Building Safety (Responsible Actors Scheme and Prohibitions) Regulations 2023

Tuesday 20th June 2023

(1 year, 5 months ago)

Grand Committee
Read Hansard Text Read Debate Ministerial Extracts
Considered in Grand Committee
15:45
Moved by
Baroness Scott of Bybrook Portrait Baroness Scott of Bybrook
- Hansard - - - Excerpts

That the Grand Committee do consider the Building Safety (Responsible Actors Scheme and Prohibitions) Regulations 2023.

Relevant document: 38th Report from the Secondary Legislation Scrutiny Committee. Special attention drawn to the instrument by the Joint Committee on Statutory Instruments.

Baroness Scott of Bybrook Portrait The Parliamentary Under-Secretary of State, Department for Levelling Up, Housing & Communities (Baroness Scott of Bybrook) (Con)
- Hansard - - - Excerpts

My Lords, these regulations establish a responsible actors scheme for developers under Sections 126 to 129 of the Building Safety Act 2022, focused on the remediation by developers of historic fire safety defects in residential buildings they have developed in England. Developers that are eligible for the scheme but choose not to join, and developers that join the scheme but then renege on their membership commitments, will be prohibited from carrying out major development or obtaining building control approvals.

Following the Grenfell Tower tragedy, it became evident that thousands of residential buildings over 11 metres had serious fire safety defects. This put resident safety at unacceptable risk while leaving many leaseholders facing potentially life-changing remediation costs. This scheme is one part of the Government’s wider response to the building safety issues that came to light following Grenfell. In addition to the scheme, we are protecting residents by investing £5.1 billion in remediating unsafe cladding on 18 metre-plus buildings; securing industry contributions to remediation through introducing a building safety levy; implementing statutory leaseholder protections against unfair costs of remediation; and creating new legal avenues for affected parties to recover remediation costs from those who caused the problem.

This scheme focuses on major private sector developers, which sit at the top of the supply chain and have overall responsibility for their developments. The Government engaged with major developers through a remediation pledge and then a legally binding developer remediation contract. I welcome the action taken by 48 developers that have signed the developer remediation contract; these include the top 10 private sector UK housebuilders. The scheme will create a level playing field whereby eligible developers that commit to remediate are not placed at a competitive disadvantage compared with those that do not.

The regulations set out three descriptions of persons who are eligible to join the scheme. Developers based anywhere may be eligible for the scheme, if they developed relevant buildings in England. First, major housebuilders are eligible where their principal business has been residential property development; they were responsible for the development or refurbishment of one or more 11 metre-plus residential buildings in England in the 30 years ending 4 April 2022; and they meet the profits condition set out in the regulations. Secondly, developers are eligible where they meet the profits condition and they were responsible for the development or refurbishment of at least two buildings that we know are defective because the buildings have been assessed as eligible for a relevant government remediation fund. Thirdly, there is a voluntary eligibility provision. This allows other persons to join, where they were responsible for the development or refurbishment of a building that would require remediation under the developer remediation contract.

The profits condition is focused on typical operating profits averaged across the three years from 2017 to 2019, which were not impacted by the Covid pandemic. Both the profits condition and other aspects of the eligibility provisions make appropriate provision for the complex company group structures used by some developers.

The regulations make clear that registered providers of social housing are not eligible for the scheme. They will not be invited or permitted to join.

The core conditions of membership of the scheme are for developers to commit to identifying and remediating life-critical fire safety defects in residential buildings over 11 metres in height that they developed or refurbished in England in the 30 years ending on 4 April 2022, and to reimburse taxpayers for government-funded remediation of such buildings. To demonstrate their commitment, an eligible developer must enter into a self-remediation contract: a contract containing the terms of the developer remediation contract published by the Secretary of State in March this year. The membership conditions require members to give effect to their remediation and reimbursement commitments in accordance with the contract’s terms.

I turn now to the application provisions. The Committee will be aware that the Joint Committee on Statutory Instruments has drawn attention to two technical aspects of the drafting of these regulations, including one relating to the scheme’s application provisions. I am grateful to the Joint Committee for its time, its valuable scrutiny and its report, which the Government have carefully considered. We have corresponded with the Joint Committee and provided a memorandum setting out our position, which is printed as an appendix to the Joint Committee’s report.

