I will speak in particular about the work of the Housing, Communities and Local Government Committee. First, I congratulate my hon. Friend the Member for Kensington (Emma Dent Coad). I say in a heartfelt way that I do not think her constituents—particularly those most directly affected by this disaster—could have a better champion. She has the respect of Members across the House for what she has done to represent her constituents forcefully, with emotion and with detailed knowledge of these matters. She certainly has my respect for what she has done.

In looking at a disaster and a tragedy such as Grenfell, we can occasionally look at what can come out of it that will help others—in this case, what will help other people to be safer in their homes as a result. As a Committee, we have not looked at the causes of the disaster and the reasons for it, because that is a job for the inquiry to do. It was not our job to go into that area and second-guess its findings, but we have tried to follow up particularly on the work of the Hackitt report. We have looked at what improvements can be made to regulations and rules on buildings and building safety to make other people safer in their homes and other buildings they are in in the future.

We produced a report last July after taking evidence. Prior to that, we had had a session with Dame Judith after both her interim report and her final report. We have had Ministers before us on a number of occasions. I see the Minister for Housing in his place. He came most recently in January, and he is coming again in a few weeks’ time. Dame Judith came in January, and she is coming again at a session before the Minister. We have tried to follow through not merely on what the promises were, but on how far they have been implemented and what more needs to be done. We have had a very detailed exchange of correspondence with Ministers. Indeed, I am still waiting for some answers on the most recent questions we have asked. As I say, we tried to concentrate in our inquiry on the issues of cladding, building safety and building regulations.

In the end, this is a story of a response by the Government with a recognition that dangerous or potentially dangerous material on high-rise and high-risk buildings needs to be removed. However, it is also a story of probably quite a slow response in some respects, and of a response that is still completely inadequate in others and one that has not been finalised. I hope it has not been finalised because I hope that the Government will go further. It is a story about ACM cladding—the cladding on Grenfell—and clearly a requirement for that to be removed, and it is a story of other materials that may be just as dangerous as ACM cladding. It is a story of materials generally that are not of limited combustibility and what should happen to them. It is a story not merely of high-rise residential buildings, but of other high-risk buildings such as hospitals and old people’s homes. Very importantly, it is a story not merely about new building, but about existing buildings, and I will make particular reference to that in a few moments.

It was immediately agreed that the ACM cladding—the cladding on Grenfell—on other high-rise residential buildings should be removed. However, the Government initially produced no funding to go with that. It took till 16 May 2018—roughly a year after the disaster—for the Government to come forward with £400 million, which was welcome. It has generally meant quite a lot of progress on taking the cladding off high-rise social housing, and that progress is welcome. It is not quite complete, but it is welcome progress.

Alongside that, there has been a real problem in relation to private sector buildings and the refusal of the freeholders to accept responsibility. The Government’s reasoned response was that leaseholders should not have to pay for the responsibility. However, for a year after the announcement of the funding for social housing, there was virtually no progress at all on private high-rise buildings, except where some developers decided that they would accept responsibility for the material they had put on. We have to recognise that, in some cases, developers were no longer responsible for the buildings—they may have been bought out by other companies, which were often freehold companies with limited assets— while there were leaseholders who could not pay. It really was a situation that was never going to be resolved. Ministers kept saying—I think this was the famous phrase—“We rule nothing out”, but for the most part nothing actually got done for a long period of time. That was even though the Committee, when it did its report last July, recommended that an immediate fund be established, initially at a very low rate of interest, at least to provide the wherewithal to get this work done, and we could argue about who would pay for it afterwards. We are still very much in that position.

Jim Fitzpatrick Portrait Jim Fitzpatrick (Poplar and Limehouse) (Lab)
- Hansard - - - Excerpts

Does the Chairman of the Select Committee accept that there was not only a financial impact on the leaseholders exposed to this pressure, but an emotional one on their mental health from the anxiety of living in what they thought was not a safe home and of worrying about where they were going to find the money to pay for the remedial work and other fire costs?

Clive Betts Portrait Mr Betts
- Hansard - -

I entirely accept my hon. Friend’s point. I suppose I am trying to take a practical and financial approach to this issue. I recognise that that is all right for me sitting in here as a Member of Parliament, but for the people who actually live in these properties it is a very different experience, given the impact on their daily lives and their mental health, as my hon. Friend has rightly highlighted.

The Government then gave additional powers to local authorities. I am not sure that a single local authority has used any of those powers yet. Indeed, when the permanent secretary came to see the Committee, she said there was a risk to local authorities if they used the powers in relation to whether they could actually make them hold and make them effective, and whether local authorities could actually get any money back if they went in and spent the money themselves.

