amendment removes clause 58 (3), which limits the ability of a contracting authority to require whatever evidence is necessary to make their assessment about whether a supplier is reliable.
Government amendments 31 to 50.
Amendment 17, in clause 68, page 49, line 15, at end insert—
“(10A) Within a year of the passage of this Act, the Secretary of State must prepare, publish and lay before Parliament a report on the effectiveness of this section in ensuring prompt payment of small and medium-sized enterprises.
(10B) Not later than 6 months after the report has been laid before Parliament, a Minister of the Crown must make a motion in the House of Commons in relation to the report.”
This amendment would require the Government to report to Parliament on the effectiveness of this section in ensuring prompt payment of SMEs.
Amendment 68, in clause 71, page 51, line 11, at end insert—
“(6A) When a planned procurement notice is published under section 15 or a tender notice is published under section 21, the contracting authority must include a statement of the outcomes which the contract is intended to achieve.
(6B) The contracting authority must commission an independent evaluation of whether each contract delivered the outcomes mentioned in subsection (6A), unless the contract is excluded by regulations under subsection (6D).
(6C) An evaluation under subsection (6B) must—
(a) be performed by an independent body in accordance with UK Government Evaluation Standards, and include a clear recommendation on whether similar further public contracts should be begun, renewed or extended;
(b) be commissioned in time to be completed within six months of contract termination, renewal or extension;
(c) be published in full by the contracting authority immediately it is received from the independent external body.
(6D) The Secretary of State may by regulations specify types of contracts that do not require independent evaluations under subsection (6B).
(6E) Where the independent evaluation under subsection (6B) recommends that similar public contracts should not be begun, extended or renewed, any contracting authority which nonetheless intends to do so must publish its reasons not less than 30 days before the agreement is begun, extended or renewed.”
Government amendments 51 to 55.
Amendment 13, page 78, line 12, leave out clause 119.
Amendment 8, in clause 122, page 82, line 5, at end insert—
“‘Real Living Wage’ means the hourly wage rates for London and for outside London calculated annually by the Resolution Foundation and overseen by the Living Wage Commission (or their successor bodies);”.
This amendment inserts a definition of the Real Living Wage for the purposes of Amendments 4 to 7.
Government amendment 56.
Amendment 64, in schedule 6, page 106, line 7, at end insert
“or an offence under section 86, 88 or 92 of the Money Laundering, Terrorist Financing and Transfer of Funds (Information on the Payer) Regulations 2017.”
This amendment is intended to ensure that the full range of criminal offences for money laundering are properly captured for the purposes of exclusion from public procurement.
Amendment 65, page 106, line 12, leave out “or 6” and insert ”, 6 or 7”.
This amendment includes the failure of commercial organisations to prevent bribery as an offence which is a mandatory exclusion ground.
Amendment 66, page 106, line 14, at end insert—
18A An offence under Schedule 3 of the Anti-Terrorism, Crime and Security Act 2001 (sanctions evasion offences).”
This amendment is intended to make criminal offences for sanctions evasion grounds for mandatory exclusion from public procurement.
Government amendment 57.
Amendment 15, page 110, line 12, at end insert—
“National security
42A A mandatory exclusion ground applies to a supplier if a decision-maker determines that the supplier or a connected person poses a threat to the national security of the United Kingdom.”
This amendment would move national security from among the discretionary exclusion grounds in Schedule 7 to the mandatory exclusion grounds in Schedule 6.
Government amendment 58.
Amendment 18, in schedule 7, page 113, line 2, at end insert—
“1A A discretionary exclusion ground applies to a supplier if a contracting authority determines that a supplier, within a year leading to the date of tender—
(a) has been found by an employment tribunal or court to have significantly breached the rights of an employee or worker engaged or formerly engaged by it with one or more aggravating features, or has admitted to doing so; and
(b) has not conformed with applicable obligations in the fields of environmental, social and labour law established by national law, collective agreements or international environmental, social and labour law provisions; and
(c) has not taken steps to rectify the situation through—
(i) paying or undertaking to pay compensation in respect of any damage caused by the breach of rights; and
(ii) clarifying the facts and circumstances in a comprehensive manner by actively collaborating with any relevant employment tribunal or court process and the parties thereto; and
(iii) taking concrete technical, organisational and personnel measures appropriate to prevent further breaches of rights of a similar kind.
1B In making a decision on whether a discretionary exclusion ground applies to a supplier under paragraph 1A, a contracting authority must—
(a) evaluate the adequacy of any action taken by the supplier in accordance with sub-paragraph (c) of that paragraph, taking into account the gravity and particular circumstances of the breach or breaches of rights, and
(b) make reasonable provision for the employer and the employee or worker concerned to make representations, which may be made by agreement by a trade association or trade union.”
This amendment would give contracting authorities the discretion to exclude suppliers who have significantly and repeatedly breached the rights of staff in the last year unless they have “self-cleansed”.
Amendment 67, page 113, line 17, at end insert—
“Financial and economic misconduct
3A A discretionary exclusion ground applies to a supplier if the decision-maker considers that there is sufficient evidence that the supplier or a connected person has engaged in conduct (whether in or outside the United Kingdom) constituting (or that would, if it occurred in the United Kingdom, constitute) any of the following offences—
(a) an offence under section 327, 328 or 329 of the Proceeds of Crime Act 2002 (money laundering offences);
(b) an offence under section 86, 88 or 92 of the Money Laundering, Terrorist Financing and Transfer of Funds (Information on the Payer) Regulations 2017;
(c) an offence under Schedule 3 to the Anti-terrorism, Crime and Security Act 2001 (sanctions evasion offences);
(d) an offence under section 2, 3, 4, 6 or 7 of the Fraud Act 2006 (fraud offences);
(e) an offence under section 993 of the Companies Act 2006 (fraudulent trading);
(f) an offence under section 1, 2, 6 or 7 of the Bribery Act 2010 (bribery offences).”
