Grand CommitteeMy Lords, these regulations establish a responsible actors scheme for developers under Sections 126 to 129 of the Building Safety Act 2022, focused on the remediation by developers of historic fire safety defects in residential buildings they have developed in England. Developers that are eligible for the scheme but choose not to join, and developers that join the scheme but then renege on their membership commitments, will be prohibited from carrying out major development or obtaining building control approvals.
Following the Grenfell Tower tragedy, it became evident that thousands of residential buildings over 11 metres had serious fire safety defects. This put resident safety at unacceptable risk while leaving many leaseholders facing potentially life-changing remediation costs. This scheme is one part of the Government’s wider response to the building safety issues that came to light following Grenfell. In addition to the scheme, we are protecting residents by investing £5.1 billion in remediating unsafe cladding on 18 metre-plus buildings; securing industry contributions to remediation through introducing a building safety levy; implementing statutory leaseholder protections against unfair costs of remediation; and creating new legal avenues for affected parties to recover remediation costs from those who caused the problem.
This scheme focuses on major private sector developers, which sit at the top of the supply chain and have overall responsibility for their developments. The Government engaged with major developers through a remediation pledge and then a legally binding developer remediation contract. I welcome the action taken by 48 developers that have signed the developer remediation contract; these include the top 10 private sector UK housebuilders. The scheme will create a level playing field whereby eligible developers that commit to remediate are not placed at a competitive disadvantage compared with those that do not.
The regulations set out three descriptions of persons who are eligible to join the scheme. Developers based anywhere may be eligible for the scheme, if they developed relevant buildings in England. First, major housebuilders are eligible where their principal business has been residential property development; they were responsible for the development or refurbishment of one or more 11 metre-plus residential buildings in England in the 30 years ending 4 April 2022; and they meet the profits condition set out in the regulations. Secondly, developers are eligible where they meet the profits condition and they were responsible for the development or refurbishment of at least two buildings that we know are defective because the buildings have been assessed as eligible for a relevant government remediation fund. Thirdly, there is a voluntary eligibility provision. This allows other persons to join, where they were responsible for the development or refurbishment of a building that would require remediation under the developer remediation contract.
The profits condition is focused on typical operating profits averaged across the three years from 2017 to 2019, which were not impacted by the Covid pandemic. Both the profits condition and other aspects of the eligibility provisions make appropriate provision for the complex company group structures used by some developers.
The regulations make clear that registered providers of social housing are not eligible for the scheme. They will not be invited or permitted to join.
The core conditions of membership of the scheme are for developers to commit to identifying and remediating life-critical fire safety defects in residential buildings over 11 metres in height that they developed or refurbished in England in the 30 years ending on 4 April 2022, and to reimburse taxpayers for government-funded remediation of such buildings. To demonstrate their commitment, an eligible developer must enter into a self-remediation contract: a contract containing the terms of the developer remediation contract published by the Secretary of State in March this year. The membership conditions require members to give effect to their remediation and reimbursement commitments in accordance with the contract’s terms.
I turn now to the application provisions. The Committee will be aware that the Joint Committee on Statutory Instruments has drawn attention to two technical aspects of the drafting of these regulations, including one relating to the scheme’s application provisions. I am grateful to the Joint Committee for its time, its valuable scrutiny and its report, which the Government have carefully considered. We have corresponded with the Joint Committee and provided a memorandum setting out our position, which is printed as an appendix to the Joint Committee’s report.
I welcome this opportunity to reaffirm our overall position on the issues raised, as explained in the memorandum. On the application provisions, we consider it to be clear in context that, where the Secretary of State identifies that a person is likely to be eligible for the scheme, they will be invited to join it, but the registered providers of social housing will not be invited to join, as they are not eligible under Regulation 6. In light of the Committee’s report, we will monitor implementation carefully and consider bringing forward amending regulations in the event that the regulations give rise to a misunderstanding in practice as to who is invited or able to join the scheme. The Government will also issue guidance on aspects of the scheme. However, the issue of developer remediation of unsafe buildings is urgent, and I seek the Committee’s approval of these regulations today.
