Wednesday 22nd January 2020

(4 years, 11 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Harriett Baldwin Portrait Harriett Baldwin
- Hansard - - - Excerpts

The honest answer is that I do not know the background and whether that LEP was approached, or whether my hon. Friend will now be able to tell it about this exciting proposal, which benefits the Wyre Forest and allows services to Kidderminster.

The history of this 86-mile line between Oxford and Hereford represents sharp decline and, now, slow recovery. The lovely, fully doubled line of the early part of the 20th century was reduced to mainly single track in the 1960s, ’70s and ’80s—perhaps not coincidentally, a time when the whole railway network was in public hands. By the 1980s, there were only two trains a day between Paddington and Hereford.

Thanks to the campaigning of my predecessor, the late Lord Spicer, as well as Sir Peter Luff—the former MP for Mid Worcestershire—and many others, two sections of the track were redoubled between 2008 and 2011. By 2015, a broad hourly service had been achieved. The partial redoubling has also brought some improvements to journey times. Since the December timetable changes, one train per day in each direction completes the London to Worcester journey in less than two hours.

Having looked at a range of options, the North Cotswold Line Taskforce has given unanimous backing for what it calls option 5, a redoubling of four miles of track from Wolvercote Junction, Oxford, to Hanborough station, and the redoubling of five miles of track from Evesham to Pershore. In addition, option 5 includes second platforms at Pershore and Hanborough.

The combination of those elements in option 5 would allow two trains an hour from Worcester to London, additional services beyond Worcester to Malvern, Hereford and Kidderminster, a regular Worcester to London service in less than two hours, and faster services from Malvern and Herefordshire to London, as well as improved performance and reliability.

Anneliese Dodds Portrait Anneliese Dodds (Oxford East) (Lab/Co-op)
- Hansard - -

The hon. Lady is making an excellent speech. Does she agree that those improvements on the North Cotswold line would also unlock additional opportunities in the nearby area? For example, it would be possible to link the line through to the Cowley branch line, and having the additional capacity at Hanborough might make it possible for that station to operate almost as a parkway, which would relieve some of the pressure on Oxford station. It would be a win-win not only along the route, but in many nearby areas.

Harriett Baldwin Portrait Harriett Baldwin
- Hansard - - - Excerpts

I thank the hon. Lady for her support and, through her, thank Oxfordshire County Council for the support it has given this taskforce. I believe that option 5 allows a significant improvement to services around the Oxford area. I will come on to some of the environmental benefits of the scheme. She may well want to call a similar debate at some point in the future on the proposals she is making.

I do not know the details of the proposals the hon. Lady is making, but I do know that the benefit to cost ratio of this scheme is well over 4:1. That is with a cost estimate of just under £200 million for the whole option 5 scheme, including an optimism bias in the cost estimates. The five counties supporting the taskforce, including Oxfordshire, are home to more than 2.5 million people, and their economic gross value added is greater than that of the West Midlands Combined Authority and the Greater Manchester Combined Authority. Moreover, they are only asking for half the budget from the Department for Transport.

As I mentioned, there are clear environmental benefits. As train travel increases, it will take cars off the road. Currently, my West Worcestershire constituents travel miles along the congested motorway network just to get to Warwick Parkway and Birmingham International stations so that they can use the Chiltern line and the west coast main line. The strategic outline business case goes into detail on the benefits to the road system, and estimates that 5 million miles of highway driving would be avoided. Indeed, the delivery of the Worcestershire Parkway station—it is due to open any day, and I invite my hon. Friend the Minister to come and officiate at its opening—will strengthen the case for more travellers across south Worcestershire to use the North Cotswold line.

There will be huge tourism benefits, as the line goes through some of the loveliest countryside in the world. It passes the cathedral city of Oxford and goes on to the cathedral cities of Worcester and Hereford. It goes through the heart of the beautiful Cotswolds, near Blenheim Palace and, of course, through the glorious Malvern hills. There will also be huge housing benefits. The scheme will increase the affordability of housing for those working in Oxford, by giving them the opportunity to commute by rail from less expensive areas. In short, it will unleash the potential of the midlands engine and link it to the Oxford-Cambridge arc corridor, connecting it all more reliably, more frequently and more quickly to London, the Crossrail network and Heathrow.