Now we at least have the £200 million fund that the Government have announced for private sector properties, but there are a lot of questions about it. First, who applies for the fund? Who ensures the work is carried out? Is there a timeline by which all this work has to be carried out? What happens if no one applies and the building is still there with this cladding on it? What happens to the local authority if it goes in and does the work in default: does it get the money back? What happens where a developer has already, rightly, paid for the work themselves: can that developer claim the money back from the fund, or does it apply only to work that currently has not been carried out? In the end, who is responsible for the work being signed off as satisfactory? There are a lot of questions that need addressing, and I have written to Ministers about them on behalf of the Committee.

Mary Creagh Portrait Mary Creagh
- Hansard - - - Excerpts

The Chairman of the Select Committee has proved very tenacious in following up on these issues. Does he agree with me that the Grenfell Tower fire was a systems failure—a whole-system failure—at various points, and that it is now imperative for the Government to put in whatever money is required to rebuild that system from the bottom up, so that in dealing with the consequences and the aftermath of that fire we do not recreate problems or create new ones in the systems for homes, inspections or fire regulations?

--- Later in debate ---
Clive Betts Portrait Mr Betts
- Hansard - -

I thank my hon. Friend for taking away from me my final, winding-up comments. She is absolutely right, and that is at the heart of Dame Judith’s report. This is about making sure that materials are right and are properly tested. In the end, it is not even about the building regulations in relation to fire; it is about the building industry as a whole and how it operates. There is a race to the bottom, and the industry is taking the cheapest on board all the time as the way forward. This is about making sure not merely that the materials are right, but that the materials specified are actually used, that the buildings are properly signed off and that they are properly maintained and managed. This is a whole-system issue.

Sandy Martin Portrait Sandy Martin
- Hansard - - - Excerpts

Does my hon. Friend agree with me that the correct way of doing that is for local authorities, not private companies, to police the building regulations system?

Clive Betts Portrait Mr Betts
- Hansard - -

That is a really important point. In our report in July 2018, one of the things we highlighted was the conflict of interests in the building industry, which go right the way through. Fire authorities can actually be testing their own work and recommendations, which is wrong. This is also about the whole testing regime for products. We had evidence of producers going around different testing organisations until they found the one that actually approved their material, and there was no record of the failures from other organisations. Fundamentally, this is about building inspectors being appointed by developers and then signing off the work of the people that have appointed them. That cannot be right. This is not necessarily about local authority or private sector building inspectors, but about who appoints them to a particular job and whom they are accountable to, which is absolutely key. Dame Judith’s recommendations on that need to be followed through, because they are really an important part of the changes we need.

On other issues, when the Minister came to the Select Committee in January, we asked him about other forms of material. Rockwool had drawn to the Committee’s attention about 1,600 properties on which the material was not ACM, but could be as dangerous. The Minister was very open and direct about it, and he did say that all those properties would now be tested—I think there has been a delay in the testing, which is unfortunate, but it has started—but that if those tests showed that the material on those properties was as dangerous or as risky as ACM, the same rules would apply about taking it off and about having a requirement to take it off. That is what he said. There is, of course, disagreement about the testing arrangements, which have been a matter of contention right the way through our work. We must come to a conclusion whereby the industry in general is satisfied that the tests are fit for purpose, but nevertheless that testing is happening, and if any material is as dangerous as ACM, it must be removed. Will the Government pay for that as well as for taking ACM off homes in both the social and private sectors? That is a fundamental question. There is no point in banning the stuff if we then return to the same problems that we had with ACM.

The Government introduced a ban on materials that are not of limited combustibility immediately after Dame Judith’s report—on reflection she probably feels that she might have recommended that herself, and she is certainly comfortable with that recommendation, which was right. But there is a problem—the elephant in the room—how can we possibly say that it is too risky to put materials that are not of limited combustibility on new buildings, if we are happy for such materials to remain on existing buildings? How can we say to people, “You are safe in your homes, but we wouldn’t put that material on a new home because we don’t think it’s safe”? That is a fundamental problem.

I am sure that sums are going round in the heads of people in the Treasury, who will be counting the cost of taking material that is not of limited combustibility off all existing buildings. That cost will be considerable and probably far larger than the budget for dealing with ACM to which the Government had to commit, but is the Minister really comfortable with saying to people, “You’re going to live in a home that has material on it that we would not consider safe to put on a new building”?

I know that if building regulations are changed, we cannot always go back and retrospectively apply them to all existing buildings, but we are talking about a fundamental issue of safety and fire prevention that the Government must consider. Importantly, we must also think about non-residential buildings. Many hospitals, schools, student accommodations and residential homes are not covered by the current ban, although they are high-risk buildings. In 2018 the Committee said that this is about not just high-rise but high-risk buildings, and that provision must be applied.