I welcome this opportunity to reaffirm our overall position on the issues raised, as explained in the memorandum. On the application provisions, we consider it to be clear in context that, where the Secretary of State identifies that a person is likely to be eligible for the scheme, they will be invited to join it, but the registered providers of social housing will not be invited to join, as they are not eligible under Regulation 6. In light of the Committee’s report, we will monitor implementation carefully and consider bringing forward amending regulations in the event that the regulations give rise to a misunderstanding in practice as to who is invited or able to join the scheme. The Government will also issue guidance on aspects of the scheme. However, the issue of developer remediation of unsafe buildings is urgent, and I seek the Committee’s approval of these regulations today.

The regulations set out the time period to join the scheme and give developers an opportunity to make representations if they believe that they are not eligible. They also set out how developers can join the scheme in other circumstances, including under the voluntary eligibility provisions.

Membership of the scheme may be revoked for breach of membership conditions or ended without fault where a member has substantially satisfied their obligations. Members will have the opportunity to make representations to the Secretary of State before their membership is revoked. Should an eligible developer decide not to join the scheme by the end of the application period, or should their membership be revoked for failure to comply with the scheme’s conditions, they will, in accordance with the regulations, be prohibited from carrying out major development or obtaining building control approvals.

At this point the developer, and known persons controlled by the developer, will be notified and then added to a published prohibitions list, which will be used by local authorities for enforcement. Only a person named on the prohibitions list will be subject to the prohibitions. The regulations also apply the prohibitions to persons controlled by the developer to make sure that developers cannot easily avoid the prohibitions by continuing their development business through other entities they control. Prohibited persons will be subject to a planning prohibition that prevents them carrying out major development in England, except where planning permission is received before these regulations come into effect. Development of land carried out by a prohibited developer in breach of a prohibition will constitute a breach of planning control.

The regulations include provision that developers notify the local planning authority about their status as a prohibited person, or when the prohibitions are lifted. The Joint Committee on Statutory Instruments has reported on the absence of a specific sanction for failure to give notice under these provisions. I would like to reassure the Committee that these regulations are effective without such a sanction. The primary mechanism for identifying prohibited persons will be the prohibitions list published by the Secretary of State, so local planning authorities will have access to all the information they need even if a developer fails to notify them. In addition, any developer that engages in development contrary to the prohibition will as a result be subject to sanctions through planning enforcement.

The regulations also establish a building control prohibition, which prevents prohibited persons gaining initial and final building control approval in respect of any building work that requires such approval. The prohibitions have limited exceptions. The purpose of these exceptions is to mitigate potential impact on innocent third parties such as off-plan buyers, the wider public and certain entities that are not in the building industry.

The building control prohibition is subject to exceptions that seek to protect innocent third-party purchasers of properties from a prohibited developer, including a specific exception to assist those whose deposits could be at risk if a prohibition came into effect after they had exchanged contracts. There are also exceptions to ensure that emergency repairs and other repairs to any occupied building that are necessary for the safety of residents can proceed.

Both prohibitions are subject to exceptions to exclude critical national infrastructure projects and to permit certain entities in developers’ corporate groups that are not in the building industry to have the prohibitions disapplied to them where this would not frustrate the purpose of the scheme.

I know the Committee will also be concerned about other industry actors, particularly construction products manufacturers. It is unacceptable that cladding and insulation manufacturers have not yet acknowledged their responsibility for the legacy of unsafe buildings. Most recently, the Secretary of State has written to three industry participants, Kingspan, Arconic and Saint-Gobain, and to their institutional shareholders, to make it clear that those manufacturers must contribute to the cost of remediation or may face severe consequences. The Government will consider all options to ensure that construction products manufacturers contribute their fair share.

These regulations launch an important scheme for developers to remediate unsafe buildings. Given the urgency of this issue, we are bringing forward these regulations for a scheme focused on larger developers at speed. We propose to extend the scheme over time to cover all developers that have built defective buildings over 11 metres and should be paying to fix them. I commend these draft regulations to the Committee.