This amendment is intended to allow relevant Ministers and Contracting Authorities the power to exclude suppliers from procurement where they have evidence of financial and economic criminal activity, such as fraud, money laundering, bribery or sanctions evasion, but there has not yet been a conviction by a court.
Amendment 16, page 116, line 6, at end insert—
“Sanctions offences
14A(1) A discretionary exclusion ground applies to a supplier if the decision-maker considers that the supplier or a connected person has engaged in conduct constituting—
(a) An offence established in any regulations made under Part 1 of the Sanctions and Anti-Money Laundering Act 2018;
(b) An offence established under Part 5 of the Customs and Excise Management Act 1979.
(2) A discretionary exclusion ground applies to a supplier if the decision-maker considers that there is sufficient evidence that the supplier or a connected person has engaged in conduct outside of the United Kingdom that could result in such an offence being committed if that conduct occurred in the United Kingdom.”
This amendment would create a discretionary exclusion ground where a supplier (or connected person) has violated UK sanctions or export controls, or would have done so if they were in the UK.
Amendment 3, page 116, line 10, at end insert—
“Involvement in forced organ harvesting
14A(1) A discretionary exclusion ground applies to a supplier if a decision-maker determines that the supplier or a connected person has been, or is, involved in—
(a) forced organ harvesting,
(b) unethical activities relating to human tissue, including anything which involves the commission of an offence under sections 32 (prohibition of commercial dealings in human material for transplantation), 32A (offences under section 32 committed outside UK) or 33 (restriction on transplants involving a live donor) of the Human Tissue Act 2004, or under sections 20 (prohibition of commercial dealings in parts of a human body for transplantation) or 20A (offences under section 20 committed outside UK) of the Human Tissue (Scotland) Act 2006, or
(c) dealing in any device or equipment or services relating to conduct mentioned in paragraphs (a) or (b).
(2) “Forced organ harvesting” means killing a person without their consent so that their organs may be removed and transplanted into another person.”
This amendment is designed to give a discretionary power to exclude suppliers from being awarded a public contract who have participated in forced organ harvesting or unethical activities relating to human tissue, including where they are involved in providing a service or goods relating to such activities.
Government amendment 59.
It is a genuine honour to take the Procurement Bill through Report stage. As the House will know, this is a major piece of post-Brexit legislation that enables us, for the first time in many decades, to reform our procurement system, to the benefit of contracting authorities, suppliers and taxpayers.
I begin with new clause 15 and amendment 52. We are inserting into the Bill a new clause that allows us to meet the UK’s international obligations on record keeping. We are strengthening record keeping obligations in the Bill to more fully reflect our obligations in both the agreement on Government procurement—the GPA—and the comprehensive and progressive agreement for trans-Pacific partnership. They both require records to be kept for a minimum of three years. New clause 15 sets out the obligation on contracting authorities to
“keep such records as the authority considers sufficient to explain a material decision made for the purpose of awarding or entering into a public contract.”
A material decision is one that requires a contracting authority
“to publish or provide a notice, document or other information in relation to the decision”,
or decisions, that are required to be made under the Bill. Records must be kept for three years from award of, or entry into, a contract—or, if the contract is awarded but not entered into, from the date of the decision not to enter into it.
The primary goal of the Bill is to streamline procurement regulations and ensure the overall efficiency of the system, while avoiding overwhelming businesses and contracting authorities with a multitude of rules and regulations—a point that we will no doubt return to this afternoon. As such, and in line with international requirements, the obligations attach only to the award of, and entry into, contracts; they do not apply to the management stage of a contract.
Information on the management of major contracts will of course be put into the public domain, thanks to the Bill’s considerable transparency obligations. That includes information on key performance indicators, such as performance against them; information on amendments to contracts; and information on contract termination, which will require reporting on performance. The time limit already in the Bill on the duty to maintain records of communications with suppliers is being relocated to sit alongside the new record keeping duty. The record keeping requirement is intended to act as a minimum; contracting authorities may of course keep records for longer, and indeed may be required to do so under other legislation.
Government amendments 24 and 25 change the point at which, under clause 52(1), contracting authorities are required to publish key performance indicators. They will no longer have to do so before entering into a public contract. Instead, there will be a requirement to publish them under proposed new subsection (2A) of clause 52. Clause 53, on contract details notices, provides that the details of KPIs will be specified in regulations under clause 95. That is because it is not possible to publish the KPIs before entering into the public contract, as they arise as part of the process of entering into the contract.
Government amendments 19, 20 and 56 make a necessary technical adjustment to ensure that the City of London Corporation is caught by the Bill in respect of its public sector functions, but not its commercial functions. The Bill is intended to apply to local authorities—clause 2 makes it clear that publicly funded bodies are caught by it—but due to its evolution and structure, the corporation does not operate solely as a local authority. It has significant private sector trading activities—for example, it operates private schools and undertakes property management—that are clearly not intended to be caught by the Bill. Unlike district and county councils, being a local authority is not the corporation’s raison d’être; rather, it has some local authority functions bolted on to its wider organisational functions. Without the amendments to clause 2 and schedule 2, there would be a risk of unintended consequences; the Bill would apply to either all the corporation’s activities, including its commercial activities, or none of them, depending on whether the corporation’s balance of income was derived mainly from its trading activities or from public funds in any one year.
Government amendments 21 to 23 resolve a drafting inconsistency between clause 19, which governs the award of contracts following a competitive procedure, and clause 43, which has rules allowing a contracting authority to switch to direct award if no suitable tender was received in a competition. Under clause 19, a tender may be disregarded in a competition if it breaches a procedural requirement set by the contracting authority—for example, if it is submitted late or is over its word count. Abnormally low tenders can also be disregarded, provided the tenderer has advance notification and the chance to respond, pursuant to subsections (4) and (5).
The changes proposed to clause 43 will ensure that only a material breach of procedural requirements will render a tender unsuitable: for example, being 10 words over the set count should not result in an unsuitable tender permitting direct award. Abnormally low tenders cannot be deemed unsuitable unless the supplier has had an opportunity to demonstrate that it will be able to perform the contract for the price offered, as is required under clause 19.
