Lords ChamberMy Lords, I very much agree with what the noble Lord, Lord Haselhurst, just said about the Archives. There are real risks in maintaining them in their present physical location.
As has been noted by the noble Baroness the Leader of the House and my noble friend Lord Newby, I served on the Joint Committee on the restoration and renewal of the Palace of Westminster, the report of which was published in September 2016, almost three years ago. That paved the way for the Bill before us today, via resolutions that were passed by each House of Parliament in the early weeks of 2018.
I have a vivid memory of the day before that Joint Committee first sat in September 2015 of visiting the internal works in the basement of the Palace of Westminster. I was struck by the state of the mechanical and electrical services and rapidly concluded that doing nothing, kicking the can down the road, was not an option. Indeed, that was very much the conclusion that the Joint Committee came to. It identified an overwhelming need for the works to go ahead, and that they should be undertaken most effectively by a full decant of the Palace of Westminster. The Joint Committee made recommendations about the governance, especially for a sponsor body comprising Members of both Houses as well as external members, and a delivery authority with necessary technical expertise, and about the necessity for clear accountability for Parliament to be responsive to the requirements of the public, staff and Members.
These recommendations are largely reflected in the Bill before us. There has of course been the addition of the estimates commission and an understanding of the inevitable sensitivity about cost and the monitoring of it. I suspect that is probably a worthwhile addition to the Bill.
One of the other things we reflected on was timing, and we tried to convey a sense of urgency in that report. Admittedly, we did not anticipate the 2017 general election, but the noble Baronesses, Lady Stowell and Lady Smith of Basildon, and the noble Lord, Lord Carter of Coles, will recall that we had in mind that all who were elected in what we then thought would be a 2020 general election should have an opportunity to speak in the House of Commons before decant, and that those who were elected in the 2025 general election should have the opportunity to speak in the actual House of Commons after Parliament returned.
I am not quite sure what kind of timeline is anticipated now, but we took the view that, because of the deteriorating condition of the Palace of Westminster, the R&R programme should begin at the earliest possible date. I note Clause 1(3), which I think is faithful to the terms of the resolutions passed by both Houses. It says,
“the functions under this Act in relation to the works must be exercised with a view to facilitating the return of that House to the Palace of Westminster as soon as is reasonably practicable”.
That is a very welcome sentiment, but we are entitled to ask what it is anticipated that it will mean in practice. When replying to the debate, could the noble Earl the Deputy Leader of the House tell us the current thinking on the timeline?
I was somewhat alarmed by paragraph 160 of the report of the Joint Committee on the draft Bill, which rehearses some of the difficulties and possible delays in the Northern Estate programme, with particular reference to Richmond House and the Ministry of Defence car park. It refers to,
“delay (possibly resulting in decant being postponed for several years, until 2028)”.
In other words, it suggests the possibility of the decant starting just around the time that the Joint Committee on which I served thought we would be coming back into the Palace of Westminster. Given the risks of staying on this building—the risks of incremental failure and the risk of a significant failure—it would be useful to hear what is being done to try to tackle and reduce some of these possible delays, not least in relation to Richmond House and the Ministry of Defence car park.
Another issue of great importance is parliamentary accountability. Of course, the real clients are the public—the citizens of the United Kingdom—who wish not only to preserve our heritage but to see a Parliament that is fit for purpose in the 21st century. However, we also know that day to day, in practical terms, the Members of both Houses—who, as the noble Lord, Lord Cope, said, have some pretty strong views on things and do not hesitate to make them known—have the potential to be quite demanding as this project proceeds. That is why it is important that we have a sponsor body.
Sir David Natzler, the former Clerk of the House of Commons, in his evidence to the Joint Committee on the draft Bill, indicated that Sir Charles Barry had had to appear before over 100 parliamentary committees because there was not a sponsor body; my noble friend Lord Newby and the noble Lord, Lord Cope, referred to Mr Barry’s War and the importance of being able to channel and focus the legitimate concerns and interests of Members of each House. It is important that each House balances accountability and oversight on one hand with not wanting to micromanage on the other. We should let the bodies that we are creating with this Bill get on with the job.