Lord Naseby Portrait Lord Naseby (Con)
- Hansard - - - Excerpts

My Lords, I very much welcome the way my noble friend has introduced these important regulations. My dear late father was an architect so I was brought up in that climate, and I do not think anybody in the industry disputes the fact that those responsible for developing unsafe buildings should remedy the defects at their own cost as quickly as possible. That bit seems to be agreed all round.

However, there are some aspects of the scheme that I hope my noble friend will take on board and that should probably result in some changes. The first is the presumption that anyone who has developed a building above 11 metres has to bear the burden of proof that their buildings are not unsafe. That is a pretty costly execution to be done, plus I wonder whether this self-examination is actually the right way forward. What ought to happen is that a regulator should be employed and report accordingly to the Secretary of State.

Secondly—and this is an important dimension—the regulations impose qualifying criteria for membership that appear to bear no rational relationship with the harm identified. Rather than specifying membership criteria by reference to the number of buildings above 11 metres developed, instead the criteria relate to profitability. The result is that a cowboy developer that has built countless buildings of 11 metres and over unprofitably appears to escape the criteria, but for the responsible developer that has built virtually no buildings above 11 metres, profitability is required to join the scheme, with all the obligations that entails.

16:00
My third overall observation is that membership, as I understand it, involves the requirement to sign up to a binding contract negotiated by the department’s lawyers, apparently with some select representatives from the industry. I am not aware, in the time I have been in Parliament—nearly 50 years now—of where we have had a statutory liability subordinated to a contractual document in terms that give some cause for concern.
I will list three key features that came to my mind as I worked my way through these papers. First, there is eligibility. Inclusion is understandably determined with reference to profitability in financial years 2017, 2018 and 2019, together with having developed any residential building over 11 metres in any year since 1992. So you are automatically included, even if you have only one or two buildings a few centimetres over 11 metres and they do not, in the view of the developer, need remediation. They are automatically excluded if they are unprofitable, no matter how many buildings the developer builds of 11 metres and over. Logically, one would have thought that the more buildings that have been developed, the greater the statistical risk to the public. In other words, rather than leaving the burden of proof where it normally lies—on the regulator to show that there had been a breach—in this scheme, instead, it amounts to the Secretary of State saying, “I have decided, in broad terms, that because you all meet these criteria”, seemingly selected without consultation, I am told by the industry, “you must prove that you are not in breach”.
Secondly, there is obligation. The obligation is to sign a developer remediation contract. As my noble friend rightly says, this contract has already been signed—voluntarily, we are told, but it seems from talking to some of the contractors in the business that it was not entirely voluntary, bearing in mind the sanctions if they do not sign—by 48 companies, thankfully. That is good in itself. It seems to me that it was not, initially at least, intended that those companies with buildings that were not in need of repair should be included. Nor, as I understand it, was it anticipated that people, particularly small and medium-sized contractors, with buildings that were 11.2 or 11.3 metres —and others right at the bottom of the scale—would be included.
Thirdly, and importantly, I come to the sanctions. They are pretty tough. In fact, I am not aware of any such scheme in all the time I have been working in and commenting on this market. Failure to join the RAS means exclusion from the planning and building control systems, hence exclusion from—
Baroness Pitkeathley Portrait The Deputy Chairman of Committees (Baroness Pitkeathley) (Lab)
- Hansard - - - Excerpts

My Lords, there is a Division in the Chamber. The Committee will adjourn for 10 minutes.

16:04
Sitting suspended for a Division in the House.
16:14
Baroness Pitkeathley Portrait The Deputy Chairman of Committees (Baroness Pitkeathley) (Lab)
- Hansard - - - Excerpts

My Lords, as there is another Division immediately, we will not restart the Committee. We will start it again at 4.25 pm, by which time the second Division will have taken place.

16:15
Sitting suspended for a Division in the House.
16:26
Lord Naseby Portrait Lord Naseby (Con)
- Hansard - - - Excerpts

My Lords, I had finished two of the three key features I wanted to address, which were eligibility and obligations. I now turn to probably the most important of the lot: sanctions. As I understand it, failure to join the RAS means exclusion from the planning and building control systems. In effect, that means exclusion from most commercial and residential development in England for all companies, including non-developer companies—for example, an engineering subsidiary wanting to expand.

