(4 days, 21 hours ago)
Public Bill CommitteesQ
Lord Roe: I am conscious of time, but it comes in all shapes and forms. It could be reluctance to devote the money required to an expensive specialist contracting model to get the work done, so you can hold things up at contract. It could be putting forward really poor, under-resourced design proposals. There are multiple different ways you can hold this process up. To be fair, lots of things make operating in this landscape complicated and hard. Perhaps I will come back to that as a principal answer: this is a good tool. It will not solve remediation, but that is not what it is intended for. A lot of stuff on the delivery side has to be improved, whether it is inside the regulator or the other agencies or out in industry. That will probably give us the greatest gain, but this is a very useful tool where people are not complying.
With the greatest respect, I hope the witnesses this afternoon bring up-to-date evidence. We have gone from a 30% approval rate and a median determination time on approvals into the gateway 2 system of over a year, which was completely unacceptable. Charlie and I were charged with trying to shift that. We publish data transparently every single month. We are now at a 92% rolling approval rate. We got the median determination time down to something in the region of 20 weeks, and we will reduce it further. I personally am not experiencing huge levels of non-compliance, to be fair to the industry. They have worked hard to improve the standard of applications and move things on, but this is a very difficult space to operate in—and where there are bad actors, this will be a good tool.
Sarah Gibson (Chippenham) (LD)
Q
Mark Norris: Like the building safety regulator, the LGA welcomes the Bill. It is another tool in the toolbox. As MHCLG’s statistics already show, local authorities are out there doing enforcement now and have been for a number of years. Some 940 buildings are being inspected by councils under the Housing Act to take enforcement actions against some of the bad actors that Lord Roe referred to, supported by the Joint Inspection Team, which the Department funds the LGA to support. They have completed over 200 inspections so far.
The issue for us, which Lord Roe touched on, is capacity and resources to do that. Environmental health officers are in short supply—there is not a ready tree on which they grow to recruit them from. In terms of being able to do additional work, we already know that environmental health officers have a range of additional responsibilities. Recent legislation, including the Renters’ Rights Act 2025 and the social housing Act from 2023, includes a range of additional duties on local housing authorities within the housing space. Resourcing capacity in environmental health will be needed going forward to support councils in being able to do that work. We are fully up for the task, but need the resources and capacity to do that alongside everything else we are being asked to do, as you pointed out.
Q
Kate Green: This is a helpful provision; it potentially gives regulators a timelier and more proportionate enforcement option, but we would not want that to arrive at a situation where commercial developers, who often have very deep pockets, considered that a financial penalty was an acceptable cost of delay and that they could afford to hold back, address other priorities that they might have and just pay the price of that. We really do see those penalties as a backstop to other effective enforcement action.
We would also draw attention to the need for the capacity to use that civil route to secure compliance. There will need to be investigation, evidence gathering, decision making and dealing with appeals, and all that will require sustainable long-term funding in to the system. A civil route is certainly welcome. However, our other concern is about buildings subject to the developer contract, where using a contractual route rather than a statutory basis to ensure compliance puts more hurdles, if you like, in the way of residents seeking to have their buildings remediated.
Sarah Gibson
Q
Kate Green: Yes. Unfortunately, I did not hear Ms Fisher’s evidence this morning, but I do share those concerns. There will be an audit process, but that will be a dip sample, in a way; there will not be capacity for Homes England to audit every fire risk assessment that is undertaken. We will need to know that we have a robust audit process and that Homes England has the resources to carry that out.
We also need to be clear that where fire risks are deemed tolerable, there is an appropriate response from the insurance industry, which recognises that they must have full regard to that audit process based on the PAS 9980 framework that you referred to, and that, if fire risks are deemed tolerable, residents should not be penalised by higher insurance premiums, because effectively the insurance now has that assurance that the building can be insured cost-effectively.
(4 days, 21 hours ago)
Public Bill CommitteesQ
Kate Henderson: Equal access to remediation funding, brought in last year at the spending review, is hugely welcome. It has made a big difference to our ability to deliver remediation at pace and to invest in existing homes and development. Previously, our members—housing associations—and councils had to self-fund remediation, which diverted resources away from new homes and refurbishment. Some of our members even had to sell buildings to pay for remediation work. Members are now actively applying to the cladding safety scheme and receiving funding. We are expecting starts and completions of remediation by our members to begin to increase as we get the approvals. Homes England will be able to provide more data on that.