Clause 6(2) of the Bill provides for the possibility of a parliamentary relationship agreement; the content of that agreement will be important. Paragraph 103 of the Joint Committee report on the draft Bill recommends that,
“parliamentary members of the Sponsor Body should be responsible for answering parliamentary questions”,
and that that should be dealt with in the parliamentary relationship agreement rather than in the Bill. Again, it would be helpful if we could get some indication as to the current thinking on this. Is it, for example, as with the Church Commissioners in the other place or the Senior Deputy Speaker here, who often are able to come to be Dispatch Box and answer on behalf of other bodies? It might be useful to have a member of the sponsor body who is a Member of your Lordships’ House, who would be identified as the person who perhaps responded to debates or Questions when they were raised by Members.
As regards the duties on the sponsor board, I welcome the duty specified in Clause 2(4)(h); the noble Baroness the Leader of the House indicated that that was brought in by amendment in the other place and that the Government will wish to reflect on it. On the one hand, we do not want to become too specific, but it is important that we try to find ways in which the benefits—the work that will be created for small and medium-sized enterprises—can be shared across the United Kingdom. Also, we should look in particular at the importance of and the opportunity for apprenticeships, particularly in specialist skills in the heritage and conservation sector. That was brought home to us very much on the Joint Committee. To be able to train people up in these specialist skills would be a worthwhile legacy, but not to do it could lead to delays and bottlenecks. Therefore, as paragraph 306 of the Joint Committee report said in September 2016:
“Conducting the works in one phase will make a significant demand on market capacity … A wide range of specialist trades will be required in a short space of time, and the Delivery Authority will need to be able to be capable of managing a large and complex supply chain”.
Therefore I very much hope that, while it may be going too far to specify apprenticeships in the Bill, nevertheless we will get some acknowledgement of the importance of that and of addressing the need for specialist skills, which has been identified. Perhaps some indication could also be given as to what has already been done to deal with market engagement.
There is a huge challenge here: value for money, and balancing heritage with practicability and legitimate issues such as access. However, as the Public Accounts Committee of the other place said in its 45th report, we should be getting on with it. The most efficient thing is to get on with it. That is what I hope we will do, and why I hope we will give the Bill a good passage through your Lordships’ House.
Parliamentary Buildings (Restoration and Renewal) Bill Debate
Full Debate: Read Full DebateLord Wallace of Tankerness
Main Page: Lord Wallace of Tankerness (Liberal Democrat - Life peer)Department Debates - View all Lord Wallace of Tankerness's debates with the Leader of the House
(5 years, 3 months ago)
Lords ChamberMy Lords, it is with great pleasure that I open the Committee stage of this Bill. My noble friend Lady Smith—who, as the House will know, was a member of the original Joint Committee and spoke with her usual eloquence and depth at Second Reading on behalf of these Benches—unfortunately has other commitments and cannot be here until later but is very much hoping to join us as soon as possible. Meanwhile, my noble friend Lord McNicol and I are holding the fort.
I am moving Amendment 1 and speaking to Amendment 16, both of which are in my noble friend’s name. It is right that we start today with amendments to Clauses 1 and 2 that aim to ensure and reiterate that the core purpose of the restoration and renewal programme must be to enable the Houses of Parliament to continue to serve as the UK’s primary legislative and democratic institution.
Clause 2 lists areas to which the sponsor body must have regard, but the work of Parliament, legislation and the representative democratic function is not referred to anywhere in the Bill. As my noble friend Lady Smith said at Second Reading,
“That is a serious omission. At no point should the sponsor body … lose sight of that”.—[Official Report, 8/7/19; col. 1675.]
Our amendments seek to remedy this. The House will be aware that, as this project progresses, it is vital that we bring the public and Parliament with us. We must make both aware that the works are imperative not only to preserve this historic building for future generations but to ensure that this country can long benefit from its constitutional role.
By stressing the significance of the works for the sanctity of democracy, we can better demonstrate that the costs and work involved are vital and necessary, and we help address and dissuade notions that this is only for the benefit of parliamentarians. Safeguarding Parliament’s role in our constitution is of vital benefit to everyone in the UK. Through these amendments, this House can do more than send this message; we can ensure that this principle is at the forefront of consideration for the sponsor body as works progress.
Amendment 16 would legislate that the sponsor body must always take regard of the primary democratic and constitutional functions of Parliament during the project. Amendment 1, meanwhile, would ensure that while the decant takes place the aim of the works will be to facilitate both Houses’ return so that their democratic and constitutional functions can be upheld and continued.