These sanctions are automatic. The regulations remove discretion in their use from the Secretary of State. The underlying Act originally contemplated the availability of discretion, but somehow it does not appear to have been carried through to the regulations. There are no mechanisms to determine whether the sanctions are proportionate to the risk or the harm. These coercive penalties would also apply to any further membership conditions applied in future, including compulsory financial contributions for works to buildings to which the scheme member had no connection at all.

I conclude with my reading of the situation. The severity of the penalties and the sanctions, the lack of discretion in their application, the arbitrary nature of inclusion in the scheme and the effect on employees, subcontractors, other stakeholders and shareholders seem to me, and to others outside who I have talked to, to be disproportionate and suggest that—I hope—His Majesty’s Government will think again. This industry is absolutely vital to this country; we see that daily in the newspapers.

My noble friend mentioned the material suppliers. In many ways, to any of us who take a real interest in this, they are equally liable. After all, without rotten materials that were highly inflammable, we probably would not have had Grenfell. I am surprised that, if I understand what my noble friend said, so far no single firm in that field has contributed anything or is proposing to join the scheme and contribute.

The other area that my noble friend did not cover was overseas developers. A fair number of projects was undertaken by overseas developers. We have a diplomatic corps in these countries. I hope that our ambassadors or high commissioners in the relevant countries have been given the information to pursue these developers. They should be looked upon just as firmly as are our developers. If they do not wish to contribute at all, frankly, in my judgment they should be barred from working in the United Kingdom in future.

Baroness Pinnock Portrait Baroness Pinnock (LD)
- Hansard - - - Excerpts

My Lords, it is seven years since the Grenfell Tower fire that killed 72 people and devastated the lives of countless others. We owe it to them, and to all those still living in buildings deemed to be unsafe, to find a route to full remediation that excludes innocent tenants and innocent leaseholders from any of the costs.

As the Minister stated, the Building Safety Act included the measures that the Government intended to take to enforce the cost of remediation on those who developed the buildings. They should also have included a route to impose the costs of remediation on those who used the flammable cladding. I know that the Minister referenced this but to date, seven years on, the Government have not been able to find a route to force the three substantial manufacturers that the Minister named to accept responsibility and accept that they ought to pay towards the costs of remediation.

Then there are the construction companies that omitted fire breaks, relied on false material-testing outcomes and relied on building inspectors contracted by the very same construction company. We Liberal Democrats have said from the very beginning, seven years ago, that whatever legislation is passed to put these wrongs right, leaseholders must not pay a penny.

Through the Building Safety Act and this statutory instrument, the Government have focused entirely on the developers. Of course, that is right, but there are government responsibilities here as well. I am talking about all Governments, not necessarily this one. Thirty years ago, those who privatised the Building Research Establishment and the British Board of Agrément enabled building control inspectors to become independent of the local planning authority. All these policy decisions played a part in enabling the Grenfell disaster. I say that because that has been said in the Grenfell Tower inquiry.

No doubt, when the inquiry publishes its findings, hopefully sometime this year, it will expose these facts and attribute relative responsibilities. Meanwhile, these regulations are draconian; in many cases rightly so. However, there are inevitably some unforeseen consequences. The first of these relates to developers that are brought into the scheme and discover that, following intrusive building inspections, their developments need no further action. The noble Lord, Lord Naseby, and I have obviously had access to the same lobbying material from those in the industry who are concerned about some aspects of these regulations.

The principle is sound; the implementation is leading to some circumstances in which those who are not responsible will be required to fund remediation for which they have no part to play. The issues arise, first, from the criteria the Government have set. As the noble Lord, Lord Naseby, pointed to, these are around profitability—so those developers that were unprofitable but nevertheless built these faulty and dangerous buildings are excluded. I am sure the Government did not intend that to be the case, so I hope the Minister will point to the way in which that will not happen. It does not seem right at all, because we know how companies can evade some of the requirements put on them.