Moving on to amendment 59, paragraph 2(3) of schedule 10 inserts new section 14(5A) into the Defence Reform Act 2014. The DRA, and the Single Source Contract Regulations 2014 made under it, make provision for the pricing of defence contracts to procure goods, works and services that are not let competitively and meet the necessary criteria, including a financial threshold. New section 14(5A) is being introduced to address uncertainty about when an agreement for new goods, works and services should be regarded as an amendment to an existing contract within the scope of the DRA regime, and when it should be regarded as a new contract in its own right. The proposed new subsection currently addresses the situation by identifying two specific categories of existing contract not subject to the DRA regime that, when amended on a non-competed basis to add further goods, works or services, would become subject to that regime.
A third such category of contract not currently addressed by proposed section 14(5) has subsequently come to light. That category covers a single source contract that was below the financial threshold set by the SSCRs that is subsequently amended to add new goods, works and services that take it above that threshold. Amendment 59 will ensure that such contracts are brought within the regulation-making power. A hypothetical example would be a contract that was let competitively for £6 million a few years ago and was not subject to the regulations, where proposed section 14(5) and section 14(3)(b) —which excludes contracts let through competitions—did not apply, and a single source amendment was subsequently placed a few years later for £10 million of new work. That kind of amendment is referred to in section 14(5), and under the proposed new regulations, it would be treated as a new contract for the purposes of the regulations. Under the current wording of schedule 10, the agreement covering the new work would fall under the regulations.
Amendments 38, 32, 36, 37, 39 to 51, 57 and 58 significantly strengthen the exclusions and debarment provisions for exclusion on national security grounds. As the Bill stands, placing a supplier on the debarment list on national security grounds will make it excludable from all contracts within the scope of the Bill. That means that the supplier will be identified as posing a threat to the national security of the UK, but contracting authorities will have discretion as to whether they exclude the supplier in each particular procurement. Having engaged with colleagues in the House and reflected on their concerns, I can confirm that the Government are content to further strengthen those provisions. The new amendments will enable a Minister of the Crown to take a stronger approach in response to a specific risk profile of a particular supplier and make targeted decisions about whether the debarment should be mandatory for particular types of contracts, depending on the nature of the risk.
I thank the Minister for the work he has been doing on the Bill, and for listening to colleagues—there is more work to be done, but we are certainly moving in the right direction. There is an issue about dual use stuff: we are talking about national security, but for technology such as cellular modules in Government cars that may or may not be being used by competitor nations to listen in to conversations, it is not just a narrow definition that we should be worried about, but a rather more expansive definition of some of the risks posed by that technology and where it is placed in either very specific national security contexts or, more broadly, among things that are critical to our national infrastructure.
I thank my hon. Friend for his remarks, and for the constructive dialogue that we have had while preparing for today’s debate. As he hopefully knows from what we have already said on this subject—he will hear it again in what I am about to say—the structure that we are putting in place will be able to make exactly that sort of assessment.
If a supplier poses an unacceptable risk in relation to certain goods, such as network communications equipment, the Minister will be able to enter on the debarment list that that supplier is an excluded supplier for contracts for the supply or support of that type of equipment, but that will not necessarily mean that the supplier will be excluded from all other types of contract. Similarly, the entry may also—or as an alternative—stipulate that the supplier is excluded from contracts relating to certain locations or sites, or contracts let by certain contracting authorities. That removes discretion from contracting authorities regarding exclusions where a supplier poses a threat for particular contracts, thereby reducing the risk of a supplier being allowed to participate in a procurement when they should not be.
By allowing this type of targeted and proportionate approach, we can direct that suppliers must be excluded where the risks are unacceptable, and allow contracting authorities to make appropriate choices where a risk is manageable—for example, if a supplier is providing pencils or plastic furniture. We think that approach to national security exclusions is both proportionate and robust, and will allow us to effectively counter the risk posed by some suppliers, including those that many in this House are concerned about.
The Minister has said that he wants a proportionate response and I take that point. I also thank him for the talks we have had about this issue, which is the basis of my support for new clause 1. However, one thing he has not yet addressed is the timescale. Clearly, a lot of kit that we would regard as suspicious under the Bill needs to be removed. Can he give some indication of what sort of timescale we will need to remove it?
I thank my right hon. Friend for the constructive conversations that we have had in getting ready for today’s debate. He is slightly pre-empting some remarks that I will come to later. I hope that he saw the announcement that the Government made the other day. It is in the nature of the work that we are doing that, first, we wish to remove devices and components that pose a security risk to sensitive sites—I will say more about the timescale for that later. Secondly, we intend through the use of the unit and the provisions in the Bill to prevent similar devices and components from entering our sites in future. It is a two-part process: first, get rid of what is already there and, secondly, prevent other such services from coming in in future.
The Minister has mentioned sensitive sites. I do not quite understand what that phrase means—I am hoping that we will get a proper explanation in due course—but what I would observe is that, as far as I can see, every single Government site is by nature and definition sensitive. The Department for Work and Pensions is very sensitive because any disruption of its payments would render the UK in a terrible state. Is it not the case that all Departments of central Government are by nature sensitive sites and, therefore, should take upon themselves the reality that they must all rid themselves of these things?
My right hon. Friend makes a good point, and I thank him for his constructive engagement with me and the Minister for the Cabinet Office on this issue. We understand and hear his concerns about sensitive and non-sensitive sites—not least, we understand his view that the definition could incorporate a broader range of assets, where information gleaned on the movement of officials and politicians could be detrimental to our national security. We will continue to work on that issue with him, both in today’s debate and in the Lords debate that will follow it. I am sure that we can reach a sensible conclusion that will be to his satisfaction.