The importance of including in the Bill the broad principle that the works must never lose sight of the fact that they are taking place to maintain Parliament as a place of democracy was underlined by noble Lords from across the House at Second Reading. I hope that the Government will agree and bring forward proposals on Report to ensure that this principle is incorporated into the Bill. I beg to move.
My Lords, I am happy to speak in support of the amendment that has just been so ably moved by the noble Baroness, Lady Wheeler. It is important we remember that the principal functions of this place are its constitutional, legislative and scrutiny functions. That should not be forgotten. That said, in many of the debates we will have in Committee, we will remember many of the other things that happen in this place. I was going to say it is a village; it is probably larger than that in terms of the number of people who work here. However, at the end of the day, if it were not for the democratic and constitutional functions that take place, most of that other work would not materialise.
Although it is not one I signed, possibly through omission rather than as a deliberate act, the words “at the earliest opportunity” in Amendment 1 are important, because there is an urgency in this: both in starting now and, when the works start, in getting back in as soon as possible. Throughout the whole process, it is important that we try to maintain the pace. We will come later to an amendment I have tabled about timelines. We all know from large public works that there is often a tendency to delay, but I hope that once we get out it will not be very long until we get back in.
My Lords, any amendment which improves the Bill is obviously a good thing, but I was not clear from what my noble friend said how this amendment does so. It is not clear to me how the words,
“as soon as is reasonably practicable”,
and,
“at the earliest opportunity that its work and democratic and constitutional functions can reasonably be delivered in the restored Palace”,
are in any way different. Could my noble friend answer that when she responds?
If I can interject in this discussion, there is a real danger that the noble Lord, Lord Adonis, is right, but it does not have to be like that. That is why I am very supportive of Amendments 9 and 27, which are exceedingly important. When the Minister winds up, I would appreciate it if she could comment on Amendment 27 and the annual report to Parliament on “the areas in which” those who have contracts operate.
It seems that the decisions will have been made by then. They are very dependent on the nature of the procurement exercise, which is why Amendment 9 in the names of the noble Lord, Lord Blunkett, and the noble Baroness, Lady Byford, is terribly important. It seeks to insert provisions that,
“opportunities to secure economic or other benefits of the Parliamentary building works are available in all areas of the United Kingdom”,
which implies that the start of the procurement process will be geared to deliver that objective. The Government and those responsible for making the decisions about procurement need to plan this very carefully. It will not be enough for the procurement system simply to take national contractors from a national list, with companies that say they can employ people from all parts of the country. In reality, what will almost certainly happen is that the noble Lord, Lord Adonis, will be proved right because the labour force will come from a narrower part of the UK—London and the south-east. I want to avoid that.
It is important that procurement reaches SMEs, not just big national companies. It needs to get specialist professions such as specialist architects, and get to companies based purely in the regions of England, or based only in Scotland, Northern Ireland or Wales. It will not be enough for only national contractors to get the lion’s share of the business. I hope the Government will plan to achieve all this in a proactive way. I fully understand the legal position in relation to procurement law, but this is surely about enabling proper competition, not simply relying on a system which does not promote genuine competition. To do that requires competition to be enabled rather than minimised.
My Lords, in following on from my noble friend I welcome these amendments. I was very pleased to hear the noble Lord, Lord Blunkett, and the noble Baroness, Lady Byford, refer to skills and apprenticeships. I return to a subject which I raised at Second Reading. The noble Baroness, Lady Stowell, and I served on the Joint Committee on the Palace of Westminster and will readily remember the evidence we received regarding the importance of skills. However, we are talking about skills in the heritage sector, where there may be a shortage at the moment, and there could well be lead times in training people to deploy those skills when it comes to R&R.
One of the recommendations which the Joint Committee made in paragraph 306 of its report is that,
“market engagement should begin early, and be facilitated by the early establishment of a shadow Sponsor Board and shadow Delivery Authority”.
I understand that we do not have a shadow delivery authority at the moment, but it would be helpful if, in responding to the debate—if not tonight then in writing—the Minister could tell us what steps have already been taken to pursue that market engagement and identify where there might be bottlenecks, and see what could be actively done at the moment to try to ensure that there will be an adequate supply of skilled tradespeople when the time comes to undertake this important work.
