Fire Safety Bill (Second sitting) Debate

Full Debate: Read Full Debate
Department: Home Office
The strategy behind fire safety in this country—the stay put policy for tall buildings, which is now itself coming into question—depends on compartmentalisation and on fire being contained within a small area of a block. If there is the opportunity for it to spread, because fire doors do not work, windows have combustible surrounds, or the fire can penetrate elsewhere, we immediately undermine the whole principle. That is the reason for amendment 2.
Sarah Jones Portrait Sarah Jones (Croydon Central) (Lab)
- Hansard - -

Let me start by saying that the Opposition support the Bill. We are here to be constructive. Although clearly we wish that things had gone faster and that we had been able to do more, we support the Bill and want to make it the best that it can be. On Second Reading there was agreement across the House on what needs to be done to fix some of the problems with the legislation. Amendment 2 relates to one of those problems, which has been raised by many of the organisations that have submitted written evidence.

I associate myself with everything said by my hon. Friend the Member for Hammersmith, who is an expert in this area. He is absolutely right that we need to ensure right at the outset that we include parts of the building not currently listed in the Bill.

Amendment 2 would do what amendment 1 would do, but in a slightly different way. As the explanatory statement states, the amendment would make the Regulatory Reform (Fire Safety) Order 2005 apply

“to all parts of a building that contains two or more dwellings, other than those dwellings themselves,”

Not just the

“parts that come within the meaning of structure, external walls or common parts.”

I had a long conversation with the London Fire Brigade about how we define “common parts”. Introducing that term without a definition alongside the definition of “domestic premises” in article 2 of the fire safety order could lead to confusion about what it means and could add an additional layer of complexity to what is already quite a difficult landscape.

In the past, “common parts” has been used to refer to entrance halls, corridors or stairways in a block of flats, but it does not necessarily cover areas such as lift motor rooms, service risers, roof voids and other potentially high-risk areas, as well as fire safety facilities that are inside individual dwellings but used in common for the protection of the entire premises, such as sprinklers and detection systems.

This is not a new issue. Following the Lakanal House fire, the coroner recommended that there be clear guidance on the definition of “common parts” in buildings containing multiple domestic premises. Dame Judith Hackitt has also recommended that the assignment of responsibilities in blocks of flats be clarified.

The purpose of the Bill, as we discussed this morning and as my hon. Friend the Member for Hammersmith has already mentioned, is to provide clarity on what is covered under the law. Without really clear definitions, there will be new questions of interpretation, and we will not achieve what we are setting out to achieve. There will be the potential for confusion and conflict.

Simply put, the absence of a clear definition creates opportunities for those who might try to game the system. We know that the system has not worked in the past, because people have been able to do things that nobody intended them to do. We want to make it crystal clear that the provisions cover all common parts of the building, and want to make it clear that “common parts” includes all the other spaces, such as lift motor rooms, that are not set out in the Bill.

David Simmonds Portrait David Simmonds (Ruislip, Northwood and Pinner) (Con)
- Hansard - - - Excerpts

I very much sympathise with the motivation behind the amendments, but I am unpersuaded by the argument. There is sometimes a risk of seeking to make very precise what in reality is not at all precise.

Following the Grenfell Tower disaster and the Lakanal House fire, the Local Government Association, working with local authorities across the country, commissioned a huge piece of work to try to understand the inherent risks in tall buildings, but also in other types of building in the public estate, and to learn lessons that might be relevant to the private sector.

I want to refer to a particular type of structure known as a Bison block, which is common in west London and found across my constituency, and which my local authority has spent a good amount of time examining. It is particularly relevant to amendment 2, which is seeking a very tight definition. The blocks were large panel system builds. They are quite common across the capital and in other parts of the country.

A great many of these blocks were extensively refurbished, particularly in the 1980s, because they are not especially attractive buildings and in the past there have been concerns about their structural integrity and safety. The refurbishment was undertaken by a process that we might understand as cladding. In this case, a brick skin was erected around the entire outside of the building. New windows were installed, and the structure now looks considerably more attractive than when it was first constructed.

To manage the risk of fire spreading in the cavity between the floor where a fire occurs and another floor, a steel band needs to be installed between each storey’s-worth of brick structure. It ensures that a fire that gets into that cavity cannot spread up or down. On examination following the Grenfell disaster, it was discovered that some of the window installations, for example, had been changed, which had had an impact on the integrity of the fire safety system. The banding had been constructed many years ago. The challenges of inspecting something that is inside a sealed brick structure, the natural dilapidations of time and the consequences of a small amount of heave or subsidence around the site would all have had an impact on it. That is a significant issue for those of us who are concerned about the safety of those high-rise towers.

I am concerned that the amendment, by seeking to be very precise, could open the door to our not including a number of the elements that we would see in a variety of structures around the country. I have heard the Minister speak about this before when questions have been asked of him. I am satisfied that one of the motivations behind the Government’s choice of wording was to make the definition sufficiently broad that all the issues were captured. To ensure that the definition relates to all the different, unique types of structure out there, many of which there may be little evidence of on the public record today, it may be wise not to narrow our definitions too much. We could end up with a lawyers’ bonanza of arguments about whether, for example, the provision covers the steel band structure for fire safety in a Bison block. For that reason, I am unpersuaded of the merits of the amendment.

--- Later in debate ---
Andy Slaughter Portrait Andy Slaughter
- Hansard - - - Excerpts

I will reply to two points. The first was made by the hon. Member for Ruislip, Northwood and Pinner, who has huge experience in this sphere, not least from his role in local government over the years. I disagree with his point because the example that he gave of modifications to the exterior of a building should be included in the Bill under that part of clause 1 that talks about external walls. I think that that is specifically envisaged to include not just external cladding but the whole external structure; it would therefore include voids and attempts that have been made through banding to restrict those voids.

Equally, I do not agree with what the Minister said. We all understand the point about private homes. It cannot be dismissed. We mentioned this morning the issue of leaseholders who provide their own front doors and how far that is considered, but there are other issues. There are issues to do with sprinkler systems and their installation in the homes of either leaseholders or tenants—assured or secure. This is not a black-and-white issue in terms of what goes into individual homes.

