Public Bill CommitteesI beg to move, That the clause be read a Second time.
At present, we know that it is taking too long for promoters of nationally significant infrastructure projects to prepare applications for development consent that are robust and ready for examination. Part of the reason is the time it is taking for promoters to gain access to the land to carry out surveys to understand its condition and status, to inform their assessments of the project’s environmental impact.
The Government remain committed to ensuring that applicants and landowners reach agreements privately on when land can be accessed and on any compensation necessary as a result of activities carried out by the promoter when surveying the land. However, we appreciate that such agreements cannot be made in every circumstance. While that is regrettable, it should not come at the cost of delaying the delivery of the critical infrastructure that this country needs.
In this new clause, I am making changes to provide a more efficient route to accessing land to carry out surveys for promoters of nationally significant infrastructure projects. These align with rights already available to, and often used by, DCO applicants under the Housing and Planning Act 2016. The changes will give authorisation to promoters to access land on the premise that sufficient notice is given to landowners and occupiers, with regulations to be made requiring the specific information to be contained in that notice.
Should access be unreasonably prevented, promoters will be able to apply to a justice of the peace for a warrant to use force to enter the land and carry out the surveys required. The use of force that may be authorised by a warrant is limited to what is reasonably necessary to exercise the power conferred by the provision. The new clause is an important step change in speeding up the preparation stage of applications for development consent and ultimately the delivery of nationally significant infrastructure projects. It will come into force when the Secretary of State introduces the associated regulations.
I have a couple of queries. I understand the spirit of the proposal; when I was involved in this part of the planning regime, almost no applications came forward for the power to enter land because of the elaborate process involved, so I very much understand and welcome the spirit in which these changes are made.
However, I ask the Minister to consider whether there is a risk of going from one extreme to the other. The new clause would grant any person who proposes to make an application the power to enter land. We would be interested to know what provisos will sit around that. Can anybody simply say, “I am going to make an application” and therefore get an order to enter land? Do the Government envisage guidance or regulations on that aspect? Generally, however, we support the clause.
I appreciate the reasons why the hon. Gentleman has raised those points; I have a couple of points that may provide him with reassurance. The provisions in section 53 will allow authorised persons to carry out surveys required in connection with the preparation of environmental assessments and habitats assessments. The entry powers being sought are for a very specific purpose.
As I said, the Government strongly advocate that applicants and landowners should first reach agreements privately when access is required. The problem that the new clause is trying to address is that that does not always happen. We want to ensure that, when necessary, there is a mechanism for applicants to be able to access land and carry out the requisite surveys.
When exercising the power conferred under section 53(1), authorised persons are required to provide the owner or occupier of the land with at least 14 days’ notice of their entry. Regulations, to come forward in due course, will specify certain information that the notice will contain. That information will include details of the negotiations that have been held regarding the entry, full details of the surveys to be undertaken and the rationale for undertaking them, and evidence that the surveys are required in connection with the NSIP in question.
To the points made by the hon. Gentleman, I say that access is required for specific purposes, notice will have to be given and regulations will be forthcoming that provide further details. In general terms, however, we absolutely want in the first instance for applicants and landowners to be able to reach agreements. We think that this power is required and proportionate for circumstances when that does not take place.
Those provisos on the regulations are helpful. They are important because to go on to someone else’s land without their agreement initially is a significant power. We agree with the Minister that it should be used only as a last resort, once all the alternatives set out in the guidance have been explored.
Question put and agreed to.
New clause 42 accordingly read a Second time, and added to the Bill.
New Clause 43
Changes to, and revocation of, development consent orders
“(1) Schedule 6 to the Planning Act 2008 (changes to, and revocation of, orders granting development consent) is amended as set out in subsections (2) to (4).
(2) Omit paragraph 2 (non-material changes to orders granting development consent) and the italic heading before it.
(3) In paragraph 3 (changes to, and revocation of, orders)—
(a) in sub-paragraph (3)(b), omit “or paragraph 2 of this Schedule”;
(b) in sub-paragraph (5A), after “should” insert “, when considered in conjunction with any other changes already made,”.
(4) In paragraph 4 (changes to, and revocation of, orders: supplementary), after sub-paragraph (6) insert—
“(6A) If a development consent order is changed in exercise of the power conferred by paragraph 3(1), the development consent order continues in force.
(6B) If a development consent order is changed or revoked in the exercise of the power conferred by paragraph 3(1), the change or revocation takes effect on—
(a) the date on which the order making the change or revocation is made, or
(b) if the order specifies a date on which the change or revocation takes effect, the specified date.
(6C) Except in a case within sub-paragraph (7), the Secretary of State must publish an order making a change to, or revoking, a development consent order in such manner as the Secretary of State thinks appropriate.”