Funding from the cladding safety scheme also funds things such as project management, which is really important to deliver remediation faster. It frees capacity within our member organisations to build new affordable homes and improve existing ones. I should say that the funding only covers external wall defects; members are still facing significant costs for internal walls, including compartmentation and fire doors. We very much welcome the cladding safety scheme funding for high-risk buildings, and new funding has become available for buildings under 11 metres that are also deemed high-risk. That opened earlier this year, and we understand that that fund for buildings under 11 metres is massively oversubscribed. It would be really useful to have the data from those applications to understand the scale of works required in high-risk buildings under 11 metres.
In the sector more broadly, there are lots of other significant changes happening. We absolutely support Awaab’s law and welcome the clarity in the decent homes standard, but recognise that those measures all add cost. Remediation funding that we have access to very much helps to meet those competing demands and makes them more manageable, but the overall financial picture remains complex and has its challenges.
Sarah Gibson (Chippenham) (LD)
Q
Jaclyn Mangaroo: That is a really good question. In some cases, it may be. We have seen it most often with the pledged developers where they are using a contractor that may be part of the organisation, and so are marking their own homework. For a responsible entity where it is an enfranchised building, or where an RMC or an RTMC has the opportunity, they have really no incentive to say that their building is safe when it is not. They have very little incentive to do that. They really want to go much further.
The regulation of the profession will certainly help to improve competency, and hopefully it will speed up the process and reduce delays, as long as that auditing of the fire risk assessments can be done quickly through Homes England. We are all about making sure that there are fewer delays, that stalled buildings can get started and that residents have peace of mind. There is no deadline. There is no set date for when buildings will be finished, so making sure that we get peace of mind, confidence and protection of residents into this Bill will be so important. That is how we have approached our written evidence to the Committee: does it speed things up, does it provide clearer accountability and will it actually give residents peace of mind and create safer buildings?
Q
Ben Hopkinson: Yes. There is definitely limited capacity within regulators, so we have to figure out where that capacity gets us the biggest safety improvement. Given that existing buildings are less safe than new buildings, they should be the priority for the BSR or a similar regulator.
Sam Dumitriu: I agree with that; I am happy to accept completely what Ben says.
Sarah Gibson
Q
Sam Dumitriu: There is a trade-off between prescriptive and more flexible regulation. Sometimes you might like to have very clear rules, even if they err very far on the side of caution. I think that in the case of building safety, what we have had is a few pieces of Government guidance in the past that have probably been too tick box and restrictive, and that has caused problems. I think that the approach of PAS 9980 is the right one in focusing on proportionality. I also support the position in clause 44 on tolerable risk.
As mentioned, it is very important that we prioritise the types of remediation that happen, because there are very large constraints in terms of who can deliver and assess these projects. As a result, you need some way of making sure something is proportionate and remediation is not necessary in every case. It can be very costly and that work can also potentially push other projects back in the queue.
The area of policy that I have spent the most time focusing on in recent memory is the regulation of nuclear power, and Ben has also raised the Fingleton review. We have some very similar issues here because it is a question of “health and safety principles”, “reasonably practicable” and terms like that. You tend to see regulation that errs on the side of caution—which in safety is understandable—but there can be a tendency to do work that is not 100% necessary.
In the case of building safety, one consideration around external cladding is that you often might have a building owner who has financial interests in the cladding being remediated that are not solely safety related. There might be a different cladding material that requires less maintenance, is more resistant to weather or might make the building nicer. If there is a potential safety case, what you do not want is a situation where that cladding is changed even though we are pretty confident that, in the event of a fire, everyone can be safely evacuated—the building might experience some damage, but ultimately the people inside the building get out okay, which is what we really care about. My instinct is that we do not want to move to a system that requires more work being done over what is proportionate. It is really important when we look at all of these things.
I think that in the Building Safety Act, in many cases, we have erred on the side of regulation beyond what is proportionate, particularly around second staircase rules for buildings above 18 metres. I think that it could very easily be raised to 30 metres without providing any real risk to the public. We need to be very cautious about insisting on things beyond what is proportionate.
