First Capital Connect (Hertford Loop) Debate

Full Debate: Read Full Debate
Department: Department for Transport

First Capital Connect (Hertford Loop)

David Burrowes Excerpts
Tuesday 28th January 2014

(10 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Nick de Bois Portrait Nick de Bois
- Hansard - - - Excerpts

My hon. Friend’s point would be well backed up if we added up the number of tweets that are, shall we say, less generous. In fairness—I will come to this later—FCC does at least try to confront some of the issues raised on Twitter during some peak times.

Let me set out for the Minister what the problem is, the responses from FCC and Network Rail, and my analysis and that of some of my constituents. I will not be able to cover all the issues, but I know that colleagues will mention problems common to all of us, and certainly to my constituents. I will conclude by sharing views on how the future franchise should secure commitments from operators, and why public satisfaction should be a consideration when awarding or extending franchises—a measure for which my hon. Friend the Member for Stevenage (Stephen McPartland) was an early champion.

For clarity, what is the Hertford loop? It is a line that leaves the east coast main line at Langley South junction, just south of Stevenage—why it is called the Langley junction baffles me—and passes through the stations of Watton-at-Stone and Hertford North, represented here by my hon. Friend the Member for Hertford and Stortford (Mr Prisk); Cuffley, represented by my hon. Friend the Member for Broxbourne; Crews Hill, Gordon Hill and Enfield Chase in my constituency; and Grange Park, Winchmore Hill, Palmers Green and Bowes Park in the constituency of my neighbour and hon. Friend the Member for Enfield, Southgate (Mr Burrowes). However, what is most significant in this debate and draws wider interest, including that of my hon. Friend the Member for Stevenage, is the fact that the Hertford loop is also a diversion route for the main line when necessary. Thereby hangs a tale.

Turning to the operational shortcomings, my neighbour and hon. Friend the Member for Enfield, Southgate, and I have had considerable representations from constituents served by FCC; he will, I am sure, speak for his constituents and their experiences further down the line. There has been a severe and sudden drop in service levels, most noticeably since late August 2013. The situation remains unchanged. In particular, the pre- and post-Christmas periods proved utterly unacceptable. At that point, I pressed FCC for a meeting to represent my constituents’ views and to try to learn what plans were afoot to mitigate the operational failings. Unfortunately, it took until 6 January to get a meeting with FCC, along with my hon. Friends the Members for Stevenage and for Enfield, Southgate. I am pleased to say that Network Rail also attended.

David Burrowes Portrait Mr David Burrowes (Enfield, Southgate) (Con)
- Hansard - -

My hon. Friend is making a strong case for his constituents. I understand from FCC that during the three-month period leading up to Christmas, on 83% of occasions, it did not meet its target for punctuality. He is someone with great experience in business. What would happen to him if he did not meet his core business target on 83% of occasions?

--- Later in debate ---
David Burrowes Portrait Mr David Burrowes (Enfield, Southgate) (Con)
- Hansard - -

It is a pleasure to follow my hon. Friend the Member for Stevenage (Stephen McPartland). He is a champion of both his constituents and commuters, as is my hon. Friend the Member for Enfield North (Nick de Bois). Enfield Chase, Winchmore Hill, Palmers Green and Bowes Park stations are all in my constituency. This debate is of particular concern to my constituents who, like me, travel along that line. As my hon. Friend the Member for Enfield North said, our constituents spend thousands of pounds a year for, essentially, a poor service, although there are some exceptions.

I am not sure whether any of my constituents are present—I noticed that some members of the public arrived late—but if any of them had tried to attend this debate, they would have struggled to get here on time had they taken the trains at 11.3 am and 11.31 am. They would have been greeted by the news that there were delays of between 14 and 18 minutes at Enfield. They would have heard not only about delays, but that the train was no longer going to call at Enfield Chase, Grange Park, Winchmore Hill, Palmers Green and Bowes Park, owing to an earlier broken down train. Sadly, that is typical. There are not only delays, but complete cancellations. People’s travel plans are thrown into disarray by the fact that no trains will be stopping at certain times. Commuters in particular must get to work on time. When they pay out thousands of pounds, they have a basic expectation that they will reach their destination in a reasonable time. That does not happen too often.

Sadly, my constituents have had to get used to tolerating the intolerable in many ways—to the overcrowding and overheating of carriages, as well as the delays. As my hon. Friend the Member for Enfield North carefully outlined, the past three months have been totally unacceptable. Passengers have been left literally stranded. They have had to take a bike or find some way to get a bus—when it arrives—to take them to tube stations. That is not straightforward; it is not a good, easy, efficient transfer. First Capital Connect must take much more immediate action to deal with problems when there is a good reason for things going wrong—for example, for reasons of safety.

We heard on Monday, sadly, that somebody had fallen on the line. Such things happen, and then there are delays. It is important that ameliorative action takes place, not least to give people proper transfers, so that they do not have to wait and find ways themselves—through getting a bike or by doing something else—to get a better service.

First Capital Connect, as we have heard, said in a letter that it is ultimately accountable to our constituents. Is it really? It hides behind saying that it is responsible for only about a quarter, or 24%, of delays—yes, some responsibility and accountability lies with Network Rail, particularly, and others—and it hides behind its specific contractual responsibility, saying that it is not responsible for overall performance. I say to the Minister that we must be able to do better than that when we consider the franchise agreement. It cannot simply compartmentalise its responsibilities and rely on its specific contractual delays, as it were.