(5) In section 118 of the Planning Act 2008 (legal challenges)—
(a) omit subsection (5);
(b) in subsection (6)(b), for “notice of the change or revocation” to the end substitute “the order making the change or revocation is published.”
(6) In consequence of the amendment in subsection (2), omit—
(a) paragraph 4(6)(a) of Schedule 8 to the Marine and Coastal Access Act 2009,
(b) paragraph 72(4) to (7) of Schedule 13 to the Localism Act 2011,
(c) section 28(2) of the Infrastructure Act 2015,
(d) paragraph 8(3)(b)(i) of Schedule 7 to the Wales Act 2017, and
(e) section 128 of the Levelling-up and Regeneration Act 2023.” —(Matthew Pennycook.)
This clause amends the Planning Act 2008 concerning changes to, and revocation of, orders granting development consent. The key change is to repeal the procedure for making non-material changes that is currently in paragraph 2 of Schedule 6 to that Act.
Brought up, and read the First time.
I beg to move, That the clause be read a Second time.
New clause 43 will make the process for post-consent changes to development consent orders more proportionate to the change requested. That will allow greater flexibility than the existing binary process. The current change process takes too long to deliver on the ground, and is putting developers off requesting changes that have the potential to improve design, reduce adverse environmental impacts, better meet community interests, reduce costs and speed up delivery.
The removal of the distinction between material and non-material changes will allow us to design a more proportionate single process for changes, the detail of which will be set out in new regulations. The new system will be commenced by the implementation of updated regulations. As such, there will be no impact on existing DCOs that are considering change applications in the immediate term, while the Government develop the new process alongside industry stakeholders. Transitional provisions will be included in the revised regulations to ensure an efficient transition to the new system.
The measure will support the Government’s growth and clean energy missions, giving certainty to developers, reducing cost risk and supporting faster decisions. It will ensure that we can deliver the critical infrastructure the country needs in the best form. I am grateful to the expert input provided by stakeholders through feedback on the limitations of the existing change process. Officials in my Department will continue to work with stakeholders and practitioners to refine the new process, and to ensure it delivers efficiencies and better supports the delivery of infrastructure across the country.
Question put and agreed to.
New clause 42 accordingly read a Second time, and added to the Bill.
New Clause 44
Applications for development consent: removal of certain pre-application requirements
“Omit the following sections of the Planning Act 2008—
(a) section 42 (duty to consult);
(b) section 43 (local authorities for purposes of section 42(1)(b));
(c) section 44 (categories for purposes of section 42(1)(d));
(d) section 45 (timetable for consultation under section 42);
(e) section 47 (duty to consult local community);
(f) section 49 (duty to take account of responses to consultation and publicity).”—(Matthew Pennycook.)
This new clause omits sections of the Planning Act 2008 which currently require a person who proposes to apply for development consent to consult particular people about the proposed application, including prescribed bodies, local authorities, the local community and persons with an interest in the land in question.
Brought up, and read the First time.
Question put, That the clause be read a Second time.
I thank the hon. Gentleman for his genuine question. He highlights a case that arguably represents complexities that the Government employ lots of lawyers to fix. I do not think it would prevent a new clause such as this from progressing. The intention is to prevent land banking, and if lawyers need to tweak the language a little bit, so be it.
I will move on briefly to new clauses 15, 25 and 60, which are all about ensuring that affordable housing is actually built. New clause 60 would set a lower bound on the amount of affordable housing that was due to be constructed. New clauses 15 and 25 are intended to ensure that the affordable housing commitments that developers make in their initial applications are not subsequently chipped away at or eroded by arguments about viability.
Fundamentally, if there are issues around viability, the Government and local authorities should prioritise the building of affordable housing, not the safeguarding of developer profits. The new clauses are therefore intended to ensure that when developers commit during the planning process to building affordable houses, they stick to those commitments. I commend the new clauses to the Committee, and I look forward to the Minister’s response.
I rise to say a few words about new clause 1, but I will principally speak about our new clause 55, which is a mechanism to incentivise the building of housing developments that have lain unbuilt and undeveloped for three years.
On new clause 1, I am very sympathetic to the proposal made by the hon. Members for North Herefordshire and for North East Hertfordshire—we are only missing Hampshire—but, frankly, we prefer our approach. There is a long-standing principle in planning law that the person of the applicant is not a relevant consideration, and by and large we wish to stand by that. There is scope for the new clause to be used to prejudice particular applicants.