If I remember correctly, in January, the security services took apart a UK Government vehicle because data was being transferred via a Chinese cellular module, a Chinese eSIM. We do not know who was in that car—whether it was the Defence Secretary or the Prime Minister. Evidence from a separate Tesla car scandal suggests that it would be possible for Chinese engineers to record private conversations using cellular modules. Just out of curiosity—I suspect I know the answer—are we ever going to get an update on what happened to that car and what was happening with it?
My hon. Friend will know that I am not in a position to comment on matters of national security, but he will have heard me say in answer to my right hon. Friend the Member for Chingford and Woodford Green (Sir Iain Duncan Smith) that we understand the view that the definition in the Bill could incorporate a broader range of assets, where information is gleaned on the movement of officials and politicians that could be detrimental to national security.
Amendment 34 will commit a Minister of the Crown to keep suppliers under review for potential investigation for debarment on national security grounds. We recognise that proactive consideration of suppliers will be highly advantageous in minimising the risk of suppliers who pose a threat to our national security being awarded public contracts. The amendment will therefore commit Ministers to proactively consider a new debarment investigation where there is evidence of risk, so that the Government can act effectively and on time.
I am also pleased to announce that the Government will be creating a new specialist unit with dedicated resources within the Cabinet Office to take on and manage this new approach. That new national security unit for procurement will regularly monitor Government supply chains and review pertinent information to determine which suppliers should be investigated for debarment on national security grounds. The unit will be able to draw on the full range of expertise within government and access the latest intelligence, including that from Five Eyes partners. It will be able to respond swiftly to emerging threats. The unit will also carry out investigations of suppliers for potential debarment, which will be overseen by a committee. Following the outcome of an investigation, the committee will make recommendations to the Minister as to whether the supplier should be added to the debarment list. The final decision will be made by the Minister.
The Minister is making an excellent speech and I agree with the broad thrust of everything he is saying, but in terms of the practical application—how we debar businesses and organisations bidding in through a procurement process—can he just tell us how long an investigation would take? I realise it would be a case-by-case process, but if a procurement tender is put out, and a business or entity bids into it, how long would it expect that investigation to go on before that business or entity is debarred or not?
My hon. Friend will know that is a length of a piece of string question. In setting up the unit and providing it with resource, we are mindful of the need for it to be able to respond swiftly to emerging threats and to new entities. The unit will not serve its purpose if investigations go on too long. I cannot give him any guarantees on maximum length of time for investigation, but I can assure him that those concerns are very much in our thoughts as we go about establishing this new way of working.
The new unit will also have a role in supporting and upskilling contracting authorities. By directly engaging with them and providing guidance, the unit will help contracting authorities confidently implement the national security exclusion and debarment regime correctly, maximising its effectiveness.
Amendments 26, 27, 29, 30, 31, 33, 35, 38, 53, 54 and 55 are minor and technical amendments to ensure that the exclusions and debarment regimes can function effectively.
I take this opportunity to thank all colleagues who have engaged with us on this, including my hon. Friend the Member for Rutland and Melton (Alicia Kearns), who is not in her place today. She has been instrumental in helping us to formulate these ideas in regard to national security and in particular our commitment to the national security unit for procurement.
The Government are taking national security extremely seriously, as the Bill and the amendments just mentioned make clear. Concerns have been expressed in the House regarding the use of surveillance equipment provided by entities subject to the national intelligence law of the People’s Republic of China, the risks of which we fully understand. I take this opportunity to remind the House that, in November, the Government published a written ministerial statement asking Departments to consider the removal of visual surveillance equipment from Government sensitive sites and to cease any future procurement of such equipment.
Today, we are going further. I commit to this House that, within six months of the Bill’s Royal Assent, the Government will set out the timeline for the removal of surveillance equipment supplied by companies subject to the national intelligence law of China from sensitive sites. I make it clear that we are taking firm and decisive action on this important matter and that we will be held to account for that action. That is why we will provide a clear plan for delivering on it, adhering to the timeline requested by my right hon. Friend the Member for Chingford and Woodford Green. I hope that addresses his and other Members’ wishes that the Government take appropriate action.
If I may, I will address two final points. First, I thank each of the devolved Administrations for their constructive engagement during the drafting and passage of the Bill. I am pleased that the Senedd and the Scottish Parliament have agreed to the procurement aspects of the Bill, which are the vast majority of the clauses. However, despite our best efforts and several amendments, we have been unable to secure full legislative consent motions for the concurrent powers in the Bill relating to the implementation of international obligations. That is disappointing, but not unexpected, given that it is consistent with the position taken by the Scottish and Welsh Governments on the recent Trade (Australia and New Zealand) Act 2023.
I reassure the House that, as with current practice, we will continue to engage and consult with the devolved Administrations if they choose not to legislate for themselves in implementing the UK’s international obligations, in so far as they relate to areas of devolved competence. In the absence of a Northern Ireland Executive, a legislative consent motion for Northern Ireland was not possible. However, the permanent secretary for the Northern Ireland Department of Finance has written to the permanent secretary of the Cabinet Office to welcome the Bill as drafted and the close working relationship that has developed between officials.
Secondly, I take the opportunity to clarify the rules for private utilities where they have been directly awarded rights, for example, through a directly awarded contract at the request of the Department for Transport. Private utilities are within the scope of the Bill only where they have been granted a special or exclusive right to carry out a utility activity, effectively creating a monopoly situation. Clause 6(4) clarifies that the right is not special or exclusive where the right is granted following a competitive tendering procedure under the Bill or otherwise on the basis of a transparent procedure and non-discriminatory criteria. That has the effect, for example, that, if a contract for a utility activity with an incumbent supplier is renewed or replaced without competition, the supplier will have been granted a special or exclusive right. The supplier would therefore be classed as a private utility under the Bill. An example would be where an incumbent train operating company awarded a contract following competition has been directly awarded a new contract under DFT legislation.
