Question to the Department for Transport:
To ask the Secretary of State for Transport, what steps she is taking to support (a) South Western Railway and (b) Network Rail in improving the West of England mainline to prevent soil moisture deficits impacting rail journeys on that route.
The Department is in regular discussion with South Western Railway and Network Rail on the monitoring of conditions on the West of England Line to ensure services are restored as soon as it is safe to do so. Once soil moisture levels improve and the ground begins to rehydrate and settle, engineers will carry out lasting repairs to stabilise the embankments and restore track levels, allowing the normal timetable to return.
Network Rail have plans for regional weather resilience and climate change adaptation, with £2.8 billion set aside at a national level in Control Period 7. We will work closely with Network Rail Wessex to ensure appropriate action is taken on the West of England line to minimise the risk of soil moisture deficit in future.