The amendment is a necessary or at least helpful addition to the Bill. Over a period of 30 or 40 years, a huge number of modifications will be made to buildings, even if, when a building was originally constructed, it was done in a secure way that would prevent the spread of fire and smoke. We know that this issue has been neglected, but it is so important that it should be reflected. However, given that the Minister has put it on the record that he believes that these matters will be dealt with, through the Bill and other measures that the Government are taking, I do not propose to press the amendment to a vote.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I thank the Minister for his response. He was basically saying that amendment 2 is unnecessary, which I would challenge, because the fire service has asked for the definition and thinks that it would be an important part of the Bill. I agree with the fire service, but I take the same approach as my hon. Friend the Member for Hammersmith and hope that these matters will be looked at as we go forward.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

Fundamentally, as my hon. Friend the Member for Ruislip, Northwood and Pinner says, we are concerned that the definitions in the amendments might have a narrowing effect. Detailed guidance offering definitions will come out as a consequence of the Bill, and obviously we will work with partners to ensure that we get that guidance right.

It is worth pointing out that this approach is consistent with that in the Housing Act 2004, which uses similarly broad definitions to ensure that the many and various varieties of housing in this country, some built over many hundreds of years, all fall within a generalised definition in guidance that is put in place later on.

Andy Slaughter Portrait Andy Slaughter
- Hansard - - - Excerpts

I beg to ask leave to withdraw the amendment.

Amendment, by leave, withdrawn.

Question proposed, That the clause stand part of the Bill.

Sarah Jones Portrait Sarah Jones
- Hansard - -

As the Minister said, we recently passed the three-year anniversary of the Grenfell Tower fire. I just want to mention the letter that we will all have received from Grenfell United last night. It was not able to give evidence before us today, but it welcomes the Bill and is pushing for it to have the funding that it needs and for it to apply to all buildings. It reminded us of the fire in Canning Tower, in east London, only last week, when 100 people were evacuated. It used to be covered with Grenfell-style cladding, but that was removed last year, just in the nick of time. As the letter says, there were not any serious consequences.

The importance of the Bill is not to be underestimated. Small though it is, it is incredibly important. We support the Bill and we support clause 1. It provides clarification, although it is a shame that we could not take it a bit further with our amendments. There are many issues that we would want to bring into the Bill, but because it is too small in scale, we cannot. They include electrical safety—people are keen for us to talk about that, and my hon. Friend the Member for Hammersmith mentioned it. We tried to have some of those issues included in the Bill, but they are not within its scope. There is a huge raft of issues beyond that of cladding—important as it is—that we must address, through the building safety Bill and subsequent measures.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

The hon. Lady is right to raise with me whether there is a need to address the issue of cabling and ducting in buildings. That was raised with me when I was Housing Minister, and I hope that I have explained that there will be opportunities to look at that quite soon, in more comprehensive measures to follow. For the moment, the Bill is a small, tight, technical one, which creates the foundational stone on which we will build an entirely new regulatory and fire safety regime, which must be coherent. We must therefore proceed step by step. I fully appreciate the comments that Members have made, and they will be fed into the next stage of our work, and the consultation, which will be issued next month.

Question put and agreed to.

Clause 1 accordingly ordered to stand part of the Bill.

Clause 2

Power to change premises to which the Fire Safety Order applies

Sarah Jones Portrait Sarah Jones
- Hansard - -

I beg to move amendment 3, in clause 2, page 1, line 21, at end insert—

‘(aa) for the purpose of changing or clarifying any of articles 2 to 22 or 38 of the Order’.

This amendment aims to ensure that the key articles of the Regulatory Reform (Fire Safety) Order 2005 can be amended to account for the Grenfell Tower Public Inquiry Phase 1 and subsequently the Phase 2 recommendations and changes that may be brought about by the forthcoming Building Safety Bill.

None Portrait The Chair
- Hansard -

With this it will be convenient to discuss the following:

Amendment 4, in clause 2, page 1, line 22, at end insert ‘or (aa)’.

See amendment 3.

Amendment 5, in clause 2, page 1, line 22, at end insert

‘(1A) The relevant authority may make regulations under subsection (1) for the purpose of aligning the Order with regulations which concern fire safety and which are made under any other power.’

This amendment seeks to ensure there is proper alignment between the Fire Safety Order and other regulations that relate to fire safety, including the upcoming Building Safety Bill.

Sarah Jones Portrait Sarah Jones
- Hansard - -

Amendments 3 and 4 would ensure that the key articles of the Regulatory Reform (Fire Safety) Order 2005 could be amended to account for the Grenfell Tower public inquiry phase 1 recommendations—and the phase 2 recommendations, although of course phase 2 has not happened yet—as well as any changes that may be brought about by the forthcoming building safety Bill. The issue was brought to our attention by the London Fire Brigade, and it makes a reasonable point.

Clause 2 provides for further changes to be made to the scope of the 2005 order, and clarification of its application. Our amendments would ensure that there was sufficient legal power, which could be relied on to respond to emerging evidence or events. It is important that we should not find that there are constraints in the future. The London Fire Brigade gave some examples of things that could be included. One was a legal mechanism for improvements to or replacement of the front doors of flats. Others were the installation of additional fire detection and warning systems, the retrospective fitting of fire safety measures in a building, and the adjustment or clarification of what an enforcing authority might need to be notified about.

As I have said and will keep saying, we welcome the Bill. We do not think it goes far enough, but want to make sure it does everything it sets out to do. We want to make sure that it is possible to make changes or additions to this cornerstone or foundation, as the Minister called it, including as a result of what comes from phase 2 of the Grenfell inquiry.

Amendment 5 would ensure that there was proper alignment between the 2005 order and other regulations on fire safety. The forthcoming building safety Bill, which we have talked about, will place requirements on accountable persons to ensure that buildings in occupation are safe.



This will include fire safety and will place enforcement responsibility with the new building safety regulator.

--- Later in debate ---
None Portrait The Chair
- Hansard -

We will see.

Sarah Jones Portrait Sarah Jones
- Hansard - -

We say the same things on both sides of the Committee, but we on the Opposition side want speedy action, and we have been frustrated by the delays. It would be reassuring if we could have some kind of timetable before the summer recess for when the building safety Bill will be introduced. There is a whole raft of other activities, and we do not know when they will be coming forward—and covid is no reason for these things not to come forward.

This morning, Matt Wrack asked where responsibility for some of these issues rests in Government, and I wonder whether the split between MHCLG and the Home Office compounds some of the problems with how these things fit together and work. The more information we have about the timetable, the better. It would be good if the Minister could take these matters away; I know officials are looking at how they will sit together. On that basis, I beg to ask leave to withdraw the amendment.