Three years ago, in the aftermath of the covid-19 pandemic, vital frontline staff across our NHS were struggling against dangerously low stocks of personal protective equipment. We all heard the stories of frontline workers in the early stages of the pandemic. These stories show us the impact of not procuring adequate reserves for a pandemic such as covid-19, and they show us why we need the right culture to rapidly respond to emergency procurement demands whenever they may show. Sadly, what we saw during the pandemic did not live up to standards. What followed, with the horror stories of frontline workers in the early stages of 2020, was a case study in wasteful and inefficient emergency procurement.
In January, the National Audit Office found that nearly £15 billion was wasted on unused covid supplies. That is £15 billion that could be going towards tens of thousands of full-time nursery places. It is £15 billion that could be going towards clearing the backlog in our NHS. It is £15 billion that could hand every single person in this country £220 and still have change left over. Instead, the incompetence we saw from this Government cost this country a fortune. In fact, the Government’s record keeping was so flawed that the Public Accounts Committee’s July 2022 report on the awarding of contracts to Randox during the pandemic stated it was
“impossible to have confidence that all its contracts with Randox were awarded properly.”
It is not just incompetence that costs the country. During the pandemic, the Government created a VIP lane for those offering to provide PPE. The system was extremely useful for some suppliers, with the Public Accounts Committee finding that one in 10 suppliers coming through the high-priority lane were awarded a contract. That compares with just one in 100 for the ordinary lane. The Cabinet Office and the Department of Health and Social Care also accepted that leads that went through the high-priority lane were handled better. Who was in that lane?
In the Public Account Committee’s report on PPE procurement, it stated
“The British Medical Association and the Royal College of Nursing told us that their organisations did not have access to the high-priority lane, even though they were being contacted by, and therefore would have been able to put forward, credible leads based on the knowledge of their members. The British Medical Association also noted that suppliers which had contacted them, including suppliers trusted by doctors, tried the normal channels of reaching out to the Government but had ‘hit a brick wall’. Care England told us that it had similarly shared the details of potential suppliers but there had been no follow-through.”
Instead, those with contacts with Government Ministers and officials, MPs and Members of the House of Lords were given access to this VIP lane. That included PPE Medpro, a company set up only a few days before but—surprise, surprise—with links to a Tory politician, which was awarded more than £200 million of public money. In total, £3.4 billion of taxpayers’ money in the form of contracts went to Conservative donors and friends. At a time when we were asking people up and down the country to come outside and clap, the Tory Government were giving cash to their donors. The Bill must be used to ensure that that never happens again.
It is a pleasure to wrap up a very interesting Report stage on this landmark piece of post-Brexit legislation that will allow our country to rewrite its procurement rules for the first time in decades.
It is a pleasure to follow the hon. Member for Aberdeen North (Kirsty Blackman), who had interesting reflections on the Bill. One could be forgiven for being able to listen to her remarks and not understand that the SNP has absented Scotland from the legislation. That is a great shame, and I believe that deep down she recognises the potential of the legislation. As the years go by, and small and medium-sized enterprises, and other businesses and contracting authorities in England, Wales and Northern Ireland benefit from the new regime, we will take pleasure in reminding businesses and contracting authorities in Scotland that it was the SNP that chose to keep Scotland out of it.
I touched on new clause 1, tabled by my right hon. Friend the Member for Chingford and Woodford Green (Sir Iain Duncan Smith), in my opening remarks. I am grateful for his saying that he will not push the new clause to a vote today. In return, I am pleased to reaffirm what I said earlier: we are happy to talk to him and other colleagues who are concerned about the definition of “sensitive”, to ensure that it captures the issues about which he is concerned. We do not consider “sensitive” to attach itself just to sites of military significance or intelligence centres controlled by the agencies. It goes further, and we will take his points away regarding ministerial movements.
May I be clear? On the question I was asking, and have been asking, the Government have moved, particularly in reference to the national security laws of China, but my key point is that the Government should consider that all Departments fall into that category. There should not be any “B” definition. It would be far better if everybody were incorporated into that definition by the time the Bill got to the other place. Supplication would then have to be made for a variation or change, which the Cabinet Office will make a decision about. Start with the power; then let them come and ask for it to be changed. That is the way to do it.
I thank my right hon. Friend for his comments. He will have heard me say earlier that we understand his views that “sensitive” could incorporate a broader range of assets, where information gleaned on the movement of officials and politicians could be detrimental to our national security.
I reaffirm our commitment to make a statement in the House within six months of Royal Assent, setting out the timeline for the removal from sensitive sites of surveillance equipment supplied by companies subject to the national intelligence law of China. I state again my gratitude to my right hon. Friend for his important work in this area and for the constructive dialogue that we have had with colleagues on the matter.
Amendment 3, tabled by the hon. Member for St Helens South and Whiston (Ms Rimmer), introduces a new ground for the exclusion of suppliers involved in forced organ harvesting. The amendment replicates an amendment made to the Bill in the other House, and subsequently removed by Committee of this House. I reassure her that the Government are not turning a blind eye to the extraordinarily important subject that she raises and highlights consistently.
We are in full agreement that complicity in the abuses associated with the overseas organ trade must not be tolerated. The Government have taken action to address that issue on a number of fronts. The Health and Care Act 2022 prohibits commercial organ tourism. I know the hon. Lady was involved in discussions leading to those provisions being included in the Act. The Government continue to monitor and review evidence relating to reports of forced organ harvesting in China, and maintain a dialogue with leading NGOs and international partners on that very important issue. I reassure her that forced organ harvesting is already covered by the exclusion grounds for professional misconduct. These grounds cover serious breaches of all ethical and professional standards—whether mandatory or not—that apply to different industries and sectors. The mandatory grounds in relation to corporate manslaughter and human trafficking are also relevant in this context. We have sought to limit the grounds—particularly those which, like this one, require an assessment of factual circumstances by the contracting authority—to those where there is a major and particular risk to public procurement. We are not aware of any evidence that a supplier to the UK public sector has been involved in forced organ harvesting, but I want to reassure the hon. Lady that the Bill will be able to deal with this horrendous practice appropriately.