Stephen McPartland Portrait Stephen McPartland
- Hansard - - - Excerpts

The figure of 24% that I referred to covers the whole of the Great Northern line. We are not aware of the figure for the Hertford loop line; it may be much higher than that.

David Burrowes Portrait Mr Burrowes
- Hansard - -

That is a very good point, and it has already been said that there are particular problems on the Hertford loop line. I agree with my hon. Friend that we need to look at properly ingraining customer satisfaction in the franchise agreement.

First Capital Connect also relies on the national passenger survey, saying, on the question of how train companies deal with delays—again, this is across the line and not only for the Hertford loop; the figure for that may well be very different—“There is a 43% satisfaction rate; you should be pleased with that.” It boasts that there has been a 10% improvement on the previous year, and that the figure is 5% greater than the average for London and the south-east. I hope the Minister realises that those rates are not acceptable. Whether or not they are the average, and whether or not there has been a 10% improvement, our constituents, who pay thousands of pounds, have to put up with what the majority of passengers say is unsatisfactory. That is not acceptable.

When the franchise agreement is agreed, our expectations must be so much higher. In the private sector and elsewhere, that satisfaction rate would not be accepted. Those sectors would have to bring about serious changes to provide a better service, and we must see that happen. The Which? survey in 2013, based on historical data, found that First Capital Connect had the worst customer ratings of all operators. There is a long way to go to ensure proper customer satisfaction and confidence.

As I and others have said, statistics for the past three months show that 83% of trains did not meet their punctuality targets. First Capital Connect’s core business is to get passengers—our constituents—to their destination on time, and it is failing at that great rate. It talks about issues of accountability, but it is not truly accountable for failing to deliver that core part of its contract. We need to see how we can ensure that it does better. It is not good enough, as my hon. Friend the Member for Enfield North mentioned, to say, “We have improved the Twitter service; we have 50,000 followers.” I could refer to Facebook groups; some parody the name First Capital Connect, which suggests that a whole group of people on social media have different views.

There is an infrastructure issue and a recognition that Network Rail has a lot to answer for, and indeed there is now increased investment in the line. Reference has been made to the trains and tracks being 40 years old—looking at the ages of Members present today, I think we all recognise that when one gets to 40 and beyond, there are issues—and there are problems with leaves, storms and winds, and even when new circuits get burned out. The reality is that progress has been made. There has also been progress from First Capital Connect, with additional trains coming through at peak hours, and that has all been welcome. However, now is an opportune time to ensure that First Capital Connect, or whoever takes over, does a better job.

As First Capital Connect states, decisions about future rolling stock will be made as part of the franchising process. This is a really important opportunity for us to make it crystal clear to the Minister that getting future investment soon is key to delivering a better service to our long-suffering constituents. They are long-suffering, not least because a lot of maintenance has been going on. Every Sunday, ever since I can remember, Winchmore Hill and services to Moorgate have been shut down, with a replacement bus service—a big coach trundling along our roads. People have seen that there is investment, but they are impatient to see it result in actual service improvements. They are also impatient for the franchise agreement to deliver what we are all talking about, which is true and proper accountability, meaning an improved service and improved performance.

--- Later in debate ---
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I am well aware of those issues, and the weather was only one part of it. Coupled with the other problems to which my hon. Friend alludes, weather was probably in some cases the straw that broke the camel’s back and caused annoyance and anger among passengers. When we have such weather situations, safety must remain the highest priority, and it is in no small part due to Network Rail’s performance on safety that the UK now has one of the safest, if not the safest, railways in Europe.

David Burrowes Portrait Mr Burrowes
- Hansard - -

Will the Minister respond to the point made so well by my hon. Friend the Member for Hertford and Stortford (Mr Prisk)? Why did our line seem to perform so much worse as a result of the storms? Yes, storms happened across the line, but the Hertford loop seemed to come off worst.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I was involved in conference calls following the St Jude’s day storm, and the main issue was fallen trees. A decision was taken that, before services could commence, proving trains would be put through the routes so that large numbers of commuters were not stranded, possibly with trains backed up on the line behind a number of fallen trees. Where the embankments or the margins of a rail line are wooded, there are likely to be more fallen trees on the line. That was a particular problem north of London and in the south-east during the St Jude’s day storm. From a safety perspective, the right decision was taken. I gave evidence to the Select Committee on Transport stating that, before trains carrying commuters could use a line, proving trains ran to ensure that the lines were clear so that the trains could reach their destination.

--- Later in debate ---
David Burrowes Portrait Mr Burrowes
- Hansard - -

On the Hertford loop, the safety issue was not so much fallen trees as compacted leaves. The equipment necessary to unpack those leaves took a long time to get down the lines. The delays getting to us to ensure the safety of the line was a particular operational issue, and I understand that that problem has been repeated over the years. As we see continued poor weather coming down the line, as it were, we need to ensure that the problem is not repeated.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I am aware that “leaves on the line” has become a standing joke, but it is no joke for those affected. I will ensure that Network Rail considers its strategy for ensuring that such situations can be addressed.