My Lords, sometimes competitive tender can breed low bidding rates, and contractors make up their profits through claims. Is the idea to generate negotiated unit prices or have competitive bidding?
Parliamentary Buildings (Restoration and Renewal) Bill Debate
Full Debate: Read Full DebateLord Wallace of Tankerness
Main Page: Lord Wallace of Tankerness (Liberal Democrat - Life peer)Department Debates - View all Lord Wallace of Tankerness's debates with the Ministry of Defence
(5 years, 3 months ago)
Lords ChamberNo, my Lords, I did not say that. I was making a hypothetical case that, were such a grant to be considered—I am not saying that it would be—it would have to satisfy different conditions. Of course I agree that this is a public project for national Treasury funding.
I have now lost my thread completely. This is the second time that my noble friend has interrupted me when I was developing my strategic thinking. I return to the principle. It is extremely important, for all the reasons we know, that this change is owned by the people we are here to serve. It is absurd not to recognise them in the Bill or to give them a voice.
We know how to do this, although it is complicated. At what point do you start involving people? How do you structure it? How do you reach out? How do you collect the voices, as it were? But we do it every day in major and minor projects around the country. It is not a miracle; it is a science.
To take just one example before I close, the National Museum Wales has, I am delighted to say, just won a national museum of the year award. In its redevelopment, which involved a great deal of new building, it involved thousands of people from all manner of excluded groups in the local and national community. The result has been transformational in their and our understanding of what people expect from a national museum.
This is not a museum. We have a much greater duty. But those principles and methodologies can certainly be adopted and followed.
My Lords, I support the amendments and the spirit in which they have been moved and spoken to by the noble Lords, Lord Blunkett and Lord Bethell, and the noble Baroness, Lady Andrews.
In my involvement both in the Joint Committee and in taking part in debates, I have been very conscious that we are here as trustees. That has implications not only because we have responsibility—we have to get on with it, because we would not be thanked by the public if we dithered and an accident happened which destroyed part of this important part of our national heritage—but, as trustees, we are temporary. There are 650 Members of the other place here by election. Those of us who are here are, as the noble Lord, Lord Blunkett, said, at the hand of the grim reaper or may choose to take retirement. That makes it important to remember that we are here but there is a great public out there, to whom we owe responsibility. As the noble Lord, Lord Bethell, said, it is important that we try to understand what they want from what is, in fact, their Parliament—a place where they can engage with not only Members of Parliament but Members of your Lordships’ House. How can they get their views across? How can we use this place for education, so that we bring up a new generation of citizens who want to take part in the democratic process?
The amendments are directed at engaging the public more in what we are doing at the moment; I suspect that those who know about it are somewhat cynical about it, so an explanation of why a large amount of money is being spent might go a long way. They are also trying to gauge what the public wish to see in how we spend that money. When the noble Lord, Lord Bethell, talked about access and people wanting to talk to their MPs, I reflected on the fact that, when we voted earlier this evening, my noble friend Lord Foster of Bath asked me, if I got a chance when I spoke this evening, to say that he thinks that it would be a good idea to have a coffee shop in the Royal Gallery because it is a large space that is not used for much else, except on historic occasions, but which could clearly be adapted and changed. I rather suspect that, on first hearing, people would say, “Oh, we can’t do that”, but has anyone ever asked? It would be a good place for that, in the same way that Portcullis House has become a meeting place for discussion and discourse for Members of the House of Commons—you can take people there. That is perhaps worth thinking about if we want to engage the public more.
My Lords, I certainly agree with the noble and learned Lord, Lord Wallace of Tankerness, that we are trustees, or custodians, of this Palace of Westminster, which ultimately belongs to the public that we exist to serve. Clearly, we need to ensure that, through this programme of works, the Palace that belongs to the public and the people who occupy it are in a position to serve the public better.
I also support the need for public engagement with and consultation on these works. I would counsel one thing, however. During the debate, I have been a little worried by comments about attempts by us to help the public to understand better what this project is all about. At the moment, those of us in positions of great privilege and some power think—too often and mistakenly—that we are the ones with all the information and that we need to impart it and impose it on other people. As has been made clear by other noble Lords in their contributions, we want to understand better what the public expect from their Parliament and reflect on what they want so as to influence how we change.