There is also a practical consideration. Land changes hands very quickly and, whoever owns it, different applicants can make applications. I am reminded of the famous case in Oxford of university students applying for a nuclear power station on Christ Church meadow, because a person can apply for anything on any land, whether they own it or not. In fact, the Town and Country Planning Association applied for permission for an airport on Maplin Sands, even though it was probably not going to be able to build it. Those bizarre examples demonstrate that the person of the applicant is not a relevant consideration.
Under new clause 1, a different applicant with a different name or a different agent of the same landowner could immediately come forward, so I have practical concerns about it. Our approach is to introduce a “use it or lose it” principle into the planning system. Specifically, where a development of 100 homes or more has been granted permission but not started within the applicable period—usually three years—the land will transfer to the relevant local authority. We expect that in those circumstances, the usual provisions of the Land Compensation Acts and the principles of fairness in compulsory acquisition, which I referred to in a previous debate, would apply.
We accept the principle that developers and house builders need a pipeline—a plan for their land—but three years is a significant amount of time. The recent moves to encourage the build-out of homes that have not been built have not succeeded. We have had a reduction from five years to three years in the lifespan of planning permissions, but there has not been a significant change in the build-out rate, so we need significant measures if we are to make these major schemes happen.
This is not about penalising people; it is about dealing with an issue that is clearly undermining our ability to tackle the housing crisis. Across the country, there are permissions for 1.5 million new homes that have not been built—13,000 in my authority area of Somerset alone. Those homes could house thousands of families. Research from TerraQuest, which operates the planning portal—not a particularly radical or out-there organisation —shows that a third of all homes given planning permission since 2015 have not been built. Ten years on, that shows that unbuilt permissions are an enduring problem that needs to be tackled. If all those permissions had been built out, the Government would have hit their annual 300,000 homes target in eight out of the last 10 years, and yet the approach so far focuses almost entirely on allocating more and more permissions in the hope that that will result in more homes being built.
There is no lack of planning permissions; the problem is that developers are not building out the ones they already have, because the current system does not penalise delay. Two big things could be done to improve housing supply: funding social housing and funding infrastructure. If those things were funded in a range of areas around the country, there would be almost unlimited build-out rates on stalled sites.
Developers clearly, and I think reasonably and rationally, will only build out at a rate that sustains the price of their product and their viability. They have fiduciary duties to their shareholders, and they need to maintain the viability of their companies. So they will not build out at a rate significant enough to flood the local market with housing and depress the price. We cannot blame them for wanting to make a profit—that is what we expect them to do—but we need to fund social housing publicly, as it was funded in the past, to get out of that bind. That is why I believe we need a stronger lever than we currently have.
The hon. Gentleman makes a fair point. Local plans are set over a longer time horizon. There is an issue, as he knows, with the number of local plans across the country that are up to date. There are other, corresponding issues about the date at which those local plans that are brought forward begin, and whether they are brought forward at all. Our general position—I will not go any further than that—is that we are keeping this under review. It has been our stated position so far that new towns will deliver over and above the targets produced by the standard method.
When a new town might build out will be highly place-dependent; it will depend on the particular circumstances and delivery vehicle. Let us see what sites the new towns taskforce recommends. We are keeping this under review because we recognise that we need the right incentives in place to support proactive local authorities to work with us to bring new towns together. Although we have been clear that the site selection will ultimately be in the national interest, in terms of building these large-scale new communities out quickly and effectively, and ensuring that they are exemplary developments, it will obviously be far easier if local authorities are proactive and constructive.
The Minister is making a very important point. He will no doubt recall that, on a number of occasions, I have argued that those new towns should be within the housing targets. Our view is that if they are going to be successful, they need to be community led and embedded in the mission of that council area or community.
To the Minister’s point about aligning incentives, we encourage him to continue to keep that matter under review and open for a further reason: the scale of the increase in allocations. For example, my council has to find a 46% increase in housing allocations, which is extremely challenging, as it is in areas where, for example, there are green belts or protected land. It is extremely challenging for some authorities to identify land for housing, and if that has to be on top of a new town, it will be even more challenging. I welcome the Minister’s statement that he is keeping the matter under review, and we encourage him to do that.
The hon. Gentleman’s position on the matter is very clear. We will keep under review how the taskforce’s recommendations on new towns interact with housing targets.
Although I appreciate that the hon. Member for Ruislip, Northwood and Pinner is seeking, understandably, to prevent areas with a new town from taking unmet need from neighbouring areas, his new clause would have the effect of discouraging effective cross-boundary co-operation on a much wider range of matters, which could lead to issues with local plans in those areas. For that reason, I ask him not to press it.
