High Speed Rail (Crewe - Manchester) Bill (Instruction) (No. 3) Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (Crewe - Manchester) Bill (Instruction) (No. 3)

Jack Brereton Excerpts
Tuesday 21st May 2024

(1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Jack Brereton Portrait Jack Brereton (Stoke-on-Trent South) (Con)
- View Speech - Hansard - -

I must say that the motion before the House is quite bizarre. Now that the hybrid HS2 Bill has been adapted to supposedly deliver Northern Powerhouse Rail, we are asking the Select Committee on the High Speed Rail (Crewe – Manchester) Bill to agree a Bill for a railway that ends in a field, with no connection to the rest of the rail network. This is effectively a railway to nowhere. The motion and the adaption of the hybrid Bill will not facilitate a functioning railway until a connection is established to the rail network at Latchford in Warrington. The Department for Transport is presuming that the remainder of the line will be approved through a completely separate planning process, but does not say what that process is and when it will be brought forward. That is a massive departure from what was experienced in phase 1 or even phase 2, in which a whole corridor approach was considered, with clear connections possible, in each phase, to the existing network. It is totally flawed to segment NPR in the way proposed, rather than looking at the whole corridor, or even a whole phase or section. The proposal does not even properly consider what could be thought of as the NPR core route. The House should not be asked to approve something that will not deliver a functioning piece of infrastructure.

William Cash Portrait Sir William Cash
- Hansard - - - Excerpts

The instruction states:

“The Committee shall, before concluding its proceedings, amend the Bill by—”

and then sets out certain arrangements relating to certain aspects of the railway. It then states:

“making such amendments to the Bill as it thinks fit in consequence of the amendments made by virtue of”

the previous sub-paragraphs. The words “as it thinks fit” are an absolute carte blanche. If the railway ends in a field, it is not a railway. That is just the starting point. Have the examiners been asked to look at the Bill using the procedures for a hybrid Bill? Effectively, it will not be a Bill, when it has been treated in this way, if the instruction goes through. Should we not put forward petitions, irrespective of the constraints imposed by the instruction, to test just how much this is a matter of principle? The Bill is also constrained by the fact that Second Reading is now effectively torn up, and a new principle is being inserted into the Bill.

Jack Brereton Portrait Jack Brereton
- Hansard - -

I thank my hon. Friend for those very thoughtful points. I entirely agree that the instruction is wide-ranging. It is concerning to see those sorts of powers being put forward to the Committee. It really does show the abuse of the hybrid Bill process. If any services are to use the line, the railway would have to secure much wider enhancements and additional complex infrastructure, and there is no guarantee of that being delivered. As I said, the delivery of any services on this line will depend on permission being secured for the rest of the section, and that will be approved under a completely separate planning process. The approach being taken really is totally back to front.

Graham Stringer Portrait Graham Stringer
- View Speech - Hansard - - - Excerpts

As the hon. Gentleman knows, I have a principled disagreement with him on HS2, but I respect his position. He is making a powerful case for dividing the House on this matter. Will he divide the House on it?

Jack Brereton Portrait Jack Brereton
- Hansard - -

We may come to that shortly, but I am very concerned about this. Certainly, we may consider dividing on the motion.

We should focus first on properly understanding the connectivity enhancement need, and then design the infrastructure to meet that need. Instead, we already have the infrastructure design, and are trying to make it fit with the improvements that we would like for connectivity across the north, because we do not want to spend time doing this properly and restarting the hybrid Bill process. It might have made sense to use the proposed route when the track would be shared with HS2, but it does not make any sense now that phase 2 has gone. It is neither the optimal route for benefits nor the most cost-effective to deliver. I am afraid that this really is an abuse of the hybrid Bill process.

William Cash Portrait Sir William Cash
- Hansard - - - Excerpts

May I refer my hon. Friend to paragraph 3 of the motion? It states:

“The Committee shall treat the principle of the Bill, as determined by the House on…Second Reading, as comprising the matters mentioned in paragraph (4); and those matters shall accordingly not be at issue during proceedings of the Committee.”

What the motion is actually saying, surely, is that the principle of the Bill as originally passed will now be replaced by a new principle, and that any petitioner or anyone else who gets up to speak about it in any context will be told, because of an instruction by the whole House on what I could describe as the misleading basis—I am not accusing the Minister of this; I am merely commenting on the wording of the motion—that the issue cannot be put, and indeed is not to be regarded as an issue. That is a contradiction of what is clearly going on.

Jack Brereton Portrait Jack Brereton
- Hansard - -

My hon. Friend has made a powerful point. That, too, illustrates the failings of the hybrid Bill process. My hon. Friend and I know about this all too well because of the abuses of the process that we have seen in Staffordshire, which really have not guarded against some of the issues and challenges to which people have been drawing attention. It brings into question the fitness of the process in its entirety, and the way in which hybrid Bills have been enacted.