However, I would go one step further: we must be frank and understand that the process of consulting people is another opportunity for us to show that we are changing and that we want to serve them better. I want us to ask about what it is that people want to see us change in terms of our behaviour as parliamentarians. If we can understand better what they want from us in terms of how we behave—to show that we take them seriously and listen to them in carrying out our work—we should consider what we need to do differently in terms of how our building is formatted, refurbished and renewed to make sure that we are better placed to show that we are listening and responding, and to give people confidence that that is what this is all about.
My Lords, I promise to be as brief as I can. This is a probing amendment that I do not seek to push further. Clause 5 is about consultation strategy. It indicates that the sponsor body must prepare a strategy for consulting Members of each House of Parliament and must keep that strategy under review and revise it where appropriate. The purpose of my amendment is to require that the strategy or any revised strategy which is published under this section includes the sponsor body’s best estimate of the timeline for the Palace restoration works, including likely dates for the decants of each House and, when they have taken place, the estimated date of completion.
In one of the earlier debates, the noble Lord, Lord McNicol, talked about large infrastructure projects and the many that have run over budget or over time. Clearly if we are trying to engage the public and keep them on side, that can often be the thing that makes them less receptive to a major project. Therefore, it is important that we ensure that there is some focus on the timeline so that the public are well aware of the likely dates. If there is any reason—there might be a very good reason—why things fall behind schedule, it is important that people know why and that a proper explanation is offered.
My Lords, I am very grateful to those who have taken part in this debate and indicated some support for the general approach I was taking. I am very grateful to the Minister for his response and thank him specifically for his update on the planning in relation to Richmond House—although I think it was very clear, or at least implicit in what he said, that there are still possibilities of that taking time. There is the possibility of a challenge if Westminster City Council were to give positive approval. So it is quite clear that there could be some factors that could delay decant.
As the debate unfolded, it seemed that there was some support for having some kind of reporting back to Parliament. I note and understand the point the noble Earl made that if we do it at the consultation stage it could raise expectations, and that the appropriate point would be after the outline business case had been made. He said that if there was a material change, the sponsor body might have to come back. I will reflect and consult with others on whether we want to put something in the Bill on that, rather than just leaving it open-ended about what would be a material change. We may want to do something that would require the sponsor body to continue to update us after the initial approval of the outline business case.
I thank the noble and learned Lord for giving way. To some extent, this debate is unreal, because there are already dates out there. We have been debating the dates of 2025 for the decant and 2035 for moving in. At every stage of the preparation of the plans, the questions that will be asked are, “Are you sticking to the 2025 date or not? If not, when is it moving to and how long will it be before you get back?”. The idea that the sponsor body—with its chair and chief exec—will be able to avoid publishing and giving its view on this issue is entirely unreal.
The noble Lord makes an important point. When I was on the Joint Committee on the Palace of Westminster, our expectation was that we might decant in 2023, but it is now clear that that is no longer the case. Dates have been put out there. We need to maintain public confidence in the project, in terms of not only time but cost. Having been one of the first Members of the Scottish Parliament, I recall well what that can mean in relation to building a parliamentary building. To maintain public confidence, it is important that explanations are given. Often things are no fault of anyone—they are just circumstance —but often it helps to explain what the circumstances are. Therefore, it might merit considering whether we can come back to this at a later stage. In the meantime, I beg leave to withdraw this amendment.
My Lords, the purpose of this amendment is that the sponsor body should nominate from among its members a Member of the House of Commons and of the House of Lords to be its principal spokespersons in their respective Houses. This was considered by the Joint Committee looking at the Bill. It thought it a worthwhile thing to do but said that it should not be in primary legislation. Indeed, I would not necessarily want to press the amendment, but this is a useful opportunity for us to be updated on where we are and on the thinking on how we will report back to this House and the Commons on the sponsor body’s work.
As I understand it, the Leader of the House of Commons and the noble Baroness, Lady Evans, wrote to the shadow sponsor body with the Joint Committee’s findings and asked specifically about the importance of having a political figurehead for the programme. It replied:
“We note that analogous arrangements already exist in both Houses, with the spokespeople for each Commission responding to oral and written questions”,
and it anticipated that the sponsor body would,
“be invited to consider and agree its preferred approach to the appointment of spokespeople in the autumn, ahead of its transition to the substantive stage”.