I turn to new clause 48. In our manifesto, the Government committed to restoring mandatory housing targets and reversing the supply-negative changes introduced by the previous Government in December 2023. In December 2024, we therefore implemented a new standard method for assessing housing needs that aligns with our ambition for 1.5 million new homes over this Parliament and better directs homes to where they are most needed and where housing is least affordable. The standard method is an important tool to ensure that housing is delivered in the right places, which is critical to tackling the chronic shortages facing the country across all areas and all tenures.
We consulted extensively on our changes to the standard method. Our public consultation received more than 10,000 responses from a range of relevant parties, including 387 submissions from local authorities. Our response to the consultation sets out the evidence received and how the Government have responded to the points raised. We have also published revised guidance to support authorities utilising the standard method. Given the recent consultation exercise on the revised standard method, I do not believe that new clause 48, which seeks further consultation and procedural steps, is the right way forward. I ask the hon. Member for Ruislip, Northwood and Pinner not to press it.
I turn to the hon. Member’s new clause 50. National planning policy—specifically paragraph 72 of the NPPF—already expects local planning authorities to prepare strategic housing land availability assessments to provide evidence on land availability within their area. Authorities should then set out, through their local plans, a sufficient supply and mix of sites that can be brought forward over the plan period. Through this existing policy, local planning authorities are already expected to make an assessment of the number and type of homes that are required and proposed to be built in the authority’s area. I note the comment that several hon. Members have made about older people’s housing. I think it fair to say that the housing and planning system has not kept pace with demographic change, but that is why the Government are exploring the recommendations of the older people’s housing taskforce, for example.
In addition, we are committed to introducing the new plan-making system, which includes the following provision set out in new section 15C(8) of the Planning and Compulsory Purchase Act 2004, as inserted by the Levelling-up and Regeneration Act 2023:
“The local plan must take account of an assessment of the amount, and type, of housing that is needed in the local planning authority’s area, including the amount of affordable housing that is needed.”
New clause 50 would therefore duplicate national planning policy and legislation that we anticipate will come into effect later this year. It would create new burdens on local planning authorities, with the effect of delaying plan making. It would also undermine the Government’s priority for extensive coverage of local plans across England, reducing much-needed housing supply. I ask the hon. Member for Ruislip, Northwood and Pinner not to press it.
I fully understand and support the principle behind new clause 75, tabled by the hon. Member for Hamble Valley. The Government fully recognise the benefits that small sites can offer in contributing to house building, diversifying the housing market and supporting faster build-out. We are therefore fully committed to increasing delivery on small sites and supporting our SME developers. This is a real priority for the Government. The statistics show that back in the 1980s SMEs built something like 40% of housing supply; the figure now is less than 10%. That is a large part of the reason that we are not bringing homes forward in the numbers we would want. Council house building is another example.
Via the NPPF, local authorities are already expected to allocate 10% to small sites in local plans unless they can provide a strong explanation why this is not possible. If such an explanation proves wanting, the plan can be found unsound when it is examined by an independent inspector. In line with the thinking behind new clause 75, we consulted on strengthening that requirement by making it wholly mandatory in local plans. That was part of the summer 2024 consultation on the NPPF, but the responses we received were clear that making the target fully mandatory would be resource-intensive, would put significant pressure on local authorities, would be unworkable in many areas and might lead to delays in plan making.
In the Government response to the NPPF consultation in December, we therefore made clear our intention to explore other options to support small site delivery as part of the upcoming national development management policies. I do not want to tease the Committee again, but details will be forthcoming and will be subject to consultation. Although I appreciate the principle behind new clause 75, I therefore do not believe that it is the best way to support small site delivery. I ask the hon. Member for Hamble Valley not to press it.
With this it will be convenient to discuss the following:
New clause 11—Accessibility requirements to be made mandatory—
“The Secretary of State must, within six months of the passing of this Act—
(a) make provision for M4(2) (Access to and use of dwellings) in Schedule 1 of the Building Regulations 2010 to be made mandatory, and
(b) issue guidance for developers and other relevant stakeholders on how M4(2) is to be complied with.”
This new clause would make the existing Building Regulations requirements in relation to accessibility, which are currently optional, mandatory.
New clause 110—Accessibility standards for new homes—
It must be a condition of any grant of planning permission for new homes that—
(a) all planned homes meet Building Regulation M4(2) (accessible and adaptable dwellings); and
(b) where an application for planning permission is for 20 or more homes, a minimum of 15% of planned homes meet Building Regulation M4(3) (wheelchair user dwellings).”
It is a privilege to continue to serve under your chairmanship, Ms Jardine.
