(6 years, 11 months ago)
Commons ChamberAs the hon. Gentleman implies, we do have such a strategy. He is also right that cyclists need the same kind of attention that I mentioned in my previous answer. They can be put into hazardous circumstances by a range of different obstacles that they encounter as they go about their business. The Government are strongly committed to cycling, as I think he knows, but he is right that we must look closely at the hazards cyclists face, and that will be included in the strategy.
My hon. Friend knows well the interest I have taken in this project. Highways England is currently conducting a final review of the route options for the A417 missing link. It is on track to launch a public consultation early in the new year.
My right hon. Friend knows that the south-west is a low-growth area. This is a highly important strategic national road scheme linking the south-west with the midlands and the Thames corridor. Does he agree that we need to get on and build this scheme as soon as possible?
It is not just about that; we also know that this is a highly dangerous piece of road, where, tragically, there has been a further accident with loss of life in the past few weeks. So it is not just about creating the right economic links; it is also about creating a safer road network. For both those reasons I have been very clear with Highways England that I want to get on with this project.
(8 years ago)
Commons ChamberOrder. I am grateful to the Doorkeeper, who was beetling around the Chamber looking for the wallet of some hapless fellow, poor chap. Geoffrey Clifton-Brown.
I am glad to say that I have not lost my wallet, Mr Speaker.
I warmly welcome the Secretary of State’s announcement, but if Heathrow is to meet its emissions targets a large number of people will have to be persuaded to travel by rail rather than car, so will he say something about the western rail link proposals? Will he also consider providing fast rail links between all London’s airports?
Both the western and the southern rail links are part of the schedule for Network Rail’s future projects. Heathrow airport is due to pay part of the cost of those links, since they involve broader issues than this project alone, but as a result of today’s decision their construction will need to be accelerated. Links between airports are not currently being considered, but if the economy of the south-east continues to grow and develop, they may well be considered in the future.
(8 years, 8 months ago)
Commons ChamberI am grateful to the right hon. Lady for her point of order, to which my response is twofold. First, as I am sure she will be aware—this will not satisfy her, but I say it as a matter of fact—the report to which she has referred is tagged to the Third Reading debate on the Bill. That is to say, it is highly germane to that debate.
Secondly, the right hon. Lady asked me whether she could call for, or seek by one means or another, a separate debate on the report. The answer is that most certainly she can seek such a debate, and she may well be successful in obtaining such a debate—I do not, at this point, know—but that, of course, will not assist her in terms of the business scheduled for today. The matters that are up for debate in the House today will naturally proceed, and must, in terms of good order, do so. Nevertheless, the right hon. Lady, who is a wily operator, has made her point in her own way, and it is clearly on the record. That seems to bring—
—a warm smile to the visage of the hon. Member for The Cotswolds, from whom we shall now hear.
On a point of order, Mr Speaker —and thank you for your good wishes. As you will know, I very rarely make points of order in the House, but on this occasion I must seek your advice on how I might lobby the business managers about the inadequacy of the time that has been provided for the Report and Third Reading debates on the Bill today.
Millions of people up and down the line are affected by this large and highly complex project, and by the Bill. I do not think that three hours for Report and Third Reading is sufficient to give Members of Parliament an opportunity to make representations on this complex project on behalf of their constituents, let alone members of the Select Committee, some of whom—although not I—spent 160 working days sitting in the Select Committee. Some might give the House the benefit of their wisdom by suggesting how the hybrid Select Committee procedure could be improved.
First, let me acknowledge and pay tribute to the extremely unselfish and conscientious work that the hon. Gentleman and others did on the Committee, under the distinguished and stoical chairmanship of the hon. Member for Poole (Mr Syms). Secondly, I would say to the hon. Gentleman that if the Government Chief Whip was here, he would have heard the hon. Gentleman’s point of order, but he is not, so he has not. That said, I feel sure that the thrust of it will be conveyed to the Chief Whip ere long.