The next area has again been raised by the noble Lord, Lord Naseby, but I want to emphasise some of it. I remember the debates on the Building Safety Act. Initially, it was all about trying to ensure that only those developers and construction companies, and those who knowingly supplied flammable cladding—I am still waiting for that bit; I say “knowingly” as it is in the evidence of the Grenfell Tower inquiry—would be made liable for the remediation cost. That is fair and is absolutely the right thing to do. Those who did these things knowingly must be made to pay for them, but not those who did not. Unfortunately, the great scoop of these regulations will pull in some companies and developers that built blocks of flats of over 11 metres but kept to the rules that existed at the time. That does not seem right.

Another issue with these regulations—I am sure that the Minister will recognise this as an unforeseen outcome of them—is that I could see no way by which developers, once they join the scheme and then assess their buildings, at a considerable cost, are able to leave the scheme if they find that there is no action to be taken. This issue was in the lobbying material as well. Perhaps the Minister will either give me an assurance that they can or point me to where it says that they can leave, because that would be helpful.

There is another issue with these regulations, which are very extensive. Many developers are part of a wider family of companies, some of which will have had no part to play in development. That family of companies is being brought into the scheme and could be sanctioned, even if it is a company that has nothing to do with development. That does not seem right either, and I am sure the Government did not want it to happen. It would be foolish, but the sanctions are automatic.

This is all about the unforeseen outcomes of some draconian regulations, which I support. But we have to try to find a way in which good players are able to escape the scheme, and the sanctions and obligations that are part of it.

I will now raise the consequential impact of these regulations on local planning authorities. I remind the Committee that I am a councillor and a vice-president of the Local Government Association. I notice that there is an impact assessment, and calculations have been made of additional costs, but I am not sure that it has taken into account the differential impacts on local planning authorities across the country. The regulations will have very little impact on some, and a major impact on others. For those on which there will be a major impact, there will be expectations of additional members of staff, either in building inspection or as local planners. That does not seem to have been raised in the impact assessment as a calculation of costs to local planning authorities. I know the Minister agrees with the “new burdens” philosophy—the agreement that any new burdens that the Government impose will be met in full—so will the costs be met in full and, importantly, over the lifetime of these regulations?

Secondly, in her opening remarks—for which I thank her—the Minister emphasised social housing remediation a couple of times. Can she remind us where the costs for essential remediation of social housing—either local authority housing or social housing providers—will come from?

My next point is about the end date for the regulations. It seems that they are designed to respond to a specific set of issues so, once all the remediation work has been done, will the regulations cease? I could not find a sunset clause; should there be one? Otherwise, we will have sets of regulations that are no longer relevant.

Finally, I remind the Minister that these regulations address the safety issues facing only those who live in buildings that are more than 11 metres high. She will know what I am about to say, because I feel very strongly about it: those living in blocks that are 11 metres or lower are being forgotten. The leaseholders who live there still face extortionate insurance costs, for example, and many are still trapped in their flats, unable to sell. My big ask of the Minister is this: will she agree to meet those of us in the House who are concerned about this situation to discuss it and see whether we can find a way forward? It is not going away. The Government have tried; I am not pointing fingers. It is just that this is where we are, and we have to try to find a solution.

In conclusion, I totally support these regulations, with the caveats that I have explained. I want them to succeed, but I want the Minister and the Government to think about the unconsidered consequences. I look forward to what she has to say in response.

Baroness Taylor of Stevenage Portrait Baroness Taylor of Stevenage (Lab)
- Hansard - - - Excerpts

My Lords, I draw attention to my interests in the register as a councillor at both district and county level and as a vice-president of the District Councils’ Network, though not the LGA—yet.

I thank the Minister for introducing the regulations, which we welcome. I am sure all noble Lords want every possible step taken to support leaseholders and to speed up the remediation of these unsafe buildings. Perhaps it is my inexperience in this House, but would it not be more appropriate for legislation with 43 clauses to be considered properly, as a Bill, rather than as regulations? We understand how urgent this is, so if the Minister has done it as a matter of expediency, perhaps she could confirm that it could not have been achieved in another way, allowing full scrutiny of all the issues raised by noble Lords this afternoon.

