Question to the Ministry of Defence:

To ask the Secretary of State for Defence, if he will make an assessment of the adequacy of (a) crew accommodation and (b) crewing levels in the Fleet Solid Support Ships contract following the principal contractor’s completion of the Preliminary Design Review stage.


Answered by
Maria Eagle Portrait
Maria Eagle
Minister of State (Ministry of Defence)
This question was answered on 29th October 2024

Navantia UK, the prime contractor for the Fleet Solid Support (FSS) ship programme, is responsible for delivering the Design and Manufacture contract. The successful completion of the Preliminary Design Review marks the first major milestone in the programme and confirms the robustness and maturity of the ship’s design.

The Ministry of Defence (MOD) including representatives from the Royal Fleet Auxiliary (RFA) are well engaged with Navantia and the British designer of the ship, BMT, to monitor the progress of all aspects of the programme. This includes the RFA’s accommodation requirements, which are designed to a standard that is fully consistent with our expectations and is compliant where practicable with Merchant shipping regulations. The FSS design meets this intent, in order to improve the living conditions for our RFA seafarers.

Crewing levels are based on a detailed analysis of the MOD’s requirements. The core RFA crew is expected to be around 100 in number with additional military augmentees and specialists embarked for specific tasks and roles. As the design matures the MOD, working with the contractor, test the ship design and equipment selection criteria against this headmark, to ensure that the ship can be safely operated and maintained.