(8 years, 8 months ago)
Commons ChamberI thank my right hon. and learned Friend for giving way on that point; I intervene because I had wanted to speak on this new clause but now will not have time. We heard cases in the Select Committee where it was quite clear that the lack of local valuers is doing an injustice to the people whose homes are being acquired. Does he agree that the Government must put that injustice right? The Select Committee made very strong recommendations about that aspect. This injustice must be put right.
I am so grateful to my hon. Friend. Yes, these are precisely the areas where Government intervention would be valuable. I urge my right hon. and hon. Friends on the Front Bench, even at this late hour, to give this careful consideration.
There is a similar story on the relationship with local authorities. Most of our local authorities, like all local authorities in this country, given the difficult conditions resulting from the continuing economic problems besetting our planet, are short of money to carry out important local projects. Therefore, the prospect of having their infrastructure ripped up during the construction process is inevitably a subject of legitimate concern to them. There is no proper reason why they and the local council tax payer should have to bear the end cost, of any description, on this project going ahead. Here again is an opportunity for my right hon. and hon. Friends on the Front Bench to beef this up and provide the necessary tools to ensure that HS2 honours these commitments.
I am no position to speak to HS2, and I do not understand why it has been so deficient in its approach to dealing with local communities, but that is the reality. I note from the Public Administration Committee’s most recent report that HS2 says that it has learnt its lessons and will do things differently in future. I very much hope that is the case, but until I actually see it with my own eyes and witness it from the comments of my constituents, I have reason to continue to doubt that that will in fact happen. That is all the more reason why these amendments, which are straightforward and should not add to HS2’s costs, or indeed to the burden of carrying out the project, ought to be accepted.
That point has been raised several times. The intention, as expressed in the documents, is to have a pedestrian connection between them.
An overarching approach to an integrated station would not only take account of all the anticipated works but achieve the objectives of securing the best possible outcomes for the residents of Camden and minimising the enormous disruption they will undoubtedly suffer. Many properties will be demolished and other properties will be in extremely close proximity to the works; public open spaces will be lost; there will be fleets of heavy goods vehicles and commercial vehicles; and noise pollution will undoubtedly disrupt the peaceable enjoyment of many properties, including in places such as Cobourg Street, which is a tranquil community with a quiet courtyard at its heart, notwithstanding its close proximity to busy traffic and the railway station. Businesses in streets like Drummond Street will also be disturbed.
We are asking the good people of Camden to put up with a great deal and to make huge sacrifices for the benefit of the nation, and Labour has tried to do all it can, in new clause 22 and in Committee, to mitigate the impact on the quality of life for residents. We acknowledge the sincerity of the Minister and his colleagues in working to that objective, but we take the view that this is so important that the assurances given ought to be in the Bill and have the full force of law.
We seek to minimise the amount of excavated material and construction materials transported into and around the site by road and to have as much as possible moved by rail. Camden Council has developed a Euston area plan, and we propose that any designs for the enlarged Euston station take full cognisance of that plan and other such framework documents and relevant guidance. The assurances talk of various boards, including the Euston strategic board, the Euston station strategic redevelopment board and the Euston integrated programme board, which bring together a number of prescribed partners. We seek to ensure that the nominated undertaker—the relevant body carrying out the HS2 works—is obliged to participate in those boards, as the assurances given by HS2 so describe.
Does the hon. Gentleman agree that if Euston station were holistically designed and developed, it would provide a huge opportunity for regeneration in the Euston area and produce a lot of good quality local affordable housing to replace some of the affordable housing that will be devastated by HS2?
I agree entirely with the hon. Gentleman’s intervention. That is the thrust of our new clause, which I trust he will support. It stipulates that the redevelopment board will advise the Secretary of State on the delivery of an “integrated and comprehensive design” for the enlarged Euston station, and it is for the integrated programme board to make sure that the designs and construction plans for Euston fit with proposals for other Euston schemes.
Access is a real issue, so while the construction is under way, which it will be for many years, we want to ensure that pedestrians and cyclists have continuous access through the site, east to west and north to south, insofar as it is “reasonably practicable” to do so. A design panel will work to ensure that the relevant partners can agree an appropriate design. Whoever is appointed for these purposes by HS2 will be obliged to work with that panel to ensure full buy-in to the design. Indeed, there will be an obligation on the nominated undertaker to take proper notice of the recommendations made by the design panel, and if for some reason the nominated undertaker does not follow those recommendations, our new clause states that it will be required to explain why that is so. The new clause makes sure that the community is properly engaged throughout the construction works at Euston so that its concerns will be recognised and its voice heard.