Ben Hopkinson: “Tolerable” seems to be the right standard in the Bill. There is a completely understandable drive for caution and safety within these complex issues. However, we have to be careful about proportionality. Already the Bill’s impact assessment shows that the costs of it are 10 times higher than the benefits. If you removed tolerability and mandated complete safety, how expensive would that be? Would we accidentally shut down new construction because we are burdening house builders with incredible asks on development capital?
There are a lot of competing issues here and tolerable seems to strike the right balance. Certainly, you want to make sure that the kind of buildings that are most unsafe are the ones that are remediated first, and removing a tolerable guideline risks buildings with only minor imperfections being treated exactly the same as the ones with the most dangerous cladding. I think that the Bill, as drafted, seems sensible and obviously we will look at the regulations as to how “tolerable” is actually defined.
Q
Steve Day: Yes, I did not actually say it, but it was another element that I was happy about. The cladding manufacturers largely have escaped liability. I do not know if you followed our campaign with the Earl of Lytton in the House of Lords. We initially had a remediation scheme, which was trying to make developers pay for breaches at the time of construction with a wide construction industry levy, which did bring in construction manufacturers. That aligns with our approach, but there are some areas where you could extend the levy. The build-to-rent sector, for instance, has largely escaped it. They could contribute, given that they are building. Build to rent would be an area.
Before the Committee, we had a look at the latest status of developers and house builders. The top 10 have £24 billion in net assets, largely due to hoarding land banks and making significant returns to shareholders. We looked at just how much were share buybacks and dividends. For instance, Barratt Redrow has announced an intention to return £400 million to shareholders. With £24 billion plus £400 million, they can afford to pay a little more to cover all these leaseholders. On the buildingsafetyscheme website, you can see a breakdown of all the information that I am giving here, including the items of the mortgage-backed securities—we are going to publish those so that everyone can see the exposure due to bad building in this country.
I really encourage the Committee to look at whether freeholders may evade their responsibilities. There have been certain restructuring events that you might want to consider, which may mean that you have a good bank/bad bank scenario as we had at Lehman Brothers, where some assets may be transferred to the bad bank, and then there is no money to pay the remediation liabilities. I would recommend looking at anti-avoidance measures, potentially as an amendment to the Bill.
Sarah Gibson
Q
My worry is that we have seen poor construction and a race to the bottom over the last 30 years in the UK construction industry, and now the Government are hoping to build large amounts of new housing. How do we make sure that the housing that we are building now will not be the retrofits of 2050, and that we will not be in the same position then? What key things do we need to be doing to make sure that this does not happen again? Is it a question of building control? Is it a question of enforcement? What do we do to make sure that we do not end up here again?
Ian Abley: It is a question of regulation 7. You already have the tools to do it. They are adequate. Building regulation requirement B4(1) said that the external walls should be adequate to resist the spread of fire. That is still the case. The definition of “adequate” is the thing that is missing. But that forces you into a world of very straightforward thresholds of what is and what is not safe.
The problem with tolerability, to my mind, is not so much that it has not collapsed into a low. If the high and medium-risk buildings that already exist are declared as such to the Building Safety Regulator, they have to go through building remediation, which puts them back into the building regulation loop. The structure of PAS actually encourages anybody with a medium or high-risk building who cannot afford to remediate to shop around and find a fire engineer who will give them a “tolerable” report, and they magically get to avoid the building regulation process entirely.
Regardless of David Crowder’s intent for setting up a structure that looks vaguely like something that the Health and Safety Executive would do—with the carrot of risk going from unacceptable through tolerable and down to acceptable—what PAS does is encourage remediation avoidance. Any impecunious building owner is going to find it far cheaper just to employ a fire engineer who will give them a “tolerable”. I have seen that on an epic scale with a signatory to the developer remediation contract.
It is a beautifully connived process where everyone seems to be doing their job, but all that happens is the risk gets accepted by the building owner and then the process stops. The estates of buildings fall off the statistics, and it looks like the remediation problem is not as big as was first thought. If clause 44 mandates the tolerability wheeze into the legislation instead of defining “adequate”, you will see that right the way down to the 11-metre height.
I will leave it there because I am mindful that other colleagues want to come in.
Sarah Gibson
Q
Dame Judith Hackitt: The part about fire engineers’ competence and how we assess that is being addressed separately from the Bill. We already know that there is more work we need to do there, and I am involved in that.