I just want to make sure that the Minister has not forgotten my new clause 12.
I absolutely have not, and I am very much looking forward to getting to it after I gone through the intervening amendments. I appreciate the hon. Lady’s enthusiasm.
The mandatory grounds for exclusion cover the types of misconduct that raise only the most serious risks for contracting authorities. We have strengthened the mandatory grounds significantly in comparison with the EU regime, but they cannot and should not cover every offence that could raise a risk to contracting authorities. However, I can offer reassurance that the offences in question could justify discretionary exclusion on the ground of professional misconduct. This means that contracting authorities would have the flexibility to consider excluding the supplier, but could also factor in the nature of the contract being tendered and other relevant considerations in exercising their discretion.
Amendment 67 seeks to add a discretionary exclusion ground where there is evidence of financial and economic crime activity but there has not been any conviction of the listed offences. These concerns would already be caught by the ground of professional misconduct, which permits contracting authorities to weigh up the available evidence in the context of their procurement and use their discretion in determining whether an exclusion would be appropriate.
New clause 9, tabled by the hon. Member for Richmond Park (Sarah Olney), revisits the issues we discussed in Committee on the application of this Bill to certain healthcare services. New Clause 9 would insert a new clause 119 that would amend the Health and Care Act 2022, effectively deleting the power that enables the Department of Health and Social Care to make bespoke procurement regulations for the purposes of certain healthcare services, known as the provider selection regime. Amendment 13 deletes the existing clause 119 that provides a Minister of the Crown with a power to disapply the Bill to enable the provider selection regime regulations to be applied to those healthcare services.
The combined effect of these two amendments would be to stop the Department of Health and Social Care making separate procurement rules for certain healthcare services, and make the Procurement Bill apply to all healthcare services instead. As was discussed in Committee, the idiosyncrasies of healthcare delivery necessitate some special rules. The decision to create a free-standing scheme of healthcare-specific rules was taken in 2021 to give the NHS the tools required to deliver more joined-up patient pathways through the health system and to avoid some of the problems of double regulation of both the existing healthcare rules and the standard procurement rules. Significant effort has been expended and invested in consulting on and developing that free-standing scheme over several years now. All sides of the marketplace, including commissioners and providers in the healthcare industry, are expecting this new scheme to be delivered promptly to meet the policy aspirations that they have been so extensively consulted upon.
The Procurement Bill does not address any special measures tailored to support the healthcare reform made by the Health and Care Act 2022, as these measures have always been intended to be provided for in the new provider selection regime regulations. For example, the provider selection regime would permit direct awards to be made in defined circumstances, such as critical A&E services, that cannot be disrupted or when a certain provider is required to play a pivotal role in an integrated healthcare system. It would be incredibly unhelpful for both schemes at this critical stage, when both these healthcare regulations and the Procurement Bill are on the cusp of delivery, to start attempting to unpick it all now. Doing so would add unacceptable and entirely avoidable costs and delays to both programmes, for no tangible benefit. It would also mean more NHS contracts being subject to the rules of the Procurement Bill without due consideration of the exemptions and specific arrangements required to safeguard sustainable and joined-up delivery of NHS services to patients.
Of course Parliament will have its rightful opportunity to scrutinise the provider selection regime regulations, but it cannot be right to do this through the Procurement Bill for the purpose of killing off a near-ready scheme that supports important healthcare reforms that have already been debated and agreed by Parliament in the Health and Care Act.
Amendment 14, also tabled by the hon. Member for Richmond Park, would explicitly name the NHS in the definition of a contracting authority, a matter also discussed in Committee. Although I understand and entirely agree with the view that NHS bodies should be contracting authorities within the scope of this legislation, there is no need for any amendment in this respect, as the Bill already applies to NHS bodies in its current form.
New Clause 10, tabled by the hon. Member for Vauxhall, would require the submission of a tax report where a bidder is a multinational supplier. The tax reports of winning bidders would then be published. I understand that the aim of this amendment is to encourage contracting authorities to favour suppliers that can demonstrate responsible tax conduct. However, hon. Members will know that the basis on which contracts must be awarded under the Bill is by reference to award criteria that relate to the contract being tendered, not to other matters such as where a supplier pays tax. This is the right principle to deliver value for money for the taxpayer. Crucially, it is also a feature of the UK’s international obligations under the World Trade Organisation’s Government procurement agreement. Of course, the Government expect businesses to take all necessary steps to comply with their tax obligations. It is for His Majesty’s Revenue and Customs to enforce the law on tax, and indeed UK-based multinational enterprises are required to make an annual country-by-country report to HMRC.
Turning to amendment 2, tabled by the right hon. Member for Ashton-under-Lyne (Angela Rayner), we consider that the Bill already has the balance right in terms of achieving greater transparency on direct award. Indeed, save for the small subset of user-choice contracts, it will now be mandatory to publish a transparency notice declaring an intention to award a contract in every case. This will include confirmation of the contracting authority having undertaken a conflicts assessment prior to signature of the contract.
In addition, the Bill also requires the conflicts position to be kept under review and to be revised at key points in the procurement, which will be confirmed via the contract details notice, after the contract is signed. This further ensures contracting authorities comply with ongoing statutory requirements contained in the Bill. Of course, we are all aware that MPs and peers are already required to register their interests, and civil servants are required to confirm annually that their declarations of interest are up to date. Furthermore, the Bill includes an additional safeguard in clause 83(4) so that where
“a contracting authority is aware of circumstances that…are likely to cause a reasonable person to…believe there to be a conflict”
these must also be addressed. We take these matters very seriously, and there is no need for additional provision to cover this issue. We will continue to work with contracting authorities to show that they know the requirements around conflicts of interest and that they are implemented effectively.
On new clause 12, I welcome the ongoing efforts of the hon. Member for Oldham East and Saddleworth (Debbie Abrahams) to improve liquidity for small businesses, including by advocating for and championing the increased use of project bank accounts. We recognise the energy and enthusiasm she brings to that campaign.