New clause 5 would require building regulations to be made that require new homes to meet the zero carbon standard and to include renewable energy. Back in 2006, the then Labour Government rightly set out plans to achieve zero carbon in new housing. The same Government made a commitment in the carbon plan that there would be a regulatory requirement for zero carbon homes from 2016, which was the key date. That 2016 commitment was renewed by the coalition Government in 2011 and was included in the 2014 Infrastructure Bill. However, all the commitments to on-site efficiency standards and allowable solutions—the extra bit to make new homes zero carbon—were cancelled by the incoming Conservative Government in 2015, in a shocking retrograde step in addressing carbon emissions.
We came so close to achieving the zero carbon homes standard back then. A cross-sector ministerial taskforce had been in place from around 2008. Two preparatory upgrades to building regulations had already been made—by the Labour Government in 2010, and by the coalition Government in 2013—and regulations were drafted for the 2016 upgrade that would have delivered zero carbon homes.
Labour housing and planning Ministers who are now in the Cabinet—I will not name them in case they do not want to be named—chaired the ministerial taskforce and took the programme forward. Under the coalition Government, a predecessor of my hon. Friend the Member for Hazel Grove (Lisa Smart), Andrew Stunell—to whom I pay tribute, and who introduced his first Bill on this subject back in 2004—continued the zero carbon homes programme as a Minister until 2015.
We then had the complete cancellation of the programme in 2015. The Energy and Climate Intelligence Unit has estimated that, had the zero carbon standard been reached, residents would have paid £5 billion less in energy bills since 2016 as a result of living in better insulated and more energy-efficient homes.
My noble Friend Baroness Parminter tabled a zero carbon homes amendment to the 2015-16 Housing and Planning Bill on Report, but the then Government did not support it. The Minister at the time in the Lords said that the Government would
“introduce nearly zero energy building standards”.—[Official Report, House of Lords, 25 April 2016; Vol. 771, c. 925.]
Of course, that falls well short. Undeterred, the Lords voted in favour again; the then Government ultimately tabled their own amendment that committed to reviewing energy performance requirements under building regulations, but they never did so—and, again, that fell a long way short.
Almost 20 years on, we still do not have a zero carbon standard for new homes. It was, and still should be, a cross-party and cross-sector issue. There is a legal commitment to reduce carbon emissions in this country, and mandating zero carbon new homes would ensure that we do not make the task even harder for ourselves than it already is. Zero carbon homes insulate households not just in terms of energy but from fluctuations in energy prices. They reduce demand for electricity from the national grid and obviously reduce carbon footprint.
Much more recently, my hon. Friend the Member for Cheltenham (Max Wilkinson) tried again to acquire a degree of solar generation on new homes with a private Member’s Bill—his sunshine Bill. When the Minister responded to that debate back in January, he said that
“the Government already intend to amend building regulations later this year...that will set more ambitious energy efficiency and carbon emissions requirements for new homes.”—[Official Report, 17 January 2025; Vol. 760, c. 652.]
I am not sure why I am quoting the Minister to himself, but he will no doubt recall saying that rooftop solar deployment will increase significantly as a result.
We look forward to a response on the new clause, which moves us towards and helps to deliver zero carbon homes. It would give the Government six months to set out regulations, and it merely seeks to hold the Minister to his word on the topic. The Minister ought to emulate once more the forward-looking approach of the Labour Government back in 2006, who committed this country to a trajectory of zero carbon homes. Almost 20 years on, we and many others want the certainty of a legislative provision to secure a zero carbon future for British housing and bring the benefits of solar generation to all residents.
After all, we could have avoided building an entire new power station had this standard been introduced in 2016, as was proposed through cross-party agreement at the time. It is now almost a decade since the first zero carbon homes plan would have been introduced. This will be a lost opportunity if Parliament does not commit, finally, to taking that last step to make all new homes zero carbon.
I warmly welcome the new clause tabled by the hon. Member for Taunton and Wellington. I refer colleagues to the fact that I have proposed a private Member’s Bill on exactly this topic—the Carbon Emissions from Buildings (Net Zero) Bill—and my very first Westminster Hall debate was on environmental building standards, so I am fully behind the new clause.
It is essential that we build new housing to the best possible standards, and that we build new homes that are fully fit for the future. We know that doing so has social, environmental and economic benefits. It has social benefits, because it reduces people’s fuel bills and tackles issues such as mould in homes. It has environmental benefits, because, of course, there are huge energy efficiency advantages. It has economic benefits, not least because it is much more economically efficient in the long run to build houses effectively at the start so that we do not have to retrofit them years down the line. We already have a huge retrofit challenge in the coming years, so the very least we can do is to ensure that all new houses are built to zero carbon standards.