Let us be clear, however, that we are never going to get to a point where fire engineers always agree on a single solution, because the nature of the beast is such that different solutions may be arrived at that give an acceptable level of risk. That is one of the reasons why we have focused on making all the regulation outcome-based so that it gives people the opportunity to look at different routes and so on.
In the cases where disagreements occur, it is really important to have a body that can stop that becoming a long-term delaying process and a dispute through the courts, and focuses on agreeing what is going to be done, getting it done and letting other things play out while speeding up the process whereby residents get to a position where they can both feel safe in their building and, indeed, sell their properties and move on if that is what they want to do.
Q
Dr David Crowder: Again, I have not focused my interest on the Bill; I am concerned with the PAS. Currently, the Bill simply refers to the PAS, and the PAS gives a definition of whether a building is safe in terms of the risk of external fire. I know it is not for me to ask the questions, but I suppose there is a question to put back to those writing the Bill: are you seeking simply to limit the ability of any square metre of external wall to burn—to reduce its propensity to burn at all—or are you looking in the round at whether the people in the building are safe, in spite of the possibility of some fire spread?
This is where tolerability comes in. A number of public consultations have occurred around what people are content with. Let us start with buildings that comply with the building regulations as written right now, and buildings that have solid masonry wall construction. They are low risk, because the walls simply do not burn, so there is no hazard that anyone needs to concern themselves with in terms of the external walls. That does not mean that external fire spread will never occur, because you can still get window-to-window fire spread, but the walls will not make the problem worse.
If you have combustible material, the follow-on question is: how far does it go? How far up the wall could the fire spread if that combustible material was involved? Does it cross compartment lines, and is there therefore a likelihood of the fire going somewhere else? The final question then concerns the internal arrangements: if that spread should occur and covers a reasonable distance across the building, are there facilities for people to get out of the building?
We have taken a very scientific approach to it, and I am not sure it is conducive to legislation, to return to your question. There is probably a shorter, punchier way of doing it, but my fear, and the driver behind the way the PAS is written, is about giving people options and not assuming that everyone has the resources to do absolutely everything to mitigate risk.
Sarah Gibson
Q
You mentioned that, for fire engineers, control and signing up to ethical standards and so on is in the process of being done. One would therefore expect that fire assessors, who are, of course, more likely to be involved in the remediation we are talking about, would also be included in that regulation. My question is: do you think that the level of control over those applying the assessment and the ethical codes that go with it are sufficient to limit the issues we have seen around discrepancies? Is it more a question of enforcement than legislation for what is causing the discrepancies?
Dr David Crowder: I think that enforcement would help. The answer to your question lies not necessarily within “tolerable” but in the freedom that users have been given to simply reach different conclusions and walk away. That is what we have tried to clamp down on with the redraft.
By way of example, I review FRAEWs on occasion, and I am quite obviously well versed in what PAS 9980 says. We have risk tables in the PAS that give different risk ratings to different features of buildings, and I have seen instances where appraisers will quietly slip in that a feature of a building has a different risk rating from what the PAS says it should have, and that then flows through and changes their outcome. The new PAS—the 2026 edition—says that, for any deviation, including that, you have to declare in your report that you have done something different. With multiple appraisals, people now have to explain why they have reached a different conclusion.
I have seen instances in the past where appraisers are restricted by their professional indemnity insurance and all they can do is condemn combustible cladding. They will not be given professional indemnity insurance unless they condemn everything combustible and give the okay only on stuff that is non-combustible. I argue that it is an ethical problem that they are allowing their work to be influenced by a pressure other than the science and engineering—that needs to be declared. If that is the reason their report says something different from the previous one, they need to say that that is the case.
Equally, it might just be because they do not have the risk appetite. If it is simply risk appetite, they need to say that, so that people can take them to task and we can start getting some clarity. We have done everything we can to try to narrow the field, and I would like to see more appraisers being held to account when they are providing answers that people do not understand.
The additional thing is peer review. We have also prescribed in the 2026 edition that when an appraiser is reviewing somebody else’s FRAEW, they should not simply start again at the beginning, run through the whole process and then reach their own answer, which is likely to be different because different engineers have different views. We now positively say that they are instead expected to go through the other engineer’s work—