Palace of Westminster: Restoration and Renewal Debate
Full Debate: Read Full DebateGeoffrey Clifton-Brown
Main Page: Geoffrey Clifton-Brown (Conservative - North Cotswolds)Department Debates - View all Geoffrey Clifton-Brown's debates with the HM Treasury
(7 years, 10 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
The hon. Member who represents North West Cambridgeshire—I am very grateful to him for helping me.
The truth, however, is that we did look at the option of our staying in, and so did the original report. The IOA, or independent options appraisal, costed and evaluated both a rolling programme and two different versions of staying in the building. That is all part of the original report provided, so it is simply wrong to say that we did not look at the idea of staying in. We looked at it very seriously, but we came to the conclusion— all of us, from different political parties of different persuasions—that it was simply unfeasible, unworkable and impracticable for us to stay in.
Some people have also asked me, “If the work is so urgent, why don’t we get on with it now?” The truth is that we are getting on with work now: the cast-iron roofs are being restored; three years of work is about to start on the Elizabeth Tower, or Big Ben, which will cost £29 million; and last year we spent £49 million on repairs alone. The point is, however, that the mechanical and electrical elements constitute one very large, single project that needs to be well prepared for—we cannot just start tomorrow.
Furthermore, the Palace authorities do not have the requisite capacity or skills. I am not doing them down; they themselves would argue that they do not have the capacity or the skills in-house to manage such an enormous infrastructure project. We need to put a sponsor body in place, with Members of both Houses sitting on it, and some others, to commission a delivery authority with the expertise and technical know-how to do things properly, much as with the Olympics.
I congratulate the hon. Gentleman on securing the debate. Timing is important in this whole thing. If we are to meet the 2023 target start date, we need to set up the delivery authority pretty soon. It will require a statute of this House to do it, so the authorities need to get on with the matter.
The hon. Gentleman is absolutely right: we should have started some considerable time ago.
About 10 years ago, when I was Deputy Leader of the House for five minutes, we were already arguing that we needed to get this work on the road. The Committee was asked to delay publishing its report until the local government elections were done, until the referendum was done, until we had a new Prime Minister, and so on, and still there has been no debate. We have to get a move on.
I am grateful to have caught your eye, Mr Flello. As one of the few chartered surveyors in the House and as a member of the Finance Committee for more than 10 years, I have been heavily involved with this matter from well before the inception of the Joint Committee on the Palace of Westminster, and all the way through to date. The Palace of Westminster is an iconic symbol of this nation. It is absolutely symbolic of everything the UK stands for. In many ways, the strength of our democracy is upheld by the strength of our Parliament encased in these buildings. As politicians, we have an absolute duty to the people of this country and to future parliamentarians to maintain it properly and get this whole thing right.
Much has been said in the debate, so I will be brief. Over the course of our history, including following the damage caused by the burning of Parliament in 1834 and 14 separate bombings during the blitz in 1940, only piecemeal repairs have been carried out. It is surprising to say the least, considering Great Britain’s prowess for engineering thoroughness, maintenance and ability, that no comprehensive record has been kept of what work has or has not been done on the building.
I will briefly outline what is wrong in layman’s terms. When any system or service has failed in the past, there has been simply a “make do and mend” response—a pipe added here or a wire added there. The high pressure steam heating system is encased in asbestos insulation, which has remained well beyond its designed lifespan and original capacity. It could burst and produce asbestos fibre at any minute. The main sewage pump needs replacing, as does the electricity supply, which is liable to major failure. It is unacceptable that Parliament could be plunged into darkness at any minute during great occasions, such as the Queen’s Speech during the state opening of Parliament. There is no doubt in anybody’s mind that this work needs to be done.
The timing of the restoration and renewal works is crucial. As a chartered surveyor, my view is that the entire building must be cleared so that all of the asbestos can be removed in one go, and as the hon. Member for Rhondda (Chris Bryant) said, so that all of the services—water, electricity, sewage, internet and so on—can be renewed and separated in one concerted action. Doing that piecemeal or by partial decant is completely impractical.
Other concerns have been raised, first that Parliament will never return. Frankly, after an expenditure of £3.5 billion, that would be a national scandal. The second concern is what will happen to MPs who are here for only one term. The delivery authority will have to ensure that the Chamber is open for at least part of any Parliament. The third concern is the legislative status of the temporary Chamber in Richmond House. For goodness’ sake, surely we can design something that is worthy of this Parliament? If that cannot be done in Richmond House, let us put it in the Foreign Office or the Treasury. That problem can surely be overcome.
I will address the fourth concern for a minute or two. A lot of concerns have been raised, including by me, about the cost and delivery of this enormous project. I have done a little bit of research, and the nearest comparable project I could find was the demolition of Chelsea barracks, which cost £3 billion. That was a third smaller than this place, which covers 73,000 square metres. It is therefore likely that the cost of this project will be well in excess of £3 billion. That cost is well substantiated by Deloitte in its report.
The report is excellent on financial grounds, but the problem is that the report has not scoped the work properly, so I do not know how it can be completely costed. That is why a shadow delivery authority needs to properly scope the work, consult parliamentarians on what is needed in this place and come up with realistic costings. However, Deloitte makes the important point that, for every year of delay, we add £60 million to £85 million to the cost of the project.
The only option is a full decant and a continuous, unbroken period of restoration and renewal. It is our responsibility to get on with this work, so that future generations and parliamentarians do not make the same mistakes as previous generations. Indeed, we are in grave danger of making the same mistakes ourselves if we go for a partial or continuous repair option—options 1 and 2 in the report.
The public support the project. We need to appoint a shadow delivery authority as soon as possible to scope the work, consult parliamentarians on what facilities they want in place—as the hon. Member for Rhondda said, the disabled access is appalling and it is a scandal that we have such poor facilities for our guests—produce proper costings and report back to Parliament. The work must then be enshrined in statute, so that a statutory delivery authority can begin to get on with the work as early as possible in the next Parliament.
I have listened carefully to the Minister’s speech. With great candour and great respect, I say to him that I think he is making excuses on the Government’s behalf. We need to have this debate and to establish a shadow authority as soon as possible, so that the work can be scoped and costed accurately, and we know how to move forward.
My hon. Friend knows that time is always a precious commodity in this House. Business managers are always under time pressure, now more than ever, but the matter is being given very careful consideration.