The provision is even more important, given today’s publication of the Parliamentary and Health Service Ombudsman’s report on a complaint about HS2. It effectively concludes that there are fundamental problems with the way HS2 Ltd communicates with the residents affected by their plans and the way it handles complaints.
The report dealt with specific complaints, but it is worrying that the Chairman of the Public Administration and Constitutional Affairs Committee has said:
“There is still a culture of defensive communication and misinformation within this public body and that is not acceptable. Unless those responsible for delivering HS2 understand that first and foremost they serve the public, they will continue to be criticised for having complete disregard for the people, some of them vulnerable, who are impacted by this large-scale infrastructure project.”
I was not expecting to be called, Madam Deputy Speaker, but I am delighted.
Having sat on the Select Committee, I wish to say two things, hopefully in less than a minute. First, the hybrid Bill Committee system needs overhauling: 160 days— not for me, as I joined only after the election—and 1,600 petitions is unsustainable. Somebody needs to look at the system. Finally, we should all celebrate the fact that we have a record number of people travelling on trains, but we need more capacity. I say to my right hon. Friend the Secretary of State, even though he did not acknowledge that I had been on the Committee, that we need to plan this thing properly. We must ensure that there is proper connectivity into HS2 from all the other lines and that the west coast main line and other lines can make the most of the opportunity for freight.
(9 years, 4 months ago)
Commons ChamberThe hon. Lady points out that this issue is important not just for London but for the whole United Kingdom. We need to reflect that in our deliberations on the subject.
May I praise Sir Howard Davies for the rigour of his report? Although I do not expect my right hon. Friend the Secretary of State to make a decision, will he expedite the many processes that this airport has to go through, so that we actually get a runway built and the UK can compete in the 21st century?
(9 years, 11 months ago)
Commons ChamberI can give a cast-iron guarantee that, during the remaining three or four months of the coalition Government, there is absolutely no chance whatever of the company being privatised. As for what happens in the next Parliament, I am sure the hon. Lady is as aware as I am that no Parliament can bind another, so it will come down to the parties’ manifesto commitments.
The national road network is vital. Even though it represents only 2% of the road length, it carries 30% of all traffic and 60% of all freight and business traffic, and 90% of our constituents will use it every year. My hon. Friend the Member for Tamworth (Christopher Pincher) mentioned the M42 and quoted from G. K. Chesterton. I am sure the Minister of State will enjoy reading it in Hansard tomorrow.
Various questions were raised about the local road network, including by the shadow Minister, the hon. Member for Birmingham, Northfield (Richard Burden). A duty will be placed on the new company to co-operate, including with local authorities, and the road investment strategy will provide long-term certainty of investment and clear performance and delivery expectations. This will give local authorities greater clarity on the implications for the local road network, allowing them to prioritise their investments better. The governance and performance structure will ensure that the strategic highways company forges open and effective relationships with local bodies through their route strategies.
On the hon. Gentleman’s question about spending, I can tell him that £4.7 billion has been spent on local roads this Parliament—27% more than throughout the lifetime of the last Parliament—and we have already announced £6 billion for the period 2015-16 to 2020. He also asked, as did several other Members, about the accountability of the new company. Ministers will remain accountable to Parliament for the way roads are run, and the strategic highways company will be accountable to Ministers for delivering the road investment strategy. Oversight from the Department for Transport, the strategic roads network monitor and our new Transport Focus will ensure that those strategies are delivered.
The Chair of the Environmental Audit Committee, the hon. Member for Stoke-on-Trent North (Joan Walley), made a wide-ranging speech, but in particular she mentioned air quality. The Government obviously take their air quality responsibilities incredibly seriously, and the Bill will place a general duty on the company to consider the environment, including the impact of its operations on air quality. I am sure the report her Committee published today will inform its work.