This Bill was designed and set out to deliver phase 2b of HS2. It was never about NPR alone, so its original objectives were very different. To try to adapt the Bill in this way is totally flawed. It would not afford the due process that is required for the decision in question. I believe we should abandon this phase 2b Bill, and come back with a new hybrid Bill that will deliver NPR properly. We should look at the whole corridor between Liverpool and Manchester, and at areas beyond, not just at the section in the middle, which does not go anywhere. We need a Bill that is capable of delivering the whole project. We cannot just deliver a partial scheme, and expect it to magically result in capacity being released to enable the promised enhancement of services.

There are constraints along the whole route. What about the complexities of crossing the M56, the M6 and the Manchester ship canal to connect with the rail network at Latchford, east of Warrington Bank Quay? What about the enhancements that will be needed between Warrington and Liverpool, including the upgrading of the Fiddlers Ferry line to facilitate services, and what about the capacity improvements that are needed at Liverpool Lime Street station? All these issues need far more detailed consideration and focus, as well as a proper process for approval—and we have not even mentioned how all this will be delivered within a tight £12 billion budget envelope; it is more likely to cost more than £16 billion. As for the point raised by the hon. Member for Preston (Sir Mark Hendrick) about connecting with the west coast main line, I am afraid that that will not be possible because of the challenges presented in the Warrington area; the Arpley chord cannot provide a connection with the west coast main line to serve west coast stations north of Warrington.

One might ask why we in Staffordshire are so interested in these matters. It is because we fear those who are seeking to reignite phase 2 of HS2 and all the horrors that it was set to wreak on our fine county. People in Stoke-on-Trent and Staffordshire have overwhelmingly welcomed the Prime Minister’s courageous and correct decision to scrap phase 2. They want the £36 billion released to be spent on projects that will truly deliver the improvements in local transport that will help to transform their lives, and not on remote “white elephant” pet projects.

It is disappointing that the eagerness to progress the plans set out in the motion has not been mirrored in the actions to wind down site compounds, fill in the thousands of boreholes that have been left, and return land to its rightful owners across the rest of the phase 2 route. Little to no progress seems to have been made yet, and the significant costs continue to spiral, even though the project has been cancelled. People in Staffordshire communities such as Swynnerton and Yarnfield, in the constituency of my hon. Friend the Member for Stone (Sir William Cash), are still fearful, given that they have not yet seen any visible signs of unwinding. Motions like the one before us today do nothing to dispel those fears, and there are concerns that some people would like nothing better than to see phase 2 restarted. That is why I have tabled several probing amendments, because we need to know that all elements relating purely to phase 2 will be removed.

Amendment (a) would leave out the provisions relating to the entirety of phase 2b from the junction with phase 2a at Crewe to where it would have joined the line to share track with NPR—importantly, including the stub and junction for where the line would join NPR, which would otherwise remain part of the design. Clearly, following the cancellation of phase 2, the stub and junction are no longer needed, so they should be removed from the design. Removing them would help to reassure that phase 2 could not be restarted at a later stage.

Gavin Williamson Portrait Sir Gavin Williamson
- View Speech - Hansard - - - Excerpts

I thank my hon. Friend for making such powerful points. Does he hope that the Minister will come to the Dispatch Box and give him those reassurances—maybe right now?

Jack Brereton Portrait Jack Brereton
- Hansard - -

Absolutely. We need reassurances from the Minister to allay the many fears among our communities throughout Staffordshire.

Amendment (c) is consequential on amendment (b), and both relate to the “Ashley infrastructure maintenance base - rail”. This IMB-R was specifically designed to service phase 2 of HS2. Given that phase 2 has been cancelled and that the IMB-R will no longer be required, NPR will be served by other facilities on the wider network. Again, the removal of the facility would give much reassurance about the cancellation of HS2 phase 2, and confirm that the project will not be brought back at some future point.

Amendment (d) would remove references to “high speed” but retain the word “railway”. This would be an important change, given that the line will be a conventional railway, not high speed. The NPR route between Manchester and Liverpool cannot and will not be high speed, because it is too short, at 67 km. It has two intervening stations and involves the use of sections with very sharp bends at Warrington and south of Liverpool, so it would be impossible for the route to be high speed. Without phase 2, it makes no sense to design this short section to high-speed standards, which would end up being dramatically over-specified and incur huge additional and unnecessary costs—unless, of course, the intention is to reignite phase 2.

On NPR, I must make it clear that I fully support the intention to properly connect cities and communities across the north. I know the importance of improved rail connectivity for my own city of Stoke-on-Trent, and I have led efforts to reopen more of our local rail network. I am incredibly grateful for the Government’s support for projects such as reopening Meir station and the Stoke to Leek line, which were included as part of Network North. I know the transformative impact that improving such rail services can have on the opportunities available to our communities.

What has been set out today, however, will not deliver on the intention of Northern Powerhouse Rail and communities in the north—it will not even come close. As the Minister and the Secretary of State will know, we have presented the Department with far superior alternatives, which should be given more serious consideration. The alternative upgrade proposals for the Chat Moss route would not only entail half the cost, but deliver far greater benefits. Upgrading the alternative route could deliver a shorter route between Manchester and Liverpool that is capable of delivering a 26% quicker journey time than is proposed. That is 26 minutes, as compared with the 35 minutes in the proposals.

