To ask the Secretary of State for Transport, what steps she plans to take to reduce the time within which utility companies conducting roadworks must ensure that roads are permanently repaired to six months.


Answered by
Lilian Greenwood Portrait
Lilian Greenwood
Parliamentary Under-Secretary (Department for Transport)
This question was answered on 7th April 2025

Utility companies can put temporary reinstatements in place following works to re-open roads to traffic whilst, for example, waiting for specialist materials which may be specified by local authorities such as a particular type of paving stone. Permanent reinstatements must be put in place within 6 months. The DfT has no plans to change these arrangements.