The Government have invested £400 million this Parliament to support the market for ultra-low emission vehicles, with a further £500 million being invested through to 2020. Specifically on air quality, we have committed £100 million in the roads investment strategy to support improvements in air quality and mitigation for new schemes. I shall come to zero-carbon homes shortly, but I should mention at this juncture that one of the allowable solutions for off-site carbon abatement, across the range of possible measures, could be the development of a national network of electric car charging points—one of the barriers to the growth of low-carbon vehicles. I am sure we would all want to see that.
Further public accountability will be provided by the new watchdog mentioned by the hon. Member for Rugby (Mark Pawsey). We will be converting Passenger Focus into a new body, Transport Focus, which will better describe its reason for existence: it will now be commenting on the state of the roads as well as the modes of transport that use them.
Finally on roads, my right hon. Friend the Member for Arundel and South Downs (Nick Herbert) made an important point about whether the company should have a view to the design and aesthetics of road infrastructure. It was an entirely reasonable point, and it allows me to mention the enjoyable evening I had last night in my constituency, watching a spectacular fireworks display over the Avon gorge marking the 150th anniversary today of the opening of the Clifton suspension bridge. That bridge, designed by Isambard Kingdom Brunel, is surely the most iconic bridge not only in England or the United Kingdom, but possibly in the whole world. In the 21st century, we probably cannot aspire to the magnificent standards of the 19th century, but surely we can improve on the ugly concrete slabs that characterise our motorway network as laid down between the 1960s to the 1980s.
When Brunel was building his bridge, there was no planning and no local inquiry system. If we are really serious about infrastructure in this country and if we are trying to build an extra runway in London or HS2, it will take at least five if not 10 years to get planning permission and the local inquiry through. What can the Bill do to shorten that period?
One of its aims is indeed to streamline decision making to make sure that national infrastructure projects are built on time.
A few Members mentioned the part of the Bill that deals with invasive non-native species. Species control orders will be used to support national eradication programmes for newly arrived species in exceptional circumstances. We expect approximately only one such order to be issued a year, and we do not intend species control orders to be used where the reintroduction of former native species is undertaken legally. I hope that reassures the hon. Member for Brighton, Pavilion, who had a particular concern about the European beaver.
The shadow Minister asked about the operation of the habitats directive of the European Union. Our responsibilities under the habitats directive extend only to protecting those European-protected species whose natural range includes Great Britain. Many of the species listed in the habitats directive, such as the crested porcupine and the marsh frog, are clearly non-native to Great Britain and could be invasive. The directive allows for derogations from protection in certain circumstances, including for reasons of public health or environmental protection.
Several Members spoke in support of the deemed discharge proposals to speed up planning consents under the Bill. The deemed discharge of planning conditions is indeed a good example of where a small legislative change, as proposed in the Bill, provides far greater certainty for house builders, other planning applicants and communities. Feedback from the sector is that local planning authorities often take longer than the statutory eight-week period to reach decisions, preventing building work from starting on sites. This measure will help to ensure that local authorities hit the deadlines that they should already be working towards.
Zero-carbon homes is the part of the Bill for which my Department is responsible, and I am particularly proud that we have got to this moment. Concerns were, however, mentioned by the right hon. Member for Greenwich and Woolwich (Mr Raynsford), the hon. Member for Southampton, Test (Dr Whitehead) and my right hon. Friend the Member for Hazel Grove (Sir Andrew Stunell). The intention of clause 32 is to make sure that all new homes achieve a zero-carbon standard from 2016—either through on-site measures or off site where on-site measures are not physically possible. As my right hon. Friend mentioned, there have in fact been two tightenings of part L of the building regulations in this Parliament: one when he held my post in 2011 and one in April this year. Together, those two measures have increased by 30% the energy performance of new homes built with planning permissions after those dates.
From 2016, we want another 20% advance in the energy efficiency of new homes across the mix of housing. Those energy efficiency measures should be done on site where possible, but off site where not. There could be practical reasons why those energy efficiency measures could not be introduced on site. That is why it is necessary to provide for a scheme of allowable solutions. This incorporates a wide range of measures such as the retrofitting of older housing stock—several Members mentioned that there could be a great need for that—and there could be local or national schemes where we need to act together as a nation and not necessarily tie the allowable solutions scheme to local authorities.