My only ask of the Minister today is that he agree to pay half of the develop stage costs and allow the proposed scheme into the industry’s rail network enhancements pipeline. With that funding, an outline business case and a structural survey can be prepared for 2022. A commitment from his Department of only £1.5 million of the £3 million cost—taskforce members will pay the other half—will enable that progress.

I am sure my hon. Friend the Minister sees how compelling option 5 is in terms of value for money, the environmental benefit and the country’s productivity. The proposals are sensible, modest but impactful, and achievable in the tangible future. When he makes his case to the Chancellor, he will be making it to a friendly Worcestershire colleague, and he will know just how many other colleagues will be pleased by approving further progress on this wonderful train line.

--- Later in debate ---
Chris Heaton-Harris Portrait Chris Heaton-Harris
- Hansard - - - Excerpts

I would absolutely love to have that honour. I hope my hon. Friend has the capacity to invite me and that I am not going to turn up and be shoved off a platform because someone else is meant to be opening the station. If I am available, I would love to come. The issue has been a point of interest for me in the Department in the past few months as we have got to this point, but I am pleased that work is now well advanced.

The Government are committed to finding new and innovative ways to attract different forms of investment into the railways. Worcestershire Parkway will be a good example of how such investment can add value to our railway network.

Anneliese Dodds Portrait Anneliese Dodds
- Hansard - -

I am grateful to the Minister for giving way and for his positive words. I underline the connection between this line and another major project, which is the change to Oxford station. He will know that is a challenging project and that some of the discussion has been around where the buses will go in Oxford and whether it is necessary to have a multi-storey car park. I do not think that is necessary; I think we should privilege the buses. Having that link to Hanborough could help, if we used that as an additional parkway on top of the new Oxford Parkway station, which has been very successful. Will he bear that in mind when he talks about these issues?

Chris Heaton-Harris Portrait Chris Heaton-Harris
- Hansard - - - Excerpts

The hon. Lady makes a good point for her constituents. What she has just described is a point of controversy in the city. Hanborough serves as a vital link not only to Oxford, but to Witney and other towns and villages across the piece. Her point is well made.

Worcestershire Parkway will enable thousands of new journeys on the two key rail corridors that it serves: Birmingham to Cardiff, and the line we are talking about today. I very much look forward to coming down and seeing it open, in operation and serving passengers who are seeing the benefits it delivers.

It is fair to say that the North Cotswold line has already been transformed from what it was a little over a decade ago. Members of Parliament and other supporters along the route can take great pride in their actions and what they have achieved, but time does not stand still and the world moves on, especially in the Cotswolds. We must look forward and effectively plan for the next investment and the next generation and for how they can grab the great opportunities that the Government will be providing and enabling. I therefore welcome and commend the work of the North Cotswold Line Taskforce in taking the lead on how to bring about further enhancements. Where others may have sat back and reflected on their success, the taskforce has galvanised stakeholders to push for more—in this case, £1.5 million more as a starter. I recognise that it wishes to see faster and more frequent services. I very much hope we can work together to move things forwards.

I assure my hon. Friend the Member for West Worcestershire and all Members here today that the Department will analyse in great detail the proposals set out in the taskforce’s strategic outline business case. We only received it 10 days ago, and it would be remiss of me to promise money without going through due process within my Department, but I guarantee we will go through that process as quickly as we can. The request for funding to develop the case further will be properly analysed and considered. There is a lot of information to digest in what we have been given, but I pledge that Department officials will set the way forward with the taskforce by the end of next month, so that we can move forward at a pace that allows us to do the work properly.

To conclude, I thank all Members for their contributions to an important debate. This is a fantastic success story, and I hope it continues to be so in the future.