16:45
Some of these issues, including those around eligibility, as raised by the noble Lord, Lord Naseby, and those around housing associations, social housing and other actors, as raised by the Minister, show that further work on this—what amounts to a mini-Bill—might have been helpful. I think there is probably another piece of work to be done on the issues we have heard about construction materials.
We have worked constructively with the Government through the drafting of legislation to improve building and fire safety and will continue to do so. It is unfortunate that here we are now—I am sorry to contradict the noble Baroness, Lady Pinnock—I believe six years on from the dreadful events of Grenfell Tower.
Baroness Pinnock Portrait Baroness Pinnock (LD)
- Hansard - - - Excerpts

Oh yes, it is six years.

Baroness Taylor of Stevenage Portrait Baroness Taylor of Stevenage (Lab)
- Hansard - - - Excerpts

It is unfortunate that we are only now starting to make some progress on the essential remediation works that will allow leaseholders to sleep easily in their beds and begin to get their financial plans and aspirations back on track. I appreciate that some well-intentioned developers have done work in the meantime, but the regulatory framework supporting it is only now coming into play.

I pay tribute to the tireless campaigning groups, both those directly associated with Grenfell and others such as the Cladiators group in my area, driven by Sophie Bichener. I know the Minister is very familiar with Sophie’s case so I will not reiterate all the details, but the firebreaks referred to by the noble Baroness, Lady Pinnock, are a good example of non-cladding-related building fire safety jeopardy. Without these campaigns, we would almost certainly be no nearer having this leaseholder limbo resolved.

The fact that 48 developers have now signed up to the remediation contract is a significant step forward; there is no doubt about that. However, signing up is one thing and action is another. We hope that things will start to move much more quickly now. What steps is the department taking to ensure that developers move as quickly as possible on the remediation steps, and how will it monitor, challenge and enforce where appropriate?

We hope that the reports of full risk assessments by major developers to determine which defects need resolution and which do not are not simply a further device to delay essential works. Can the Minister tell us whether any deadlines are being set for all such risk assessments to be completed?

We would also like some reassurance about how leaseholders will be kept informed and updated on progress. Does this responsibility fall on the developers? If so, how will the department ensure that it has been carried out?

In his Statement on 14 March 2023, the Secretary of State rightly said:

“Those who are responsible must pay”.—[Official Report, Commons, 14/3/23; col. 727.]


While we welcome the fact that 48 builders have already signed up, it is extremely disappointing that some have still refused to do so. We are aware that the Secretary of State has rightly been very robust in his language in trying to bring builders that have not yet signed the contracts into line with those that have. We absolutely support this robust approach and hope that it is successful. If not, as the Secretary of State has clearly stated, such developers will be prohibited from further development. We have heard more about that this afternoon.

It would be helpful to know how such a ban will be enforced. The Minister has set out some further information relating to the enforcement process but it would be helpful to know how it will work. Is it to be done by the department or will it be a new burden on local government—as referred to by the noble Baroness, Lady Pinnock—and will that new burden be fully funded?

We welcome any action to address the building safety crisis, but the remediation contract and responsible actors scheme are still only a partial fix to the problem—in part, owing to the more limited scope of the definition of a relevant defect used in the remediation contract—compared to the Building Safety Act. Signing the contract will not obligate developers to fix all life-critical fire safety defects as defined by the Building Safety Act 2022. The Government acknowledge this in the Explanatory Memorandum, where they state:

“The developer self-remediation approach, and the RAS, is to be expanded over time to cover other developers who developed or refurbished defective 11m+ residential buildings and should pay to fix them”.


Is it intended to extend the contract in future to cover all life-critical fire safety defects? We also have a particular concern regarding the number of buildings covered by the contract. The department itself estimates that only 1,500 buildings will be remediated as a result of the contract, whereas credible estimates put the total number in need of remediation at around 10,000.

The Secondary Legislation Scrutiny Committee comments that

“between 6,220 and 8,890 mid-rise (11 to 18 metres) residential buildings required work to alleviate life-critical fire safety risks due to external wall systems”.