The new clause refers specifically to solar power generation on roofs. I warmly welcome the Government’s announcement—I believe it was on local election day—that they are moving in that direction. However, in zero carbon design, other factors are much more important, including building orientation, design around transport and fabric first. I would like to discuss another factor, namely embodied carbon. I have tabled new clause 91 on the subject, but I am not sure that we will get there. When we talk about zero carbon, we need to recognise both the operational carbon, which is the carbon produced by a building during its lifespan—over the next, say, 80 years—and the embodied carbon in buildings, which is becoming a larger factor in the construction industry. We will soon be at the point where embodied carbon is half of the carbon associated with a building during its lifetime.
Before I respond to the Minister, I note that I should have spoken to new clause 11. I will not do so at length, but it would improve accessibility for new homes, make sure they are adaptable and introduce a minimum standard for them.
On the zero carbon standard, I am grateful for the Minister’s generally positive response about the direction of travel, but so far, the rhetoric has been about getting us nearer to zero carbon. We need to be bold and decide that we are finally going to make new homes zero carbon. It is a small step to take. In previous legislation, there was an allowable solution that would compensate for the final balance of emissions in any new house that could not achieve it through fabric first. It is achievable, it needs to be done, and we will push new clause 5 to a vote.
Question put, That the clause be read a Second time.
With this it will be convenient to discuss the following:
New clause 34—Sustainable drainage (No. 2)—
“The Secretary of State must, within one month of the passing of this Act—
(a) bring into force Schedule 3 (Sustainable drainage) of the Flood and Water Management Act 2010, and
(b) provide guidance to local planning authorities, land and property developers and other relevant stakeholders on—
(i) how to incorporate sustainable drainage into new developments, and
(ii) the minimum expected standards for ongoing maintenance of sustainable drainage infrastructure.”
This new clause would require the Secretary of State to bring into force the sustainable drainage provisions of the Flood and Water Management Act 2010 and provide guidance on the building in of sustainable drainage in future developments.
New clause 89—Review of drainage performance of new developments—
“(1) A review of a development’s drainage performance must take place five years after the completion of the development.
(2) Where a review recommends that action be taken to improve the development’s drainage performance, the developer must implement such recommendations, giving priority to those relating to flood risk.”
This new clause requires developers to review the drainage performance of a development five years after being built.
It is a pleasure to speak to new clause 7, which would require schedule 3 of the Flood and Water Management Act 2010 to be commenced. My Liberal Democrat colleagues have pressed on this matter repeatedly over recent months and years, including in Westminster Hall. The schedule, which was never commenced, would require sustainable drainage systems—SuDS—to be provided in all but the most exceptional cases. It would establish a proper authority for regulations to ensure they are properly designed and maintained. It is not right that because of inadequate regulation and safeguards, the burden of poorly constructed drainage systems should fall on individuals who have saved for years to get their first home. Without proper enforcement of sustainable drainage, there is a real risk that the drive to increase housing numbers will exacerbate the current problems with drainage and flooding.
After the 2007 floods, Sir Michael Pitt recommended the introduction of the provision. It was duly passed as part of the 2010 Act, but it was never commenced. By 2014, the Government had consulted on the necessary guidance and were on track for commencement before the end of 2015. In 2015, the consultation came to an end, the work came to an end and it was not commenced. The policy approach taken by the then Conservative Government was that we would deal with sustainable drainage through policy, and policy would be sufficient. A little later on, in their 2023 review of the implementation of schedule 3 to the Flood and Water Management Act 2010, they set out that a previous review had concluded that
“non-statutory technical standards for sustainable drainage systems should be made statutory: as the ambiguity makes the role of the planning authority very difficult. The review also found that in general there were no specific checking regimes in place to ensure that SuDS had been constructed as agreed, leaving concerns about unsatisfactory standards of design and construction, and of difficulties of ensuring proper maintenance once the developer has left the site.”
If only that schedule had been brought into effect, a great deal of flooding of people’s homes would have been avoided.
In the past, we have had a body of law to control our sewage and drainage system, originally from the Public Health Act 1936, which dealt with any kind of drain that is
“communicating with a public sewer”,
in the words of the Act. But SuDS are a new way of doing things, and they do not have the same body of regulation. There is therefore no longer any reason why schedule 3 should not be commenced as soon as possible, if not immediately. It should not take another flood to make that happen.
It is time to implement the recommendations of the 2008 review, the Government’s consultation response in 2014, the 2023 Department for Environment, Food and Rural Affairs review that I quoted, and schedule 3 of the Flood and Water Management Act 2010 before our constituents find themselves forced into communicating with a public sewer in their homes and gardens in a way that is all too close and personal.
I commend the hon. Member for Taunton and Wellington on tabling the new clause. It is very similar to new clause 34, which is in the name of my hon. Friend the Member for Mid Bedfordshire (Blake Stephenson). My hon. Friend’s goes slightly further, in that it would ensure
“minimum expected standards for ongoing maintenance”,
but we welcome the sentiment, and we understand why the hon. Gentleman and the Liberal Democrats have tabled the new clause.