The regulations set out the time period to join the scheme and give developers an opportunity to make representations if they believe that they are not eligible. They also set out how developers can join the scheme in other circumstances, including under the voluntary eligibility provisions.
Membership of the scheme may be revoked for breach of membership conditions or ended without fault where a member has substantially satisfied their obligations. Members will have the opportunity to make representations to the Secretary of State before their membership is revoked. Should an eligible developer decide not to join the scheme by the end of the application period, or should their membership be revoked for failure to comply with the scheme’s conditions, they will, in accordance with the regulations, be prohibited from carrying out major development or obtaining building control approvals.
At this point the developer, and known persons controlled by the developer, will be notified and then added to a published prohibitions list, which will be used by local authorities for enforcement. Only a person named on the prohibitions list will be subject to the prohibitions. The regulations also apply the prohibitions to persons controlled by the developer to make sure that developers cannot easily avoid the prohibitions by continuing their development business through other entities they control. Prohibited persons will be subject to a planning prohibition that prevents them carrying out major development in England, except where planning permission is received before these regulations come into effect. Development of land carried out by a prohibited developer in breach of a prohibition will constitute a breach of planning control.
The regulations include provision that developers notify the local planning authority about their status as a prohibited person, or when the prohibitions are lifted. The Joint Committee on Statutory Instruments has reported on the absence of a specific sanction for failure to give notice under these provisions. I would like to reassure the Committee that these regulations are effective without such a sanction. The primary mechanism for identifying prohibited persons will be the prohibitions list published by the Secretary of State, so local planning authorities will have access to all the information they need even if a developer fails to notify them. In addition, any developer that engages in development contrary to the prohibition will as a result be subject to sanctions through planning enforcement.
The regulations also establish a building control prohibition, which prevents prohibited persons gaining initial and final building control approval in respect of any building work that requires such approval. The prohibitions have limited exceptions. The purpose of these exceptions is to mitigate potential impact on innocent third parties such as off-plan buyers, the wider public and certain entities that are not in the building industry.
The building control prohibition is subject to exceptions that seek to protect innocent third-party purchasers of properties from a prohibited developer, including a specific exception to assist those whose deposits could be at risk if a prohibition came into effect after they had exchanged contracts. There are also exceptions to ensure that emergency repairs and other repairs to any occupied building that are necessary for the safety of residents can proceed.
Both prohibitions are subject to exceptions to exclude critical national infrastructure projects and to permit certain entities in developers’ corporate groups that are not in the building industry to have the prohibitions disapplied to them where this would not frustrate the purpose of the scheme.
I know the Committee will also be concerned about other industry actors, particularly construction products manufacturers. It is unacceptable that cladding and insulation manufacturers have not yet acknowledged their responsibility for the legacy of unsafe buildings. Most recently, the Secretary of State has written to three industry participants, Kingspan, Arconic and Saint-Gobain, and to their institutional shareholders, to make it clear that those manufacturers must contribute to the cost of remediation or may face severe consequences. The Government will consider all options to ensure that construction products manufacturers contribute their fair share.
These regulations launch an important scheme for developers to remediate unsafe buildings. Given the urgency of this issue, we are bringing forward these regulations for a scheme focused on larger developers at speed. We propose to extend the scheme over time to cover all developers that have built defective buildings over 11 metres and should be paying to fix them. I commend these draft regulations to the Committee.
My Lords, I very much welcome the way my noble friend has introduced these important regulations. My dear late father was an architect so I was brought up in that climate, and I do not think anybody in the industry disputes the fact that those responsible for developing unsafe buildings should remedy the defects at their own cost as quickly as possible. That bit seems to be agreed all round.
However, there are some aspects of the scheme that I hope my noble friend will take on board and that should probably result in some changes. The first is the presumption that anyone who has developed a building above 11 metres has to bear the burden of proof that their buildings are not unsafe. That is a pretty costly execution to be done, plus I wonder whether this self-examination is actually the right way forward. What ought to happen is that a regulator should be employed and report accordingly to the Secretary of State.