Amendment, by leave, withdrawn.

Question proposed, That the clause stand part of the Bill.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I will be brief. I want to make a point about finances and resources, and it seems fitting to mention that as we debate clause 2. We heard a lot of evidence this morning about the need for proper resourcing. We heard from L&Q about the extraordinary amount of money that it and its colleagues will have to spend in the housing association sector on removing cladding. Although the Government’s £1 billion fire safety fund is welcome, that will not be anywhere near enough.

As for enforcement of the legislation, the fire service has had significant cuts, as was outlined excellently in the Fire Brigades Union’s written evidence to the Committee, particularly around inspection, where we need to beef up the resources. We will need a lot more fire risk assessors. We will have to try to fund all that. There is a point to be made about what the Home Office has done about the cost, because the resources are not anywhere near enough. That is all I want to say, but it is a really important point that the Government will have to grapple with.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

I recognise Members’ impatience for us to get the measure through as quickly as possible and to put the new regime in place, not least because it will take time to bed in. There will be not only structural change, but cultural change in various parts of the building safety world. The Bill is a start. There will be a consultation shortly. The Bill will be scrutinised before the summer recess. There will be a flurry of activity. On the point made by the hon. Member for Croydon Central about coherence between Departments, as Housing Minister I recognise that issue, and she will be pleased to know that the old sparring partner of the hon. Member for Hammersmith—I am not sure he will be pleased—and former leader of the London Borough of Hammersmith and Fulham is now the joint Minister between the Home Office and the Ministry of Housing, Communities and Local Government. He has responsibility for fire, albeit in the Lords, which is why I am here today.

Question put and agreed to.

Clause 2 accordingly ordered to stand part of the Bill.

Clause 3

Extent, commencement and short title

Sarah Jones Portrait Sarah Jones
- Hansard - -

I beg to move amendment 6, in clause 3, page 2, line 25, after “may” insert “not”.

This amendment seeks to ensure that the Bill be brought into force at the same time for all buildings it will apply to, rather than adopting a staged approach that may make arbitrary distinctions between similar premises.

This amendment is slightly controversial, in that there are different ways to interpret it. It seeks to ensure that the Bill is brought into force at the same time for all the buildings that it will apply to, rather than us adopting a staged approach that may make arbitrary distinctions between similar premises. Some might have concerns about the amendment; the National Housing Federation—the only organisation that responded to all the amendments in writing, which is very impressive—is worried that if we bring everything into the scope of the Bill straight away, there will be a capacity issue. I understand that, but I will explain the thinking behind the amendment.

I have heard from several organisations that the Home Office was looking at perhaps bringing into scope buildings over 18 metres first, and then other types of buildings. The view put to me was that that is slightly arbitrary and not the best way to approach the issue. We heard this morning about the risk-based approach, which had its infancy and was undertaken excellently in my borough of Croydon, rather than people there saying, “We will do this set of buildings first and then this set of buildings.” People who knew what they were doing were trusted to look first at the areas that were most problematic.

--- Later in debate ---
Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

We acknowledge that clarification of the scope of the Regulatory Reform (Fire Safety) Order 2005 will represent operational change for many, particularly responsible persons, who, as the hon. Lady said, will need to update their fire risk assessments to include external walls and flat entrance doors. The Bill will also have an impact on the fire sector, fire risk assessors and other competent professionals, such as fire engineers, who are needed to assist the responsible person in complying with the order.

We acknowledge that there are capacity and capability issues, particularly in relation to assessing the risk for external walls. This is not just the Government speaking, but a number of organisations from the fire sector, local authorities and housing associations. The Government are committed to ensuring that we commence the Bill in a way that is workable across the system, while ensuring that swift action is taken to address the most significant fire safety risks.

That is why, as I mentioned this morning, we have established a task and finish group—co-chaired by the Fire Sector Federation and the National Fire Chiefs Council—that will be responsible for providing a recommendation on how the Bill should be commenced. The group will advise on the optimal way to meet the Bill’s objective of improving the identification assessment of fire risks in multi-occupied blocks and addressing them as soon as possible to ensure resident safety while also effectively managing any operational impact.

The task and finish group is made up of representatives from the early adopters group on building safety at the Ministry of Housing, Communities and Local Government; private sector developers; the fire sector; the NFCC; and a number of fire and rescue services. The group is expected to report no later than the end of September. It is tasked with providing a recommendation based on an assessment of the evidence and on their knowledge and expertise, which the hon. Member for Croydon Central said was preferable.

We expect that recommendation to address how the highest-risk buildings should be prioritised for assessment of the composition of, and risk associated with, their cladding systems. Ministers will consider the advice and make a final decision. The amendment would remove the ability to make regulations that enable the Bill’s provisions to be commenced on different days for different purposes. That is, it removes the possibility of using regulations to ensure a staged commencement. I make no comment on whether and how the commencement might be staged, but the Government will not prejudge the advice of the task and finish group, or support any restrictions on the ability of the Secretary of State and Welsh Ministers to make informed decisions about when and how regulations are made to commence the provisions in the Bill.

I am particularly conscious that this morning the hon. Lady raised the issue of individuals who might, because of a sudden commencement, find themselves in some kind of limbo, and be unable to undertake property transactions for many years, given the scale of what is required. Notwithstanding that risk is the primary concern, some of those issues will have to be taken into consideration. I hope that gives the Committee a suitable explanation as to why the amendment should be withdrawn.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I will withdraw the amendment on the basis that there will be a task and finish group, but I stress that we have had a lot of groups, conversations and consultations. In my previous role in housing, we had 60 consultations on leasehold reform, yet we still do not have leasehold reform. We need to push this forward. Having some sense of when the Bill will commence and how it will be implemented would be helpful. It would also be helpful to know the implementation date, because that is not set out in the Bill. There is a lot of uncertainty, and we are putting a lot of faith in the experts and in the Minister to get this done as quickly as possible, but I beg to ask leave to withdraw the amendment.

Amendment, by leave, withdrawn.

Question proposed, That the clause stand part of the Bill.