Some progress has been made on many issues, but we have a lot more to do. Dame Judith recommended a whole review of building regulations, which is key, and we must get proper tests agreed. There is the conflict of interest to resolve, and the issue of existing buildings. Fundamentally, however, as my hon. Friend the Member for Wakefield (Mary Creagh) prompted me to say, this is about the whole construction industry not being fit for purpose. We need a fundamental review of how it operates, considering not just specifications, but including the management of projects and ensuring that people have homes and other buildings that are safe to live in.

None Portrait Several hon. Members rose—
- Hansard -

--- Later in debate ---
Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

As I am sure the hon. Gentleman understands, fire safety policy does not fall within my remit and is effectively a Home Office issue. I did recently meet representatives of the fire service, who said that this policy is under constant review but remains valid. However, I am happy to write to him with details of what the Government are doing with regard to “stay put”. I understand the concern that that policy has produced in the light of the Grenfell disaster and it is important that we are transparent about it. As I have said, I am more than happy to write to him with some details.

On building safety, we are determined to bring forward meaningful legislative reform. Just today, we launched a consultation on the new building safety regulatory system. The written ministerial statement was not actually laid, as the hon. Member for Croydon North (Mr Reed) said during the debate. It was raised at 10.30. I asked Doorkeepers to distribute it if they could, and it is now available for Members to read if they wish. In that review, we have accepted all 53 of Dame Judith Hackitt’s recommendations and in some areas we intend to go further. What we are proposing is a radically new building and fire safety system—a system that puts residents’ safety at its very heart. It will be a challenging but essential step to help drive the long-term culture change that we need and restore confidence in our country’s building safety system.

Clive Betts Portrait Mr Betts
- Hansard - -

I thank the Minister for giving way. I had not seen the details of the statement until I spoke earlier in the debate, but I welcome the Government laying it. I know that the Minister has made arrangements to speak to me later about it and to come to the Select Committee where I am sure we can ask further questions. May I just draw his attention to one interesting phrase where he says that we have proposed that the new regime should apply from the beginning to all new and existing multi-occupied residential buildings? Does that mean that the Government are having a careful think about whether the ban on materials not of limited combustibility should apply to existing buildings as well as new buildings? It says that the regime will apply to all buildings, including existing buildings.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

I am grateful to the Chair of the Select Committee for raising this issue. The hon. Member for Croydon North also implied that we were not willing to look at other buildings retrospectively or indeed at buildings below 18 metres, or at hospital or schools or whatever it might be. What we are trying to do is fix a starting point, but then design a system that allows for flexibility in response to evidence and research in the future. One lesson is that, obviously, as building technology develops and new issues emerge, the system must have the ability to respond. That is what we are seeking to do in the consultation. Certainly, we are open to representations as part of the consultation about whether the scope should be widened. I hope that the Committee will respond.

Clive Betts Portrait Mr Betts
- Hansard - -

Was that a yes? I was trying to work out whether the Minister would be willing to look again at this matter.

Kit Malthouse Portrait Kit Malthouse
- Hansard - - - Excerpts

The issue of retrospection is obviously a difficult one from a regulatory point of view. One of the things that we have said is that all building owners have a duty to ensure that the buildings that they own are safe. If that means that they have to take remedial action retrospectively to comply, to make it safe, then they should do so. The question of liability, as the hon. Gentleman knows, is also a difficult one. Nevertheless, in the light of the reformed building regulations, it will be for building owners to review whether the buildings that they are maintaining and owning are safe and to take appropriate action.

As I said, we have accepted all 53 of Dame Judith Hackitt’s recommendations and we will be going further. Indeed, we may well go further in scope in the light of the issues that are brought forward.

The final matter raised by a number of Members, particularly the hon. Member for Westminster North (Ms Buck), was the issue of the residents’ voice, the social housing Green Paper and, indeed, the place of social housing in our society. One of the most important legacies of Grenfell must be the rebalancing of the relationship between residents in social housing and their landlords. After the tragedy, we spoke to almost 1,000 people, including the bereaved and survivors of Grenfell Tower. It came through in those conversations, time after time, that residents feel excluded from the discussion about their homes; they feel that their voices are not being heard. I reject the idea that people in social housing can expect only a second-class system. This has been and is fundamentally wrong. Last August, we published our Green Paper, “A new deal for social housing”, and our response and action plan will be published in due course. I have given commitments in the various meetings that I have had around the country that there will be change on that too.

Nothing can undo the pain and devastation caused by the fire at Grenfell Tower. We remain determined to do right by the victims and survivors of the tragedy, and to provide a legacy of real change for them—to deliver fundamental reform, to end the stigma attached to social housing and to honour the memories of those who lost their lives. I thank everybody who has participated in the debate, and share the determination across the House to ensure that nothing like Grenfell can ever happen again.