Renewable Energy Providers: Planning Considerations

Selaine Saxby Excerpts
Wednesday 25th October 2023

(1 year ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Selaine Saxby Portrait Selaine Saxby (North Devon) (Con)
- Hansard - -

It is a pleasure to serve under your chairmanship, Ms McDonagh. I congratulate my hon. Friend the Member for Stroud (Siobhan Baillie) on securing this important debate.

I have a specific project that I wish to speak about today. I established and chair the all-party parliamentary group for the Celtic sea, and I have championed floating offshore wind, or FLOW, projects across the Celtic sea, working collaboratively with developers, ports, MPs and associated businesses right around the Devon, Cornwall and south Wales coast. I therefore find myself in a particularly difficult position, as are my constituents, on the proposed White Cross wind farm in my North Devon constituency. This project is 80 MW, so it is only a demonstrator project, and it has secured a distribution-level grid connection at Yelland. Given its scale, it has avoided being a national infrastructure project, and decisions about its development now lie with the Marine Management Organisation, which is under the Department for Environment, Food and Rural Affairs, and the local planning authority.

The local community is hugely supportive of FLOW. Although there are some environmental concerns about the six proposed turbines, it is the cable corridor that is proving highly controversial. I have been expressing my concerns about the proposed cable route ever since the project came to light. The route submitted to the planning authority involves tunnelling through several miles of sand dunes, a large seaside car park, holiday chalets, a golf course and possibly a world war two munitions dump, and it will take several years to construct. The quickest route to the plug-in point at Yelland is across Crow Point, a very active sand system and highly designated sand dune complex. Although that route is potentially more environmentally contested, it would cause far less damage to hospitality businesses in a constituency that is dependent on its tourism economy. No one has been able to explain to me who decided on the cable corridor, and both the MMO and the local authority advise that they have no influence and cannot comment on whether a better corridor might exist.

White Cross is owned by Flotation Energy, which has recently been taken over by the Japanese company TEPCO. As somebody in the industry observed last night:

“Their website is a disgrace. There is no contact details for anyone within the company. Just a generic reply section. Very poor and unacceptable. They are taking advantage of the consenting regime because they are under 100 MW. Compared to the work done on other projects it is a joke.”

Other developers have fallen over themselves to engage with the APPG, which works cross-party and cross-Government, but not White Cross. I would like to put on the record my wish to meet TEPCO, and for it to explain why it is bulldozing its project through our community.

One of the objectives of the APPG for the Celtic sea has been to co-ordinate a more strategic approach to this new region of offshore renewables, to avoid some of the cable issues seen on the east coast. The APPG’s preference throughout has been to establish a single cable corridor to Devon and Cornwall, and one to south Wales, in order to reduce sea floor damage, as well as cabling onshore as the bigger projects go out to sea. The project, which is ready to bid for a contract, will connect to Pembroke, and I know that the cable corridor there has been well managed, and that landowners have been fully consulted. Local landowners are being threatened with compulsory purchase orders, and businesses were not consulted or advised until the planning application was submitted. Councillors are completely at sea when it comes to dealing with this type of planning application.

Additionally, the project is now taking up almost the entire time of one planning officer, in an area where planning is the biggest factor slowing down commercial development and the building of the homes we so desperately need. I hear that the planning department apparently does not have any planning grounds to reject the application. Any support that the Minister’s team can provide to the council and councillors on planning would be most welcome.

I have spoken with the MMO and it also does not believe it that it has grounds to reject the application, or the ability to challenge it. It appears that the developer has been able to choose a cable route of their suiting, without any agreement with the local community or the bodies that provide the planning and leasing.

My concerns are multiple. There are only two potential grid plug-ins along the north Devon coast, and these are vital national infrastructure resources at this time—Yelland and Alverdiscott. My understanding is that Yelland is smaller, but I have been unable to speak to National Grid ahead of today to clarify whether the White Cross development will completely utilise the capacity at Yelland. The concern is that it will not.

My view, and that of many in my constituency, is this: if we have to endure this level of disruption to get a cable corridor installed on land, does the development maximise the potential of the Yelland socket? There is growing concern that the developers have chosen a scale that avoids being classed as a national infrastructure project and the scrutiny that would come with it. That may mean that the socket is not optimised.

I have asked White Cross why it could not work with the other projects in the region and consider Alverdiscott for its cable. I was advised that it is too far and therefore too expensive. If a strategic view of cable corridors was taken, the costs might be reduced, but I do not believe that this has even been considered.

I recognise that Alverdiscott has had concerns about the situation it finds itself in as a hub for plugging in huge renewable projects. It is vital that communities that are asked to host this sort of infrastructure are properly compensated. White Cross does not seem to have offered any community reimbursement, as recommended in the report by the electricity networks commissioner, Nick Winser.