Sarah Jones Portrait Sarah Jones
- Hansard - -

Very briefly—although, we are now doing well for time—I want to reiterate the point about the Bill not having a date for when the new requirements will come into force, aside from what is implemented and when. The Bill allows the Secretary of State to choose a date that is considered appropriate, and that makes us uncomfortable. Again, we need to do this as quickly as possible, because these are literally matters of life and death. That is the biggest issue with the clause; other than that, I am happy.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

Thank you, Mr Streeter—Sir Gary. [Hon. Members: “Hear, hear.”] I apologise. Again, I acknowledge the impatience. It is worth remembering that the Bill is a technical clarification of a fire safety order that should be functioning well in the vast majority of circumstances. Although there are respectable views about disagreements on definition within the order, which is why we are seeking to clarify it, in the end there is still someone out there who has responsibility for safety in all these buildings. Although I recognise the impatience of the hon. Lady and other hon. Members to get it under way—we share their impatience—I would give that background.

The task and finish group should be reporting by the end of September. There will be more consultation legislation on the way. I realise that the hon. Lady is suffering a little from consultation fatigue. Nevertheless, these are complex issues dealing with effectively unravelling and reknitting a huge system of building safety regulation that has grown up over many decades and needs wholescale reform. It is therefore no surprise that if we want to get this right for the future and avoid any possibility of a future Grenfell, we need to ensure that we do the detailed work, which is what we are trying to do—hence this foundation stone today.

Question put and agreed to.

Clause 3 accordingly ordered to stand part of the Bill.

New Clause 1

Public register of fire risk assessments

“(1) The Secretary of State must, by regulations, make provision for a register of fire risk assessments made under article 9 (risk assessment) of the Regulatory Reform (Fire Safety) Order 2005 (SI 2005/1541).

(2) Those regulations must provide that the register is—

(a) publicly available; and

(b) kept up-to-date.

(3) Regulations under this section are—

(a) to be made by statutory instrument; and

(b) subject to annulment in pursuance of a resolution of either House of Parliament.”—(Daisy Cooper.)

This new clause would enable would-be renters and owners to check the fire safety status of their potential home, like the EPC register.

Brought up, and read the First time.

--- Later in debate ---
Daisy Cooper Portrait Daisy Cooper
- Hansard - - - Excerpts

New clauses 1 and 2, which stand in my name, are fairly self-explanatory. They both call for a public register: one for assessments, and the other for assessors. The Hackitt review said that risk assessments should not only be held by building owners, but be kept centrally with a public body such as a Government-appointed regulator. Chapter 4 of the Hackitt review refers to

“the need to rebuild public trust by creating a system where residents feel informed and included in discussions on safety, rather than a system where they are ‘done to’ by others… The interim report recommended that fire risk assessments should be carried out annually and shared in an accessible way with residents.”

For something as vital as fire safety, that information should be readily accessible to current and prospective residents of the building, both for public trust and for the sake of enforcement. Of course, the most accessible way to present such assessments is on a public register. If the Government are not minded to support new clause 1, I would welcome assurances that they intend to introduce such a public register at some point.

New clause 2 would create a public register for fire risk assessors. Of the two clauses that I have tabled, this is by far the more urgent. We heard shocking evidence this morning from the FBU that there are still people calling themselves fire assessors who are going out and conducting fire assessments without being qualified to do so. The witness gave the example of a member of the union who died in a building that had reportedly been assessed by one of these non-qualified fire assessors. We cannot wait for the public register of fire risk assessors; we need it now. The practice by those who are not qualified must stop.

In 2018 the London Fire Brigade raised the issue of assessor numbers. The Fire Safety Federation talked about fears that there were overwhelming demands for ESW1 surveys. It is clear that most mortgage companies now require the ESW1 certificate before lending. Feedback from my constituents, from management agencies and from local government indicates that there is a severe shortage of professionals across the country who are insured to sign off the new survey. A new public register would not only help to build trust, but show Government and industry how many fire assessors we need to train. From the questions we asked this morning, it was clear that the current number of assessors is between 400 and 50,000. Those were the numbers we were given, which is why it is so important that we have a public register and that we have it now.

My constituents have told me about delays of between 12 and 18 months in getting ESW1 surveys, putting their lives on hold and leaving them in constant fear of living in a dangerous home. That is made all the worse for my female constituents who are pregnant and living in such homes, as well as those who fear a loss of income as we head into a pandemic recession.

My final point is that there is a precedent for both these public registers. We have a register for homes, in the form of the energy performance certificate, which operates in the same way. EPC certificates are publicly available on a Ministry of Housing, Communities and Local Government website. There is a register for domestic energy assessors and for energy performance certificates, so there is a precedent for such registers to exist. It is a simple proposal that could be adopted in exactly the same way, but for fire safety, which, from a safety perspective, is far more vital.

Sarah Jones Portrait Sarah Jones
- Hansard - -

Thank you, Sir Gary—I did wonder whether that was the correct way to address you when you are in the Chair. I also forgot to say, “It is a pleasure to serve under your chairmanship.”

None Portrait The Chair
- Hansard -

It never is. [Laughter.]

Sarah Jones Portrait Sarah Jones
- Hansard - -

It is good to get these things right.

I welcome the two new clauses proposed by the hon. Member for St Albans, who speaks for the Liberal Democrats. We are coming from the same place and we all accept that having fire risk assessors who are not necessarily qualified in any way is completely unacceptable. We need to get to grips with that for many reasons, including those that she mentioned.

The register of fire risk assessments is slightly challenging because it would take a long time to get the assessments, to get it up and running and to get it done. That may be something for the future, but not now. Having a public register of fire risk assessors is a way of dealing with the problem. It is similar to our new clause 7, which is about having an accreditation system for fire risk assessors. That is probably one of the most important elements of our concern, and it was raised by Members on both sides of the House on Second Reading. I raised that concern in a conversation with the Minister and Lord Greenhalgh when I was first appointed, and I know that the Government are looking at it.

It is remarkable that there is currently no legal duty to have any kind of qualification before becoming a fire risk assessor. It could be argued that some parts of the role are relatively straightforward, such as checking whether there are obstructions in the way of fire exits. The Bill introduces the need for an understanding of the nature of cladding; what it is made of and how it works. There is absolutely no way someone could assess that without being qualified.

Concerns have been raised for many years about private sector involvement, lack of qualification and a “race to the bottom” mentality. The fact that anyone can set up as a fire risk assessor to assess schools or care homes cannot be defended.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

It is shocking.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I agree; it is shocking.

