Boeing E-7: Repairs and Maintenance

(asked on 30th April 2025) - View Source

Question to the Ministry of Defence:

To ask the Secretary of State for Defence, what the status is of the (a) modification and (b) integration processes for the second and third E-7 Wedgetail aircraft.


Answered by
Maria Eagle Portrait
Maria Eagle
Minister of State (Ministry of Defence)
This question was answered on 7th May 2025

The modification of the second and third E-7 Wedgetail aircraft continues.

The second Multi-role Electronically Scanned Array (MESA) radar is fitted to aircraft two and the third MESA is on site and scheduled to be fitted in June 2025.

Reticulating Splines