Secondly—and this is an important dimension—the regulations impose qualifying criteria for membership that appear to bear no rational relationship with the harm identified. Rather than specifying membership criteria by reference to the number of buildings above 11 metres developed, instead the criteria relate to profitability. The result is that a cowboy developer that has built countless buildings of 11 metres and over unprofitably appears to escape the criteria, but for the responsible developer that has built virtually no buildings above 11 metres, profitability is required to join the scheme, with all the obligations that entails.
My Lords, I had finished two of the three key features I wanted to address, which were eligibility and obligations. I now turn to probably the most important of the lot: sanctions. As I understand it, failure to join the RAS means exclusion from the planning and building control systems. In effect, that means exclusion from most commercial and residential development in England for all companies, including non-developer companies—for example, an engineering subsidiary wanting to expand.
These sanctions are automatic. The regulations remove discretion in their use from the Secretary of State. The underlying Act originally contemplated the availability of discretion, but somehow it does not appear to have been carried through to the regulations. There are no mechanisms to determine whether the sanctions are proportionate to the risk or the harm. These coercive penalties would also apply to any further membership conditions applied in future, including compulsory financial contributions for works to buildings to which the scheme member had no connection at all.
I conclude with my reading of the situation. The severity of the penalties and the sanctions, the lack of discretion in their application, the arbitrary nature of inclusion in the scheme and the effect on employees, subcontractors, other stakeholders and shareholders seem to me, and to others outside who I have talked to, to be disproportionate and suggest that—I hope—His Majesty’s Government will think again. This industry is absolutely vital to this country; we see that daily in the newspapers.
My noble friend mentioned the material suppliers. In many ways, to any of us who take a real interest in this, they are equally liable. After all, without rotten materials that were highly inflammable, we probably would not have had Grenfell. I am surprised that, if I understand what my noble friend said, so far no single firm in that field has contributed anything or is proposing to join the scheme and contribute.
The other area that my noble friend did not cover was overseas developers. A fair number of projects was undertaken by overseas developers. We have a diplomatic corps in these countries. I hope that our ambassadors or high commissioners in the relevant countries have been given the information to pursue these developers. They should be looked upon just as firmly as are our developers. If they do not wish to contribute at all, frankly, in my judgment they should be barred from working in the United Kingdom in future.
My Lords, it is seven years since the Grenfell Tower fire that killed 72 people and devastated the lives of countless others. We owe it to them, and to all those still living in buildings deemed to be unsafe, to find a route to full remediation that excludes innocent tenants and innocent leaseholders from any of the costs.
As the Minister stated, the Building Safety Act included the measures that the Government intended to take to enforce the cost of remediation on those who developed the buildings. They should also have included a route to impose the costs of remediation on those who used the flammable cladding. I know that the Minister referenced this but to date, seven years on, the Government have not been able to find a route to force the three substantial manufacturers that the Minister named to accept responsibility and accept that they ought to pay towards the costs of remediation.
Then there are the construction companies that omitted fire breaks, relied on false material-testing outcomes and relied on building inspectors contracted by the very same construction company. We Liberal Democrats have said from the very beginning, seven years ago, that whatever legislation is passed to put these wrongs right, leaseholders must not pay a penny.
Through the Building Safety Act and this statutory instrument, the Government have focused entirely on the developers. Of course, that is right, but there are government responsibilities here as well. I am talking about all Governments, not necessarily this one. Thirty years ago, those who privatised the Building Research Establishment and the British Board of Agrément enabled building control inspectors to become independent of the local planning authority. All these policy decisions played a part in enabling the Grenfell disaster. I say that because that has been said in the Grenfell Tower inquiry.
No doubt, when the inquiry publishes its findings, hopefully sometime this year, it will expose these facts and attribute relative responsibilities. Meanwhile, these regulations are draconian; in many cases rightly so. However, there are inevitably some unforeseen consequences. The first of these relates to developers that are brought into the scheme and discover that, following intrusive building inspections, their developments need no further action. The noble Lord, Lord Naseby, and I have obviously had access to the same lobbying material from those in the industry who are concerned about some aspects of these regulations.