As I said in Committee, project bank accounts are most often an effective way to ensure fair payment and to protect suppliers, and they are already the Government’s preferred vehicle for construction contracts where it is cost-effective and cost-efficient. Government Departments have made a commitment to use PBAs in construction projects unless there are compelling reasons not to do so. However, it is not the Government’s position that PBAs should be mandated across all contracting authorities, as they are not always suitable or cost-effective, particularly where the subcontractor is very small or is paid more frequently than monthly, or where the supply chain is short. Instead, we intend to continue educating contracting authorities, through guidance, on the circumstances in which we believe PBAs are practical and effective.
I remind the Minister that new clause 12 covers contracts worth over £2 million, so it is not for all contracts.
I accept the hon. Lady’s point, but there are other circumstances to consider, which I have just outlined.
We are already working with industry to discourage the withholding of retentions by supporting zero retention for high-quality work pilot projects and reducing the default rate of retentions within certain types of contract to zero. However, we do not support dictating the operation of construction contracts to the degree proposed.
I beg to move, That the Bill be now read the Third time.
I stand here today proud of the progress we have made to deliver an important manifesto commitment. The Procurement Bill constitutes a vital piece of legislation following our exit from the European Union, which allows us to set our own rules that will work best for the UK. I am delighted to say that we will sweep away bureaucratic regulations and broaden opportunity to small businesses right across the country.
One in every £3 of public money, some £300 billion a year, is spent on public procurement. For too long, modern and innovative approaches to public procurement have been bogged down in bureaucracy. We are changing that. The Bill simplifies our public procurement rules, cutting down the 350 different procurement regulations to create a single rulebook. This will create a more efficient, innovative and friendly procurement system, increasing value for money and opening up public contracts to small businesses, in turn supporting the Prime Minister’s commitment to grow the economy.
I keep promising my colleagues that I will be brief, but I will always give way to the hon. Lady.
The Minister is being very generous with his time. He will not be surprised by my question. I was a little disappointed that my new clause 12, on introducing and mandating project bank accounts, was disregarded. I mentioned the estimate that 6,000 small construction firms will go into insolvency this year. What is the Department’s analysis of how that might be prevented by project bank accounts?
I am sure I could try to produce a one-hour solution, or I could be more direct with the hon. Lady. I know she has raised this issue on numerous occasions, but she and I have not spoken about it one-on-one. If she wishes to speak to me about it, we could have a meeting, if that would help. I might learn something from it or I might be able to inform the hon. Lady, but if she wishes to do that, I will make certain that we have that opportunity.
On that point, will my right hon. Friend give way?
Construction businesses are terribly important. If the Government could do something about the ban on building, for example because of pollution in the River Wye, then those construction businesses would find new opportunities and would flourish.
My hon. Friend is vociferous on the issue of the River Wye. He never misses an opportunity and has proved his dexterousness yet again, in doing so in this debate.
We, on the Government Benches, are proud to be the party of small business. I am delighted that, as part of this Bill, authorities will now have to have regard to small and medium-sized enterprises and the barriers that they face.
Finally, the Bill will put in place a new exclusions framework that will help to make it easier to reject bids from suppliers whose performance on previous contracts has been unacceptable, or who have been involved in serious wrongdoing, such as fraud, collusion or modern slavery. Crucially, on Report, we introduced a package of vital amendments that will protect our national security and ensure that public contracts do not go to suppliers who pose a risk to our country.
We will also create the national security unit for procurement, which will proactively investigate suppliers for national security threats, and we will publish, within six months of the passing of the Bill, a timeline for the removal of all the surveillance equipment provided by suppliers subject to the national intelligence law of China from sensitive Government sites, protecting places that are most vulnerable to sinister interference and espionage. Together, these changes constitute robust protections against the ever increasing national security threats.
I would like to take this opportunity to thank all hon. Members across the House for the quality of the debates and the scrutiny provided throughout the passage of the Bill. I am indebted to my hon. Friends and to those across the House for the helpful engagement and the comments they have made, which have undoubtedly refined this crucial piece of legislation.
I am particularly grateful to my hon. Friend the Member for Brentwood and Ongar (Alex Burghart) for his excellent work on Committee and on Report in this House, and to Baroness Neville-Rolfe for her tireless work in the other place. The Bill has had a long progression, so I would also like to thank our predecessors, Lord Agnew and my right hon. Friend the Member for North East Somerset (Sir Jacob Rees-Mogg), for their work on the Bill in its earlier stages.
I thank the officials who have worked on this Bill, particularly the Bill manager, Katrina Gayevska, Sam Rowbury, Ed Green, Janet Lewis and other officials who worked on this legislation, as well as the staff in the private offices of all the Ministers in the Cabinet Office, for their support and help throughout.
When he entered office, the Prime Minister said that he would deliver on the manifesto on which we were elected. I am proud today to be doing just that, and I wholeheartedly commend the Bill to the House.
I call the Deputy Leader of the Opposition.
I start where the right hon. Member for Horsham (Jeremy Quin) left off, by saying thank you to all right hon. and hon. Members who have spoken today, in particular my hon. Friend the Member for Vauxhall (Florence Eshalomi) for her contributions throughout the stages of the Bill. I also thank the brilliant Clerks and the House staff, and everyone who has been involved and on hand to support every step of the Bill.
It has been a long and complex process, and I know the Cabinet Office has been very busy in recent weeks, so I welcome the opportunity to debate something of more substance today. Unfortunately, the substance of the Bill, while necessary, is a little bit of tinkering around the edges of a broken system. I understand the need for a new Procurement Bill, to consolidate the patchwork of former EU rules and to bring the spaghetti of procurement regulations into one place, but it seems this distracted Government are more concerned with the civil war than writing good legislation.