We have all seen examples, and one was given to us this morning. In 2017 an independent fire risk assessor was given a four-month jail sentence when a court described his assessment of a Cheshire care home as “woefully inadequate”. In the same year, a private hire safety consultant was found to have given valueless risk assessments to several businesses in south Wales, putting people at serious risk of death because of poor escape routes, a lack of fire alarms and insufficient precautions to reduce fire and the spread of fire. In 2012 a fire risk assessor in Nottingham was fined £15,000 after it was found that fire precautions in two hotels he assessed were inadequate, potentially putting hundreds of lives at risk. I suspect there is much inadequacy that we do not know about because it has not come to light.

Therefore, what do we do about this? We propose a fire risk assessor accreditation system. There are ways of easily mapping skill levels and the competence of individuals that are used across many sectors. We could look at those and work with the experts to find the right balance. For many years, the further education sector has used regulated qualifications to train the workforce. Vocational qualifications, which have been around for many years, have been the main way of demonstrating that an individual has met a certain standard. I spoke at length to the chief executive of the British Woodworking Federation, who sits on the Build UK WG2 competence of installers working group in Government, which is looking at some of these issues and mapping the competence of an installer following the Hackitt review. It is looking at third-party certification routes, continuous professional development and different things that would be possible. There are relatively straightforward options through the Health and Safety Executive, Ofqual—there are all sorts of ways to do this.

In anticipation that the Minister might not accept the new clause, I ask him to take this matter seriously and accept that there is a problem that we must do something about. I also ask him to see it in the round with what on earth happens if it takes a long period of time to try to build up workforce expertise, with people potentially living in buildings without the piece of paper that tells them they can get insurance and mortgages, as the hon. Member for St Albans said. This job must be done—whether it is done now is for the Minister to decide—and it must be done sooner rather than later, to avoid deaths in the future.

Andy Slaughter Portrait Andy Slaughter
- Hansard - - - Excerpts

I agree with these sensible new clauses, because they would remedy the defects identified by the FBU and others in how the system currently works, by professionalising it and taking it seriously. Having said that, they would create another requirement to be actioned by the Government. Whether the Government accept the new clauses or not, I am sure that they wish to see fire risk assessments and mediation carried out properly and efficiently.

We heard evidence this morning from the Fire Safety Federation and the head of fire safety at the L&Q Group about how the system is working—or not working—in practice. Whether the Minister accepts the requirements, we seriously need to address the current investigation process. I say this with no disrespect to the witnesses, but I was not filled with confidence by them saying that the processes of assessment must be looked at, with is done either through the enforcers, the owners and the Government coming together, or through everyone doing their own bit, because it is simply not working at the moment.

I gave the example, which I will briefly amplify, of a block of some 400-plus flats owned by Notting Hill Genesis, a big housing association in London, with which some issues to be resolved have been found. Those issues are not the most serious issues; there is some timber construction and some cladding on the building. Most of the building is constructed of brick. The effect was that the building perhaps did not have as high a priority as more dangerous structures. The effect of that has been to set out for all residents, including those leaseholders who have sold or are trying to sell their properties, a process that goes through six separate stages: initial survey, survey review, developer engagement, project planning, specification and tender, and remedial works. That process could take as little as 16 months or up to 42 months, and only at the end of it would an EWS1 form be issued. I thought that was bad enough, but we heard from the head of fire safety at L&Q that they expect it to be 10 years before all the buildings in London are dealt with.

That situation cannot be allowed to continue, so I ask the Minister to ensure, when he looks at the issues raised by the new clauses, that we have competent and professional assessment of risk, and proper processes to carry out those assessments. We must also look at the speed at which that work is done, because the Government have found it necessary during the covid crisis, and previously during the housing crisis, which we see particularly in London but which exists generally across the country, to intervene with measures that help people either to get on the housing ladder, to upscale or to move; there need to be different types of packages in that regard.

That is needed here and now. This matter cannot be left to the relationship between leaseholders or tenants and their landlords or owners at the end of the building process; it must be for the Government to address. Otherwise, in what is already an extremely depressed and fractured housing market, this situation will cause further delay and misery. It is not just a case of people being forced to stay in properties that they do not want to stay in—they want to move, perhaps because their family is growing, or because they want to take up a job in another part of the country. This situation is causing real financial and social distress. That may be an unintended consequence of what is designed to be an efficient process, but the process is simply not working at the moment.

--- Later in debate ---
My constituents, and many others around the country, are in a completely impossible position. They are struggling to, or cannot, extend their mortgage to pay this large one-off fee. However, they also cannot sell their flat without the EWS1 certificate. They feel trapped in an unsafe building, while having to try to find the funds to pay the escalating service charges that they simply cannot afford. That simply cannot be right.
Sarah Jones Portrait Sarah Jones
- Hansard - -

I want to put on record our support for the notion that leaseholders have been incredibly hard done by in recent years. They are championing their cause through incredibly powerful campaign groups, and we have heard over the past three years of the costs that have been put on them to remove cladding. It is extraordinary. In new clause 4, I try to ensure that they are not part of the definition of the responsible person in the legislation.

I agree with the premise of the new clause proposed by the hon. Member for St Albans, but having been the shadow housing Minister for three years, looking at the issues of leasehold and freehold and working with the Law Commission and with lawyers to try to unpick some of the legal issues, I think that it would be a challenging new clause to accept as it is, without significant compensation having to go to freeholders. I think the hon. Lady is probably right to describe it as being a blunt instrument, but I agree about the impossible position of leaseholders being faced with more costs when they are struggling so much.

Andy Slaughter Portrait Andy Slaughter
- Hansard - - - Excerpts

I applaud the hon. Member for St Albans for bringing the matter to the Committee’s attention, although the new clause may not quite be the way to deal with the issue in law. I say that because although Government have made funds available in a drip by drip way—it is quite a substantial amount of money, so perhaps drip by drip is the wrong phrase—it is an inadequate sum to deal with the necessary remediation.

The way in which the funding relating to ACM and other types of cladding has been announced to social landlords and then private landlords has not only created some degree of confusion, but meant that there are huge gaps in terms of accessibility to funds to leaseholders and freeholders for carrying out remediation work. Therefore, landlords—not the worst landlords, necessarily; in some ways, it could be the better ones—are seeking to deal with remediation works in relation to blocks that do not fall within the fairly restrictive criteria that the Government have set. They are saying, “Yes, we will remove cladding, or do other works, but it isn’t covered by the Government’s building funds at the moment. We will therefore look, with section 20 notices or in other ways, for leaseholders to carry the costs.”