How does the Minister envisage this being resolved and what is the timescale? How many of the outstanding buildings beyond the 1,500 are the responsibility of those developers that have refused to sign the contract?

Meanwhile, ACM cladding remains on faulty high-rise buildings, with remediation not having even started on 22 of them. The building safety fund for remediation of non-ACM cladding and other fire safety defects on high-rise buildings is proceeding at a glacial pace, with just 37 buildings having completed remediation out of the 1,225 applications for funding. The building safety fund for non-ACM high-rise remediation was rated as red in the Infrastructure and Projects Authority annual report for 2022, falling from amber the year before, meaning, to quote the report:

“Successful delivery of the project appears to be unachievable. There are major issues with project definition, schedule, budget, quality and/or benefits delivery, which at this stage do not appear to be manageable or resolvable. The project may need re-scoping and/or its overall viability reassessed”.


Many leaseholders in unsafe buildings waited patiently for years for building safety fund applications to be processed by the department, only to see them terminated. What guarantees are there that any building covered by the contract will not face additional delays to remediation work? Although we welcome the further action proposed in the regulations, some questions remain outstanding. How will leaseholders in buildings with defects outside the scope of the contract get them remediated?

With reference to developer obligations to identify, assess and remediate unsafe buildings, the contract stipulates that they must be carried out “as soon as reasonably practicable”. What assurances can be given to affected leaseholders of their ability to enforce this to ensure that developers are acting within a reasonable timeframe? What is the point of contact in the department and what powers will be used to support them? Why are buildings that are part of national infrastructure exempt? Surely, people working in or living close to such buildings should expect at least as great a level of protection, if not more.

I note the Minister’s comments about prohibited persons, but it is difficult to see how the use of new entities will not avoid those prohibitions and, without sanctions on that, where is the incentive not to do so? Can the Minister explain how new developers will be brought into the regulatory framework?

The Minister raised the critical issue of construction products. Will we receive further regulations on this? It seems they may be necessary. There was a Question today in your Lordships’ House on the manufacturers of construction products used in schools. Surely the manufacturers of construction products must be responsible for adequate safety testing of materials they produce.

I agree with the noble Baroness, Lady Pinnock, about work for remediation of buildings under 11 metres. What assessment has been done by the department of the extent of those issues in lower-rise buildings?

To reiterate, we welcome the additional regulations and encourage the Minister and the Secretary of State to be as robust as is necessary to bring these long-drawn-out issues to a stage of remediation and resolution. We hope that the department will use every power it has to deal with those who are not looking to do the right thing and live up to their responsibilities. The leaseholders in these buildings have been faced with a living nightmare. We owe it to them to get these issues resolved without any further delay.

Baroness Scott of Bybrook Portrait Baroness Scott of Bybrook (Con)
- Hansard - - - Excerpts

I thank the noble Lords who have contributed today. I open my remarks and answers to the questions asked by saying that the noble Baroness, Lady Pinnock, is absolutely right: six years ago, 72 people died; that is what we are talking about today and why this is such an important statutory instrument. To the noble Baroness, Lady Taylor of Stevenage, I say that this is secondary legislation to the Building Safety Act 2022; that is how it comes in today.

I move on to answering questions. A number were asked by all three noble Lords, so excuse me if I do not mention each name but I will try to remember them. First, the Government believe that it is fair and reasonable that developers that meet the prescribed eligibility criteria for the responsible actors scheme, including a profit threshold, should be asked to assess whether they have developed relevant buildings that require remediation, and remediate those buildings.

We believe it is appropriate that the Government create a level playing field with consequences for eligible developers that opt not to make these important commitments. The obligations under the scheme and contracts for developers with no buildings to remediate are very modest once they have done the necessary work to check and confirm that they have developed no buildings requiring remediation work. As I said in my speech, an eligible developer that substantially satisfies its obligations under the regulations and the self-remediation terms may be released from the scheme. I think that answers the question from the noble Baroness, Lady Pinnock. We are engaging with a number of developers about the developer remediation contract, and I hope they will respond positively to that engagement.