Britain faces huge economic challenges—challenges made worse by years of economic incompetence, a disastrous kamikaze Budget and a Government on the side of vested interests. Wages have flatlined, prosperity has turned to stagnation and Britain has the highest forecast inflation in the G7. Procurement is one of the biggest and most effective tools available to Government to drive up standards across the economy and create world-class, affordable and effective public services.
As the Minister said in his response, we are talking about £300 billion of public money a year, a third of public spending and more than the NHS budget. What we should be debating this evening is a bold new set of rules to direct investment to the places that need it most. We should be discussing how we can clear the pipes and flush out the system with transparency after years of cronyism and waste. We should be debating legislation that pumps money back into the pockets of local communities, creates decent jobs and skills in our towns and cities, and hands wealth back to the people who built Britain.
Instead, what we have before us today is a damp squib. This Bill fails to close the loopholes that saw obscene waste of taxpayers’ money through the VIP lane, it fails to mandate social value to secure investment in good British business, and it fails to create robust protections for workers. Labour recognises the need for a new procurement Bill, and for that reason we will not oppose this one, but surely we can do better than this.
This evening the Government chose to vote against a Labour amendment that would have blocked VIP lanes, for the third time. They have had three opportunities to show that they have learnt from the waste and the cronyism that we saw during the pandemic, and on all three occasions they have refused. In fact, loopholes included in this Bill will make it easier for Ministers to bypass existing transparency rules. The Tory VIP lane is at the heart of why we need a procurement Bill. It exposed the true weaknesses in the system and showed us why we desperately need a more agile and transparent procurement system.
It is a bit late in our proceedings, but I really would encourage the right hon. Lady to read the Bill, even at this late stage.
I think the Minister knows full well that I have read the Bill, and it is a real shame that in the conversations that my hon. Friend the Member for Vauxhall and I have had with him and his team, they have refused to help stop this loophole. The Tory cronyism on the VIP lane is still there in this legislation. The VIP lane enabled a shameful waste of taxpayers’ money and profiteering by unfit and unqualified providers, and as a result the Government have written off £10 billion of public funds spent on personal protective equipment that was unusable, overpriced or undelivered.
While I welcome the moves in the Bill to issue “transparency notices” before awarding a contract, these are just baby steps; they barely scratch the surface. We must see end-to-end transparency. And it is not just me who thinks that. The amendment that the Government voted down today is a proposal by the National Audit Office, a totally independent body calling for the Government to end their murky practices that saw taxpayers’ money wasted at eye-watering rates.
This Bill also gave us an opportunity to reimagine the way we spend public money in order to promote decent work across the economy, to reward businesses that treat their workers right, and to use procurement to raise the floor on working conditions for all. Any suppliers given taxpayers’ money should provide their workers with decent pay, respect, dignity and fairness, as well as access to a trade union. Economies across the world expect that from their employers. In France, Germany and the Netherlands, for example, more collective bargaining, stronger workers’ rights and a fair share of wealth lead to higher growth, productivity and staff retention. President Biden’s Government direct investment to companies with a track record of treating their workers with respect, so why can’t we?
But over the last 13 years, the Tories have failed to use the levers of government to drive up standards for working people. In fact, things have got worse. I am disappointed but not surprised that the Government today voted down our amendment, which would have held suppliers to account when they repeatedly abuse workers’ rights. Taxpayers do not expect their money to be handed to suppliers with a track record like that. They want to see their money going to suppliers who pay their staff properly and who uphold fair conditions, job security and union access. That is the bare minimum.
I also want to take this moment to welcome the Government’s last-minute amendments on national security. I could not help but recognise some of those amendments. I would also like to pay tribute to the hon. Member for Rutland and Melton (Alicia Kearns), whom I worked closely with to highlight the need for change in managing the risk in procurement. I welcome the Minister’s recognition that the current system leaves the door open for foreign threats to enter our supply chain and for taxpayers’ money to be spent with no oversight on whether they are properly vetted. That said, I hope the Minister can tell us what criteria his Government will use to identify suppliers who pose a risk to national security, and I hope he will consider the inclusion of cyber-security criteria in that assessment.
In closing, I would like to once again thank all hon. and right hon. Members for their contributions today. While procurement might seem a dry topic, it is absolutely central to the way that our country works, and when Ministers abuse the procurement system, it is taxpayers who suffer. As we saw during the pandemic, the VIP lane for PPE contracts was a scandal of epic proportions that allowed the shameful waste of taxpayers’ money and inexcusable profiteering, yet instead of learning the lessons of this failure, this evening Ministers voted for a third time to protect the loophole that allows the VIP lanes to exist. The Government have a duty to learn the lessons from the pandemic and, quite frankly, Ministers have abdicated that duty here today. While the Tories are too distracted to govern, Labour in power would flush cronyism out of the system and protect taxpayers, to ensure that every pound is spent in the national interest.
Question put and agreed to.
Bill accordingly read the Third time and passed, with amendments.
Energy Bill [Lords]: Ways and Means
Resolved,
That, for the purposes of any Act resulting from the Energy Bill [Lords], it is expedient to authorise—
(1) the imposition, by virtue of the Act, of charges or payments under licences issued under the Gas Act 1986;
(2) the making of provision under the Act requiring electricity suppliers to make payments, or to provide financial collateral, to the Secretary of State;
(3) the making of provision under the Act in relation to income tax, corporation tax, capital gains tax, stamp duty, stamp duty reserve tax, stamp duty land tax or value added tax in connection with a transfer of property, rights or liabilities by a scheme under the Act.—(Andrew Bowie.)
Electronic Trade Documents Bill [Lords]: Second Reading
Motion made, and Question put forthwith (Standing Order Nos. 59(3) and 90(5)), That the Bill be now read a Second time.
Question agreed to.
Bill accordingly read a Second time; to stand committed to a Public Bill Committee (Standing Order No. 63).
Electronic Trade Documents Bill [Lords] Committee
Ordered,
That the Electronic Trade Documents Bill [Lords] Committee shall have leave to sit twice on the first day on which it shall meet.—(Robert Largan.)