We are right to draw attention to this point, and I hope that the Minister will respond to it. He has been reading out his ministerial brief, which is all to the good because we need to put it on the record, but it would be quite good for him to respond to some of the points spontaneously made by Opposition Members.

--- Later in debate ---
Daisy Cooper Portrait Daisy Cooper
- Hansard - - - Excerpts

I beg to ask leave to withdraw the motion.

Clause, by leave, withdrawn.

New Clause 4

Meaning of responsible person

“In article 3 of the Regulatory Reform (Fire Safety) Order 2005 (SI 2005/1541) (meaning of responsible person”), at the end of paragraph (b)(ii) insert—

‘(2) Where a building contains two or more sets of domestic premises, a leaseholder shall not be considered a responsible person unless they are also the owner or part owner of the freehold.’”—(Sarah Jones.)

This new clause aims to clarify the definition of ‘responsible person’ to ensure leaseholders are not considered a responsible person unless they are also the owner or part owner of the freehold.

Brought up, and read the First time.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I beg to move, That the clause be read a Second time.

None Portrait The Chair
- Hansard -

With this it will be convenient to discuss new clause 5—Single assessment of risk—

“In article 9 of the Regulatory Reform (Fire Safety) Order 2005 (SI 2005/1541) (risk assessment), after paragraph (3) insert—

‘(3A) Where a building contains two or more domestic premises, any person identified as a responsible person in relation to any part of the building must co-operate with other responsible persons to obtain a single assessment of risk relating to the building as a whole.’”

This new clause seeks to create a requirement that, where a building contains two or more domestic premises and there are multiple responsible persons, a fire risk assessment should be a single document in instances.

Sarah Jones Portrait Sarah Jones
- Hansard - -

New clause 4 also relates to leaseholders, and I think what it proposes is quite straightforward, easy to do and something that the Government could put on the face of the Bill relatively easily.

On Second Reading, the definition of a responsible person was raised again by Members from across the House. There were worries about the ambiguity of that definition, and about the risk that the responsible person might seek to use any such confusion or ambiguity to avoid their responsibilities under the Bill. There is a worry that leaseholders might be defined as the responsible person, which they are not unless leaseholders have collectively bought the freehold; that model is not used much, but it does exist. The point of this new clause is simply to ensure that unless that model exists—unless leaseholders have bought the freehold—leaseholders are not the responsible person. It is a relatively straightforward clause, and I cannot see that it would cause any problems.

I suspect that new clause 5 is a probing one, because there are many complex types of buildings, with different types of ownership within them. A block may well contain council housing, housing associations, leaseholders, and—although not part of the Bill—commercial premises within residential premises. All those different types of ownership within a block creates a complex situation when it comes to making the “responsible person” responsible for ensuring the safety assessment is done for the entire building. This clause is a question and challenge to the Government: how will the Bill work when we have all these levels of complexity, including commercial premises, different types of residential premises and different problems with access? This relates in part to some of the issues we were talking about this morning, such as getting access to domestic properties, but there are blocks in my constituency where half of the block is housing association, and half is a mix of all kinds of other private housing. We are worried about how that is going to work in real life when this legislation is introduced, so that is the point of new clause 5.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

The fire safety order places the onus on the responsible person to identify and mitigate fire risks. For the most part, it engages responsibility for fire safety in line with the extent of control over a premises or part of a premises. That is the underlying principle.

In multi-occupied residential buildings, the leaseholder of a flat is unlikely to be a responsible person for the non-domestic premises. The exceptions to this would be where they own or share ownership of the freehold, as is acknowledged in new clause 4. However, the leaseholder can be a duty holder under article 5 of the order. This will be determined according to the circumstances in any particular case. This Bill does not change that arrangement; it does, of course, clarify that the order applies to the flat entrance doors. Depending on the terms of a lease or tenancy agreement, responsibility to ensure the door complies with the requirements of the order could therefore fall to the responsible person for the building, having retained ownership of the doors, or the tenant or leaseholder as a duty holder. The lease can also be silent.

Legislating for the removal of the leaseholder as a responsible person, or indeed duty holder, would undermine the principles of the order. It could leave a vacuum when it comes to responsibilities under the order, and therefore compromise fire safety. However, as part of our intention to strengthen the fire safety order, we will test further some of the relevant current provisions of the order with regards to flat entrance doors in order to support compliance, co-operation and, if necessary, enforcement actions. The NFCC has offered to support these considerations; again, the fire safety consultation is the right place for us to take such matters further. The Government are committed to ensuring that sufficient guidance and support is given to those regulated by the order. That is why the Home Office, working alongside our stakeholders, has established a guidance steering group that will be responsible for recommending, co-ordinating and delivering a robust and effective review of all the guidance provided under the order.

--- Later in debate ---
The fire safety consultation will set out specific proposals to address those and other issues raised in the 2019 call for evidence, and it is of the utmost importance that the fire risk assessments provide robust and accurate assessments of the fire safety of a premises as a whole, regulated by the order. That is why we want to ensure that the steps we take are informed by the people they will impact, and that they can have a say on how best we can address the issues raised from the call for evidence. I will, however, ask officials to reflect on the comments that have been made this afternoon, and to ensure that they and any additional issues that have been raised are incorporated in the consultation. On that basis, I hope the new clause will be withdrawn.
Sarah Jones Portrait Sarah Jones
- Hansard - -

I feel like we are being beaten down with consultations, steering groups and promises of honey to come. I know it is complex and there a lot of questions to answer. The basic premise of new clause 4 is that, where there is a freeholder, the leaseholder should not be the responsible person. I know there are complexities with that: who is responsible for the front door, and how does it all work? That all needs to be ironed out, but there is a basic principle in the new clause. Given the Minister’s proposal to go back and talk to officials, however, I beg to ask leave to withdraw the motion.

Clause, by leave, withdrawn.

New Clause 6

Duties of owner or manager

“The relevant authority must by regulations amend the Regulatory Reform (Fire Safety) Order 2005 (SI 2005/1541) to require an owner or a manager of any building which contains two or more sets of domestic premises to—

(a) share information with their local Fire and Rescue Service in respect of each building for which an owner or manager is responsible about the design of its external walls and details of the materials of which those external walls are constructed;

(b) in respect of any building for which an owner or manager is responsible which contains separate flats, undertake regular inspections of individual flat entrance doors;

(c) in respect of any building for which an owner or manager is responsible which contains separate flats, undertake regular inspections of lifts and report the results to their local Fire and Rescue Service; and

(d) share evacuation and fire safety instructions with residents of the building.”—(Sarah Jones.)