The principle is sound; the implementation is leading to some circumstances in which those who are not responsible will be required to fund remediation for which they have no part to play. The issues arise, first, from the criteria the Government have set. As the noble Lord, Lord Naseby, pointed to, these are around profitability—so those developers that were unprofitable but nevertheless built these faulty and dangerous buildings are excluded. I am sure the Government did not intend that to be the case, so I hope the Minister will point to the way in which that will not happen. It does not seem right at all, because we know how companies can evade some of the requirements put on them.
The next area has again been raised by the noble Lord, Lord Naseby, but I want to emphasise some of it. I remember the debates on the Building Safety Act. Initially, it was all about trying to ensure that only those developers and construction companies, and those who knowingly supplied flammable cladding—I am still waiting for that bit; I say “knowingly” as it is in the evidence of the Grenfell Tower inquiry—would be made liable for the remediation cost. That is fair and is absolutely the right thing to do. Those who did these things knowingly must be made to pay for them, but not those who did not. Unfortunately, the great scoop of these regulations will pull in some companies and developers that built blocks of flats of over 11 metres but kept to the rules that existed at the time. That does not seem right.
Another issue with these regulations—I am sure that the Minister will recognise this as an unforeseen outcome of them—is that I could see no way by which developers, once they join the scheme and then assess their buildings, at a considerable cost, are able to leave the scheme if they find that there is no action to be taken. This issue was in the lobbying material as well. Perhaps the Minister will either give me an assurance that they can or point me to where it says that they can leave, because that would be helpful.
There is another issue with these regulations, which are very extensive. Many developers are part of a wider family of companies, some of which will have had no part to play in development. That family of companies is being brought into the scheme and could be sanctioned, even if it is a company that has nothing to do with development. That does not seem right either, and I am sure the Government did not want it to happen. It would be foolish, but the sanctions are automatic.
This is all about the unforeseen outcomes of some draconian regulations, which I support. But we have to try to find a way in which good players are able to escape the scheme, and the sanctions and obligations that are part of it.
I will now raise the consequential impact of these regulations on local planning authorities. I remind the Committee that I am a councillor and a vice-president of the Local Government Association. I notice that there is an impact assessment, and calculations have been made of additional costs, but I am not sure that it has taken into account the differential impacts on local planning authorities across the country. The regulations will have very little impact on some, and a major impact on others. For those on which there will be a major impact, there will be expectations of additional members of staff, either in building inspection or as local planners. That does not seem to have been raised in the impact assessment as a calculation of costs to local planning authorities. I know the Minister agrees with the “new burdens” philosophy—the agreement that any new burdens that the Government impose will be met in full—so will the costs be met in full and, importantly, over the lifetime of these regulations?
Secondly, in her opening remarks—for which I thank her—the Minister emphasised social housing remediation a couple of times. Can she remind us where the costs for essential remediation of social housing—either local authority housing or social housing providers—will come from?
My next point is about the end date for the regulations. It seems that they are designed to respond to a specific set of issues so, once all the remediation work has been done, will the regulations cease? I could not find a sunset clause; should there be one? Otherwise, we will have sets of regulations that are no longer relevant.
Finally, I remind the Minister that these regulations address the safety issues facing only those who live in buildings that are more than 11 metres high. She will know what I am about to say, because I feel very strongly about it: those living in blocks that are 11 metres or lower are being forgotten. The leaseholders who live there still face extortionate insurance costs, for example, and many are still trapped in their flats, unable to sell. My big ask of the Minister is this: will she agree to meet those of us in the House who are concerned about this situation to discuss it and see whether we can find a way forward? It is not going away. The Government have tried; I am not pointing fingers. It is just that this is where we are, and we have to try to find a solution.
In conclusion, I totally support these regulations, with the caveats that I have explained. I want them to succeed, but I want the Minister and the Government to think about the unconsidered consequences. I look forward to what she has to say in response.