Monday 18th July 2011

(12 years, 10 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Asked By
Lord Berkeley Portrait Lord Berkeley
- Hansard - -



To ask Her Majesty’s Government what are the environmental benefits of the proposed Thames Tunnel.

Lord Henley Portrait The Parliamentary Under-Secretary of State, Department for Environment, Food and Rural Affairs (Lord Henley)
- Hansard - - - Excerpts

My Lords, the Thames Tunnel proposed by Thames Water would reduce the frequency of spills of untreated waste water into the Thames from the current average of once a week during rainfall to three or four times a year, and reduce spill volumes from 39 million cubic metres annually to around 2.3 million cubic metres. This would meet the dissolved oxygen standards identified by the Thames Tideway Strategic Study and protect local ecology.

Lord Berkeley Portrait Lord Berkeley
- Hansard - -

I am grateful to the Minister for that Answer. I agree with him that the tunnel will help to clean up the Thames but in the process it could make a serious mess of London. One of Thames Water’s proposals is to concrete over most of Barn Elms Playing Fields and other greenfield sites and to remove spoil by road, involving some 500 trucks passing through London every day. Will the Government insist that Thames Water takes the majority of the spoil out by water down the river, because the line goes under the river? Secondly, will the Government safeguard the necessary brownfield sites, such as the Battersea power station site, to avoid the need to use greenfield sites in the construction?

Lord Henley Portrait Lord Henley
- Hansard - - - Excerpts

My Lords, I am grateful to the noble Lord for stressing the importance of the fact that it will clean up the Thames. That is very important, both in itself and in order to avoid infraction proceedings under the urban waste water directive. I note the noble Lord’s other points, which are really matters relating to planning issues. Thames Water will be consulting later this year on the route and where to put the various access points for the tunnels. After that, these are matters that should be left to the planning process rather than to Government.