This new clause would place various requirements on building owners or managers, and would implement the recommendations made in the Grenfell Tower Inquiry Phase One Report.

Brought up, and read the First time.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I beg to move, That the clause be read a Second time.

None Portrait The Chair
- Hansard -

With this it will be convenient to discuss new clause 9—Inspectors: prioritisation—

“In discharging their duties under article 27 of the Regulatory Reform (Fire Safety) Order 2005 (SI 2005/1541) (powers of inspectors) in relation to any building which contains two or more sets of domestic premises, an inspector must prioritise the premises which they consider to be at most risk.”

This new clause would require the schedule for inspecting buildings to be based on a prioritisation of risk, not an arbitrary distinction of types of buildings.

Sarah Jones Portrait Sarah Jones
- Hansard - -

The new clause does what the Government say will come later: it puts on the face of the Bill the recommendations made in the Grenfell Tower inquiry phase 1 report. At the beginning of June, the MHCLG announced that it was preparing to open a public consultation on recommendations for new fire safety regulations emerging from the Grenfell Tower inquiry. In a letter to Martin Moore-Bick, the Prime Minister gave assurances that action on the findings of the inquiry’s first report “continues at pace”. However, the Government had already promised in October 2019 to implement the inquiry’s recommendations in full and without delay. Failing to include the simpler recommendations for the Bill, such as inspections of fire doors and testing of lifts, is a breach of their commitment to implement the recommendations without delay.

Only this week we saw alarming statistics that underline the urgency of implementing the recommendations. Of more than 100,000 doors in about 2,700 buildings across the UK inspected by the fire door inspection scheme in 2019, 76% did not comply with building regulations and about one in six, or 16%, were not even proper fire doors. Nearly two thirds, or 63%, of the buildings also had additional fire safety issues. Those are huge challenges. We need to move as quickly as possible to implement the recommendations.







Earlier this month, the Secretary of State for Housing, Communities and Local Government said that the Bill

“provides a firm foundation upon which to bring forward secondary legislation”.—[Official Report, 2 June 2020; Vol. 676, c. 41WS.]

The Minister has taken the same approach, but there is no timetable for when everything else will happen. There are lots of committees, consultations and groups looking at these things, but it is not acceptable that after the promise of “without delay” in October 2019, we still have not moved on those issues by the middle of summer 2020.

I do not understand, and it would be good for Minister to explain, why we would not put such provisions in the Bill. They have the support of the organisations that we heard from this morning. It is just a case of putting things up front in the legislation, rather than waiting for an undefined time that may or may not come at some point in the future.

The new clause would require an owner or manager to

“share information with their local Fire and Rescue Service in respect of each building for which an owner or manager is responsible about the design of its external walls and details of the materials of which those external walls are constructed…in respect of any building for which an owner or manager is responsible which contains separate flats, undertake regular inspections of individual flat entrance doors…in respect of any building for which an owner or manager is responsible which contains separate flats, undertake regular inspections of lifts and report the results to their local Fire and Rescue Service; and…share evacuation and fire safety instructions with residents of the building.”

It just pushes faster and implements more quickly the action that the Government have committed to implementing. I press the Government to accept that that is possible, or to set out exactly when those things will become part of legislation.

David Simmonds Portrait David Simmonds
- Hansard - - - Excerpts

I have similar feelings about new clause 6 as I had about amendment 1. There is a risk that by seeking to be precise, we may create additional gaps in the legislation. Looking at the list, it would be clear to anybody with experience of the issue in a wider context that many other issues would come into consideration in such circumstances.

For example, the London Borough of Hillingdon had to go to court on 16 occasions last year to gain access to tenants’ properties to undertake essential safety-critical work on gas installations. If we were to define the duties that we are placing on the responsible individuals, the list would be extremely long. I have heard the Minister talk on the issue and I know that, with his local government experience, he is well aware of the context.

The properties to which the legislation will apply are hugely diverse, as are the risks that they offer. I therefore strongly believe that the new clause is another example where we are better off having a broader-brush piece of legislation that provides the opportunity to catch every set of circumstances flexibly, rather than being unnecessarily specific and risking missing out things that might turn out to be safety-critical.

--- Later in debate ---
In summary, the Government’s position is that adequate arrangements are in place to ensure that enforcement authorities target their resources appropriately and are accountable for their decisions without the need to make it a statutory requirement. I ask that the new clause be withdrawn.
Sarah Jones Portrait Sarah Jones
- Hansard - -

I hear what the Minister says—there are stages that we need to go through to get this right—but the Bill has no date for its commencement, so we could put this provision in the Bill and then do the things that need to be done in order to bring it into force at the time that the Secretary of State deems right. Therefore I would, on this new clause, like to test the will of the Committee.

Question put, That the clause be read a Second time.

--- Later in debate ---
Brought up, and read the First time.
Sarah Jones Portrait Sarah Jones
- Hansard - -

I beg to move, That the clause be read a Second time.

New clause 7 is about fire assessors being accredited. Again, I heard what the Minister said: there is the competency steering group; we are going to bring forward these kinds of changes. I think that we could be doing that sooner rather than later, so I would like to test the will of the Committee on this new clause, too.

Question put, That the clause be read a Second time.

--- Later in debate ---
Brought up, and read the First time.
Sarah Jones Portrait Sarah Jones
- Hansard - -

I beg to move, That the clause be read a Second time.

New clause 8 refers to an issue about waking watch that has been raised with us many times by struggling leaseholders. The aim of the new clause is to clarify exactly when a waking watch must be in place and when one should not be. We have seen since Grenfell that this involves a huge number of buildings; tens of thousands of people are living in blocks where some kind of remediation work is necessary and so a waking watch has been put in place. There are lots of concerns about waking watch in general. How qualified are the people doing the job, and are there enough of them? Is it a suitable alternative to the work that needs to be done?

Many leaseholders have told us that there are conflicting instructions on whether people should have waking watch, depending on where you are and which block you live in. The National Fire Chiefs Council says that waking watch should be temporary, but there are residents living in blocks that have had a waking watch for nearly three years, at huge cost. I have spoken to leaseholders who are paying £14,000 a year for the waking watch. In one galling case, residents on the block spent £700,000 on waking watch, but when the building was tested, it was found to be safe, so they spent a lot of money collectively for something that they never actually needed in the first place.