I move on to the issue of construction product manufacturers. I know that this is a concern of noble Lords and it is an important one. I reiterate that the Secretary of State made clear in a recent letter to the major institutional shareholders in the three companies most involved—Kingspan, Arconic and Saint-Gobain—that, if an appropriate financial package is not agreed, the focus of the department will be trained on them, and the consequences for the relevant construction product manufacturers are likely to be severe. We can do this only one stage at a time, but they are next in line. The Secretary of State made it clear that reputational, legal, commercial or further new tools could all be considered if these firms do not do the right thing.

My noble friend Lord Naseby asked: who says that these buildings are unsafe? The Government believe that it is fair and reasonable that the developers that meet the prescribed eligibility criteria for the RAS, including a profits threshold, should be asked to assess whether they have developed relevant buildings that require remediation. I do not think that is unreasonable.

My noble friend also asked why we were focused on profits. We have used the £10 million average operating profits threshold to make sure that the initial phase of the scheme captures larger, more profitable businesses and those that have developed the majority of the affected buildings.

My noble friend also asked about the application of prohibitions to group companies. An eligible non-member of the scheme will be prohibited along with the entities that they control, so it is not all group companies and an exception is available for entities controlled by an eligible non-member that is not in the building industry. Developers can have quite complex business relationships both here and abroad, and we need to capture those as well.

17:00
That takes me on to foreign developers. I thought I made it clear that any overseas-based developer that meets the eligibility criteria in the regulations will be eligible for the scheme. The eligibility criteria do not distinguish between overseas-based and UK-based companies. Several developers that have signed the developer remediation contract have overseas parent companies at the moment. Looking beyond the responsible actors scheme, the building safety levy will be tied to the building safety process in England. Qualifying projects will be required to pay the levy regardless of where the developer is based. I hope that answers the question about that.
I think I have answered the question from the noble Baroness, Lady Pinnock. Where members have satisfied the Secretary of State that they have done everything they should, their membership can then cease.
I knew the noble Baroness would bring up the point about buildings under 11 metres. I am sorry that there is nothing more to say, but I will reiterate what I have already said for Hansard, because it is important. The scheme and the developer remediation contracts cover residential buildings over 11 metres. That reflects the risk to life from historical fire safety defects, which is much lower in buildings under 11 metres. Therefore, building safety-related remediation works are required in a very small number of buildings under 11 metres. We discussed this at length in the debates on the Bill and I am not sure I can say any more, except that, in very rare cases where remediation work is needed, the responsibility for the costs of fixing the historical building safety defects should—and does—still rest with the building owner. They should not pass these costs on to leaseholders but seek to recover them from those responsible for building unsafe homes in the first place. I am more than happy to meet the noble Baroness and any other noble Lords to discuss this further if she would like to. I will get my office to get in touch with her.
The noble Baroness, Lady Pinnock, also raised social housing remediation. Registered providers are already responsible in law for the safety of their buildings, and the Government are working with the Regulator of Social Housing to strengthen oversight of buildings developed for registered providers by developers covered under the RAS contract. Registered providers can access government remediation schemes for funding. It is covered, but under different legislation.
The noble Baronesses, Lady Pinnock and Lady Taylor of Stevenage, quite rightly asked about new burdens for local planning authorities. We are working closely with local authorities and local planning authorities to ensure a smooth implementation of the scheme. If any disproportional costs for local authorities and local planning authorities are identified, they will be addressed through the new burdens doctrine, as we normally would. Details of implementation of this will be set out in guidance to come.
The noble Baroness, Lady Taylor of Stevenage, also asked about a lot of numbers and timings. If she does not mind, I will get those up-to-date figures and timings and will write a letter, copying it to all noble Lords. I will also ask the team to look at Hansard and make sure that anything I have not answered is put in the letter and answered at the same time.
To conclude, these draft regulations establish a responsible actor scheme to secure the safety of people in residential buildings, to protect leaseholders and taxpayers from costs and to ensure a level playing field where any developer eligible for the scheme that does not take responsibility for remediating unsafe residential buildings will face serious consequences. As I have said, there is of course much more to do, and the Government intend to expand the scheme in future, but I hope the Committee will welcome this important step forward.
Motion agreed.