This is an issue that many of us have faced. The hon. Gentleman and I both attended a Westminster Hall debate about problems with drainage in new developments. I said then that in our constituencies, several of us could point to new developments in which planning officers and constituents had no confidence, even though the planning authority had acted entirely appropriately within the guidelines. I think particularly of Botley parish council in my constituency and Boorley Green, where development is going on along the River Hamble and further up into Winchester Street. Schedule 3 of the Flood and Water Management Act 2010 was supposed to help with the expected standards.
With many new developments, a lot of the water companies are not sufficiently accountable to the people they serve. Local authorities are slightly constrained by the planning system from making the changes that they could make to help the long-standing flooding problems, if schedule 3 was brought in.
I welcome the new clause, and it will have our support. We will work with the hon. Gentleman on Report to strengthen the new clause. I do not mean that there is anything wrong with it, but I would like it to be combined with new clause 33 and the standards on ongoing maintenance. I hope the hon. Gentleman takes that as a helpful suggestion, and we look forward to supporting his new clause.
I genuinely appreciate the Minister’s constructive response; I know that he is interested in and concerned about the issue.
We all know that the industry will have objections to new regulations—back in the day, house builders objected to being required to put bathrooms inside houses. Objections will come as surely as night follows day. Previous Governments responded by saying, “Don’t worry; we can just change policy—it will be fine.” The 2023 report explicitly states that the policy approach has not worked. We have had 10 years of experimentation and a full Government review by the Department for Environment, Food and Rural Affairs, and the response was that the current ambiguity makes the role of the planning authority very difficult—essentially, it has not worked.
Relying on policy is also a departure from the tried-and-tested approach in which things to do with the physical structure of the building—drainage and all those matters—come under the building regulations. All drainage matters come under the building regulations, so why would sustainable drainage not be covered by regulations but be a matter of policy? That leaves the ambiguity that the DEFRA report points out, and it simply has not worked. For all those reasons, I cannot see any alternative to our pressing the new clause to a vote.
Question put, That the clause be read a Second time.
With this it will be convenient to discuss the following:
New clause 14—Purposes and principles to be followed by parties exercising planning or development functions—
“(1) Any party exercising any function in relation to planning and development must—
(a) have regard to the purpose of the planning system outlined in subsection (2), and
(b) apply the principles outlined in subsection (3) for the purposes of achieving sustainable development.
(2) The purpose of the planning system is to promote the spatial organisation of land and resources to achieve the long-term sustainable development of the nation and the health and wellbeing of individuals.
(3) The principles are—
(a) living within environmental limits;
(b) ensuring a strong, healthy and just society;
(c) achieving a sustainable economy;
(d) promoting good governance including promoting democratic engagement and accountability; and
(e) using sound science responsibly.
(4) For the purposes of this section, ‘sustainable development’ means managing the use, development and protection of land and natural resources in a way which enables people and communities to provide for their legitimate social, economic and cultural wellbeing while ensuring the health and integrity of terrestrial and marine ecosystems and the species within them, as well as the wellbeing of future generations.”
The new clause would define the purpose of the planning system and of planning as promoting the efficient spatial organisation of land and resources to achieve the long-term sustainable development of the nation and the health and wellbeing of individuals.
New clause 41—Exercise of planning functions to be compatible with the purpose of planning—
“(1) Any person or body exercising a planning function must do so in a manner that is compatible with the purpose of planning as set out in subsection (2).
(2) The purpose of planning is to manage the development and use of land in the long-term public interest.
(3) Anything which—
(a) addresses the long-term common good and wellbeing of current and future generations,
(b) has full regard to the achievement of the commitments in and under the Climate Change Act 2008 or the Environment Act 2021,
(c) is in accordance with the United Nations Sustainable Development Goals, and
(d) delivers fair planning processes that are open, accessible and efficient,
is to be considered as being in the long-term public interest.
(4) In this section, a planning function means any statutory power or duty relating to the use or development of land in England.”
This new clause would introduce a purpose of planning and provide that anyone exercising a planning function must do so in a manner that is compatible with that purpose.
New clause 9 concerns healthy homes, and would ensure that national and local government plans are designed with a clear and explicit aim of improving the physical, mental and social health and wellbeing of people in those homes.
We cannot afford to keep building homes that make people ill. It is instructive to recall that the original planning system and the original planning Act emerged from the garden city movement, the public health movement and the desire to enable people to escape from slums. The first planning Act was the Housing, Town Planning, etc. Act 1909, which was mainly concerned with public health. We need to re-establish the link between planning and health if we are going to improve our health outcomes, prevent health inequalities and address the sicknesses in our society.
