Nuclear Safeguards Bill (Second sitting) Debate
Full Debate: Read Full DebateEleanor Smith
Main Page: Eleanor Smith (Labour - Wolverhampton South West)Department Debates - View all Eleanor Smith's debates with the Department for Business, Energy and Industrial Strategy
(7 years, 1 month ago)
Public Bill CommitteesQ
I wonder if you might briefly share with us what you think might be possible so that the Bill is not a contingency, and whether you think the timescale that we have in front of us over the next period is sufficient to bring in either associate membership, perhaps, or similar arrangements with Euratom. Alternatively, if the Bill is to be used as a contingency, do you think that the timescale in front of us—bearing in mind all the detail of the secondary legislation that we need to get through as far as the Bill is concerned—will be sufficient to make that happen?
Sue Ferns: I think the answer is that we do not feel confident that the timescale is sufficient. From speaking to members in the ONR who essentially have to deliver the key provisions of the Bill, it is clear that they need to build an IT system to log the data properly. They need to have resources to deliver what is required, bearing in mind that we are a heavy utiliser of Euratom resources in the UK. As the previous witness said, we need to make sure that there are inspectors in place to be able to police the regime.
It is easy to say that; it is much more difficult to deliver it. Nuclear inspectors are thin on the ground at the best of times. Absolutely, ONR is doing its very best to try to ensure that it can expand its inspector resources, but I think even ONR feels that it is a challenge. The question is where will these people come from? The only obvious source is from elsewhere in the industry, because there are not qualified nuclear inspectors who are currently out of the labour market. That is absolutely a major challenge. The honest answer to the question is that I do not know whether the timescale is sufficient, but at this stage we certainly do not feel confident about it.
Kevin Coyne: I would answer that question with two responses. First, as I said, we as a union hoped that we would have remained in Euratom. We do that because we believe there is not a necessity to leave Euratom in effecting Brexit under article 50 and through article 160a. It was possible, I understand, to remain. That is important, because of the uncertainty that we now believe is cast over that.
As I said before, our concern is mainly with our members’ interests and with jobs. Sizewell B, for instance, will be in operation until 2034, and it relies extensively on components from the United States. It is very important that the co-operation agreements that the previous witness talked about are in place by 2019, and there must be serious doubt with the inspectorate in its current state. I believe that the numbers are 160 inspectors, and the ONR has fewer than 10 in place currently. So, there is the training and the programme and—importantly—all of that must cast doubt upon our ability, and if that is the case it will affect the smooth operation of nuclear plants in future, until there is a regime in place that equally matches the plants.
Secondly, I would argue that there is an impact on new nuclear development for the regime. For instance, there is the whole fuel cycle in Britain, which is gearing up to be a serious and important new operator of new nuclear build. We want within that the whole fuel cycle—the whole of the nuclear operation. As you know, in Preston we have a factory—Springfields—that produces fuel, which is wholly dependent on mixed fuels from other nations, co-operation agreements and the operation of Euratom in ensuring that that fuel supply is there and available.
There is a real threat, because of the problems with Westinghouse, that that plant in Preston would suffer as a result of the safeguards not being in place in time. That would result not only in the loss of jobs but in issues for the fuel cycle itself, for Britain’s ability to recreate the whole of the nuclear cycle for the export orders for the industry, and for the jobs that that entails.
Q
Kevin Coyne: I will defer to my colleague, who is from the union that represents these people.
Sue Ferns: How long to train a nuclear inspector?
Q
Sue Ferns: It takes quite a number of years to train a nuclear inspector. Obviously, if you get people from the industry, they have a level of experience, but not in that context. I believe that ONR is considering whether it can provide additional training to some of its other staff, to enable them to take this role. They are people who inspect, but don’t inspect for safeguarding. However, none of that happens overnight. This is a highly skilled, very specialist area, which is why there is such a premium on this source of labour, so it will take a period of time to be able to do that.
Kevin Coyne: The reputation of the UK nuclear industry and its attendant skills and safety record are things that we, including the trade unions, are very proud of. I would argue that it is important that Euratom inspectors are highly regarded and renowned throughout the world, but that takes time. It is very important to have that reputation, so that people in the rest of the world believe the reports and the regulations that emanate from that.
Q
Sue Ferns: I think that there are a couple of things. First, as the previous witness said, there should be a clearer timetable for various steps. At the moment there is a deadline and then there are two years. How will we get there? The path is unclear.