We will clearly not remove all the cladding that needs to be removed for some time, given that the issue it is not just ACM cladding, but HPL and other forms, too. Those things take time and we do not have enough people to do the work. What will happen in that time? Do people really have to pay that much money for that long when, in some areas, people are told they need a waking watch, and in others, they are not? Other questions remain about whether people can have other alarm systems that would mean not paying as much. People are going bankrupt paying for something that is supposed to be temporary but is not needed or the best thing for them to do.

Through the new clause, we are saying to the Government that this issue has been raised many times. There is inconsistency about the waking watch and how it is applied. In any case, it is not supposed to be in place for only a short period, not three years. The issue was raised by Government Members on Second Reading and has been raised in housing questions for some time. We want a system where it is clear what waking watch is for and what it is not for, to resolve inconsistencies.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

I should start by acknowledging the issue of waking watch. It is obviously very serious. In my previous position as Housing Minister, I met a number of groups that were struggling to pay for waking watch. I will speak later about what the Government are doing to support its proper use. I acknowledge the issue the hon. Member for Croydon Central raised, and I am sorry for the particular story she pointed to. However, expanding the scope of the Bill with this new clause is not the best way to achieve what she seeks.

There are significant issues with the wording of the new clause. First, it would introduce a regulation-making power that “must” be exercised to amend the fire safety order. Further, the term “fire safety failings” is very broad and subject to interpretation. There could be several circumstances where there is a fire safety failure that would not warrant the imposition of a waking watch—for example, cases where only a faulty fire door or smoke detector needed replacing. In such circumstances, swift remedial action can be undertaken, but the wording makes no distinction between fire safety failures.

Aside from the wording, we oppose putting this provision in primary legislation in any event. A decision on the use of waking watch is a matter for the responsible person when considering how to achieve compliance in particular premises. That decision must factor in the circumstances of the premises and other fire protection measures in place. Auditing for compliance is ultimately an operational issue, best dealt with by the relevant enforcing authority on a case-by-case basis. Specific circumstances will dictate what form of remedial action is necessary. The fire safety order already provides for an appropriate enforcement action to be taken. To impose a prescriptive legislative requirement of this type would be unhelpful and, worse, potentially inhibit an enforcing authority from taking the most appropriate action.

We are, however, taking forward work in conjunction with the NFCC on waking watches; it might reassure Members if I outlined it briefly. First, the NFCC is updating its guidance on waking watches. Once that guidance is available, we will ask fire protection boards to advise fire and rescue services on how best to ensure the guidance is implemented on the ground by responsible persons. That will include looking into other measures, such as installing building-wide fire alarm systems to reduce the dependency on waking watches wherever possible.

We are also looking to publish data on the costs of waking watches. That will ensure transparency on the range of costs, so that comparisons can be clearly made. Our aim is to help reduce the over-reliance on waking watch and, where it is necessary, reduce costs.

Furthermore, as Committee members may be aware, we are already working with the NFCC and fire and rescue services to undertake a building risk review programme on all high-rise residential buildings of 18 metres and above in England, which will ensure that all such buildings are inspected or reviewed by the fire service by the end of next year. It should give residents in high-rise blocks greater assurance that fire risks have been identified and action taken to address them, reducing the need for waking watches and other interim measures.

Essentially, we find ourselves in the same argument that my hon. Friend the Member for Ruislip, Northwood and Pinner has raised on a number of occasions: by being prescriptive, we create a situation where anomalies may occur and lacunae open up in the fire safety framework, of which this foundational Bill is meant to be the keystone—or whatever firm word we want to use—for the future. For that reason, we hope that this new clause will also be withdrawn.

Sarah Jones Portrait Sarah Jones
- Hansard - -

Heaven forbid that lacunae should open up! I immediately withdraw the new clause. I completely understand the point about this being a matter for the responsible person. The issue is that the freeholder is the responsible person, and the leaseholder is the one who has to pay, so there is a problem there.

I welcome the work that the Government are doing in trying to shine a light on some of the issues about costs; we have heard all kinds of accounts of different costs for the same job, so shining some light on that would be helpful. I think this is an issue that needs to be pushed, but I am happy to beg to ask leave to withdraw the motion.

Clause, by leave, withdrawn.

Question proposed, That the Chair do report the Bill to the House.

None Portrait The Chair
- Hansard -

Colleagues, we have done well. If anyone wishes to say anything pleasant about officials at this stage, that is the usual course of events.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

Strangely, the officials have not provided me with a script of nice things to say about them. First, I am obviously grateful to all Members of the Committee for the constructive way in which our proceedings have taken place and to you, Sir Gary, for your benign chairmanship.

This is obviously a difficult and complex piece of work, and while we see the emanation of it in the clauses and the various bits of legislation that come before us, a whole team of officials at both the Home Office and MHCLG has been beavering away on this for some time, engaging with various industry groups and often with affected residents who are in distress, in as sensitive and proportionate a way as possible. I know the Committee express their appreciation for all that work as well.

I hope, as we move into the next phase of this very important journey and this enormous reform to the system, we can continue with not only that very forensic work that officials have done to put us in this position, but the collegiate and co-operative political atmosphere. As I say, this is a situation that, unfortunately, has arisen over a number of decades, under Governments of all colours, and it behoves us all as a political class to put it right.

Sarah Jones Portrait Sarah Jones
- Hansard - -

I will be brief; my hon. Friend the Member for Canterbury has put her jacket on, so I know it is time. I thank the officials who have helped me to find my way through this, not least when the House adjourned at 5.30 pm on Monday instead of 10.30 pm as normal, since that was the deadline by which we had to table amendments. There was a particular pickle at that moment, but the officials were incredibly helpful. Thank you, Sir Gary, for your chairmanship.

I will finish by saying again that we welcome this piece of legislation. We wish things had gone a lot further and faster. There is a lot more to be done, and we are very hungry to see it done and happy to help the Government in any way we can to get it done. We all keep top of mind the people who lost their lives in the Grenfell Tower fire. That is what we are here for, and we must therefore act as quickly and as well as we can.

None Portrait The Chair
- Hansard -

Thank you very much. I know the whole Committee will endorse those remarks. I also thank Yohanna for her excellent clerking of the proceedings.

Question put and agreed to.

Bill accordingly to be reported, without amendment.