(9 years, 11 months ago)
Commons ChamberThe Government are committed to publishing draft clauses based on the Smith commission report by 25 January 2015. I will report to the House in due course on further progress in relation to the devolution of powers within the United Kingdom, and on the consequences for England.
It is of course important for the whole concept of the northern powerhouse to work for people throughout the north of England and for rural as well as urban areas to benefit from it. Given the locations of our constituencies, my hon. Friend and I will both be very insistent that that should happen. It is certainly possible for the whole of the north to benefit from the uplift in prosperity, skills, transport infrastructure and superfast broadband, because the Government have put together a stronger set of measures for the north of England than any other Government in recent decades.
I am sure my right hon. Friend is well aware that my constituents are very keen on English votes for English laws. How will he implement that, and how does the Smith commission recommend that it—as well as devo-max in Scotland—should be implemented in a way that will not lead to a break-up of the Union?
The Government will shortly publish a Command Paper setting out the options for what have become known as English votes for English laws, as well as plans for further decentralisation within England. I hope to publish it before Christmas, and will seek to make a statement in the House, following which we shall all be able to consider together how to proceed with those plans.
(9 years, 11 months ago)
Commons ChamberI hear what my hon. Friend says. No doubt he has made representations to Philip Atkins, the leader of Staffordshire county council, because those are local highway authority roads. I will join him in making those strong representations. I agree with him that Tamworth is an excellent place to invest.
I warmly thank my right hon. Friend for visiting the missing link on the A417. He therefore knows what an important economic link it is from the M4 to the M5. Will he put a bit more flesh on the bones than he did in his answers to my hon. Friends the Members for Stroud (Neil Carmichael) and for Tewkesbury (Mr Robertson)? Is it his intention to solve this problem? We have had feasibility studies for years. When does he expect work to start?
I am not sure that I can add much to the last two answers I gave on that point. There is a desire to find a solution, but it is not the easiest area to deal with. I have made a commitment to start work on it during the RIS programme so that a solution can be found in the longer term to this serious bottleneck.
(10 years, 1 month ago)
Commons ChamberNo. I am not going to call the right hon. Gentleman because Nettleton Bottom and Crickley Hill are a very long way from Newcastle. We will hear from him later, I feel sure.
Nettleton Bottom happens to be in the constituency of my hon. Friend the Member for Tewkesbury (Mr Robertson) and in mine. May I therefore reinforce what my hon. Friend has so adroitly put to the Minister? The recent fatality—I send my sympathy to the family—is the eighth since this time last year. This road is in desperate need of refurbishment.
I do understand that the death toll on this road is continuing to rise, and I also understand the delays that travellers are enduring as a result of congestion. I know that my hon. Friend has previously made this case, as has my hon. Friend the Member for Tewkesbury (Mr Robertson). The Department is conscious of that and of the need to do more across a whole range of roads, but he can be assured that the powerful case they have both made will not fall on deaf ears.
(10 years, 4 months ago)
Commons ChamberThis is a particularly challenging operation from both an environmental and an engineering perspective. The cost of the work has been estimated at about £255 million. It would include two junctions which would be grade separated, and the road is, of course, in an area of outstanding natural beauty. However, I have some good news for my hon. Friend: the Secretary of State plans to visit that part of the road next week.
While we look forward eagerly to the Secretary of State’s visit, we look forward even more eagerly to what my hon. Friend the Minister can do to upgrade the priority of this particular scheme. This is one of the busiest arterial roads in the country: it links the M4 to the M5. Tragically, we have had five deaths since last November. This is a really important priority. What can my hon. Friend do to help?
It was made clear to us when we met my hon. Friend and our hon. Friend the Member for Gloucester (Richard Graham) during the winter that dealing with the problem has been in the “too difficult to do” box for too long. The phrase “missing link” is a very good way of describing this piece of road, given the congestion that it causes and, of course, its accident record, which is not good at all.