Right now, 3.5 million homes, which are lived in by around 15% of households, fail to meet the decent homes standard. That is not just a housing issue; it is a public health issue. According to the Resolution Foundation, poor-quality housing doubles the likelihood of someone experiencing poor general health. It costs the NHS £1.4 billion a year to treat to treat and costs society an estimated £18.5 billion, because it damages productivity, education outcomes and life chances. If we are serious about levelling up and addressing health inequalities, we must start with the homes that people live in.
We know that deregulation has not worked. The extension of permitted developments under the last Government allowed the conversion of offices and shops into substandard housing, flats without windows, and rooms too small for someone to stretch their arms out without touching the walls. Those were “homes” in name only. If the Government enact any further changes to permitted development rights, they should at least adopt this new clause to ensure that those homes are healthy, regardless of how they are built.
Even the revised national planning policy framework, while nodding towards health inequalities, includes no effective levers to address them or to force those making development decisions to consider health outcomes. A vague instruction to have regard to local health inequalities is simply not enough.
Similarly, while the decent homes standard refers to health outcomes, it deals only with fixing the dangers in the existing rental stock. We need to consider health outcomes during the development stage to prevent dangers, rather than considering them only when they have already become a problem. This new clause would do that. It is about designing out risks from the start and embedding health into the DNA of planning once again, and into development policy.
This new clause is backed by the Town and Country Planning Association, which says it will establish clarity on housing standards and wider development quality, setting a level playing field for industry. That is fundamental for promoting positive health outcomes across all new homes and communities.
Surely, it is time that we moved from building homes quickly and at any cost to building them well and making them healthy for the people who live in them. I urge the Committee to support new clause 9.
I rise to speak to new clauses 14 and 41, which have been grouped with new clause 9 and address the same question of what the purpose of planning should be. To be clear, new clause 14 has the support of the Town and Country Planning Association, and new clause 41 has the support of the Royal Town Planning Institute. Indeed, there is a widely held view in the planning sector that it is necessary to have a clear statutory purpose for planning, both to guide planning decisions and to make it more publicly understandable what planning does and what it is for.
The suggestion in these new clauses is that the Planning and Infrastructure Bill should take the opportunity to set out a clear purpose for planning, based on the UN’s sustainable development principles, to which, of course, the UK Government are a signatory and make fairly frequent reference. That would offer an opportunity to build consensus around the purpose of planning in all its diverse glory—not just in plan making, but in decision making.
What we have seen with the Government’s emphasis on reframing national planning policy in the NPPF as being all about economic growth is not just bad for the environment but risks missing out on the opportunity to ensure that all planning policy and decisions are good for people, as the hon. Member for Taunton and Wellington just explained.
Creating a statutory purpose for planning would give a clear foundation for national planning policy and would help to prevent the sudden shifts in national policy direction that have been a feature of the system since 2010. As it currently stands, planning law has only an exceptionally weak duty:
“to contribute to the achievement of sustainable development”.
That duty is limited only to plan making and does not extend to decision making. That existing duty contains no definition of sustainable development and makes no reference to the internationally recognised framework of the sustainable development goals.
I feel that in framing a vision for our future development, as outlined in new clause 14, a specific requirement should be placed on the Secretary of State to have special regard for the wellbeing of present and future generations in planning. Planning decisions are, by definition, long term. The world we inhabit today is shaped by planning decisions made decades in the past, so it can only be right that we explicitly recognise the needs of children and young people in both plan making and decision making.
Although new clauses 14 and 41 have slightly different wording, their intention is effectively the same, which is to ask the Secretary of State to use the Bill as an opportunity to set out a statutory purpose for planning that specifically frames all planning decisions around the broad concept of sustainable development, as very clearly articulated in the SDGs and elsewhere.
I simply make the brief point that there is a whole swathe of statutory requirements on planning—good design, sustainable development, mitigating climate change—and such legal duties can be included in planning legislation.
I venture to say that the hon. Gentleman almost makes my point for me. There is a whole layering of statute, policy and guidance, and if we had more time, we could have a more extensive debate on the merits or otherwise of including a clear purpose of the planning system. I am sure there would be lots of disagreement about what that purpose should be. However, on the principle, as I have set out, the Government think that planning policy and guidance are adequate to achieve the outcomes we all want to see achieved through the planning system.
Thank you, Ms Jardine. You have reminded me that I have the right to sum up, which I am happy to forgo in the interests of time. We will not push new clause 9 to a vote, so I beg to ask leave to withdraw the motion.
Clause, by leave, withdrawn.