It occurred to me on more than one occasion this evening that it might have been helpful if we had a spokesperson from the shadow sponsor body to tell us where it had got to on various things. My noble friend Lady Scott of Needham Market, who has had to leave, has sought to do that in a personal capacity. I am not criticising the fact that it has not happened—we are still at a shadow sponsor body level—but one can foresee situations where issues will arise. It would be helpful to have someone at Oral Questions, answering Written Questions or debates in your Lordships’ House, or making Statements and reporting back, just as the Senior Deputy Speaker comes to the Dispatch Box to present reports and respond to them.
I understand that the question of how we deal with this issue might have gone, or is going, to the Procedure Committee. The purpose of the amendment is to get on the record how the House anticipates it might deal with it, so that we can have somebody who comes to your Lordships’ House—and for that matter to the House of Commons—to update us and, to some extent, to be the face of the sponsor body and to answer for it. I beg to move.
My Lords, I will first say a few words in support of the excellent amendment from the noble and learned Lord, Lord Wallace. It makes complete sense to have someone in the Chamber who is able to explain to us the proceedings and progress of the project whom we can ask questions of. To have that in the Bill makes sense. I would welcome the Minister’s comments on how that could be achieved.
My amendments have a different purpose, which is to get the voice of the public on the sponsor body from the outset. There is some flexibility in its current composition, described in Part 1 of Schedule 1: the sponsor body will have between seven and 13 members, between three and five of whom will be external members, including a chair. Between four and eight will be Members of Parliament. Members of Parliament or Peers will be in the majority, which makes sense. But there is not much room in those numbers for somebody who could perhaps represent the public and champion issues such as access and education. One of them will need to be a chair, whose focus will be on driving the project forward and managing the sponsor body itself. I imagine one might be a leading person from the construction industry, and another might have major project experience or heritage experience. That is why I would like to ask the Minister how the voice of the public could be best represented at a very high level from the beginning, when the brief for this project is being decided and the strategy formulated.
In many ways, there are fewer concerns about the delivery authority. It will have nine members, who will be more broadly recruited, with only two executive directors and the rest non-executive directors. It is really the sponsor body where I detect a bottleneck. It would be extremely helpful if the Minister explained how it could be tweaked to give more access to a voice from the public.
Again, I am grateful to noble Lords who have taken part in this debate, and particularly to the Minister for his reply. All the amendments in this group raise important issues. The Minister made a valid argument about how we might use the parliamentary relationship agreement to deal with some of them. As I indicated, provision for how the sponsor body would report to Parliament need not necessarily be in the Bill; the amendment was an opportunity to get an idea of current thinking. I was not reassured by the Minister saying that it would be put back into the court of the chair of the sponsor body, but no doubt that can be worked through and may well be the subject of a Written Parliamentary Question later in the year—it will be interesting to see who answers it. I beg leave to withdraw the amendment.
My Lords, Amendment 29 is in my name and those of my noble friend Lord Adonis and the noble Lord, Lord Kerslake. I did not speak at Second Reading as, owing to previous commitments, I knew that I could not be present for the opening and closing of the debate, but I attended for a good part of it and followed it closely. As we know, one of the frustrations of our work is that we often do not know business long enough in advance to prevent such diary clashes. I was struck by some of the speeches at Second Reading: in particular those of my noble friend Lady Andrews and the noble Baroness, Lady Scott of Needham Market, who both showed me that the building I had worked in for so many years as a Member of either this House or the other House was in such a dramatic state of dereliction and decay and just how huge the task facing us is.
A colleague and friend, looking at this amendment, said, “Is this the Geordie amendment, then?”. As much as I would like Parliament to be based in Newcastle or Gateshead, the amendment is much less ambitious. It asks simply that the sponsor body prepare and publish a report giving an assessment of relocating the Houses of Parliament for the duration of the parliamentary building works to a location outside London; and that the sponsor body must make arrangements for the report to be laid before and debated by both Houses of Parliament. That seems a very reasonable amendment, particularly as the study would be prepared concurrently with all the other things being done and therefore not involve delaying the timetable further. Although the idea of relocating Parliament outside London in the way proposed has been mentioned before and some have talked about the cost of doing so, as far as I am aware, no official work on such an option or the cost of doing so has yet been be produced.