Additionally, due to the extreme complexity and over-engineering of parts of the proposed route, not only could our proposal be delivered eight to 10 years sooner, meaning that communities across the north would feel the benefits far earlier, but our proposals would allow connectivity of the NPR core route to a far greater range of destinations throughout the north-west, including Preston, Wales and even into Scotland. It would also release the budget needed to enable the delivery of the much-desired underground through-platform at Manchester Piccadilly, which would otherwise remain far beyond reach.

To conclude, I hope that the Government will give far greater consideration to how NPR can be delivered, which can mean greater benefits and better value for money for the taxpayer. The proposal before us today does not do that. It is not even capable of delivering a functional piece of infrastructure. I strongly believe that the only way that can be achieved is through the introduction of a new hybrid Bill that is capable of properly delivering on the aspirations of Northern Powerhouse Rail and properly divorcing the scheme from phase 2 of HS2. It is essential that we see greater clarity and reassurance of communities throughout Staffordshire. Most importantly, we must see far greater urgency in progressing the unwinding of phase 2. I hope the Minister and the Department will take on board those concerns and reflect them in the action we need to see.

None Portrait Several hon. Members rose—
- Hansard -

--- Later in debate ---
Graham Stringer Portrait Graham Stringer
- Hansard - - - Excerpts

I agree with the hon. Lady, and I hope I have already made that point.

Jack Brereton Portrait Jack Brereton
- Hansard - -

The hon. Gentleman mentioned Scotland. Of course, it was always intended that HS2 would be compatible with the conventional network that serves Scotland. Why does he think the Department for Transport specified HS2 trains that are not able to tilt and are not the right size to go on the classic network?

Graham Stringer Portrait Graham Stringer
- Hansard - - - Excerpts

I cannot answer that question. It was a Government decision, and the Minister has indicated that he will answer.

I respect those who oppose HS2. This House has supported HS2, which has been in all of our manifestos. I think it is outrageous that HS2 to Manchester has been cancelled by an insulting edict from the Prime Minister. The most important point in this debate was made by my hon. Friend the Member for Portsmouth South (Stephen Morgan), who said that the elected Mayors of the west midlands and Greater Manchester have put together a plan to consider alternative methods of funding HS2. I hope the Minister can reassure the House that the Government will not follow a “burnt fields” policy of destroying it to make it more difficult for an incoming Labour Government to resurrect it.

The Conservative Members present say that they will remain opposed to HS2, and I remain supportive, because HS2 is good for the country, good for the environment and good for the economy of the north of England.

--- Later in debate ---
Jim McMahon Portrait Jim McMahon
- Hansard - - - Excerpts

The problem is that there was no debate or legislation when the Prime Minister woke up one morning and decided to cancel HS2; it was done on a whim. All those manifesto commitments, all those promises to the business community and to the public that we would see this through, because we had a generational responsibility to plan for the future, were scrapped overnight. I have no faith that any further parliamentary process will ultimately deliver better transport in the north of England. In the end, it will be used by people who have another interest, which is to stop it entirely.

Jack Brereton Portrait Jack Brereton
- Hansard - -

If we had a Labour Government—I hope that we will not—does the hon. Gentleman think that they would bring phase 2 back?

Jim McMahon Portrait Jim McMahon
- Hansard - - - Excerpts

In the end, it would be for the Labour Government to assess what they inherit at that point, but does that not make the case for not having a scorched-earth policy of completely derailing what could have been HS2 by selling off the lands and the assets that were purchased to free up that route in the way this Government are currently proposing?

--- Later in debate ---
Grahame Morris Portrait Grahame Morris
- Hansard - - - Excerpts

My goodness, that is a complicated intervention—I am not sure that I am suitably qualified to answer it. I just thought that I might share some of my thoughts having served on the Bill Committee, without any particular axe to grind.

I served on the Bill Committee because I was asked to do so as a servant of the House, in order to consider the merits or otherwise of the various petitions. I do not know whether Members are familiar with the process. I am not suggesting for a moment that it is perfect, and I know that there are arguments for revising the hybrid Bill procedure, which is quite lengthy, but some right hon. and hon. Members have suggested—perhaps through a lack of understanding of the process—that it is a mechanism for steamrolling through opposition, and I can absolutely assure them that that does not happen. In fact, if anything, petitioners—who may be individuals, businesses, environmental groups, local authorities or groups representing commercial interests, such as the National Farmers’ Union—are given ample opportunity to make representations to the Committee through petitions, and then to speak to those petitions and articulate their arguments for mitigation, compensation and route variation.

Jack Brereton Portrait Jack Brereton
- Hansard - -

Will the hon. Member give way?

Grahame Morris Portrait Grahame Morris
- Hansard - - - Excerpts

I will, but I am conscious of time.

Jack Brereton Portrait Jack Brereton
- Hansard - -

The hon. Member will know from Transport Committee visits that some of the commitments made in the hybrid Bill Committee have not been honoured. Does he share my concerns about that?