Question to the Ministry of Defence:
To ask the Secretary of State for Defence, what the status is of the (a) modification and (b) integration processes for the second and third E-7 Wedgetail aircraft.
The modification of the second and third E-7 Wedgetail aircraft continues.
The second Multi-role Electronically Scanned Array (MESA) radar is fitted to aircraft two and the third MESA is on site and scheduled to be fitted in June 2025.