At Second Reading, my noble friends Lord Adonis and Lord Foulkes spoke of the desirability of locating Parliament outside London; by doing so, they spoke effectively against overcentralisation and overconcentration in our capital city. Both my noble friends and I know that the idea of relocating Parliament, either temporarily or permanently, has been around for a long time. Indeed, in her Second Reading speech, my noble friend Lady Smith of Basildon reminded us of ideas from the 1960s, such as for a new, permanent capital called “Elizabetha” to be built on land between Harrogate and York. Even as a schoolgirl, I remember that idea giving rise to a lot of excited comments in local newspapers in and around Tyneside as a result.
For the avoidance of doubt, I should make it clear that I am emphatically not in favour of building on that attractive landscape and I am not proposing the Elizabetha solution. Even the name “Elizabetha” for such a new capital reminded me of that hugely entertaining book by Bill Bryson, Down Under; noble Lords may know of it. Bryson describes the debates that went on in Australia over the construction of the new capital, Canberra, as the seat of Parliament and the occasionally ludicrous names that were suggested, such as “Sydmeladperbrisho”—I think that noble Lords get the point—or, even more weirdly, “Thirstyville”; I can just imagine the comments in the press about MPs and Peers moving there.
I also looked at some of the Hansard entries from the time when the Elizabetha idea was put forward. Some Members in the other place spoke in favour of Parliament being established north of the Trent—it seemed like a good idea to me—midway between Thameside and Clydeside. However, some of those debates make for depressing reading. For example, that oft-controversial MP, Willie Hamilton, bemoaned that our building here was not built and not equipped for a 20th-century role. Here we are, saying rather similar things, except that we are now in the 21st century. Through my amendment, I hope simply to look at out-of-London options; for example, looking at either using existing buildings outside London or at what new facilities that might be suitable could be found outside the capital.
I am interested in what the noble Baroness says. Does she accept that, if you take the United Kingdom from the top of Shetland to Land’s End, the midpoint falls round about Dundee? Would she favour that option? It would make my journey shorter.
I would, yes, partly because there is a direct train from my local station—Alnmouth—to Dundee.
There is much that I could say but the hour is late so I will truncate my comments. I noticed that, in response to my noble friend Lord Adonis at Second Reading, my noble friend Lady Smith talked of concerns about the costs of relocation. She also mentioned the European Parliament’s different centres of activity. As a former MEP, I am conscious of the European Parliament’s travelling circus—although, in its defence, the Parliament is sadly unable to take or address that decision because, by treaty, the member states must agree unanimously on a seat for the Parliament; they have so far failed to do so, which is both costly and wearing for all those involved. However, I am not suggesting anything like the European Parliament arrangements in my amendment.
In response to my noble friend at Second Reading, the noble Earl, Lord Howe, said that,
“in October 2012, the House of Commons Commission, and at that time the House Committee in the Lords … ruled out the option of constructing a brand new building away from Westminster and no further analysis will be undertaken of this option”.—[Official Report, 8/7/19; col. 1682.]
Those remarks are not relevant to this amendment, however, because nothing in this amendment calls for either a brand-new building or permanent relocation. I note that the noble Earl also said, in response to a question from my noble friend Lord Foulkes, that he would make some information available to my noble friend and other noble Lords who spoke at Second Reading, about past debates and decisions on this subject. Obviously, since I did not speak at Second Reading, I have not received that information, but I would be grateful to see it before Report.
Finally, I know that my noble friend Lady Smith of Basildon is very supportive of the idea that all regions and nations should benefit from the restoration and renewal project. Indeed, there has been a general welcome across the House for that approach. However, as noble Lords will appreciate, that is somewhat separate and does not in any way negate the issue raised in my amendment.
In conclusion, this is a modest amendment asking merely that the sponsor body prepare a report about the costings of a temporary relocation outside London and report back to Parliament. Given that that body has to come back to Parliament in any case with a number of other estimates, it would be perfectly feasible for us to ask the sponsor body to undertake this study. What I and my co-signatories are asking for is reasonable and feasible, and I hope—even at this late hour—that the amendment finds some favour this evening.