Wera Hobhouse Portrait Wera Hobhouse
- Hansard - - - Excerpts

The hon. Lady is making a powerful speech, and I agree with a lot of what she is saying. As she is talking about compensation, will she explain what compensation would be adequate?

Selaine Saxby Portrait Selaine Saxby
- Hansard - -

I thank the hon. Lady for her intervention. Please do not think that this is a nimby issue. North Devon is home to the Fullabrook wind farm, which, when it was built, was the largest onshore wind farm in the country, at 66 MW. The project established Fullabrook CIC—community interest company—which was set up with £1 million from the then owners of the wind farm. It has now given over £1.58 million for community projects and receives £100,000 per annum from the current owners. I find it bewildering that White Cross has seemingly made no offer of community involvement. Indeed, its only offer is to decimate huge sections of coastline for its own financial gain.

I am gravely concerned that White Cross is not acting in any way appropriately with this development, and is taking advantage of the planning system, which it has chosen to use. I strongly believe that the entire Celtic sea FLOW project should be considered as one national infrastructure project. That would enable proper strategic planning and ensure that we hit our offshore wind targets, and that communities are included in decisions and appropriately recompensed for hosting infrastructure.

It is increasingly possible that the development will undermine all the support for FLOW that has been generated along this coastline. Hundreds of objections have been lodged, and further meetings are planned by local parishes in the coming weeks. It seems that the developers have carte blanche. As someone who is hugely supportive of the renewable opportunities ahead of us—as is my constituency—I ask that steps are taken to find a way through this cross-departmental maze to have this development withdrawn in its current form; that a better plan for the cabling is devised; that the Yelland socket is optimised, if used; and that the community across North Devon are properly consulted and recompensed for hosting this infrastructure.

With energy security so critical, alongside reaching net zero, surely we can devise a better way to install just six wind turbines, so that we can progress more quickly with these crucial infrastructure projects, with community support and transparency.

--- Later in debate ---
John Hayes Portrait Sir John Hayes
- Hansard - - - Excerpts

Denying “our goal”, “our God”—I believe it is the hon. Lady’s God, certainly. She is right that it is important that what we do in respect of energy, which I spend a great deal more time thinking about than she ever has, needs to reflect a balance. Everyone who understands energy provision knows that renewables can and should be an important part of an energy mix. Yet they are not nirvana for all kinds of reasons—we need the flexibility provided by the kinds of energy provision that can be switched on and off, in a way that solar and wind cannot—but it is vital that we invest in renewable technology.

That is why, for example, I have been a passionate supporter of offshore wind, which is a very effective way of generating energy in a way that does less harm to the environment than onshore wind, which the hon. Lady champions. That essentially means littering the countryside with small numbers of turbines, which are much less productive, much less concentrated and with countless connections to the grid. That greatly increases transmission and distribution costs, which already represent 15% of every energy bill. It is both economically foolish and environmentally damaging to site wind turbines in presumably thousands of locations across the country, when we can concentrate large numbers of much larger turbines offshore, producing much more energy, with a single point of connection to the grid.

There is a similar situation with solar. I imagine that the hon. Member for Bath will know, as others may, that in Germany a much higher proportion of solar power is located on buildings. In this country, our record is very poor, and I say to my hon. Friend the Minister that I would be interested to know what further steps he intends to take to incentivise, indeed oblige, adding solar panels to buildings. Warehouses are springing up all over the country, but I do not see a solar panel on any of them. There are large numbers of industrial sites, commercial sites and all kinds of other places where we could have solar panels.

Selaine Saxby Portrait Selaine Saxby
- Hansard - -

My right hon. Friend is making an excellent speech. As someone who represents a hugely rural community, I would like to ask this about solar panels. Does he agree that farmers need to be farming, that we face a food security crisis and that we need our land to be productive for food, and that rooftops are indeed the right place to put solar panels?

John Hayes Portrait Sir John Hayes
- Hansard - - - Excerpts

Absolutely. That brings me to—I do not know whether my hon. Friend anticipated this by a kind of telepathy or just through her wisdom—the next point that I intended to make. Recent worldwide events have taught us of the need for national economic resilience. We are moving to a post-liberal age—thankfully—when we will no longer take the view that we can buy whatever we want from wherever we want and it does not matter how much is produced locally or how far supply lines are extended.

We know that domestic production and manufacture of goods and food is vital for our resilience and security; in order to have that, we need to preserve the best agricultural land to grow the crops that we need. If people were really worried about the environment, they would have thought these things through a little more fully and so understand that shortening supply lines reduces the number of air miles and, indeed, road miles between where food is made and where it is consumed—as we once did—rather than extending supply lines endlessly, with the immense cost to the environment and in every other way. We need more domestic production, but to have more domestic production we must recognise that there should be no industrial solar or wind developments on grade 1, 2 or 3 agricultural land, yet that is exactly what is proposed.