Parliamentary Buildings (Restoration and Renewal) Bill Debate
Full Debate: Read Full DebateLord Wallace of Tankerness
Main Page: Lord Wallace of Tankerness (Liberal Democrat - Life peer)Department Debates - View all Lord Wallace of Tankerness's debates with the Leader of the House
(5 years, 2 months ago)
Lords ChamberMy Lords, when I moved an amendment in Committee seeking a timeline to be outlined by the sponsor body, it was not my original intention to move an amendment on Report. However, having listened to the debate and the comments made, I said at the end of the debate that there was at least merit in considering whether to come back to the issue. I have done that, albeit, crucially, in a different way—that is, with a similar amendment but with a crucial difference.
As was said on a number of occasions when this was debated in Committee, large infrastructure projects have a reputation for going over time and sometimes over budget. Having had the experience of being one of the original Members of the Scottish Parliament, I am certainly well aware of that and of the publish backlash it can sometimes cause. That is why it is important to try to find a way to ensure there is transparency, information and explanation. It is intended not to initiate a blame game but to find a way in which, by sharing information, any possible blame can be mitigated through proper explanation.
Nor is it intended to be a requirement that everything is pinned down to the last day. As the noble Baroness, Lady Smith of Basildon, said in Committee when she supported my amendment:
“We do not need to say, ‘This will happen on 3 January 2022’, but it should be possible to have an idea of a timeframe for when certain things are likely to happen. That would help with public engagement and the engagement of colleagues around the House”.—[Official Report, 22/7/19; col. 641.]
That is the spirit in which I move this amendment—not that one wishes to be precise to the very day, but rather that there can be an indication as to when some things are likely to happen. That is particularly the case with regard to the decant. As I indicated in Committee, and as was indicated in the Joint Committee report on the draft Bill, issues that could lead to delays have arisen in relation to Richmond House. As we progress, it would be useful to know just how that is progressing and, if there are particular problems, that these can be identified sooner rather than later.
My Lords, I am grateful to the noble and learned Lord, Lord Wallace of Tankerness, for his amendment, which would require the sponsor body’s reports on the progress made on the parliamentary building works to incorporate a timeline for the works that would include likely dates for decant and completion. As the noble and learned Lord said, he tabled a similar amendment in Committee, to the effect that as part of its consultation strategy the sponsor body must publish a timeline for completion of the Palace restoration works, including details on the dates of decant and return to the Palace.
In my response in Committee, I agreed that all noble Lords would—quite obviously—wish to seek further clarity on dates around decant, and I am in absolute agreement with the noble and learned Lord’s point that the sponsor body should publish details regarding decant and completion of the works not just once but throughout the course of the project. Here it is important to convey that the shadow sponsor body has always explicitly recognised that, as part of the sponsor body’s reports as set out in paragraph 27 of Schedule 1, it would rightly be required to include timescales on decant and the progress of the works. I can confirm that the shadow sponsor body is in agreement with this approach and therefore the expectation is that the reports produced by the sponsor body will include information on the timetable for the works, including details on timings for decant and return to the Palace.
I spoke at some length in Committee on various points addressing the issue raised by the noble and learned Lord. However, I thought it important to clarify what the Bill requires the sponsor body to do as regards reporting. Under the Bill, the delivery authority is required to formulate proposals for the parliamentary building works, including the timing of those works. These proposals are provided for in Clause 2(2)(e). Parliament will need to approve the proposals before any substantive works commence. If for any reason those timings change significantly, the sponsor body will need to come back to Parliament for further approval. The parliamentary approval of these proposals, as well as the shadow sponsor body outlining its agreement that the sponsor body should include information relating to the timeline for the works in reports it produces, will, I hope, provide noble Lords with the reassurance that this information will be forthcoming.
This is a matter that will surely interest all noble Lords throughout the currency of the works, whether that is before commencement, during or near their completion, so let me again thank the noble and learned Lord for tabling this amendment. I hope that I have provided him with significant reassurance on this important matter.
My Lords, I am grateful to both the noble Baroness, Lady Wheeler, and the noble Earl, Lord Howe, for their comments on this amendment, and in particular for the noble Earl’s reassuring words and the wider clarification of the roles of the sponsor body and the delivery authority in these matters. As he rightly said, the timeline for progress, decant and the likely completion is of interest not just to Members but to the wider public. What he has put on the record today is very satisfactory indeed and we look forward with interest to watching progress. With these words, I seek leave to withdraw my amendment.